You are on page 1of 47

: Class 2

(Introduction to Construction Economics, CEcon)

.(Preface)
.(Structure of Construction
Industry, CI)
.(Categories of CI)
.(Introduction of PM)
.(CEcon and
Project Economics)
. (Research Topics
of CEcon)
2012/9/21

NTU, Dept. of CE, MT Wang

1.?
2.?
3.?

NTU, Dept. of CE, MT Wang

1.?
:
/ /

(/)
3

NTU, Dept. of CE, MT Wang

1.?
--

NTU, Dept. of CE, MT Wang

1.?

1. 1. 1.

2.
2. 3.

4.

1.
1.
2.
2.

2.
:3.
(),
,95/5/20
3.
4.
NTU, Dept. of CE, MT Wang
4.

1.?

3.

1.
2.

3.
4.

1.
2.
3.
4.
5.

4.

1.
2.

1.
2.

NTU, Dept. of CE, MT Wang

1.?
(/)?
?
?
(/)?

(IT)?

(/)
7

NTU, Dept. of CE, MT Wang

1.?

(/)

(industry)
(/)

(firm)
(project)

(/)

(site)
8

NTU, Dept. of CE, MT Wang

1.?

*
*

*
*

*
*

*
*

*
*

*
*

*
*

*
*
*

*
*

*
*

NTU, Dept. of CE, MT Wang

1.?


1.1
1.2
1.2.1
1.2.2(//)
1.2.3()
1.2.4()
1.2.5()()
1.3
1.3.1
1.3.2
1.3.3
1.3.4
1.4
10

NTU, Dept. of CE, MT Wang

1.?

2.1
2.2
2.3
2.4
2.5
2.6

3.1
3.2
3.3






11

NTU, Dept. of CE, MT Wang

1.
2.
3.

12

NTU, Dept. of CE, MT Wang

1.
()
()
()
()
(//
)

13

NTU, Dept. of CE, MT Wang

1.

,:
(1)():
(2)():
(3)():
(4)():

()
()
()
()

14

NTU, Dept. of CE, MT Wang

1.
(Delivery systems)
(Conventional, Design-Bid-Build)
(Design-Build, Turnkey)
BOT(Build-Operate-Transfer)
(Tender systems)



(Selection systems)



15

NTU, Dept. of CE, MT Wang

1.
(, Construction Project
Management)

:
(1)
(2)
(3)
(4)
(5)

16

NTU, Dept. of CE, MT Wang

2.
1.:

2.: (A/E/C EPC)

3.:

4.:
()

17

NTU, Dept. of CE, MT Wang

2.

/
A/E/C (Architect/Engineer/Contractor)

(
)

18

NTU, Dept. of CE, MT Wang

2.
:

95/5 :

19

NTU, Dept. of CE, MT Wang

2.

1.
2.
20

NTU, Dept. of CE, MT Wang

10

2.

3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

13.

21

NTU, Dept. of CE, MT Wang

3.

(industry)

()

(firm)
(project)

()

(site)
22

NTU, Dept. of CE, MT Wang

11

3.

(Site Construction Management)


(Construction Materials and Methods)


(Construction Safety and Quality)
(Construction Productivity and
Labor)
(Construction Automation)
23

NTU, Dept. of CE, MT Wang

3.

(Construction Project Management)


(Project Planning and Design)

(Cost and Schedule Control)


IT

24

NTU, Dept. of CE, MT Wang

12

3.

(POSDC)
(Planning) (Organizing)(Staffing)

(Directing)(Controlling)


25

NTU, Dept. of CE, MT Wang

3.
-
()
):

//:

///

26

NTU, Dept. of CE, MT Wang

13

3.
-
(,)

:

()()

27

NTU, Dept. of CE, MT Wang

3.
-


()




()

28

NTU, Dept. of CE, MT Wang

14

3.
-

(
)

()

29

NTU, Dept. of CE, MT Wang

3.
-

()

30

NTU, Dept. of CE, MT Wang

15

3.
(contract):

(governance):

31

NTU, Dept. of CE, MT Wang

3.
:
Firm Strategic Alliance Joint Venture Integration

32

NTU, Dept. of CE, MT Wang

16

3.
(contract):
Firm Strategic Alliance Joint Venture Integration
(//)
//

(governance):
?
?
////
//

33

NTU, Dept. of CE, MT Wang

3.
Organization Theory
Organization Economics: to understand and improve the ways
in which organizations overcome agency costs, information
costs, and other obstacles to efficiency( /)
Organization Sociology
Organization Psychology
New Institution Economics



Contract Theory


/
34

NTU, Dept. of CE, MT Wang

17

3.
-
vs.()


(--)







35

NTU, Dept. of CE, MT Wang

3.
-

(
)


(
1 )

36

NTU, Dept. of CE, MT Wang

18

3.
-

()
()
()



37

NTU, Dept. of CE, MT Wang

.
1.
2.
3.

38

NTU, Dept. of CE, MT Wang

19

1.




()

39

NTU, Dept. of CE, MT Wang

2.


40

NTU, Dept. of CE, MT Wang

20

3.
A.()
B.()()
C.()()

41

NTU, Dept. of CE, MT Wang

3.
A.()

A1 ()
A2 ()

A3 ()
A4 ()

A5 () (PCM)

A6 () (design/build, turnkey)

A7 () () ()
42

NTU, Dept. of CE, MT Wang

21

3.
B.()()

B1 ()
B2 ()

B3 ()
B4 ()

B5 ()

B6 () (design/build)
B7 () BOT
43

NTU, Dept. of CE, MT Wang

3.
C.()()

C1 ()
C2 ()

C3 ()
C4 ()

C5 ()

C6 () (design/Build)
C7 () BOT
44

NTU, Dept. of CE, MT Wang

22

.
1.
2.
3.

45

NTU, Dept. of CE, MT Wang

1.
(Project Management Institute, PMI)

()

()(
)
(Progressive Elaboration)
(///)

46

NTU, Dept. of CE, MT Wang

23

2.
1.:
/ / /
////

2.:

47

NTU, Dept. of CE, MT Wang

2.
3.:

4.:

?
48

NTU, Dept. of CE, MT Wang

24

3.
(project management, PM):

PDCA (Plan/ Do/ Check/ Action)

(Feed-forward System)

49

NTU, Dept. of CE, MT Wang

4.
(PMBOK), PMI, 2000:

Knowledge &
Application of

Project
Management
Knowledge &
Application of

General
Management

Knowledge &
Application of

Domain
Area

:







50

NTU, Dept. of CE, MT Wang

25

4.
(PMBOK), PMI, 2000:

:
:///
(stakeholders)://
/(sponsor)//
:///

:////
///
://
51

NTU, Dept. of CE, MT Wang

4.
(PMBOK), PMI, 2000:
(Project Processes):

(Process Groups):
(1/21/7/8/2)
(Process Interactions):
//
(Mapping Table):
(39)

52

NTU, Dept. of CE, MT Wang

26

4.
39:

4.1()

6.1()

4.2()

6.2()

4.3()

6.3()

6.4()

5.1()

6.5()

5.2()

5.3()

7.1()

5.4()

7.2()

5.5()

7.3()
7.4()
53

NTU, Dept. of CE, MT Wang

8.1()

11.1 ()

8.2()

11.2 ()

8.3 ()

11.3 ()

11.4 ()

9.1()

11.5 ()

9.2()

11.6 ()

9.3()

12.1 ()

10.1 ()

12.2 ()

10.2 ()

12.3 ()

10.3 ()

12.4 ()

10.4 ()

12.5 ()

NTU, Dept. of CE, MT Wang

12.6 ()

54

27

4.
(General Management):
,

(Project Management, PM):

?
55

NTU, Dept. of CE, MT Wang

4.

()://

(PCM)

, PCM
56

NTU, Dept. of CE, MT Wang

28

4.
(1)
(2), WBS(Work Breakdown Structure)
(3), OBS(Organization Breakdown Structure)
(4),/:
:

(5),
(6),(PDCA)
(7)

57

NTU, Dept. of CE, MT Wang

1.
2.

3.
4.

58

NTU, Dept. of CE, MT Wang

29

1.



(Firm)

59

NTU, Dept. of CE, MT Wang

1.

(
()

60

NTU, Dept. of CE, MT Wang

30

2.
()

()
(/)
()
(/)
()


()



61

NTU, Dept. of CE, MT Wang

2.

(/)?

?

?
?
?

?

??
62

NTU, Dept. of CE, MT Wang

31

3.
(Construction Economists)
(Investment appraisal)
(Cost control during design)

(Estimating)
(Preparation of contract document)
(Evaluation of tenders)

63

NTU, Dept. of CE, MT Wang

3.
(Construction Economists)
(Cost control post contract)
(Preparation of interim valuations)

(Preparation of final account)


(Life-cycle costing)
(Value engineering)
(Maintenance economics)

64

NTU, Dept. of CE, MT Wang

32

3.
(Construction Economists)
(Environmental economics)
(Contractual disputes resolution)

(Procurement selection)
(Project management)
(Management of construction

programs)

65

NTU, Dept. of CE, MT Wang

4.



66

NTU, Dept. of CE, MT Wang

33

4.1

()

()

()

()

()

()

67

NTU, Dept. of CE, MT Wang

4.2
production function:

given a specific level of technique, we can have


Quantityf(k, l), k: capital, l: labor, q: quantity, p: price
Costg(quantity)
revenue function:
Revenueh(price, quantity)pq
Pricep(q)
profit function:
ProfitRevenueCost
p(q)qg(q)
maximize profit:
let d/ d q0, given QualityDQualityS
General equation: :

f(k, l, q, c) = 0
68

NTU, Dept. of CE, MT Wang

34

4.3
cost function:
Costf(k, l, time, quality)
revenue function:
Revenuebidding price
= g(k, l, time, quality , competitors)
profit function :
ProfitRevenueCost, QualityDQualityS

f(k, l, time, quality, c) = 0


if we neglect the influence of competitors.

General equation:

69

NTU, Dept. of CE, MT Wang

4.4
Project Economics
Project-Oriented Economics
Production Function:

q = f1(k, l)
q: quantity,
k: capital, l: labor,
k and l are input factors
This implies a quantity produced per unit time.
70

NTU, Dept. of CE, MT Wang

35

4.4
Cost Function:
c = f2(q)
c: cost, depending on fixed cost and variable
cost
therefore,
c = f2(f1(k, l)) = f3(k, l)
This is derived at a given level of production
technique (at a certain level of products
quality) and within a given unit time.

71

NTU, Dept. of CE, MT Wang

4.4
It can be generalized as the following

equation if we consider production duration


and quality:
cost = f4(k, l, time, quantity, quality )
or
f5(k, l, time, quantity, quality, cost) = 0

72

NTU, Dept. of CE, MT Wang

36

4.4
For a typical manufacturing product, time =

1 and quality = constant. Therefore this


equation can be simplified as:
f6(k, l, time =1, quantity, quality = constant,
cost) = 0 => f6(k, l, q, c) = 0

73

NTU, Dept. of CE, MT Wang

4.4
For a project product, quantity = 1.

Therefore the generalized equation can be


simplified as:
f7(k, l, time, quality, cost) = 0

74

NTU, Dept. of CE, MT Wang

37

4.4
Construction is a project-oriented product.

As it can be imagined, how to integrate the


three factors of cost, time, quality is always
the critical issue in construction
management area.

75

NTU, Dept. of CE, MT Wang

4.4
As a result,

the generalized demand-supply equation


f5(k, l, time, quantity, quality, cost) = 0

can be used to explain the demand and supply


behaviors of both project oriented products and
repetitive production products.
Manufacturing product: f(k, l, q, c) = 0
Project product: f(k, l, time, quality, c) = 0
by neglecting the influence of competitors.
76

NTU, Dept. of CE, MT Wang

38

4.4
Quality is a kind of information.
Project economics has to do with quality

economics and information economics, which is


also a kind of transaction cost.
Competition has to do with game theory in the
construction industry.
Therefore, this course will introduce the
following theories: game theory, information
economics, transaction cost theory.
77

NTU, Dept. of CE, MT Wang

4.4
According to quality characteristics,

product or goods can be classified as:


Search Goods: quality is known before it is

sold.
Experience Goods: quality is unknown until it
is used (consumed).
Credence Goods: quality is limited to be
understood even it is used (consumed).

78

NTU, Dept. of CE, MT Wang

39

1.
2.
3.

4.
5.
6.
7.
79

NTU, Dept. of CE, MT Wang

1.
(1)
(2)
(3)
(4)
(5)
(6)

80

NTU, Dept. of CE, MT Wang

40

1.

?
?
?

?

??
81

NTU, Dept. of CE, MT Wang

1.
(4)(6)

?

?

?
82

NTU, Dept. of CE, MT Wang

41

2.
(7)
TOP500
(8)ENR
TOP500
(9)ENR
TOP500
(10)
ENR TOP500
(11)
ENR TOP500
83

NTU, Dept. of CE, MT Wang

2.

?

?
??

84

NTU, Dept. of CE, MT Wang

42

2.

A.(

WTO)?
B.(
)
?
C.(
)
?

85

NTU, Dept. of CE, MT Wang

2.

A.(
)
B.(
)
C.(
)

86

NTU, Dept. of CE, MT Wang

43

3.





87

NTU, Dept. of CE, MT Wang

3.

?
?

?

?
88

NTU, Dept. of CE, MT Wang

44

4.

89

NTU, Dept. of CE, MT Wang

5.
(Firm)?

90

NTU, Dept. of CE, MT Wang

45

6.

BOT

91

NTU, Dept. of CE, MT Wang

6.

92

NTU, Dept. of CE, MT Wang

46

7.

A.

B.

D.

93

NTU, Dept. of CE, MT Wang

2005.1.31

Bolton and Dewatripont, Contract Theory, MIT


Press, 2005.
Drake, B. Construction Economics in the Single
European Market, the Committee of European
Construction Economists (CEEC), E&FN SPON, 1995.

94

NTU, Dept. of CE, MT Wang

47

You might also like