SIDE-TO-SIDE CABLE CARDIGAN
Aug 23, 2018
5 minutes
Design by Jo Sharp
SKILL LEVEL
WHAT YOU'LL NEED
Yarn
6, 7 balls 50gm Jo Sharp Soho Summer DK Cotton in 256 Bisque: 5, 6 balls 50gm Jo Sharp Alpaca Silk Georgette in 756 Pearl
Tie Belt: 1 ball 50gm 50gm Jo Sharp Alpaca Silk Georgette in Pebble
Needles
5.50mm knitting needles
5.50mm double pointed needles set
10.00mm knitting needles
Stitch holder
Tension
11sts by 16 rows over Moss stitch using 10.00mm needles and both yarns worked together over to 10cm
Special abbreviations
Pbf - Purl into back and front of P st (inc 1 st) C6B - cable 6 back Slip next 3 sts onto cable needle and hold at back of work, knit next 3 sts from left hand needle, then knit 3 sts from cable needle.
C6F - cable 6 forward Slip next 3 sts
You’re reading a preview, subscribe to read more.
Start your free 30 days