EQUIPMENT PLANNING FOR IMPLEMENTATION OF ROAD WORKS

S
No

Equipment

Capacity

Qty

Total
No of Eqpt Total No of
Workin
No of
Working
Eqpt
g
Production
No of Hrs /
Unit
days
Hrs (Peak
Required
Period
Day
Per Hrs
/Mth
Prodt.
(Mths)
Wise)

A EARTHWORK/GSB/WMM
1 Dozer CL/GB

D8

450,000 M2

700

643

12

25.0

10.0

0.21

2 Dozer EW

D6

500,000 M3

185

2,703

12

25.0

12.0

0.75

3.a Excavator -E/W(Cut &Fill)

.9 Cum

1,000,000 M3

75

13,333

12

25.0

12.0

3.70

3.b Excavator - BOULDER

.9 Cum

437,109 M3

45

9,714

12

25.0

12.0

2.70

3.b Excavator -Miscellaneous work

.9 Cum

M3

45

12

25.0

12.0

2.00

4 Excavator

.9 Cum

M3

23,047

12

25.0

12.0

8.40

5 JCB

.4 Cum

M3

9,000

18

25.0

10.0

3 Motor Grader -E/W

125 HP

1,088,734 M3

160

6,805

12

25.0

10.0

2.27

3 Motor Grader- GSB

125HP

52,077 M3

60

868

12

25.0

10.0

0.29

6 Motor Grader

125HP

M3

7,673

12

25.0

10.0

2.56

8
2

3 Vibratory Compactors -E/W

8-10 TON

1,088,734 M3

95

11,460

12

25.0

10.0

3.82

3 Vibratory Compactors -GSB

8-10 TON

52,077 M3

50

1,042

12

25.0

10.0

0.35

3 Vibratory Compactors -WMM

8-10 TON

40,000 M3

50

800

12

25.0

10.0

0.27

7 Vibratory Compactors

8-10 TON

M3

13,302

18

25.0

10.0

4.43

9,000

18

25.0

10.0

18

25.0

12.0

65

8 Mini Vibratory Roller


9 Tippers

2 TON
TATA-2516

10 WMM Plant

100 TPH

40,000 M3

35

1,143

12

25.0

12.0

0.32

11 WMM Paver

9M. WD

40,000 M3

35

1,143

12

25.0

12.0

0.32

12 Mobile GSB Plant

100 TPH

430,000 M3

35

12,286

20

25.0

12.0

2.05

72,000

20

25.0

10.0

15.00

15

13 Water Tanker
14
15
16
17

Front End Loader -GSB


Front End Loader -WMM
Front End Loader -BP
Front End Loader -HMP

10 KL
1.5 CUM

860,000 M3

45

19,111

18

25.0

12.0

3.54

1.5 CUM

282,354 M3

45

6,275

15

25.0

10.0

1.67

1.5 CUM

520,007 M3

45

11,556

18

25.0

10.0

2.57

1.5 CUM

134,000 M3

45

2,978

14

25.0

10.0

0.85

39,919

18

25.0

10.0

8.64

14 Front End Loader

1.5 CUM

15 Front End Loader -CR

3.1 CUM

930,000 M3

75

12,400

23

25.0

12.0

1.80

16 Front End Loader -BP/HMP

3.1 CUM

930,000 M3

75

12,400

23

25.0

12.0

1.80

120 TPH

67,000 M3

30

2,233

14

25.0

10.0

0.64

67,000 M3

55

1,218

14

25.0

10.0

0.35

257,900 M3

60

4,298

17

25.0

10.0

1.01

150,860 M3

50

3,017

17

25.0

10.0

0.71

5,400

18

25.0

12.0

B BITUMINOUS /PQC WORK


1 HMP Complete
2 Sensor Paver
3 PQC Paver +TCM
4 DLC PAVER
5 Texture & Curing M/c
6 Tandem Roller
7 PTR

9/4.5M
WD
Writgen Sp
1600
9M. WD
Writgen
TCM 1600

10 TON

67,000 M3

20

3,350

14

25.0

8.0

1.20

15-25 TON

67,000 M3

20

3,350

14

25.0

8.0

1.20

Sanjay Sharma, BE(Civil),MBA(International Business Operations),PhM (Infrastructure Management)

8 Mech. Broomer with tractor

941,380 M2

1250

753

14

25.0

10.0

0.22

Apollo
ATM 6000

941,380 M2

1250

753

14

25.0

10.0

0.22

30CUM/H

83,750 M3

20

4,188

18

25.0

10.0

0.93

2.a Batching Plant (Section-1)

120 Cum

176,253 M3

90

1,958

18

25.0

10.0

0.44

2.b Batching Plant (Section-2)

120 Cum

272,507 M3

90

3,028

18

25.0

10.0

0.67

M3

90

4,986

18

25.0

10.0

1.11

9,000

18

25.0

10.0

9 Bitumen Sprayer
C STRUCTURE
1 Batching Plant

2 Batching Plant

90/120
Cum

3 Chilling Plant

4 Mobile Crane

30 Ton

No

10,800

18

25.0

12.0

5 Mobile Crane

20 TON

No

18

25.0

12.0

6 Hydra

10 Ton

No

13,800

23

25.0

12.0

80 CUM/H

18

25.0

12.0

60 mm

18

25.0

12.0

10

9 Bar Bending Mechine

20,700

23

25.0

12.0

10 Bar Cutting Mechine

13,800

23

25.0

12.0

18

25.0

12.0

10

10,333

23

25.0

10.0

20/30 TON

5,750

23

25.0

10.0

40 TON

5,750

23

25.0

10.0

32,000

23

25.0

14.0

7 Concrete Static Pump


8 Concrete Vibrator

11 Transit Mixer

6 cum

D CRUSHER
1 Crusher

250 TPH

1,860,000 M3

180

1.80

E GENERAL
1

Trailer

Trailer (Low Bed)

3 Weigh Bridge

60 Ton

4 Weigh Bridge (Mobile)

30 Ton

24,000

20

25.0

12.0

5 Diesel Tanker (mobile)

10 KL

15,000

20

25.0

10.0

300CFM

40,250

23

25.0

10.0

7 Tractor

23,000

23

25.0

10.0

8 Kerb Casting/Cutting Machine

16,200

18

25.0

12.0

6 Air Compressor

4,800,000 MT

150

3.98

9 Welding Generators

400 AMP

34,500

23

25.0

10.0

10 Welding Rectifier

400 AMP

23,000

23

25.0

10.0

11 Diesel de-watering pumps

7-10 HP

34,500

23

25.0

10.0

1 DG Set -Crusher

1250 KVA

13,800

23

25.0

12.0

2 DG Set 500KVA

500 KVA

CR-2, HMP-1, BP 120 -2

5,700

19

25.0

12.0

3 DG Set 250 KVA

250 KVA

CAMP -4

22,800

19

25.0

12.0

4 DG Set 125 KVA

125 KVA

GSB -2,BP 30 -2, CP -2

68,400

19

25.0

12.0

12

5 DG Set 62 KVA

62 KVA

Bore Well

68,400

19

25.0

12.0

12

6 DG Set 25 KVA

25 KVA

SITE WORKS

48,000

20

F DG SETS

Sanjay Sharma, BE(Civil),MBA(International Business Operations),PhM (Infrastructure Management)

25.0

12.0