GENERATOR SET WARRANTY REGISTRATION FORM

GENERATOR SET DATA


Generator Set Model/Serial No:
Engine Model/Serial No:
Radiator Serial No:
Alternator Model/Serial No:
Control Panel Type/Serial No:
Load Transfer Panel Type/Serial
Electrical Drawing No:
Date of Ex Factor Shipment:
Warranty Period

____________ /
___________
___
____________ /
______________
_______________________________
____________ /
______________
____________ /
______________
No: ____________ /
______________
_______________________________
_______________________________
12 Months from start up
18 Months from factory shipment (include

s 6 month shelf life)


END USER DATA
Company Name: ______________________________________________________________
Address: ____________________________________________________________________
____________________________________________________________________________
Generator Set Location: (if different) _________________________________________
_____
____________________________________________________________________________
Date of Purchase: Day: ________ Month: ________ Year: ________
Date of Start-up: Day: ________
Month: ________ Year: ________
Generator Set Duty:
Prime / Standby Options: Skid / Trailer / Canopy / Atten
uated
DISTRIBUTOR DATA
Distributor: __________________________________________________________________
Address: ____________________________________________________________________
____________________________________________________________________________
Generator Set Location: __________ Miles/ Kilometres from Distributor
I hereby confirm that the above generating set has been correctly installed at t
he above location.
Signed: _________________ Date: __________ Position: _____________________

GENERATOR SET COMMISSIONING SHEET


GENERATOR SET DATA
Generator Set Model/Serial No
Engine Model/Serial No:
Radiator Serial No:
Alternator Model/Serial No:
Control Panel Type/Serial No:
Load Transfer Panel Type/Serial No:
Duty

Standby/Prime:
Volts:
Rating:
Phase:
Frequency:
Electrical Drawing No:
Date of Commissioning:

_______________________________

END USER DATA


Company Name:
Address:
Location:

Fuel System
Water Level and Additives
orrect
Lube Oil Level
Battery Electrolyte Level
Battery Terminals and Wiring
Belt Tensions
Radiator and Alternator Guards
Electrical Instruments
Engine Instruments
Engine Temperature
Engine Oil Pressure
Earth Connections
Electrical Connections Power
Operation
Electrical Connections Control
Alarm and Shutdown Devices
Enclosure
Phase Rotation

Fuse and Fuse Ratings


Manuals/Drawings Available and C
Load Test (Up to 50A)
Exhaust System
Cooling System
Jacket Water/Oil Heater
Crankcase Breather System
Air Filtration System
Battery Charging System Engine/Trickle
0C
Mains Fall System Functional Operation
Kpa
Panel Functional Operation
Changeover Panel Functional Operation
Main Circuit Breaker Functional
Motor Controls
Synchronizing Equipment
Vibration
Running Gear

Comments:
IT IS THE RESPONSIBILITY OF THE END USER TO ENSURE ALL OILS ARE AS PER MANUFACTU
RER S RECOMMENDATION AND A SERVICE PERIOD IS ESTABLISHED AND ADHERED TO AS FAILURE T
O DO SO COULD RESULT IN WARRANTY BECOMING INOPERATIVE.
Machine satisfactory commissioned and handed over subject to comments:
Distributor Name: _____________________ Signed: ______________________ Date: ___