MINIMUM VALUE OF THE ECONOMIC VALUES OF EQUIPMENTS ( http://www.alibaba.

com )
Purchased Equipment Cost
Installation
Process Piping
Instrumentation
Insulation
Electrical
Buildings
Yard Improvement
Auxillary Facilities
Total Plant Direct Cost (TPDC)

Total Plant Indirect Cost (TPDC)


Engineering
Construction
Total Plant Indirect Cost (TPIC)
Total Plant Cost (TPDC+ TPIC)
Contractor's Fee
Contigency
Direct Fixed Capital

Direct Fixed Capital


Startup/Validation Cost
Working Capital for 30 days
Total Capital Investment

Direct fixed Capital


Insurance
Local Taxes
Maintenance
Depreciation period 10 years
Depreciation
Laboratory /QA/QC
Annual Facility Dependent Cost

0.25
0.3
0.08
0.08
0.1
0.1
0.1
0.4

0.05
0.3

0.03
0.05

0.03
0.1

0.004
0.01
0.02
0.1
0.1

RM99,056.63
RM24,764.16
RM29,716.99
RM7,924.53
RM7,924.53
RM9,905.66
RM9,905.66
RM9,905.66
RM39,622.65
RM139,669.85

RM139,669.85
RM6,983.49
RM2,095.05
RM9,078.54
RM148,748.39
RM4,462.45
RM7,437.42
RM160,648.26

RM160,648.26
RM4,819.45
RM401.62
RM5,221.07

RM160,648.26
RM642.59
RM1,606.48
RM3,212.97
RM16,064.83
16064.82595
RM37,591.69