com )
Purchased Equipment Cost
Installation
Process Piping
Instrumentation
Insulation
Electrical
Buildings
Yard Improvement
Auxillary Facilities
Total Plant Direct Cost (TPDC)
0.25
0.3
0.08
0.08
0.1
0.1
0.1
0.4
0.05
0.3
0.03
0.05
0.03
0.1
0.004
0.01
0.02
0.1
0.1
RM99,056.63
RM24,764.16
RM29,716.99
RM7,924.53
RM7,924.53
RM9,905.66
RM9,905.66
RM9,905.66
RM39,622.65
RM139,669.85
RM139,669.85
RM6,983.49
RM2,095.05
RM9,078.54
RM148,748.39
RM4,462.45
RM7,437.42
RM160,648.26
RM160,648.26
RM4,819.45
RM401.62
RM5,221.07
RM160,648.26
RM642.59
RM1,606.48
RM3,212.97
RM16,064.83
16064.82595
RM37,591.69