SACHIN KUMAR Mobile +919612166399, +919936445650(HOME) Email sachinkesharwani@hotmail.

com

Career Objectives - To be quality Leading & Efficient Telecom Specialist in today's growing Industry and to be an efficient Telecom Professional equipped with skills to work in team, lead & manage team work.

A competent professional with lead role with 3 years & 6 months of experience in

Project Management Service Delivery Installation / Commissioning Technical Support Operations

Skilled in swiftly ramping up projects with competent skills and ensuring on time deliverables. Sound knowledge of installation, integration and commissioning of BTS and transmission equipments. Expose of Managing large Turnkey and Swap projects for various operators. Supervised the support, installation and commissioning of 3G/WCDMA/GSM/CDMA/SDH/PDH.

Abstract Presently working as a Cluster Project Lead for ZTE Telecom India Pvt. Limited.

AREAS OF EXPOSURE Project co-ordination / Site Management Worked as a project coordinator. Handling the teams in North East. Handling the total project without compromising in quality. Commissioning and integration of cell sites Creating E1 for new coming sites Shifting traffic from one channel to another Call testing after on-airing the sites Measurement of VSWR Making AT according to customer Plan, control and follow up the Engineers of the Project. Participating in project review meetings for evaluating project progress. Establishment of project implementation methods and procedures including network resource allocations. Monitoring the Project to meet the committed Timelines. Co-ordination of site Activities, Material Monitoring, Community Issues and Resources Deployment.

Operations and Maintenance/ Technical Support

Planning and affecting the preventive maintenance schedules of telecom equipments to increase equipment reliability hence reducing Outage. Providing technical support / training to team clients for resolving critical technical issues. Commissioning and Integration of Various GSM and Transmission Equipments Submitting field technical complaints, and get it resolved Identifying performance bottlenecks and taking adequate measures to rectify faults. Follow-up BTS Site Folder and AT Certificates with NIL Punch Point. Technical Support for Transmission, BTS.

Installation Commissioning and Integration of ZTE (2G & 3G), Ericsson (900 & 1800).

Infrastructure overview/ Installation and Commissioning

Checking of layout of Tower, DG , Shelter, BSC. Supervision of Tower Foundation. Checking tower erection as per drawing and proper Torque of bolts. Supervision of Shelter Erection. DG installation and commissioning. Electrical Grounding. Alarm termination and testing of alarms. Prepared layouts for the Wireless, Wire line. Foreseeing performance bottlenecks and taking corrective measures to avoid the same. Managed the Installation, Commissioning of BTS, BSC, Transmission MUX, MW antenna.

PRESENT ASSIGNMENT Since NOV 10 Cluster Technical Lead ZTE Telecom India Pvt. Limited Projects Undertaken Reliance , Agartala - Play Cluster Technical Lead role. Plan, control and follow up the Project Execution. Preparation of project schedule plan, TXN connectivity & Material availability. Maintained the NW equipment (Towns covered, BTS operational) and Coordination with Corporate Project Team. Support after acceptance by customer. To ensure that all the contractual obligations and regulations are met. Support and assist implementation and logistics staff to take action for HARDWARE material, which is short supplied, wrongly action for Project material, which is short supplied, wrongly supplied, damaged material or any such nonconformance noticed during supply and implementation process. Monitor that the corrective actions decided upon in conjunction with the project audits are effectively carried out.

PREVIOUS ASSIGNMENTS 1---APR10-OCT10 BTS Engineer ZTE Telecom India Pvt. Limited Projects Undertaken S Tel , Agartala - BTS Engineer. Troubleshooting of Alarms in ZTE NODE B and ZXSDR BS8800 BTS within the allotted time. Commissioning and Reconfiguration of ZTE 2G & 3G BTS (ZXSDR BS8800). Rehoming of 3G sites (From one RNC to another RNC) and 2G sites (From one BSC to another BSC). Providing Field level support for different Transmission Equipments-FIBCOM , CERAGON PDH & SDH. Co-coordinating with NOC, Transmission and RF Team to clear the Alarms and to close the TT (Trouble Ticket). Directs the development required project plan documentation identifying project goals and tasks and generating assignments consistent to meet timely output. Ensures change management procedures, including evaluation and communication processes, are established and followed for project duration and periodic audit of the same.

Use of Diplexers. Maintains clear communication with customers regarding mutual expectations, and seeks to improve customer satisfaction. Maintains established business relationships beyond the project environment, both horizontally and vertically. Correct Radio network faults in and performance degradations as per requirements. Execution of BSS corrective/preventive maintenance activities Responsible for co-operating with the technical support (upgrades, faults) of 3rd party equipment and Care Support to the remote and on-site restoration of network element functionality as defined in the agree escalation plan Major Networks Elements supported are BSC, BTS, microwave radios of ZTE ,FIBCOM and CERAGON technologies

2----APRIL09 APRIL 10 RBS TESTER Ericsson India Pvt Ltd Projects Undertaken BHARTI AIRTEL MEGHALAYA Commissioning & Troubleshooting of ML Traffic Node 2P, 6P and 20P. ML High-Cap (STM-1), ML-E in 1+0, 1+1 hot standby and working standby Configurations. Providing media for migration of working sites from one BSC to another BSC. Commissioning & troubleshooting of Ericsson BTS of all types indoor, outdoor, Micro BTS(RBS2204, 2204V2, 2206,2206V2, 2111, 2964,2964V2 2954,) Commission of various cascaded sites and Integration of sites. Complete knowledge of site. Cabinet expansion (indoor, outdoor) of sites. TRX (EDTRU, DTRU, RRU&DRU) and TMA addition as per requirement of sites. Sector addition as per requirement of sites. Alarm defining, colour coding of wires. Hop up-gradation. Commissioning & Troubleshooting AXX 9100(Connect 2xstm1 Mux with32 E1s drop), AXX9200(Edge 8xstm1 Mux with 63 E1s drops) Commissioning & Troubleshooting of DXX Tellabs 6320 ADM(add drop multiplexer with 21 E1s drop) Commissioning of PDH and SDH links in Chain as well as Ring topology. Implementation of Dual band (GSM 900, 1800) sites with TMA Complete Quality Audit of an AirTel site (within Ericssons scope/operational point of view), which reflects the Quality index of a Vendor.

3-----

JUNE 08 APRIL09 SITE ENGINEER RELCOM ENGINEERING PVT. LTD. Projects Undertaken VODAFONE ASSAM & NE.

Sound knowledge of ACME PIU (Power Interface Unit). Well Familiar with Valere & Delta SMPS. Overview of Different types of Air Conditioners & DGs. Overview of Tower Foundation, Tower Erection, Shelter Erection. Preparing Layouts for different equipments inside shelter room.

Measurement of VSWR. Making AT according to customer. Handled Logistics for Swap sites of BTS. Co-ordination of site Activities, Material Monitoring, Community Issues and Resources Deployment.

TECHNICAL PREVIEW

Ericsson Equipments (Installation, Expansion & Alignment)

o Formation of Protection Mechanisms,1+1 Radio Protection, 1+1 E1 SNCP, Ring protection, Redundancy. o BTS Commissioned- RBS (2204, 2204V2, 2204V3, 2206, 2206V2, 2964, 2964V2 2954, 2111) Used OMT. o Cascading- Distribute the E1 in BTS. o Commission Mini-Link- High Capacity SDH Hops for STM-1 Transmission. o Configured of Mini-link E and Mini-link Traffic Nodes (2P, 6P and 20P). o Routing the E1 for new BTS sites and checking loop back from OMCR. o E1 Throw - Used D4 connectors and E1s connectors. o Alignment- Ericsson micro wave antenna hops (1.8m, 1.2m, 0.6m, and 0.3m). o Alarms Testing-Generated in the Cell Site and coordination of NOC/OMC.

ZTE Equipments (Installation, Expansion)

o BTS Commissioned ZXSDR BS8800 For 2G & 3G. o Throw PCM by FIBCOM E1 slot & by CERAGON. o Routing the E1 for new BTS sites and checking loop back from OMCR. o Carrier up gradation from two carrier site to a three carrier site, Fourth carrier up gradation. o Transceivers loop test-Testing TRX using ZTE GU LMT. o Installation & Expansion-BTS. o Alarms Testing-Generated in the Cell Site and coordination of NOC/OMC. o Installation Commissioning and Integration of FIBCOM MUX with Ceragon.

Equipments & Softwares

o Site Masters (VSWR, Return loss, DTF, Power Measuring) by Bird and Anritsu. o Winlink 1000 Manager for WiMax Point to Point Link. o OMT (Operation and Maintenance Terminal), ZTE GU LMT. o MSM 6.5 (Mini link Service Manager). o Mini Link Craft 1.1. o TELLABS 6300 Extended Craft Terminal. o AXX craft terminal, DXX craft terminal, Mini-link PTP high capacity tool.

EDUCATIONAL CREDENTIALS

B. Tech. (Electronics & Communication Eng.) Higher Secondary from Board of Utter Pradesh. Matriculation from Board of Utter Pradesh.

PERSONAL VITAE

Date of Birth 10thApril, 1986 Marital Status Single Passport No H5525809 Address Vill Balarampur, Dist Allahabad,Utter Pradesh,India