JI-2005 TOTAL LAGGAN TORMORE PROJECT

RELEASE NOTE - WELD IMPACT


Release No: REL-ABJ-0008 Issue Date: Sunday, July 22, 2012 To Subcon: Remarks: ABJ ENGG REVISION UPDATED JOINT CAT No. 1 2 3 4 5 6 ISOMETRIC GB06-FH-SGP36-0142 LD00-HL-SGP25-1828 LD00-HL-SGP25-1828 LD00-HL-SGP25-1828 LD00-HL-SGP25-1828 LD00-HL-SGP25-1828 SHEET 01/01 01/01 01/01 01/01 01/01 01/01 SPOOL SPL-03 SPL-01 SPL-01 SPL-01 SPL-01 SPL-01 JOINT S7 10 7 8 9 S12 CR REV REV TYPE Normal Normal Normal Normal Normal Normal S S S S S S OLD S S S S S S NEW Joint Added Joint Added Joint Added Joint Added Joint Added Joint Added
A M D N X C R F N/A * Original Joint Normal Additional Joint due to SCR/FCR/Revision Modified/Additional Joint due to SCR/FCR/Revision Deleted Joint (RT Repair/ Other) Cancelled Joint (SCR/FCR Issued Prior to Fabrication) Additional Joint due to Sub-Contractor's mis-Execution Cut and Reweld due to (RT Repair/ Other) Repair Joint due to NDE Additional Joint due to Field Special Request e.g. Seal Weld Not Applicable NDE % Covered as per requirement

REMARKS

PREPARED BY: Name: Sign:

APPROVED BY: Name: Sign:

RECEIVED BY: Name: Sign:

Date:

Date:

Date:

PIP-DCS-004

Page 1 of 1

You might also like