Installed capacity = 202.

98 GW (5th largest in the world) Thermal power station = 66% Hydro-Power station = 19% Renewable, Nuclear and others = 15%

All India Installed Capacity

Thermal power Hydro-Power Renewable, Nuclear and others

Peak (MW) Requirement Availability (-)shortage/(+)surplus (%) 122287 110256 (-)12031 (-)9.8

Energy (Billion kWH) 861 788 (-)73 (-)8.5

Central Electricity Authority (CEA) frames National Elec. Plan once in every 5 year. CEA is responsible for overall planning & development of the Power Sector in the country. CEA is a technical organization to advise and assist the central government on matters relating to generation, transmission, distribution, trading and utilization of electricity.

Development of Power Projects on tariff based bidding Development of Ultra Mega Projects Allocation of Captive Coal Blocks New Hydro Policy Private Sector Participation in Transmission Sector National Action Plan for Climate Change Rajiv Gandhi Grameen Vidyutikaran Yojana

The plan target to fulfill the demand of electricity in whole country by 2012. In addition, the installed capacity to be enhanced to 85% and a spinning reserve of at least 5% need to be created. Also, the per