Professional Documents
Culture Documents
There will be renovation work on the roof of the D wing school building. This is estimated to take 14 weeks. There is scaffolding around the whole building. The scaffolding is being protected with sheets of wood at ground level so that it is inaccessible to students. There is also netting placed around the top part of the scaffolding. This building company is used to working with schools and is aware of the protective measures required to create an environment which is safe.