Professional Documents
Culture Documents
3 TYPES OF PROCESSES
TOP LEVEL : FUNCTIONAL. OVERARCHING PROCESS SUCH AS SYTEMS ENGINEERING, TEST AND EVALUATION DEVELOPMENT PROCESSES : ARE PROCESSES THAT FACILITATE MAKING OF A PRODUCT. THESE PROCESSES ARE NOT DELIVERED TO THE CUSTOMERINCLUDE INTEGRATION, PRODUCTION, COMPUTER SUPPORT, MODELLING AND SIMULATION DELIVERABLE PROCESSES : CAN BE THE PRODUCT OR PROCESS TO SUPPORT THE PRODUCT- INCLUDES SUPPORT, TRAINING, MAINTENANCE
INTEGRATED PRODUCT
REALISES THAT: -THE WHOLE IS MORE THAN THE SUM OF THE PARTS -WHAT IS BEST FOR THE SUBSYSTEM (OR COMPONENTS) IS NOT NECESSARILY THE BEST
COMPETITIVENESS
THE THREE ELEMENTS OF COMPETITIVENESS ARE: TIMELINESS: CAN THE PRODUCT BE DELIVERED JUST IN TIME DEMANDED BY THE CUSTOMER QUALITY: WILL THE PRODUCT WORK AS WELL AS INTENDED AFFORDABILITY: WILL THE CUSTOMERS WISH TO BUY THE PRODUCT TO GAIN COMPETITIVE ADVANTAGE WE MUST DESIGN FOR VALUE
BENEFITS OF IPPD
REDUCED TIME TO FIELD SYSTEMS REDUCED SYSTEM COST
IMPROVED QUALITY
PROGRAMMES THAT ARE EASIER TO MANAGE
DESIGN CHANGES
A GENERIC IPPD
ITERATIVE PROCESS
DEFINITION OF IPPD
DODS DEFINITION A MANAGEMENT PROCESS THAT INTEGRATES ALL ACTIVITIES FROM CONCEPT THROUGH PRODUCTION, FIELD SUPPORT USING A MULTIFUNCTIONAL TEAM TO SIMULTANEOUSLY OPTIMISE THE PRODUCT AND ITS MANUFACTURING AND SUSTAINMENT PROCESS TO MEET COST AND PERFORMANCE OBJECTIVES
IPPD
IPPD IS SOMETIMES CALLED IPD IPPD IS A MANAGEMENT APPROACH IPPD IS NOT A SET OF STEPS TO BE FOLLOWED IPPD HAS NO SINGLE IMPLEMENTATION STRATEGY SOLUTION OR
IPPD HAS ITS ROOTS IN INTEGRATED DESIGN AND PRODUCTION PRACTICE , CONCURRENT ENGINEERING PRACTICE AND TOTAL QUALITY MANAGEMENT
5 PRINCIPLES OF IPPD
5
STAKEHOLDER INVOLVEMENT AND CUSTOMER FOCUS CONCURRENT DEVELOPMENT OF PRODUCT AND PROCESSES EARLY AND CONTINUOUS LIFE CYCLE PLANNING PROACTIVE IDENTIFICATION AND MANAGEMENT OF RISK MAXIMUM FLEXIBILITY FOR OPTIMISATION AND USE OF CONTRACTOR APPROACHES
CUSTOMER REQUIREMENTS
Define Core Prepare SOWs Program Key SOW Doc Events Planning the Program Track and execute program
CONTD.
IMPLEMENTING IPPD
CULTURAL CHANGE: INTEGRATED DECISION MAKING , EMPOWERMENT FRAMEWORK: IN NEW ACQUISITION THE FRAMEWORK IS ESTABLISHED IN THE RFP ITS IMPLEMENTATION IS PRODUCT AND PROCESS DEPENDENT
IPPD TOOLS
Information Technology and decision support Trade off studies and Prioritization Cost Performance trade offs Design for Manufacturing Prototyping Modeling Simulation and CAE/CAD/CAM Metrices (Measures of Success) Education and Training
ORGANISATION EVOLUTION
THE OLD WAYS MISSION TO MAXIMISE FINANCIAL PERFORMANCE
HIERARCHIAL AUTHORITARIAN STRUCTURE NARROWLY DEFINED INDIVIDUAL JOBS MANAGE PEOPLE TO MANAGE RESULTS
THE NEW WAYS MISSION OF TOTAL CUSTOMER SATISFACTION,CONTINUOUS IMPROVEMENT , LEARNING FLEXIBLE TEAM STRUCTURES WITH AUTHORITY CLOSEST TO WORK CAPABILITY INTEGRATED WORK TEAMS WITH BROAD SCOPE
MANAGE PROCESS TO MANAGE RESULTS RECRUIT PEOPLE WITH COMMITMENT TO MISSION, SKILLS AND KNOWLEDGE. PROVIDE TRAINING FOR PERSONAL GROWTH
SYSTEMANTICS
SYSTEMS IN GENERAL WORK POORLY OR NOT AT ALL (PRIMAL SCENERIO) NEW SYSTEMS GENERATE NEW PEOBLEMS ( THE FUNDAMENTAL THEOREM) BIG SYSTEMS EITHER WORK ON THEIR OWN OR THEY DONT. YOU CANT MAKE THEM ( BASIC AXIOM OF SYSTREMS FUNCTION) A SIMPLE SYSTEM , DESIGNED FROM SCRATCH, SOMETIMES WORKS A COMPLEX SYSTEM THAT WORKS IS INVARIABLYFOUND TO HAVE EVOLVED FROM A SIMPLE SYSTEM THAT WORKS
SYSTEMANTICS(CONTD.)
A COMPLEX SYSTEM DESIGNED FROM SCRATCH NEVER WORKS AND CANNOT BE MADE TO WORK. YOU HAVE TO START OVER , BEGINNING WITH A WORKING SIMPLE SYSTEM COMPLEX SYSTEMS ARE BEYOND HUMAN CAPACITY TO EVALUATE
VIRTUAL PROTOTYPING
BRINGS VISUAL SIMULATION TECHNOLOGY
TO PRODUCT DESIGN AND MANUFACTURING TEAMS PERMITS ASSEMBLY STUDIES FIND OPTIMUM ASSEMBLY AND DISASSEMBLY SEQUENCES, CLEARANCE BETWEEN PARTS AND REAL TIME INTERFERENCE CHECKS MAKES DIGITAL MOCK UP A REALITY CAN CHECK INTERFERENCES EVEN IN LOADED VIBRATING STRUCTURES. COULD BE USED TO PREDICT SHORTS IN ELECTRONIC PACKAGING
VIRTUAL PROTOTYPE
PREDICT AND PREVENT TRADITIONAL APPROACH TO DESIGN FIND & FIX
IPPD
IPPD EXPANDED ON CONCURRENT ENGINEERING
BUISINESS PROCESSES