IRAN POWER DEVELOPMENT COMPANY

2nd 3000 MW POWER PLANT ARDEBIL EXTENSION GAS TURBINE POWER PLANT(2*GTG V94.2)

NATURAL GAS SYSTEM PIPING EQUIPMENT & VALVE DATA SHEET

IN-HOUSE REVISIONS
A4 A3 A2 A1 A0 D C B A

DOCUMENT REVISIONS

FIRST ISSUE

B.F.

88-11

B.Am 88-11

M.N. 88-11

FIRST ISSUE

B.F.

88-11 B.Am 88-11

M.N. 88-11

Rev.

Description

Pre.

Date

Chk.

Date

App.

Date

Rev.

Description

Pre.

Date

Chk.

Date

App.

Date

OWNER'S DOC. NO.:

TSM/AL-99/BP-M-11-FN0-154
FILE NO.:

REV.: 0

CONTRACT NO.:

MAPNA GROUP
(PUBLIC STOCK) DESIGN STAGE:

DETAIL

PAGE: 1 of 8

IRAN POWER DEVELOPMENT COMPANY

2nd 3000 MW POWER PLANT ARDEBIL EXTENSION GAS TURBINE POWER PLANT(2*GTG V94.2)
Page No.
A0

IN-HOUSE REVISIONS
A1 A2 A3 A4 A5 A6 A7

Remarks

Page No. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 X X X X X X X X X X X X X

DOCUMENT REVISIONS A B C D E F G

Remarks

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

X X X X X X X X X X X X X

OWNER'S DOC. NO.:

TSM/AL-99/BP-M-11-FN0-154
FILE NO.:

REV.: 0

CONTRACT NO.:

MAPNA GROUP
(PUBLIC STOCK) DESIGN STAGE:

DETAIL

PAGE: 2 of 8

IRAN POWER DEVELOPMENT COMPANY

2nd 3000 MW POWER PLANT ARDEBIL EXTENSION GAS TURBINE POWER PLANT(2*GTG V94.2) Reference Doc.: Natural Gas System MAIN PFD Natural Gas System MAIN PFD Piping Material Spec.

TSM/AL-99/BP-M-02-FR3-158 TSM/AL-99/BP-M-02-FR3-159 TSM/AL-99/FU-M-99-PT0-001

Test & Design Conditions: Main line: Design Pressure: 27 barg Test Pressure: 34 barg Misc. Line: Design Pressure: Test Pressure:

6 barg 9 barg

OWNER'S DOC. NO.:

TSM/AL-99/BP-M-11-FN0-154
FILE NO.:

REV.: 0

CONTRACT NO.:

MAPNA GROUP
(PUBLIC STOCK) DESIGN STAGE:

DETAIL

PAGE: 3 of 8

IRAN POWER DEVELOPMENT COMPANY

2nd 3000 MW POWER PLANT ARDEBIL EXTENSION GAS TURBINE POWER PLANT(2*GTG V94.2)

HIGH PRESSURE SECTION

OWNER'S DOC. NO.:

TSM/AL-99/BP-M-11-FN0-154
FILE NO.:

REV.: 0

CONTRACT NO.:

MAPNA GROUP
(PUBLIC STOCK) DESIGN STAGE:

DETAIL

PAGE: 4 of 8

IRAN POWER DEVELOPMENT COMPANY

2nd 3000 MW POWER PLANT ARDEBIL EXTENSION GAS TURBINE POWER PLANT(2*GTG V94.2)

BALL VALVE (CARBON STEEL ) VALVE CODE PRESSURE RATING TEMPERATURE RANGE(0C) SIZE RANGE(DN) BODY MATERIAL END CONNECTION TYPE MAXIMUM WORKING PRESSURE WORKING FLUID STEM SEAT BALL STEM PACKING DESIGN/TEST DIMENSION REFERENCE OTHER DESIGN REQUIREMENTS REMARKS

B-21 600
-20C TO 50 C 15-50 A105 SOCKET WELDING 25 bar g NATURAL GAS Stainless Steel PTFE Stainless Steel 304 -BS 5351

B-22A 150
-20 C TO 50C 65-450 A216WCB FLANGED RF 6 bar g GEAR OPERATION

B-23 300
-20C TO 50C 65-500 A216WCB FALNGED RF 25 bar g GEAR OPERATION

AS PER MANUFACTURER'S STANDARD AS PER BS 5351 VALVE SHALL BE PROVIDED WITH ELECTROSTATIC DEVICE AND FIRE SAFE DESIGN.

OWNER'S DOC. NO.:

TSM/AL-99/BP-M-11-FN0-154
FILE NO.:

REV.: 0

CONTRACT NO.:

MAPNA GROUP
(PUBLIC STOCK) DESIGN STAGE:

DETAIL

PAGE: 5 of 8

IRAN POWER DEVELOPMENT COMPANY

2nd 3000 MW POWER PLANT ARDEBIL EXTENSION GAS TURBINE POWER PLANT(2*GTG V94.2)

LOW PRESSURE SECTION

OWNER'S DOC. NO.:

TSM/AL-99/BP-M-11-FN0-154
FILE NO.:

REV.: 0

CONTRACT NO.:

MAPNA GROUP
(PUBLIC STOCK) DESIGN STAGE:

DETAIL

PAGE: 6 of 8

IRAN POWER DEVELOPMENT COMPANY

2nd 3000 MW POWER PLANT ARDEBIL EXTENSION GAS TURBINE POWER PLANT(2*GTG V94.2)

BALL VALVE (CARBON STEEL ) VALVE CODE PRESSURE RATING TEMPERATURE RANGE(0C) SIZE RANGE(DN) BODY MATERIAL END CONNECTION TYPE MAXIMUM WORKING PRESSURE WORKING FLUID STEM SEAT BALL STEM PACKING DESIGN/TEST DIMENSION REFERENCE OTHER DESIGN REQUIREMENTS REMARKS

B-21 600
-20C TO 50 C 15-50 A105 SOCKET WELDING 25 bar g NATURAL GAS Stainless Steel PTFE Stainless Steel 304 -BS 5351

B-22A 150
-20 C TO 50C 65-450 A216WCB FLANGED RF 6 bar g GEAR OPERATION

B-23 300
-20C TO 50C 65-500 A216WCB FALNGED RF 25 bar g GEAR OPERATION

AS PER MANUFACTURER'S STANDARD AS PER BS 5351 VALVE SHALL BE PROVIDED WITH ELECTROSTATIC DEVICE AND FIRE SAFE DESIGN.

OWNER'S DOC. NO.:

TSM/AL-99/BP-M-11-FN0-154
FILE NO.:

REV.: 0

CONTRACT NO.:

MAPNA GROUP
(PUBLIC STOCK) DESIGN STAGE:

DETAIL

PAGE: 7 of 8

IRAN POWER DEVELOPMENT COMPANY

2nd 3000 MW POWER PLANT ARDEBIL EXTENSION GAS TURBINE POWER PLANT(2*GTG V94.2)

DATA SHEET OF PRESSURE REGULATOR


DESCRIPTION UNIT DATA

Tag No. Service Density Size Operating high pressure Operating low pressure Capacity Operating temperature Mounting End connection Quantity Body Material

--kg/Nm3 in Psi Psi Nm3/hr C --No. --

00 EKG 02 AA003 Natural gas 0.683 @ 15C 1 1/2 60 2 200 -22.4 ~ 37 Direct S.W 1 Cast steel

OWNER'S DOC. NO.:

TSM/AL-99/BP-M-11-FN0-154
FILE NO.:

REV.: 0

CONTRACT NO.:

MAPNA GROUP
(PUBLIC STOCK) DESIGN STAGE:

DETAIL

PAGE: 8 of 8