You are on page 1of 1

SUB TOTAL

DELIVERABLES AND ESTIMATED MAN-HOURS


DISCIPLINE PROCESS
DRAWING CLASSIFICATIONS

PROJECT TITLE:

EXPANSION OF EAST PUMP STATION-MARAFIQ

ORIGINATOR DISC. SUP.

IM MTQ

DATE: DATE:

14-Nov-12 14-Nov-12

Revision A

ENGINEERING PACKAGE REVIEW


Existin g

DELIVERABLES
Eng'g
Design

MAN-HOURS CADD Total

New

No. of Drawings "A" size "B" size "C" size "D" size "E" size

Hours Per Dwg. A B C

NEW D E
TOTAL

EXISTING A B C D E
TOTAL

NEW A B C D E
TOTAL

EXISTING A B C D E
TOTAL

DRAFTED DRAWINGS
TOTAL MAN-HOURS (FROM OTHER SHEETS)

NON-DRAFTED DRAWINGS

Non-Deliverables Design Basis/Technical Narrative PEP method statement Design Verification plan. Review of vendor data and provision of same (Assupmtion-2) Process description and Block flow diagram (Assupmtion-2) Equipment (summary) list (Assupmtion-2) Process Flow Diagrams (Assupmtion-5) System descriptions (Assupmtion-2) Utility Flow Diagrams (Assupmtion-6) Material selection philosophy/report & material selection diagrams (Assupmtion-2) P&ID Legends and Symbols (1 P&ID) Process & Utility Studies (Assupmtion-2) Process Engineering Flow Sheets (PEFS, P&IDs, UDDs, UEFS) etc (Assupmtion-12) Drainage and Effluent Summary (Assupmtion-2) Cause and Effect Matrix (Assupmtion-2) Process Control Logic Diagrams (Assupmtion-2) Interface Schedule (Assupmtion-2) Battery limit conditions summary (Assupmtion-2) Hydraulic Calcs, basic and overcapacity analysis, surge analysis (Assupmtion-2) Utilities Summary (Assumption-6) Pump calculation data sheets (Assupmtion-2) Appropriate supporting calculations, line size, overpressure etc (Assupmtion-2) Control valve and inline instrument data sheets (IPDS sheets) (Assupmtion-2) Analyser data sheets (Residual Chlorine Analyzer) Relief valve list/specifications (Assupmtion-11) Relief load study (Assupmtion-11) Process Sizing Criteria (Assupmtion-2) Process Control and Instrumented Protection Function (IPF) Philosophy (Assupmtion-2) Tie in' Isolation and Battery Limits Lists and philosophy (Assupmtion-2) Emergency Shutdown Philosophy (Assumption-2) Drainage and Effluent Philosophy (Assupmtion-2) Sparing Philosophy (Assupmtion-2) Operation Philosophies Start up, Shutdown and Upset philosophy (Assupmtion-2) Relief valve sizing philosophy(Assupmtion-11) Maintenance Philosophy, reliability and plant availability (Assupmtion-2) Commissioning Manual input, commissioning systems definition Operating manual with developed vendor data (Assupmtion-2) Performance Test Procedures and acceptance criteria (Assupmtion2) Verification attendance and reports for: Process safety review Selected DHSE reviews in DHSE section (HAZOP) Plot Plan review Final documentation dossier FAT visits (02 Visits in Middle East,1 Engineer) Visit to site for Kick Off Meeting (02 Visits)
30 30 30 40 40 20 80 60 20 100 80

80 60 20 100 80 60 80 100 50 60 10 150 100 60 50 60 30 40 200 40 20 60 40 20 20 40 30 80 40 60 50 30 100 50 60 60 80 50

60 80 100 50 60 10 150 100 60 50 60 30 40 200 40 20 60 40 20 20 40 30 80 40 60 50 30 100 50 60 60 80 50

30 30 30 40 40 20

Assumptions: 1 Only compliance with contract scope and specification/code requirements. 2. The system to be reviewed will only consisted of new pump station ( Phase-I (6+2 pumps) & Phase-II (6+1 pumps) with auxilliaries like chlorine injection points, flow meter & Air Release Valves) 3. Only potable water stream & chlorine feed is considered. 4. Only pumping station will be considered. No evaluation for perfomance of SWRO plant. 5. 4 PFDs are considered (2 for phase-I & 2 for phase-II). 6.Utilities required for new pumping station is considered. 7. Only two reviews ('for comment' and for approval) are considered. 8. Assume that the submittals received have the supporting information with them in order to undertake the review. 9. Assume that contractor has a basic level of engineering competence and no engineering will be done. 10. Assume that the submittals received have the supporting information with them in order to undertake the review. 11. Thermal/Pressure Relief Valves on the discharge lines of pumps are considrered. Relief valves on the Storage Tanks are not considered.

NON-DRAFTED DRAWINGS Total Hrs :-------------------->


MAN-HOUR DISTRIBUTION Hrs 800 500 500 710

2510.0

2510.0

MUHAMMAD TARIQ

BASSIM ALHAMOUD HUSSAIN ALKHUDAIR IMTINAN MOHSIN

CHECK LIST : Please Check all the following items are taken care or not. 1.All New Dwg. Covered 2.All Exsisting Dwg. Covered 3.Field Visit & Dwg. Search 4.Sub Contract 5.Requisitions 6.Data Sheets 7.Calculations 8.Materials Take Offs 9.Man-Hour Distribution 10. Misc.any other Items
Dwg. Size
SIZE "A" SIZE "B" SIZE "C" New Qty Exist Qty

Yes P P

No P P P P P P

P P
New Eq "A" Ext .Eq "A"

Total Eq "A"

Cross Check
OK
TOTAL

SIZE "D" SIZE "E"

2510 Total Man-Hours ( All Sheets) :-------------------> TOTAL AV. MHRS/ "A" SIZE DWG.-------------------------->

2,510.0

#DIV/0!

TOTAL

TOTAL

TOTAL

TOTAL

PM-DEM-20/01 (04-10)

Page 1 of 1