DOWNTOWN LINE STAGE 3 , EXPO STATION & OVERRUN TUNNEL C 922 O - 31 2-Jan-13 PILE NO :
800 1000 106.749 80.905 32.00 6.156 74.749 6.00 74.905 31.84 mm mm mRL mRL m m mRL m mRL m
Pile size ( design ) Pile size ( actual ) Casing Top Level Cut-off Level : Actual depth Actual concrete length Actual Toe level Design concrete length Design Toe Level : Design Depth
Drawing no :
M/922/OVR/PL0026 Rev A M/922/OVR/PL0031 Rev A
TYPE OF CONCRETE :
RETARDATION
CONCRETING
COMMENCED ON : FINISHED ON : DURATION OF CONCRETING : FINAL CASTING LEVEL: ACTUAL VOLUME :
EXCAVATION
RIG NO : BG-1 COMMENCED ON : 02/01/2012 FINISHED ON : 02/01/2012 DURATION OF EXCAVATION: 14:30 hr 16:30 hr
DESANDING
COMMENCED ON : FINISHED ON : DURATION OF DESANDING :
NA NA
hr OVER-BREAK : hr hr:min
Vol.
1.29
CAGES INSTALLATION
COMMENCED ON : FINISHED ON : DURATION OF INSTALLATION : COMMENCED ON : 02/01/2012 FINISHED ON : 02/01/2012 DURATION OF INSTALLATION :
BACKFILLING NA NA
hr BACKFIL MATERIAL :
Excavated soil ( OA )
TREMIE INSTALLATION
COMMENCED ON : 02/01/2012 FINISHED ON : 02/01/2012 DURATION OF INSTALLATION : 18:35 hr 18:45 hr 00:10 hr:min
COLUMN TYPE:
Installed king post - KP2 ( 400 x 400 x 172 kg/m UC ) Length 26.875 m,
SOIL
DEPTH FROM TO 0 3 3 5 5 7 7 9 9 13 13 29 29 32 DESCRIPTION # # # # # # # Firm, yellowish brown sandy CLAY with hardcore.(FILL) Loose, light grey and brownish yellow clayey SAND.(F1) Firm,light grey and yellowish brown sandy CLAY.(F2) Medium dense,light grey clayey SAND.(OA) Hard,light grey and yellowish brown sandy SILT.(OA) Very dense,light grey and yellowish brown silty SAND.(OA) Hard, greenish grey and light brown sandy SILT.(OA)
Prepared by;
G 35 T
4 hrs
02/01/2012 02/01/2012
18:55 hr 19:00 hr
00:05 hr:min
81.749 mRL (based on design toe to COL) m
3 3 4.71 m 3 6.0 m
27.27 %
Excavated soil ( OA )
04/01/2013, 17:00 hr 04/01/2013, 18:00 hr
1.00 hr 20.00 m3
Installed king post - KP2 ( 400 x 400 x 172 kg/m UC ) Length 26.875 m,
DOWNTOWN LINE STAGE 3 , EXPO STATION & OVERRUN TUNNEL C 922 O - 36 2-Jan-13 PILE NO :
1200 1200 106.712 80.871 39.00 13.159 67.712 13.00 67.871 38.84 mm mm mRL mRL m m mRL m mRL m
Pile size ( design ) Pile size ( actual ) Casing Top Level Cut-off Level : Actual depth Actual concrete length Actual Toe level Design concrete length Design Toe Level : Design Depth
Drawing no :
M/922/OVR/PL0026 Rev A M/922/OVR/PL0031 Rev A
TYPE OF CONCRETE :
RETARDATION
CONCRETING
COMMENCED ON : FINISHED ON : DURATION OF CONCRETING : FINAL CASTING LEVEL: ACTUAL VOLUME :
EXCAVATION
RIG NO : BG-1 COMMENCED ON : 02/01/2012 FINISHED ON : 02/01/2012 DURATION OF EXCAVATION: 13:30 hr 16:00 hr
DESANDING
COMMENCED ON : FINISHED ON : DURATION OF DESANDING :
NA NA
hr OVER-BREAK : hr hr:min
Vol.
1.30
CAGES INSTALLATION
COMMENCED ON : FINISHED ON : DURATION OF INSTALLATION : COMMENCED ON : 02/01/2012 FINISHED ON : 02/01/2012 DURATION OF INSTALLATION :
BACKFILLING NA NA
hr BACKFIL MATERIAL :
Excavated soil ( OA )
TREMIE INSTALLATION
COMMENCED ON : 02/01/2012 FINISHED ON : 02/01/2012 DURATION OF INSTALLATION : 21:00 hr 21:10 hr 00:10 hr:min
COLUMN TYPE:
Installed king post - KP2B 2 nos( 400 x 400 x 232 kg/m UC ) Length 27.909 m,
SOIL
DEPTH FROM TO 0 4 4 6 6 9 9 11 11 13 13 16 16 19 19 24 24 26 DESCRIPTION # Loose to medium dense, yellowish brown and light grey clayey SAND with hardcore. ( Fill ) # Loose,dark grey peaty SAND. (E ) # Loose,light grey and light yellow silty SAND with some gravel.(OA) # Firm,light grey and yellowish brown sandy CLAY. (OA) # Medium dense,light grey and yellowish brown silty SAND. ( OA ) # Very dense,light grey and light yellow silty SAND wih some gravel. ( OA ) # Hard,light grey and yellowish brown gravelly sandy SILT.(OA) # Very dense,light grey and yellowish brown silty SAND wih some gravel. ( OA ) # Hard,light grey and light brown sandy SILT.(OA)
26 28 32
28 32 39
# Very dense,light grey and light brown silty SAND wih some gravel. ( OA ) # Hard,light greenish grey sandy SILT.(OA) # Very dense,light greenish grey and light brown silty SAND wih some gravel. ( OA )
Prepared by;
G 35 T
4 hrs
02/01/2012 02/01/2012
21:30 hr 22:00 hr
00:30 hr:min
83.712 mRL (based on design toe to COL) m
3 3 14.70 m 3 16.0 m
8.82 %
Excavated soil ( OA )
04/01/2013, 15:00 hr 04/01/2013, 17:00 hr
02.00 hr 30.00 m3
Installed king post - KP2B 2 nos( 400 x 400 x 232 kg/m UC ) Length 27.909 m,
gravel. ( OA )
me gravel. ( OA )
ravel. ( OA )
h some gravel. ( OA )
DOWNTOWN LINE STAGE 3 , EXPO STATION & OVERRUN TUNNEL C 922 O - 37 3-Jan-13 PILE NO :
1200 1200 106.828 80.871 39.30 13.343 67.528 13.00 67.871 38.96 mm mm mRL mRL m m mRL m mRL m
Pile size ( design ) Pile size ( actual ) Casing Top Level Cut-off Level : Actual depth Actual concrete length Actual Toe level Design concrete length Design Toe Level : Design Depth
Drawing no :
M/922/OVR/PL0026 Rev A M/922/OVR/PL0031 Rev A
TYPE OF CONCRETE :
RETARDATION
CONCRETING
COMMENCED ON : FINISHED ON : DURATION OF CONCRETING : FINAL CASTING LEVEL: ACTUAL VOLUME :
EXCAVATION
RIG NO : BG-1 COMMENCED ON : 03/01/2013 FINISHED ON : 03/01/2013 DURATION OF EXCAVATION: 14:10 16:30 02:20 hr hr
hr:min THEORITICAL VOLUME :(based on design toe to COL) hr OVER-BREAK : hr hr:min Vol. 1.30
DESANDING
COMMENCED ON : FINISHED ON : DURATION OF DESANDING :
NA NA
CAGES INSTALLATION
COMMENCED ON : FINISHED ON : DURATION OF INSTALLATION : COMMENCED ON : 03/01/2013 FINISHED ON : 03/01/2013 DURATION OF INSTALLATION :
BACKFILLING NA NA
hr BACKFIL MATERIAL :
Excavated soil ( OA )
TREMIE INSTALLATION
COMMENCED ON : 03/01/2013 FINISHED ON : 03/01/2013 DURATION OF INSTALLATION : 16:40 16:50 00:10 hr hr hr:min
COLUMN TYPE:
Installed king post - KP2B 2 nos( 400 x 400 x 232 kg/m UC ) Length 27.871 m,
SOIL
DEPTH FROM TO 0 4 4 6 6 9 9 11 11 13 13 16 16 19 19 24 24 26 DESCRIPTION # Loose to medium dense, yellowish brown and light grey clayey SAND with hardcore. ( Fill ) # Loose,dark grey peaty SAND. (E ) # Loose,light grey and light yellow silty SAND with some gravel.(OA) # Firm,light grey and yellowish brown sandy CLAY. (OA) # Medium dense,light grey and yellowish brown silty SAND. ( OA ) # Very dense,light grey and light yellow silty SAND wih some gravel. ( OA ) # Hard,light grey and yellowish brown gravelly sandy SILT.(OA) # Very dense,light grey and yellowish brown silty SAND wih some gravel. ( OA ) # Hard,light grey and light brown sandy SILT.(OA)
26 28 32
28 32 39.3
# Very dense,light grey and light brown silty SAND wih some gravel. ( OA ) # Hard,light greenish grey sandy SILT.(OA) # Very dense,light greenish grey and light brown silty SAND wih some gravel. ( OA )
Prepared by;
G 35 T
4 hrs
03/01/2013 03/01/2013
17:00 hr 17:15 hr
00:15 hr:min
81.828 mRL (based on design toe to COL) m
3 3 14.70 m 3 16.0 m
8.82 %
Excavated soil ( OA )
05/01/2013, 13:00 hr 05/01/2013, 15:00 hr
02.00 hr 29.00 m3
Installed king post - KP2B 2 nos( 400 x 400 x 232 kg/m UC ) Length 27.871 m,
gravel. ( OA )
ome gravel. ( OA )
gravel. ( OA )
ih some gravel. ( OA )
DOWNTOWN LINE STAGE 3 , EXPO STATION & OVERRUN TUNNEL C 922 O - 38 4-Jan-13 PILE NO :
1200 1200 106.572 80.853 39.40 13.681 67.172 13.00 67.853 38.72 mm mm mRL mRL m m mRL m mRL m
Pile size ( design ) Pile size ( actual ) Casing Top Level Cut-off Level : Actual depth Actual concrete length Actual Toe level Design concrete length Design Toe Level : Design Depth
Drawing no :
M/922/OVR/PL0026 Rev A M/922/OVR/PL0031 Rev A
TYPE OF CONCRETE :
RETARDATION
CONCRETING
COMMENCED ON : FINISHED ON : DURATION OF CONCRETING : FINAL CASTING LEVEL: ACTUAL VOLUME :
EXCAVATION
RIG NO : BG-1 COMMENCED ON : 04/01/2013 FINISHED ON : 04/01/2013 DURATION OF EXCAVATION: 13:30 hr 17:00 hr
DESANDING
COMMENCED ON : FINISHED ON : DURATION OF DESANDING :
NA NA
hr OVER-BREAK : hr hr:min
Vol.
1.30
CAGES INSTALLATION
COMMENCED ON : FINISHED ON : DURATION OF INSTALLATION :
BACKFILLING NA NA
hr BACKFIL MATERIAL :
Excavated soil ( OA )
hr COMMENCED ON : hr:min FINISHED ON : KINGPOST/PLUNGED IN COLUMN INSTALLATION DURATION OF BACKFILLING : COMMENCED ON : 04/01/2013 FINISHED ON : 04/01/2013 DURATION OF INSTALLATION : 18:20 hr VOLUME BACKFILLED : 19:00 hr 00:40 hr:min
TREMIE INSTALLATION
COMMENCED ON : 04/01/2013 FINISHED ON : 04/01/2013 DURATION OF INSTALLATION : 17:30 hr 17:40 hr 00:10 hr:min
COLUMN TYPE:
Installed king post - KP2B 2 nos( 400 x 400 x 232 kg/m UC ) Length 27.927 m,
SOIL
DEPTH FROM TO 0 4 4 6 6 9 9 11 11 13 13 16 16 19 19 24 24 26 DESCRIPTION # Loose to medium dense, yellowish brown and light grey clayey SAND with hardcore. ( Fill ) # Loose,dark grey peaty SAND. (E ) # Loose,light grey and light yellow silty SAND with some gravel.(OA) # Firm,light grey and yellowish brown sandy CLAY. (OA) # Medium dense,light grey and yellowish brown silty SAND. ( OA ) # Very dense,light grey and light yellow silty SAND wih some gravel. ( OA ) # Hard,light grey and yellowish brown gravelly sandy SILT.(OA) # Very dense,light grey and yellowish brown silty SAND wih some gravel. ( OA ) # Hard,light grey and light brown sandy SILT.(OA)
26 28 32
28 32 39.4
# Very dense,light grey and light brown silty SAND wih some gravel. ( OA ) # Hard,light greenish grey sandy SILT.(OA) # Very dense,light greenish grey and light brown silty SAND wih some gravel. ( OA )
Prepared by;
G 35 T
4 hrs
04/01/2013 04/01/2013
17:55 hr 18:15 hr
00:20 hr:min
81.672 mRL (based on design toe to COL) m
3 3 14.70 m 3 16.0 m
8.82 %
Excavated soil ( OA )
06/01/2013, 13:00 hr 06/01/2013, 15:00 hr
02.00 hr 29.00 m3
Installed king post - KP2B 2 nos( 400 x 400 x 232 kg/m UC ) Length 27.927 m,
gravel. ( OA )
ome gravel. ( OA )
gravel. ( OA )