You are on page 1of 2

FINAL INSPECTION PUNCHLIST

Subcontractor : Project:

Emirates Heavy Industries Emirates Aluminium Smelter Complex Phase -II

FLS Order No. Punch list No:

41430

FLS-PL-EHI-01

SL No

DATE

ITEM-No

DESCRIPTION Air Piping Module 7

CLOSE DATE

SIGNATURE

26.01.13

210-5

Failed to cut and weld an air socket before erection below the side discharge piece for 3A West Side Refer Assembly Drawing # MOE01605-507641430-3100_04

Prepared by (FLS) NAME: Swathy Nair SIGNATURE: DATE: 15.01.13

Subcontractor: Alucor / AHI NAME: SIGNATURE: DATE: