You are on page 1of 9

References

Refer No.
-

Job No.

Dwg No.

---

4
Brief Specifications Structure- R.C.C. framed structure Shrine : Garbgriha R.C.C. walls claded with white marble from outside and inside Columns in RCC, including capital & base, beams, arches, main shikhara, small shikhara, mouldings, cornices, chajjas shall be finished in white marble. Flooring: white marble with Jaisalmer yellow band Pedestal (raised platform) walls shall be finished in marble. Base/ top cornice of pedestal shall be finished in maroon granite. Steps: Tread- Single piece white marble slab with double nosing Riser- white marble Railing (vedica): Handrail and balusters in white marble Paving around temple compound: unistone floor tile or garsa slab in dark shade or interlocking CC tiles. Door Opening Size: width=150 x height= 210 cm Door Frame & Shutter in Teak Wood

960 30 150 300 150 150 300 150 30 150 300 150 30

A
173.3 VEDICA /RAILING AS/ DETAIL

251

30

71.5

PRADAKSHINA PATHA 297 1.5 300 30

LINE OF PLINTH FLOOR

399.5

30 173.3

300

1.5

MOULDING AT BASE 173 EQ 23 251 WALLS 23 THICK IN R.C.C. SHRINE


200

173

297

173.3

251

137

137

181.5

120 EQ

120

181.5

263

175

175

23

1100

DN 375.5 173.3

150

263

200

DN 1 A108

9 R @ 152.2 mm
95 240

120

ARDH-MANDAPH 182 DN

240

95

9 R @ 152.2 mm

182

95

492

173.3

95

23

60

2 R @ 150.0 mm
250 150 23 PARAPET WITH COPING 23 VEDICA /RAILING AS/ DETAIL

137

AR. VIJAY UPPAL CHIEF ARCHITECT C.A./82/10144

23

150

265

MANDAPAH 137 173.3 COLUMNS DIA 25 AS/ DETAIL 71.5 30 CORNICE AT PLINTH LVL

AR. SURINDER SHARMA SENIOR ARCHITECT C.A./81/6578

30

D
188.7 30

DN 85.3 85.3

AR. P.S. NEGI ARCHITECT C.A. 92/15300


188.7

AR. VIVEK SHARMA ASSTT. ARCHITECT C.A. 2008/43633

9 R @ 152.2 mm
240

PARAPET WITH COPING 85.3 256

85.3

30

85.3

71.5

O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale 1 : 50 Dated

85.3

23

276.4

23

30

R.L. =+/-0.0
Job No.
150 150

R.L. = +/-0.0 150 150 300

Drg. No.

1 A107

AWAH DEVI TEMPLE

PLINTH LVL.
1 : 50

SECTIONAL PLAN
WORKING DRAWING

LAYOUT

References
-

Refer No.

Job No.

Dwg No.

---

1
300

2
150 150

3
300 45.5

71.5

30

117

809

30

A
EQ 438.9 EQ

399.5

EQ

612

SHIKHARA

137

438.9

1920

137

502.1 EQ DN DN 1213.2 1 979.2

375.5

117

30

A108

SMALL SHIKHARA 502.1


1272.4

265

AR. VIJAY UPPAL CHIEF ARCHITECT C.A./82/10144

791.2

15.3

AR. SURINDER SHARMA SENIOR ARCHITECT C.A./81/6578


117

101.7

130

302.1 502.1 158.6

AR. P.S. NEGI ARCHITECT C.A. 92/15300


158.6

41.6

AR. VIVEK SHARMA ASSTT. ARCHITECT C.A. 2008/43633

117

30

O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale 1 : 50 Dated

R.L. = +/-0.0 117 253.7 302.1 253.2 117

117

Job No.

Drg. No.

ROOF PLAN
1 : 50
1 A107

3D View 3
AWAH DEVI TEMPLE

WORKING DRAWING

ROOF PLAN

References
Refer No.
---

Job No.

Dwg No.

KALASHA

AMALAKA

MAIN SHIKHRA

Level 7 1316.3
1308 PETALS IN ELEVATION KALASHA 1920 SMALL SHIKHARA

96

255

AR. VIJAY UPPAL CHIEF ARCHITECT C.A./82/10144

Level 6 612
75

AR. SURINDER SHARMA SENIOR ARCHITECT C.A./81/6578


ROOF FACIA

Level 5 537

120

ENTABLATURE

AR. P.S. NEGI ARCHITECT C.A. 92/15300

AR. VIVEK SHARMA ASSTT. ARCHITECT C.A. 2008/43633

Shrine Level 4
VEDICA / RAILING

O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale 1 : 50 Dated

400

200 ARDHMANDAPAH 182 PLINTH LVL.


CORNICE

137

Job No.

Drg. No.

137

PEDESTAL

BASE MOULDING

Level 1
315

AWAH DEVI TEMPLE

FRONT ELEVATION (East)


1 : 50

WORKING DRAWING

FRONT ELEVATION

References
Refer No. Job No. Dwg No.

KALASHA

AMALAKA

D A
MAIN SHIKHRA

405.5

Level 7 1316.3

PETALS IN ELEVATION 405.5 902.5 704.3 1920

SMALL SHIKHARA

AR. VIJAY UPPAL CHIEF ARCHITECT C.A./82/10144

255

AR. SURINDER SHARMA SENIOR ARCHITECT C.A./81/6578

3" /

12"

Level 6
75

75

612 Level 5 537

AR. P.S. NEGI ARCHITECT C.A. 92/15300

AR. VIVEK SHARMA ASSTT. ARCHITECT C.A. 2008/43633

O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
337

120

400

PLINTH LVL.
TOP CORNICE IN MAROON RED GRANITE
15

Scale

As indicated

Dated

280

VEDICA / RAILING AS/ DETAIL 45 18

Shrine Level 4 200 ARDHMANDAPAH 182 PLINTH LVL. 137

+2.5

15

10

NICHES IN ELEVATION

27.5

137

+2.5

Job No.
+/-0.0 20 +2.5 MOULDING +/-0.0 10 +2.5 +2.5 27.5 BASE CORNICE IN MAROON RED GRANITE 20

Drg. No.

20 180.1 180 COL.PEDESTAL 137 135 10 135 137 SIDE ENTRY/EXIT PEDESTAL 10

AWAH DEVI TEMPLE


Level 1 0

15

15

90

90

Level 1 0

COPING IN MAROON RED GRANITE 376.8

453 365.2

2
453
A108

WORKING DRAWING

NORTH SIDE ELEVATION


1 : 50

CARVING DETAIL
1 : 20

SIDE ELEVATION

References
Refer No. Job No. Dwg No.

VENTS WITH EXHAUST FAN

60

A
SHIKHARA

---

Level 7 1316.3

SIDE VENTS

PETALS IN ELEVATION

---

VENTS

AR. VIJAY UPPAL CHIEF ARCHITECT C.A./82/10144


55

---

RING BEAM

AR. SURINDER SHARMA SENIOR ARCHITECT C.A./81/6578

Level 6
BEAM AS / STR. 34 60 BEAM AS / STR.

612 Level 5
AR. P.S. NEGI ARCHITECT C.A. 92/15300
AR. VIVEK SHARMA ASSTT. ARCHITECT C.A. 2008/43633

34 60 ROOF SOFFIT

537

O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale Shrine Level 4
VEDICA /RAILING AS/ DETAIL

ARDH-MANDAPH MANDAPAH PLINTH LVL. 15

210

COLUMN IN ELEVATION

SHRINE

1 : 50

Dated

200 ARDHMANDAPAH 182

Job No.

Drg. No.

TIE BEAM AS/ STR.

PLINTH LVL. 137

AWAH DEVI TEMPLE

FOUNDATIONS AS / STRUCTURE

Level 1 0

9 R @ 152.2 mm
FOUNDATIONS AS / STRUCTURE SHEAR WALLS IN RCC

WORKING DRAWING

Longitudinal Section
1 : 50

SECTION

References
Refer No. Job No. Dwg No.

Notes

AR. VIJAY UPPAL CHIEF ARCHITECT C.A./82/10144

AR. SURINDER SHARMA SENIOR ARCHITECT C.A./81/6578

AR. P.S. NEGI ARCHITECT C.A. 92/15300

AR. VIVEK SHARMA ASSTT. ARCHITECT C.A. 2008/43633

O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale Dated

Job No.

Drg. No.

AWAH DEVI TEMPLE

3D View 1

SKETCH DRAWINGS

FRONT PERSPECTIVE

References
Refer No. Job No. Dwg No.

Notes

AR. VIJAY UPPAL CHIEF ARCHITECT C.A./82/10144

AR. SURINDER SHARMA SENIOR ARCHITECT C.A./81/6578

AR. P.S. NEGI ARCHITECT C.A. 92/15300

AR. VIVEK SHARMA ASSTT. ARCHITECT C.A. 2008/43633

O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale Dated

Job No.

Drg. No.

AWAH DEVI TEMPLE

SKETCH DRAWINGS

3D View 3

VIEW

B'

---

References
Refer No. Job No. Dwg No.

COLUMN IN ELEVATION

COLUMN IN ELEVATION WHITE MARBLE MAROON RED GRANITE TOP CORNICE IN MAROON RED GRANITE
15.0

Plinth Lvl.
27.5 10.0 17.5

Plinth Lvl. 137

TOP CORNICE IN MAROON RED GRANITE

137

17.5 10.0

R15.0

R15.0

WHITE MARBLE +2.5 MAROON RED GRANITE MOULDING MOULDING R.C.C. AS PER STRUCTURE
102 20.0

X
PEDESTAL

+2.5
15 20.0 20.0

+/-0.0

+2.5

A
Y
2.5 15.0

+/-0.0 +2.5
R15.0 10.0 27.5 17.5 R15.0

KEY ELEVATION

CEMENT MORTAR BASE CORNICE IN MAROON RED GRANITE


10.0

Level 1 0

BASE CORNICE IN MAROON RED GRANITE

17.5

Level 1

PART ELEVATION 'A'


SCALE 1:20

SECTION (B-B')
SCALE 1:20

MAROON RED GRANITE CEMENT MORTAR TOP CORNICE IN MAROON RED GRANITE MOULDING
34.5

AR. VIJAY UPPAL CHIEF ARCHITECT C.A./82/10144

AR. SURINDER SHARMA SENIOR ARCHITECT C.A./81/6578

0.8

BASE CORNICE IN MAROON RED GRANITE

AR. P.S. NEGI ARCHITECT C.A. 92/15300

AR. VIVEK SHARMA ASSTT. ARCHITECT C.A. 2008/43633

7.5 R2.0 17.5 2.5 17.5 5.0 R5.0 2.5 5.0 5.0 10.0 4.5 15.0 2.5 2.5 R2.0 7.5 2.0 2.5 3.0 17.5 2.5 5.0 2.5 R5.0

MAROON RED GRANITE

2.5 2.5 2.0 2.5 2.5 2.0 10.0 5.0 15.0 4.5 2.5 3.0

O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale Dated

Drawn by:

Job No. 7964

Drg. No.

ASHISH MARWHA

AWAH DEVI TEMPLE

DETAIL OF PEDESTAL
20.0

CEMENT MORTAR

DETAIL AT 'X'
SCALE (1:5)

DETAIL AT 'Y'
SCALE (1:5)

DETAIL AT 'Z'
SCALE (1:5)

ELEVATIONAL AND SECTIONAL DETAIL