Professional Documents
Culture Documents
Refer No.
-
Job No.
Dwg No.
---
4
Brief Specifications Structure- R.C.C. framed structure Shrine : Garbgriha R.C.C. walls claded with white marble from outside and inside Columns in RCC, including capital & base, beams, arches, main shikhara, small shikhara, mouldings, cornices, chajjas shall be finished in white marble. Flooring: white marble with Jaisalmer yellow band Pedestal (raised platform) walls shall be finished in marble. Base/ top cornice of pedestal shall be finished in maroon granite. Steps: Tread- Single piece white marble slab with double nosing Riser- white marble Railing (vedica): Handrail and balusters in white marble Paving around temple compound: unistone floor tile or garsa slab in dark shade or interlocking CC tiles. Door Opening Size: width=150 x height= 210 cm Door Frame & Shutter in Teak Wood
960 30 150 300 150 150 300 150 30 150 300 150 30
A
173.3 VEDICA /RAILING AS/ DETAIL
251
30
71.5
399.5
30 173.3
300
1.5
173
297
173.3
251
137
137
181.5
120 EQ
120
181.5
263
175
175
23
1100
DN 375.5 173.3
150
263
200
DN 1 A108
9 R @ 152.2 mm
95 240
120
ARDH-MANDAPH 182 DN
240
95
9 R @ 152.2 mm
182
95
492
173.3
95
23
60
2 R @ 150.0 mm
250 150 23 PARAPET WITH COPING 23 VEDICA /RAILING AS/ DETAIL
137
23
150
265
MANDAPAH 137 173.3 COLUMNS DIA 25 AS/ DETAIL 71.5 30 CORNICE AT PLINTH LVL
30
D
188.7 30
DN 85.3 85.3
9 R @ 152.2 mm
240
85.3
30
85.3
71.5
O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale 1 : 50 Dated
85.3
23
276.4
23
30
R.L. =+/-0.0
Job No.
150 150
Drg. No.
1 A107
PLINTH LVL.
1 : 50
SECTIONAL PLAN
WORKING DRAWING
LAYOUT
References
-
Refer No.
Job No.
Dwg No.
---
1
300
2
150 150
3
300 45.5
71.5
30
117
809
30
A
EQ 438.9 EQ
399.5
EQ
612
SHIKHARA
137
438.9
1920
137
375.5
117
30
A108
265
791.2
15.3
101.7
130
41.6
117
30
O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale 1 : 50 Dated
117
Job No.
Drg. No.
ROOF PLAN
1 : 50
1 A107
3D View 3
AWAH DEVI TEMPLE
WORKING DRAWING
ROOF PLAN
References
Refer No.
---
Job No.
Dwg No.
KALASHA
AMALAKA
MAIN SHIKHRA
Level 7 1316.3
1308 PETALS IN ELEVATION KALASHA 1920 SMALL SHIKHARA
96
255
Level 6 612
75
Level 5 537
120
ENTABLATURE
Shrine Level 4
VEDICA / RAILING
O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale 1 : 50 Dated
400
137
Job No.
Drg. No.
137
PEDESTAL
BASE MOULDING
Level 1
315
WORKING DRAWING
FRONT ELEVATION
References
Refer No. Job No. Dwg No.
KALASHA
AMALAKA
D A
MAIN SHIKHRA
405.5
Level 7 1316.3
SMALL SHIKHARA
255
3" /
12"
Level 6
75
75
O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
337
120
400
PLINTH LVL.
TOP CORNICE IN MAROON RED GRANITE
15
Scale
As indicated
Dated
280
+2.5
15
10
NICHES IN ELEVATION
27.5
137
+2.5
Job No.
+/-0.0 20 +2.5 MOULDING +/-0.0 10 +2.5 +2.5 27.5 BASE CORNICE IN MAROON RED GRANITE 20
Drg. No.
20 180.1 180 COL.PEDESTAL 137 135 10 135 137 SIDE ENTRY/EXIT PEDESTAL 10
15
15
90
90
Level 1 0
453 365.2
2
453
A108
WORKING DRAWING
CARVING DETAIL
1 : 20
SIDE ELEVATION
References
Refer No. Job No. Dwg No.
60
A
SHIKHARA
---
Level 7 1316.3
SIDE VENTS
PETALS IN ELEVATION
---
VENTS
---
RING BEAM
Level 6
BEAM AS / STR. 34 60 BEAM AS / STR.
612 Level 5
AR. P.S. NEGI ARCHITECT C.A. 92/15300
AR. VIVEK SHARMA ASSTT. ARCHITECT C.A. 2008/43633
34 60 ROOF SOFFIT
537
O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale Shrine Level 4
VEDICA /RAILING AS/ DETAIL
210
COLUMN IN ELEVATION
SHRINE
1 : 50
Dated
Job No.
Drg. No.
FOUNDATIONS AS / STRUCTURE
Level 1 0
9 R @ 152.2 mm
FOUNDATIONS AS / STRUCTURE SHEAR WALLS IN RCC
WORKING DRAWING
Longitudinal Section
1 : 50
SECTION
References
Refer No. Job No. Dwg No.
Notes
O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale Dated
Job No.
Drg. No.
3D View 1
SKETCH DRAWINGS
FRONT PERSPECTIVE
References
Refer No. Job No. Dwg No.
Notes
O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale Dated
Job No.
Drg. No.
SKETCH DRAWINGS
3D View 3
VIEW
B'
---
References
Refer No. Job No. Dwg No.
COLUMN IN ELEVATION
COLUMN IN ELEVATION WHITE MARBLE MAROON RED GRANITE TOP CORNICE IN MAROON RED GRANITE
15.0
Plinth Lvl.
27.5 10.0 17.5
137
17.5 10.0
R15.0
R15.0
WHITE MARBLE +2.5 MAROON RED GRANITE MOULDING MOULDING R.C.C. AS PER STRUCTURE
102 20.0
X
PEDESTAL
+2.5
15 20.0 20.0
+/-0.0
+2.5
A
Y
2.5 15.0
+/-0.0 +2.5
R15.0 10.0 27.5 17.5 R15.0
KEY ELEVATION
Level 1 0
17.5
Level 1
SECTION (B-B')
SCALE 1:20
MAROON RED GRANITE CEMENT MORTAR TOP CORNICE IN MAROON RED GRANITE MOULDING
34.5
0.8
7.5 R2.0 17.5 2.5 17.5 5.0 R5.0 2.5 5.0 5.0 10.0 4.5 15.0 2.5 2.5 R2.0 7.5 2.0 2.5 3.0 17.5 2.5 5.0 2.5 R5.0
2.5 2.5 2.0 2.5 2.5 2.0 10.0 5.0 15.0 4.5 2.5 3.0
O/O THE CHIEF ARCHITECT H.P. P.W.D. VASTU BHAWAN, NIGAM VIHAR, SHIMLA.
Scale Dated
Drawn by:
Drg. No.
ASHISH MARWHA
DETAIL OF PEDESTAL
20.0
CEMENT MORTAR
DETAIL AT 'X'
SCALE (1:5)
DETAIL AT 'Y'
SCALE (1:5)
DETAIL AT 'Z'
SCALE (1:5)