You are on page 1of 39

Module 1: MARKET OPERATIONS AND TRADING

Scheduling, Pricing and Dispatch

Philippine Electricity Market Corporation (PEMC)


Copyright 2012 by Philippine Electricity Market Corporation

Presentation Outline
Hour-ahead Real-time Dispatch (RTD) Effect of Transmission Loss Factor (TLF) on Dispatch and Usage on Scheduling Determination of Ex-ante Price (EAP), RTD Schedule and Ex-ante Quantity (EAQ) for Generator and Load Customer Real-time Expost Dispatch(RTX) Determination of Ex-post Price (EPP) for Generator and Load Customer Examples
2
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

HOUR-AHEAD REAL TIME DISPATCH (RTD) Ex-Ante

3
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

HOUR-AHEAD REAL TIME DISPATCH (RTD)


It is the Hour-Ahead Dispatch Schedule which determines the target loading, in MW, of facilities at the end of the trading interval. The RTD calculates the Ex-ante Nodal Prices.

4
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

HOUR-AHEAD REAL TIME DISPATCH (RTD)


MW
120 100 80 60 40 20 0
H (Start of Trading Interval) Initial MW (EAIQ) for H (Optimized by MMS) Hour - Ahead Dispatch Schedule RTD/Target MW (EATQ) for H+1

Time
H+1 (End of Trading Interval) 5
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

RTD Market Trading Mechanism


Trading Participant Market Operator System Operator

System Demand Forecast

Market Input Data: Energy offers (Price, Quantity, Ramp Rate)

Market Management System


Market Dispatch Optimization Model (MDOM) Pricing and Scheduling

System Conditions: System Snapshot Outage Schedules Security Limits Contingency Lists Transmission limits Reserve Requirement

6
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.1 - Generator Offers (Trading Participants)


Region Luzon Lhydro_G01 Lgeo_G01 Lcoal_G01 Ldiesel_G01 Lnat_G01 Visayas Vgeo_G01 Vcoal_G01 Vdiesel_G01 Total Participant Pmin (MW) 3,025.00 70.00 110.00 1,080.00 0 1,765.00 465.00 216.00 249.00 0 3,490.00 Quantity Price (MW) (Php/MWh) 6,312.20 684.60 1,000.00 369.00 270.69 2,400.60 2,168.32 143.00 7,469.00 2,715.00 -1.00 1,485.80 616.50 0.00 622.00 1,981.70 247.30 18,500.19 7,798.00 Ramp-rates (MW/min) RRDN RRUP 30 30 3 3 4 4 4 4 6 6 3 4 2 3 4 2

Note: Price-Qty Offer must be up to 10 energy blocks.

7
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.2 - System Demand Forecast (Market Operator)


Luzon Visayas Total Region System Demand* Forecast (MW) 5,348 932.1 6,280.1

Note: * - System Demand = Demand + Losses

8
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

General Constraint

Generation =

Losses

Demand

9
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Effect of Transmission Loss Factors on Dispatch


The incremental transmission losses based on the location of the resource with respect to the reference bus and flow of power on the grid This factor is called the Transmission Loss Factor, or Penalty Factor

TLFi =

1 PLoss 1 Pgen i

Change in System Losses

Change in Units MW Output

10
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Usage of Transmission Loss Factors on Scheduling


The amount of power (MW) that needs to be generated/consumed at the resource bus in order to consume/supply 1MW at the reference bus (Richview). The factor that is multiplied to the offer and bids to come up with a value of those offers and bids relative to the reference bus.
11
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Usage of Transmission Loss Factors on Scheduling


An increment in generation results in an increase in system losses,
The price offer is adjusted higher

PLoss 0< <1 Pgeni

TLFi =

1 PLoss 1 Pgen i

>1

12
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Usage of Transmission Loss Factors on Scheduling


An increase in generation results in a decrease in system losses then: The price offer is adjusted lower

PLoss 0> > 1 Pgeni

TLFi =

1 PLoss 1 Pgen i

<1

13
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Usage of Transmission Loss Factors on Scheduling


The generator adjusted as: offer price will be

Adjusted Offer Price = Offer x TLF

14
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.3 - Adjusted Generator Price Offers


Region Luzon Lhydro_G01 Lgeo_G01 Lcoal_G01 Ldiesel_G01 Lnat_G01 Visayas Vgeo_G01 Vcoal_G01 Vdiesel_G01 0.00 1,981.70 18,500.19 1.0243 0.9978 0.9974 0.0000 1,977.34 18,452.09 1,000.00 270.69 2,168.32 7,469.00 -1.00 1.0000 0.9937 1.0013 0.9705 1.0483 1,000.00 268.98 2,171.14 7,248.66 -1.05 Participant Offer Price (Php/MWh) TLF Adjusted Offer Price (Php/MWh)

15
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Determination of Generator Dispatch Schedules and System Marginal Price


Price (P/MWh) System Demand Forecast

Adjusted Price Offers System Marginal Price, = (Price Offer x TLF)Marginal Plant

Non-contestable Qty

G2

G3

G4

G5 G5

G1
Schedule Quantity (MW) 16
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Non-contestable Qty.: Pmin, Must-run Unit (MRU), New and Renewable Energy and/or Non-scheduled Generator

Determination of Generator Dispatch Schedules and System Marginal Price


Price (P/MWh)
Luzon System Demand Forecast 5,348 MW Over-all System Demand Forecast 6,280.1 MW V isayas System Demand Forecast 932.1 MW

System Marginal Price, = Php 2,171.1/MWh Marginal Plant: Lcoal_G01


Ldiesel_G01 Adj. P = 7248.66 Q = 143 Lcoal_G01 Adj. P= 2171.1 Vcoal_G01 Adj. P= 2002.51 Q= 193 Q = 373

Vdiesel_G01 Adj. P= 18452.09 Q = 247.3

Pmin = 3,490 MW

Vgeo_G01 Adj. P= 0 Qty = 400.5 Lnat_G01 Adj. P = -1.05 Q = 950

Lgeo_G01 Adj. P = 268.98 Q = 259

Lhydro_G01 Adj. P= 1,000 Q = 614.6

Quantity (MW)
Gen Offer = 7,798 MW

17
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

RTD HVDC Flow

HVDC Flow = 306.40 MW

Luz
Gen Sched = 5,041.60 MW System Demand = 5,348 MW

Vis
Gen Sched = 1,238.5 MW System Demand = 932.1 MW

18
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.4 - Generator Dispatch Schedules


Participants Lnat_G01 Vgeo_G01 Lgeo_G01 Lhydro_G01 Vcoal_G01 Lcoal_G01 Ldiesel_G01 Vdiesel_G01 Total Offered Qty. (MW) 2,715.00 616.5 369 684.6 622 2,400.60 143 247.3 7,798.00 RTD* (MW) 2,715.00 616.5 369 684.6 622 1,273.00 Not Cleared Not Cleared 6,280.10

19
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Determination of Load Nodal Schedules


System Demand Forecast per Region Nodal Load Pattern Nodal Demand Schedules per Region

MW

Gen

region

HVDC

System Snapshot Node 1 Node 2 Node 3

MW

LD Node 1

LD Node 2

LD Node 3

20
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.5 - Determination of Load Nodal Schedules


System Demand Forecast: Load Demand Losses System (MW) Demand (MW) (MW) Region Luzon Visayas 5260.6 915.3 87.4 16.8 5,348 932.1 Load MTN: Participants Luzon LC01_L01 LC02_L01 LC03_L01 Visayas VC01_L01 VC02_L01 VC03_L01 VC04_L01 VC05_L01 Total RTD (MW) 5,260.60 1,308.26 2,403.48 1,548.86 915.30 101.00 548.67 151.27 29.95 84.40 6,175.90
21
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.6 - Generator and Load Nodal Schedules


Generator MTN: Participants
Lnat_G01 Vgeo_G01 Lgeo_G01 Lhydro_G01 Vcoal_G01 Lcoal_G01 Ldiesel_G01 Vdiesel_G01 Total

RTD (MW) 2,715.00 616.50 369.00 684.60 622.00 1,273.00 0.00 0.00 6,280.10

Load MTN: Participants Luzon LC01_L01 LC02_L01 LC03_L01 Visayas VC01_L01 VC02_L01 VC03_L01 VC04_L01 VC05_L01 Total

RTD (MW) 5,260.60 1,308.26 2,403.48 1,548.86 915.30 101.00 548.67 151.27 29.95 84.40 6,175.90

22
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Determination of Scheduled Nodal Energy Generation/Consumption


MW
120 100
Initial MW (EAIQ) for H Hour - Ahead Dispatch Schedule RTD/Target MW (EATQ) for H+1

EAQ
80 60 40 20 0
H (Start of Trading Interval)

= (EAIQ+ EATQ)
EAQ Ex-ante Qty EAIQ Ex-ante Initial Qty. EATQ Ex-ante Target Qty. Scheduled Nodal Energy Generation / Consumption

Time
H+1 (End of Trading Interval) 23
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.7 - Forecasted/Scheduled Nodal Energy Generation/Consumption Ex-ante Quantity (EAQ)


Generator MTN: EAIQ Resources (MW) Lcoal_G01 1,084.95 Lgeo_G01 Lhydro_G01 Lnat_G01 Vcoal_G01 Vgeo_G01 Ldiesel_G01 Vdiesel_G01 Total 239.05 794.48 2,369.89 349.35 467.60 0 0 5,305.31 Load MTN: EATQ (MW) 1,273.00 369.00 684.60 2,715.00 622.00 616.50 0 0 6,280.10 EAQ (MWh) 1,178.97 304.02 739.54 2,542.44 485.67 542.05 0 0 5,792.70 Resources EAIQ (MW) EATQ (MW) EAQ (MWh) LC01_L01 LC02_L01 LC03_L01 VC01_L01 VC02_L01 VC03_L01 VC04_L01 VC05_L01 Total 1,165.40 1,862.80 1,490.30 82.80 392.20 120.80 26.30 70.90 5,211.50 1,308.26 2,403.48 1,548.86 101.00 548.67 151.27 29.95 84.40 6,175.90 1,236.83 2,133.14 1,519.58 91.90 470.43 136.04 28.13 77.65 5,693.70

24
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Nodal Prices/Locational Marginal Prices (LMP)


Marginal cost of supplying the next increment of electric energy at a specific location while considering the generation marginal cost and the physical aspects of the transmission system. LMP
=
Generation Price (SMP)

Cost of Losses

Transmission Congestion Cost

LMPi =

TLF i

* +

j aij

25
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Nodal Prices/Locational Marginal Prices (LMP)


If no congestion occurs, LMPi = TLF i
Generator: Load:

PFi = TLFi =

1 1 PL Pgen i

PFi = TLFi =

1 1 + PL Pload i

26
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.8 - Ex-ante Price (EAP) Nodal Price / Locational Marginal Price (LMP)
Generator MTN: Resources Lnat_G01 Vgeo_G01 Lgeo_G01 Lhydro_G01 Vcoal_G01 Lcoal_G01 Ldiesel_G01 Vdiesel_G01 TLF 1.0483 1.0243 0.9937 1.0000 1.0105 1.0013 0.9705 0.9974 EAP (Php/MWh) 2,071.10 2,119.63 2,184.90 2,171.10 2,148.58 2,168.32 2,237.13 2,176.80 Load MTN: Resources LC01_L01 LC02_L01 LC03_L01 VC01_L01 VC02_L01 VC03_L01 VC04_L01 VC05_L01 TLF 0.9704 0.9752 1.0046 0.9919 1.0096 0.9714 0.9611 0.8503 EAP (Php/MWh) 2,237.36 2,226.35 2,161.20 2,188.87 2,150.49 2,235.06 2,259.01 2,553.38

= Php 2,171.1/MWh

27
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

REAL TIME EX-POST DISPATCH (RTX) Ex-post

28
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

REAL TIME EX-POST DISPATCH (RTX)


It is a real time dispatch schedule process performed at the end of a trading interval utilizing actual operations data. The RTX calculates the Ex-post Nodal Prices.
29
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

RTX Market Trading Mechanism


Trading Participant Market Operator System Operator

Market Input Data: Energy offers (Price, Qty, and Ramp Rate

Market Management System


Market Dispatch Optimization Model (MDOM) Pricing and Scheduling

System Condition: System Demand (System Snapshot ) Outage Schedules Security Limits Contingency Lists Transmission limits

32
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.9 - Generator Offers* (Trading Participants)


Region Luzon Lhydro_G01 Lgeo_G01 Lcoal_G01 Ldiesel_G01 Lnat_G01 Visayas Vgeo_G01 Vcoal_G01 Vdiesel_G01 Total Note: Same as Ex-ante Participant Pmin (MW) 3,025.00 70.00 110.00 1,080.00 0 1,765.00 465.00 216.00 249.00 0 3,490.00 Quantity Price (MW) (Php/MWh) 6,312.20 684.60 1,000.00 369.00 270.69 2,400.60 2,168.32 143.00 7,469.00 2,715.00 -1.00 1,485.80 616.50 0.00 622.00 1,981.70 247.30 18,500.19 7,798.00 Ramp-rates (MW/min) RRDN RRUP 30 30 3 3 4 4 4 4 6 6 3 4 2 3 4 2

33
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.10 - RTX System Demand (System Operator)


Luzon Visayas Total Region System Demand* (MW) 5,357.7 963.4 6,321.1

Note: * - System Demand = Genregion HVDC (Import/Export of power) - Based on the system snapshot at the end of the trading interval from SO

34
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.11 - Adjusted Generator Price Offers


Region Luzon Lhydro_G01 Lgeo_G01 Lcoal_G01 Ldiesel_G01 Lnat_G01 Visayas Vgeo_G01 Vcoal_G01 Vdiesel_G01 0.00 1,981.70 18,500.19 1.0067 0.9961 0.9947 0.0000 1,973.97 18,402.14 1,000.00 270.69 2,168.32 7,469.00 -1.00 1.0000 0.9956 1.0004 0.9778 1.0442 1.0000 269.50 2,169.19 7,303.19 -1.04 Resources Offer Price (Php/MWh) TLF Adjusted Offer Price (Php/MWh)

35
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Determination of System Marginal Price


Price (P/MWh)
Luzon System Demand Forecast 5,357.7 MW Over-all System Demand 6,321.1 MW V isayas System Demand Forecast 963.4 MW

System Marginal Price, = Php 2,169.19/MWh Marginal Plant: Lcoal_G01


Ldiesel_G01 Adj. P = 7303.19 Q = 143 Lcoal_G01 Adj. P= 2169.19 Vcoal_G01 Adj. P= 1973.97 Q= 234 Q = 373

Vdiesel_G01 Adj. P= 18402.14 Q = 247.3

Pmin = 3,490 MW

Vgeo_G01 Adj. P= 0 Qty = 400.5 Lnat_G01 Adj. P = -1.04 Q = 950

Lgeo_G01 Adj. P = 269.50 Q = 259

Lhydro_G01 Adj. P= 1,000 Q = 614.6

Quantity (MW)
Gen Offer = 7,798 MW

36
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

RTX HVDC Flow

HVDC Flow = 275.10 MW

Luz
Gen Sched = 5,082.60 MW System Demand = 5,357.70 MW

Vis
Gen Sched = 1,238.5 MW System Demand = 963.4 MW

37
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.12 - Ex-post Price (EPP)


Nodal Price / Locational Marginal Price (LMP)
Generator MTN: Resources Lnat_G01 Vgeo_G01 Lgeo_G01 Lhydro_G01 Vcoal_G01 Lcoal_G01 Ldiesel_G01 Vdiesel_G01 TLF 1.0442 1.0067 0.9956 1.0000 0.9961 1.0004 0.9778 0.9947 EPP (Php/MWh) 2,077.37 2,154.75 2,178.77 2,169.19 2,177.68 2,168.32 2,218.44 2,180.75 Load MTN: Resources LC01_L01 LC02_L01 LC03_L01 VC01_L01 VC02_L01 VC03_L01 VC04_L01 VC05_L01 TLF 0.9782 0.9826 1.0074 0.9753 1.0005 0.9837 0.9569 0.8753 EPP (Php/MWh) 2,217.53 2,207.60 2,153.25 2,224.12 2,168.10 2,205.13 2,266.89 2,478.22

= Php 2,169.19/MWh
Marginal Plant:Lcoal_G01
38
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.13 - Ex-ante and Ex-post Prices and Schedules (Generator MTN)
Generator MTN: Resources Lcoal_G01 Lgeo_G01 Lhydro_G01 Lnat_G01 Vcoal_G01 Vgeo_G01 Ldiesel_G01 Vdiesel_G01 EAIQ (MW) EATQ (MW) EAQ (MWh) EAP (Php/MWh) EPP (Php/MWh) 1,084.95 1,273.00 1,178.97 2,168.32 2,168.32 239.05 369.00 304.02 2,184.90 2,178.77 794.48 684.60 739.54 2,171.10 2,169.19 2,369.89 2,715.00 2,542.44 2,071.10 2,077.37 349.35 622.00 485.67 2,175.93 2,177.68 467.60 616.50 542.05 2,119.63 2,154.75 0 0 0 2,237.13 2,218.44 0 0 0 2,176.80 2,180.75

39
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

Table 1.14 - Ex-ante and Ex-post Prices and Schedules (Load MTN)
Load MTN: Resources LC01_L01 LC02_L01 LC03_L01 VC01_L01 VC02_L01 VC03_L01 VC04_L01 VC05_L01 EAIQ (MW) EATQ (MW) EAQ (MWh) EAP (Php/MWh) EPP (Php/MWh) 1,165.40 1,308.26 1,236.83 2,237.36 2,217.53 1,862.80 2,403.48 2,133.14 2,226.35 2,207.60 1,490.30 1,548.86 1,519.58 2,161.20 2,153.25 82.80 101.00 91.90 2,188.87 2,224.12 392.20 548.67 470.43 2,150.49 2,168.10 120.80 151.27 136.04 2,235.06 2,205.13 26.30 29.95 28.13 2,259.01 2,266.89 70.90 84.40 77.65 2,553.38 2,478.22

40
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

End of Presentation

41
Philippine Electricity Market Corporation (PEMC)
Copyright 2012 by Philippine Electricity Market Corporation

You might also like