1

10

11

12

13

14

15
SIZE

16
QUANT.

CONDUCTOR AND HARDWARE SCHEDULE

A
37500
5500 5500 5500 5500

STATION SOL CONDUCTOR 40000


5500 5500

BUSBAR DROPPER EQUIPMENT EARTHING

{ 250 Al TUBE 3x800mm 50x3 Cu MK


2 2

1000m 160m QUANT.


18

37500
5500 5500

DRG.No

DESCRIPTION { 250 TUBE TO 3 x 800mm

ITEM TBTC

DIAMETER GC BUSBAR 1 R W B
1 2 5 6 7 5 2 4 3 5 7

DIAMETER GC CONNECTOR 2 B
1 7 2 4 5 3 5 7 6 2 5

CONNECTOR 1 R W B

(OUTLINE DRAWINGS NOT AVAILABLE)

HARDWARE - ITEM TO

ON HOLD

1 TWISTED COMPRESSION CLAMP TRIPLE CONDUCTOR SPACER


DRG NO 0.54/412

250/C3-38 2 3 4 5 6 7 S5 SC38/127 3Y4 3YC8 3YC6 3YC1 -108 6 6 36 18 24 24

BUSBAR 2 R
1

C L BUSBAR

TUBBULAR

P1 FITTING 127/38

P1

P2

P2

P1

P1

P2

P2

P1 PB

12540

COPP. EARTH STUD 40kA

RH EB

LH EB PB
8

EB

EB

EB

EB

RH EB
8

LH EB
8

GB704

NOTE: CLAMPS AS PER THE OLD EQUIPMENT OUTLINE DRAWINGS, CLAMP SCHEDULE TO BE REVISED ONCE ALL EQUIPMENT

C
8

GB702

2750

PB GB703

750

2105

3000

750

OUTLINE DRAWINGS RECEIVED.

C L

C CL L

TRENCH

TRENCH

TRENCH

C CL L

ELEVATION ON ELECTRICAL EQUIPMENT:


C PI L

C CT L

C CT L

C CT L

C CT L

C CB L

C CB L

C CB L

C IS L

C IS L

C IS L

C IS L

C IS L

C IS L

C PI L

C PI L

C PI L

NOTE:

1. SPACER MK 2 TO BE AT 2 m CENTRES ON DROPPERS AND 8 m (MIN.) CTRS ON STRINGERS. 2. CVT JB (1JB0601) TO BE MOUNTED ON CENTRE PHASE SUPPORT STRUCTURE 1,4M ABOVE FOUNDATION WITH

8500

8500

6000

6000

8500

8500

6000

5500

5500

6000

8500

8500

6000

6000

8500

8500

37500

40000

32000

5500

JB DOOR FACING THE LINE SIDE. 3. ADDITIONAL SPACERS TO BE INSTALLED WITHIN 500mm ON ALL JUMPERS AND DROPPERS

ON HOLD ( FOUNDATION DRAWINGS NOT AVAILABLE) ON HOLD ( FOUNDATION DRAWINGS NOT AVAILABLE)

C D

K L

S T

E
22 15

BS82

BS83

BS84

BS85

BS86

BS87

BS88

BS89

BS90

BS91

BS92

BS93

ON HOLD ( FOUNDATION DRAWINGS NOT AVAILABLE)

F
LABEL SUPP.
W C L
23a

2750

2750

2750

LABEL SUPP.

LABEL SUPP.

5500

B8
5500

ARROW INDICATES ORIENTATION OF THIS ARRGT WHEN LINED UP WITH SIMILAR ARROW ON FOUNDATION LAYOUT DRG.

15 B

22

2750

BS79
16

BS80

BS81

4000

10000
16

BS70

BS71

BS72

BS73

BS74

BS75

BS76

BS77

BS78

25

MKGC
H
15

3000

H
11500

FOUNDATION AND EARTHING PLAN


NOTE: 1. EQUIPMENT FOUNDATION LEVEL TO BE 150 ABOVE FINISHED TERRACE LEVEL EXCEPT WHERE OTHERWISE SHOWN ON ELEVATION. 40500 46500 52000 57500 63500 72000 80500 THE THREE SEPARATE BASES FOR THE SAME ITEM OF EQUIPMENT ARE TO BE AT THE SAME LEVEL. (EG: CT BASES ON ALL THREE PHASES). 32000 23500

17500

5500

COPPER EARTHING TO SPEC ON DRG NO 0.54/393 CRIMPET 0.54/393 SHT C4 CLAMP 0.54/393 SHT C6 { 10 Cu ROD 135 INDICATES MAIN EARTHMAT (1 x { 10) INDICATES EQUIPMENT EARTHING (2 x { 10) 200 INDICATES CRIMPET CONNECTION SHT C5 1400m INDICATES EARTHTAIL CLAMP CONNECTION SHT C7

K
92500 101000 109500

86500

2489

KEYPLAN STATION ELECTRIC

STATION SOL

0
REV

FIRST ISSUE
REVISION DESCRIPTION BY CHKD AUTH DATE

2482

0.68/ REFERENCE DRAWINGS

FOUNDATION FOUNDATION DRG No 0.54/ EQUIPMENT EQUIPMENT RATING AMPS kA

A TBC POST INS. --127 PCD PPC TBC -TBC 303 779

B TBC ISOL. 3150 63 8HHP ALSTOM 8049 -4600013008 7671


SUPP BY ALSTOM

C 6433 CB 4000 50 9HVP ABB 6224 -4600000747 6226/7/8/9


SUPP BY ABB

D 401 LABEL SUPT. -------400 SHT2 --

E TBC CT 3150 50 {60 HVT 6180 --

F TBC ISOL. 3150 63 8HHP ALSTOM 8053 --

G TBC POST INS. --127 PCD PPC TBC -TBC 303 779

H TBC ISOL. 3150 63 8HHP ALSTOM 8089 -4600013008 7671


SUPP BY ALSTOM

J TBC CT 3150 50 {60 HVT 6180 -4600000609 309 311

K 6433 CB 4000 50 9HVP ABB 6224 -4600000747 6226/7/8/9


SUPP BY ABB

L 401 LABEL SUPT. -------400 SHT2 --

M TBC CT 3150 50 {60 HVT 6180 -4600000609 309 311

N TBC ISOL. 3150 63 8HHP ALSTOM 8089 -4600013008 7671


SUPP BY ALSTOM

P TBC POST INS. --127 PCD PPC TBC -TBC 303 779

Q TBC ISOL. 3150 63 8HHP ALSTOM 8049 -4600013008 7671


SUPP BY ALSTOM

R TBC CT 3150 50 {60 HVT 6180 -4600000609 309 311

S 6433 CB 4000 50 9HVP ABB 6224 -4600000747 6226/7/8/9


SUPP BY ABB

T 401 LABEL SUPT. -------400 SHT2 --

U TBC ISOL. 3150 63 8HHP ALSTOM 8053 -4600013008 7671


SUPP BY ALSTOM

V
APPROVED BY

TBC
A.AMOD

ESKOM HOLDINGS LIMITED

L
REG NO. 2002/015527/06

POST INS. --127 PCD PPC TBC -TBC


DATE : 15/12/2011 DATE : 15/12/2011

CHECKED BY

EQUIPMENT STEM/PAD SIZE MAKER OUTLINE DRG No 0.54/

M.PEFFER

DATE : 15/12/2011

KAPPA
400kV DIAMETER GC BAY LAYOUT
c
SHEET NUMBER REVISION

DRAWN BY N.HARILAL

ORDER NUMBER CONTRACT NUMBER SUPPORT DRG No 0.54/ CAP

4600000609 4600013008 309 311 7671


SUPP BY ALSTOM

303 779
SCALE 1:250

0.68/2488
15

8
16

0
SIZE GROOTTE

10

11

12

13

14

A1L

SCALE: 250