You are on page 1of 6

Client: Project: Plant/Area: WO #: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 38 39 40 41 42 43 44 45 46 47 48 49 50 51

Rev

DATA SHEET
VESSELS
Equip. No: Equip. Name: ADL Doc. No: ASME VIII DIV 1 DESCRIPTION Top head Bottom head Cone kPag kPag mmHg kPag C C C m

ENG-DAT-000106

Rev: 0

Code: Service:

2:1 S.E./Torispherical/Hemisperical 2:1 S.E./Torispherical/Hemisperical APPURTENANCES

DESIGN DATA Design Opp Vac Test Temperature Design Opp MDMT Design liquid level (from BTL) Fluid Specific Gravity Vapour pressure Corrosion allowance - shell - heads Corrosive Constituents Joint efficiency Shell Head Supports Legs Internals Pressure Diameter - shell Height (shell, tan/tan) Nominal Capacity Working Capacity PWHT Test Fluid Wind design Earthquake design SPARES 5% bolting Gaskets: 1 for all blanked nozzles and manholes

Agitator Packing Baffles Vortex Breaker Lifting Lugs Trunions Grounding Lugs Trays Downcomers

Packing Supports Packing/Bed Limiter Pipe Support Brackets Pipe Supports Platform Brackets Ladder Brackets Platforms Handrails Ladders Other:

mm mm

mm mm 3 m m3

Distributor Stilling Wells FOUNDATION DETAILS ( By Vendor ) Overturning Moment @ Base Shear Force @ Base Anchor Bolt Allow. Stress No. of bolts Platform Load Base ring: OD ID PCD Thk Chair height
INSULATION Material Thickness Ins. Supports Empty (excl int.) Internals Opp Test MASS (Estimated) ( By Vendor ) kg kg kg kg

kNm kN Mpa kN mm mm mm mm mm

mm

Shell Top head Bottom head Supports Nozzles - plate Nozzles - pipe Flanges - forging Flanges - plate Nozzle reinforcement Lining

Thk (mm)

MATERIAL OF CONSTRUCTION Stiffeners Internals - plate Internals - pipe Insul. Support rings Clips., Misc. steel Bolts / studs - Internal Bolts / studs - External Nuts - Internal Nuts - External Gaskets

By Vendor

REVISION LOG REV: DESCRIPTION DATE BY CHK'D APP'D

Source Doc: DS.131.0042M.CAL.R00

1 of 6

Client: Project: Plant/Area: WO #: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 38 39 40 41 42 43 44 45 46 47


Rev

DATA SHEET
VESSELS
Equip. No: Equip. Name: ADL Doc. No: TESTING Hydrotest (shop) X-ray Impact Testing PAINTING

ENG-DAT-000106 Shell/heads Surface prep Primer Final Bottom: Surface prep Primer Final

Rev: 0

Yes None Vendor to Advise

No Spot

Full

V1

N6

EL. x.xx m (Tan line) N5A N5B Demister Pad L1B


L2B

ID = xxx mm

N1 N3 M1

N2

L2A

L1A EL. 0.00 m (Tan line)

D1 N EL. -x.xx m (Tan line)

SKETCH IS AN EXAMPLE - ALTERNATE SKETCHES MAY BE SELECTED OR MODIFIED FROM ATTACHED PAGES NOZZLE SCHEDULE Rat/type Facing Proj Ext

Mark N1 N2 N3 N4 N5 N6 M1 M2 D1 V1 L1 L2

Size

Designation/service

Proj Int Remarks

Source Doc: DS.131.0042M.CAL.R00

2 of 6

Client: Project: Plant/Area: WO #: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 38 39 40 41 42 43 44 45 46 47 48 49 50 51


Rev

DATA SHEET
VESSELS
Equip. No: Equip. Name: ADL Doc. No: Nozzle loads (process nozzles only) Fr (kN) Fc (kN) Fl (kN) NPS 50 2" NPS 80 3" NPS 100 4" NPS 150 6" NPS 200 8" NPS 250 10" NPS 300 12" NPS 350 14" NPS 400 16" NPS 450 18" NPS 500 20" NPS 600 24" NPS 750 30" AGITATOR Note: Adequate nozzle compensation to be added for nozzle loads. Mt (kNm) Mc (kNm) Ml (kNm) Remarks

ENG-DAT-000106

Rev: 0

NOTES:

Source Doc: DS.131.0042M.CAL.R00

3 of 6

SKETCHES

HLL

Page 4

PARTS

NOZZLES
L2B Nx Mx Nx Lxx Nx Mx

INTERNALS
Vortex Breaker Demister Pad

Heating Coil Nx

Mx

Nx

Nx Nx Nx Mx

Dx Nx Nx

Dx

Page 5

PARTS

SUPPORTS

MISC
EL. x.xx m (Tan line)

Page 6