Professional Documents
Culture Documents
: 0 Effective Date :
TITLE : REV
0
FABRICATION METHOD SHEET FOR LONG TRAVEL SYSTEM SEAWARD RAIL WEST PRIMARY EQUALISER PE95-LT-EQ-0002 EFFECTIVE DATE ORIGINATOR
SRI KUMAR
DOCUMENT HISTORY
Issued for Approval
APPROVED BY NAME
Ir. Ooi San Kooi Wong Chin Wai Shahril Tony Higgs/Malcolm Whiteman
Distribution:
PJ QA PD QC PU ST SH MS PP
DESIGNATION
Senior General Manager / Asst. Project Director for PE95 QA/QC Manager for PE95 Welding Supervisor for PE95 MMM Representative
SIGNATURE
DATE
PJ = Project, QA = Quality Assurance, PD = Production, QC = Quality Control, PU = Purchasing, ST = Store, SH = Safety & Health, MS = Muhibbah Steel Industries, PP = Papilla, O = Original master copy
TABLE OF CONTENT
1.0 OBJECTIVE 2.0 DRAWING NUMBER 3.0 STEP BY STEP PROCEDURE
1.0 OBJECTIVE This fabrication sequence method sheet has been developed to reduce and minimize mistakes during installation and welding work. Also, it is used to ease the monitoring, quality control and NDT work. 2.0 DRAWING NUMBER Assembly Drawings: PE95-LT-EQ-0002
3.0 STEP BY STEP PROCEDURE SEQUENCE 1 i. Fit up plates on joint: a. LT-p0024(2 unit) and LT-p0027 (2unit)
Other site
8 8
TOP VIEW
TOP VIEW
CP
Other site