RATE ANALYSIS FOR SHUTTERING OF FLOOR BEAM /SLAB.

Sr. No.

Description
Shuttering Area

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Vertical cuplock support length


-2.00 m
Vertical Cuplock support
Length-1.00 m
Adj Stirrup Head 32mm dia 600
mm long
Ledger pipe length - 1.20 M
Ledger Pipe length -1.50 m
Wooden Chavi4" x 3" size
Wooden Chavi 4" x 1" size
Nails
Ply Wood
Shuttering Oil
Tie Rod 0.9 Mt
hollow Section Size
49.5*49.5*3.6 mm
Forman
Carpenter
Helper

Qty.

Unit

Rate

Total cost

cost per sq.m

Repeatations

Rate per Sqmt

180 Sqmt

196.00 No.

623

122108

678.38

90

7.54

96.00 No.

323

31008

172.27

90

1.91

361
277
337
300
300
40
480
50

70756
98058
147606
59535
27783
480
86400
650

393.09
544.77
820.03
330.75
154.35
2.67
480.00
3.61

90
90
90
10
10
1
8
1

4.37
6.05
9.11
33.08
15.44
2.67
60.00
3.61

90

5400

30.00

50

0.60

37000
250
250
150

59200
1250
5500
4950

328.89
6.94
30.56
27.50

90
1
1
1

3.65
6.94
30.56
27.50

Total

213.03

Contractors profit @15%

31.95

196.00
354.00
438.00
198.45
92.61
12.00
180.00
13.00

No.
No.
No.
Cft
Cft
Kg
Sqmt
lt.

60.00 No.
1.60
5.00
22.00
33.00

MT
No.
No.
No.

244.98

Rate per sq.m

244.98