SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO.

TSP/PJ/013 ONSHORE FACILITIES INSPECTION & TEST PLAN FOR ELECTRICAL


Job No. : 99012 Doc No. : INSP 99012 999 Page : 1/23 Rev. 4

8700 0004

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR ELECTRICAL

4 3 2 1 0 REV.

07/01/01 21/12/00 20/12/99 17/11/99 30/09/99 DATE

ISSUE OF APPROVED FINAL DOCUMENT ISSUE OF APPROVED FINAL DOCUMENT APPROVED FOR CONSTRUCTION APPROVED FOR CONSTRUCTION ISSUED FOR APPROVAL DESCRIPTION

M. G. KIM M. G. KIM M. G. KIM M. G. KIM M. G. KIM BY

S. Y. KIM S. Y. KIM S. Y. KIM S. Y. KIM S. Y. KIM REVIEWED

S. K. AN S. K. AN Y. H. KIM Y. H. KIM Y. H. KIM APPROVED

TOTAL SOUTH PARS


SOUTH PARS FIELD DEVELOPMENT (PHASE TWO & THREE)

DOCUMENT TITLE

INSPECTION & TEST PLAN FOR ELECTRICAL


INSP 99012 999 8700 0004 DOCUMENT No. 4 REV IAFD STATUS NONE SCALE 2 CLASS 1/23 PAGE

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES INSPECTION & TEST PLAN FOR ELECTRICAL
Job No. : 99012 Doc No. : INSP 99012 999 Page : 2/23 Rev. 4

8700 0004

TABULATION OF REVISED PAGES


PAGE

Rev.1

Rev.2 X X X

Rev.3 X X X X X X X X X X X X X X X X X X X X X

Rev.4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

X X

X X

X X X X X X X

X X

Rev.1 45 46 47 X 48 X 49 X 50 X 51 X 52 X 53 X 54 X 55 X 56 X 57 X 58 X 59 X 60 X 61 X 62 X 63 X 64 X 65 X 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
PAGE

Rev.2 X X X X X

Rev.3

Rev.4

INSPECTION & TEST PLAN FOR ELECTRICAL

Job No. : 99012 Doc No. : INSP 99012 999

Page : 3/23 Rev. 4

8700 0004

CONTENTS
A. EARTHING AND LIGHTNING INSTALLATION ---------------------------------------B. CABLE LADDER INSTALLATION --------------------------------------------------------C. CABLE INSTALLATION ---------------------------------------------------------------------D. EQUIPMENT INSTALLATION -------------------------------------------------------------E. LIGHTING AND SMALL POWER INSTALLATION ----------------------------------F. HEAT TRACING INSTALLATION --------------------------------------------------------G. CATHODIC PROTECTION INSTALLATION ------------------------------------------H. TELECOMMUNICATION INSTALLATION --------------------------------------------PAGE 4 PAGE 6 PAGE 8 PAGE 11 PAGE 18 PAGE 20 PAGE 22 PAGE 23

NOTE : COMPANY reserves the right to increase surveillance from SW to W and from W to H depending on results of site surveillance activities. COMPANY shall be notified of inspection points by CONTRACTOR at least 3 days in Advance of the Activity

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Earthing and Lightning Installation

4 4 OF 23 REMARK

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY

A 1

EARTHING AND LIGHTNING INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Damage Review the Test Report Earthing Installation Cable Type/Size Location & Routing Bolts and Nuts Tighting Compression Type Connection RP 5561V 999 1620 001 Related DWG SP-COM-511 Related STD : IEC 364 CPX26 W W W W SW SW SW SW SW SW SW SW PP 99012 999 0001 550 RP 5561V 999 1630 029 QP 550 002 SW SW R SW SW R

1.1 1.2

1.3 2 2.1 2.2 2.3 2.4

LEGEND :

R : Review

SW : Spot Witness

W : Witness H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Earthing and Lightning Installation

4 5 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

Test Continuity Test Earthing Resistance Test RP 5561V 999 1620 001 TPX26 W H SW W SW W

3.1 3.2

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Cable Ladder Installation

4 6 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

B 1

CABLE LADDER INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Damage & Sharp Edge Review the Related Document Cable Ladder Installation Related DWG Proper Type / Size Cable Ladder Location / Routing Cable Ladder Damage, Sharp Edge, Burr RP 5561V 999 1630 007 RP 5561V 999 1620 001 W W W SW SW SW SW W SW CPX30 PP 99012 999 0001 550 Related DWG QP 550 002 SW SW R -

1.1 1.2 1.3 2 2.1 2.1 2.3 LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2


SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Cable Ladder Installation

4 7 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

Support(Type/Size/Welding/Anchoring ) Coating(touch up paint) on cut end & damage Portions Earthing / Bonding Final Inspection 2.4 2.5 2.6 2.7 LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

W W W W

SW SW SW W

W W SW W

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Cable Installation

4 8 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

C 1 1.1 1.2 1.3 2 2.1 2.2 2.3 2.4

CABLE INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Cable Damage Review the Related Test Record Cable Installation Cable Type / Size / Routing Cable Arrangement Cable Damage Cable Pulling Tension RP 5561V 999 1630 008 Related DWG RP 5561V 999 1630 007 CPX08 (HV cable) CPX09(LV power/control) W W W SW SW SW SW SW SW SW SW SW PP 99012 999 0001 550 RP 5561V 999 1630 029 QP 550 002 SW SW R SW -

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Cable Installation

4 9 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

2.5

Cable Installation(In Cable Trenches) - Cable Trenches Preparation - Cable Segregation - Sand Bedding and Depth Cable Termination Crimping Lug or Plug Size / Bolting Cable Bending Radius Gland , Fitting ID Marker & Wire ID Marker Cable Splicing( If required )

RP 5561V 999 1630 029 W W W CPX08 (HV cable) CPX09(LV power/control) W SW SW W W SW

W W W W H

SW SW SW SW W

SW SW SW SW W

3 3.1 3.2 3.3 3.4 3.5

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Cable Installation

4 10 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

4 4.1

Cable Test SP-COM-511 Above 1000V Cable - Continuity Test - Insulation Resistance Test - High-Voltage Test Up to 1000 V Cable - Continuity Test - Insulation Resistance Test TPX09 W H W W W W RP 5561V 999 1630 029 TPX08 H H H W H H W W H

4.2 LEGEND : R : Review SW : Spot Witness W : Witness H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Equipment Installation

4 11 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

D 1

EQUIPMENT INSTALLATION Equipment Verification(Receiving Inspection) Verify the Equipment Type/Size/Quantity Check the Physical Damage Review the Related Document Generator Installation Foundation/Level/Alignment Anchor Bolt Setting Vendor Spec Physical Damage/Loose Parts W W Related DWG RP 5561V 999 1630 033 CPX01 W H W W PP 99012 999 0001 550 RP 5561V 999 1630 007 QP 550 002 SW SW R SW -

1.1 1.2 1.3

2 2.1 2.2 2.3

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Equipment Installation

4 12 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

Earthing / Bonding Cleaning Electrical Test Power Transformer Installation Location/Foundation/Level/Alignment Anchor Bolt Setting Physical Damage/Loose Parts Vendor Spec Bushing joint / Seal 2.4 2.5 2.6 3 3.1 3.2 3.3 3.4 LEGEND : R : Review SW : Spot Witness W : Witness H : Hold RP 5561V 999 1630 007 RP 5561V 999 1630 021 CPX02 SP-COM-511 TPX01

W W H

W SW W

W SW W

H W H W

W SW W W

W SW W W

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Equipment Installation

4 13 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

Oil Level / No Leak Tap change mechanism Earthing / Bonding Electrical Test - HV Transformer - LV Transformer 3.5 3.6 3.7 3.8 SP-COM-511 Vendor Spec TPX02 TPX03

W W W

W SW SW

W W W

H W

H W

H W

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Equipment Installation

4 14 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

4.

Bus Duct Installation Bus Duct Location / Routing Support Type/Foundation/Welding/Anchoring

Related DWG CPX07 RP 5561V 999 1630 007 Vendor Spec W W W H W W SP-COM-511 TPX07 H SW SW SW W SW SW W W SW SW W W SW W

Bus Duct Level / Alignment Bus Bar Connection(Bolt tighting) Earthing / Bonding Cleaning Electrical Test 4.1 4.2 4.3 4.4 4.5 4.6 4.7

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Equipment Installation

4 15 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

HV/LV SWITCHGEAR/MCC Installation Location / Level / Foundation Support /Welding/Anchoring/Bolting Alignment of Total Board Bus Bar Connection Physical Damage

Related DWG RP 5561V 999 1630 007 RP 5561V 999 1630 022 RP 5561V 999 1630 023 Vendor Spec

CPX04(HV) CPX05(LV) W W H H W H W TPX04(HV) W H SW SW SW W SW SW W SW H W SW SW SW SW W W SW H

Earthing / Bonding Mechanical operation & CTs data Cleaning Electrical Test 5.1 5.2 SP-COM-511

TPX05(LV)

5.3 5.4 5.5 5.6 5.7 5.8 5.9

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Equipment Installation

4 16 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

Battery/Charger/Inverter Installation Location / Level / Foundation Support /Welding/Anchoring/Bolting Number of Cells Inter-connected Polarity of Interconnections between Cells Bolts, Nuts Washer Assembly Tighting

Related DWG RP 5561V 999 1630 007 RP 5561V 999 1630 025 RP 5561V 999 1630 026 Vendor Spec

CPX16/17 W W W W W W SW SW W W SW SW SW SW W W SW W W SW SW W SW W

Physical Damage SP-COM-511 Earthing / Bonding Cleaning Electrical Test 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 TPX16/17

W W H

6.9

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Equipment Installation

4 17 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

Miscellaneous Equipment Installation (LV DB, Control Station, NER, Control Panel, etc) Name Plate Location / Level / Foundation Support /Welding/Anchoring/Bolting

Related DWG RP 5561V 999 1630 007 RP 5561V 999 1630 008 Vendor Spec

CPX06/15/21/ 23/24/32 W W W W W W SW SW SW SW SW SW W SW SW SW SW SW SW W

Bolts, Nuts Washer Assembly Tighting MCBs rating Physical Damage Electrical Test 7.1 7.2 7.3 7.4 7.5 7.6 7.7 LEGEND : SP-COM-511

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Lighting and Small Power Installation

4 18 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

E 1 1.1 1.2 1.3 2 2.1 2.2

LIGHTING AND SMALL POWER INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Physical Damage Review the Related Document Lighting and Small Power Installation Lighting Distribution Board Installation Lighting Fixture / Power Socket / Welding Socket Installation - Raceway installation R : Review SW : Spot Witness Related DWG RP 5561V 999 1640 001 RP 5561V 999 1630 029 W : Witness CPX 15 CPX18/19/25 W H : Hold FORM NO. QP 545 002 2 SW SW W W W RP 5561V 999 1640 001 QP 550 002 SW SW R SW SW -

LEGEND :

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Lighting and Small Power Installation

4 19 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

- Cable / Wire installation - Lighting Fixture / Power Socket / Welding Socket Installation - Final inspection Test

RP 5561V 999 1640 001

W W W

SW SW W

SW SW W

SP-COM-511 Continuity Test Insulation Resistance Test RP 5561V 999 1630 029 RP 5561V 999 1640 001 TPX18/19/25 H H W W W W

3.1 3.2

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Heat Tracing Installation

4 20 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

F 1

HEAT TRACING INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Vendor spec Check the Physical Damage Review the Related Document Heat Tracing Installation Heating Cable Installation - Cable Type / Size / Route - Cable Tie or Tape Binding RP 5561V 999 1630 007 Related DWG Vendor spec SW R SW RP 5561V 999 1630 007 QP 550 002 SW -

CPX22 W SW SW

1.1 1.2 1.3 2 2.1

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Heat Tracing Installation

4 21 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

Accessory(Junction Box, Thermostats, Sensor) Related DWG Vendor spec Test SP-COM-511 Insulation Resistance Test ( Before insulation ) Insulation Resistance Test ( After insulation) TPX22 RP 5561V 999 1630 007

SW

SW

H H

W W

W W

2.2 3 3.1

3.2 LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Cathodic Protection Installation

4 22 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

G 1

CATHODIC PROTECTION INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Physical Damage Review the Related Document Cathodic Protection Installation CPX33 Anode / Anode Cable Installation Cable connection/bonding Related DWG Test Box, Reference Electrode, etc Vendor spec Electrical test - Loop resistance for anode cable - Potential test for reference cell SP-COM-511 TPX33 W W W W SW W RP 5561V 999 1630 007,1300 082 W W SW W W W Vendor spec RP 5561V 999 1630 017, 1300 082 QP 550 002 SW SW R SW SW -

1.1 1.2

1.3 2 2.1 2.2 2.3 3

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

DISCIPLINE :

ELECTRICAL

ITP No. Rev. No. PAGE

INSP 99012 999 8700 0004

INSPECTION & TEST PLAN FOR SITE

SUBCON

DESCRIPTION OF WORK : Telecommunication Installation

4 23 OF 23

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC. OR PROCEDURE

REPORTING FORMAT

PARTICIPATION BY SUBCON HDEC/ TPA COMPANY REMARK

TELECOMMUNICATION INSTALLATION Above item is separated from ITP for electrical. ITP for telecommunication will be issued later.

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold FORM NO. QP 545 002 2