SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
4 3 2 1 0 REV.
ISSUE OF APPROVED FINAL DOCUMENT ISSUE OF APPROVED FINAL DOCUMENT APPROVED FOR CONSTRUCTION APPROVED FOR CONSTRUCTION ISSUED FOR APPROVAL DESCRIPTION
DOCUMENT TITLE
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES INSPECTION & TEST PLAN FOR ELECTRICAL
Job No. : 99012 Doc No. : INSP 99012 999 Page : 2/23 Rev. 4
8700 0004
Rev.1
Rev.2 X X X
Rev.3 X X X X X X X X X X X X X X X X X X X X X
Rev.4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
X X
X X
X X X X X X X
X X
Rev.1 45 46 47 X 48 X 49 X 50 X 51 X 52 X 53 X 54 X 55 X 56 X 57 X 58 X 59 X 60 X 61 X 62 X 63 X 64 X 65 X 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
PAGE
Rev.2 X X X X X
Rev.3
Rev.4
8700 0004
CONTENTS
A. EARTHING AND LIGHTNING INSTALLATION ---------------------------------------B. CABLE LADDER INSTALLATION --------------------------------------------------------C. CABLE INSTALLATION ---------------------------------------------------------------------D. EQUIPMENT INSTALLATION -------------------------------------------------------------E. LIGHTING AND SMALL POWER INSTALLATION ----------------------------------F. HEAT TRACING INSTALLATION --------------------------------------------------------G. CATHODIC PROTECTION INSTALLATION ------------------------------------------H. TELECOMMUNICATION INSTALLATION --------------------------------------------PAGE 4 PAGE 6 PAGE 8 PAGE 11 PAGE 18 PAGE 20 PAGE 22 PAGE 23
NOTE : COMPANY reserves the right to increase surveillance from SW to W and from W to H depending on results of site surveillance activities. COMPANY shall be notified of inspection points by CONTRACTOR at least 3 days in Advance of the Activity
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 4 OF 23 REMARK
NO.
REPORTING FORMAT
A 1
EARTHING AND LIGHTNING INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Damage Review the Test Report Earthing Installation Cable Type/Size Location & Routing Bolts and Nuts Tighting Compression Type Connection RP 5561V 999 1620 001 Related DWG SP-COM-511 Related STD : IEC 364 CPX26 W W W W SW SW SW SW SW SW SW SW PP 99012 999 0001 550 RP 5561V 999 1630 029 QP 550 002 SW SW R SW SW R
1.1 1.2
LEGEND :
R : Review
SW : Spot Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 5 OF 23
NO.
REPORTING FORMAT
Test Continuity Test Earthing Resistance Test RP 5561V 999 1620 001 TPX26 W H SW W SW W
3.1 3.2
LEGEND :
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 6 OF 23
NO.
REPORTING FORMAT
B 1
CABLE LADDER INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Damage & Sharp Edge Review the Related Document Cable Ladder Installation Related DWG Proper Type / Size Cable Ladder Location / Routing Cable Ladder Damage, Sharp Edge, Burr RP 5561V 999 1630 007 RP 5561V 999 1620 001 W W W SW SW SW SW W SW CPX30 PP 99012 999 0001 550 Related DWG QP 550 002 SW SW R -
1.1 1.2 1.3 2 2.1 2.1 2.3 LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
DISCIPLINE :
ELECTRICAL
SUBCON
4 7 OF 23
NO.
REPORTING FORMAT
Support(Type/Size/Welding/Anchoring ) Coating(touch up paint) on cut end & damage Portions Earthing / Bonding Final Inspection 2.4 2.5 2.6 2.7 LEGEND : R : Review SW : Spot Witness W : Witness H : Hold
W W W W
SW SW SW W
W W SW W
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 8 OF 23
NO.
REPORTING FORMAT
CABLE INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Cable Damage Review the Related Test Record Cable Installation Cable Type / Size / Routing Cable Arrangement Cable Damage Cable Pulling Tension RP 5561V 999 1630 008 Related DWG RP 5561V 999 1630 007 CPX08 (HV cable) CPX09(LV power/control) W W W SW SW SW SW SW SW SW SW SW PP 99012 999 0001 550 RP 5561V 999 1630 029 QP 550 002 SW SW R SW -
LEGEND :
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 9 OF 23
NO.
REPORTING FORMAT
2.5
Cable Installation(In Cable Trenches) - Cable Trenches Preparation - Cable Segregation - Sand Bedding and Depth Cable Termination Crimping Lug or Plug Size / Bolting Cable Bending Radius Gland , Fitting ID Marker & Wire ID Marker Cable Splicing( If required )
W W W W H
SW SW SW SW W
SW SW SW SW W
LEGEND :
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 10 OF 23
NO.
REPORTING FORMAT
4 4.1
Cable Test SP-COM-511 Above 1000V Cable - Continuity Test - Insulation Resistance Test - High-Voltage Test Up to 1000 V Cable - Continuity Test - Insulation Resistance Test TPX09 W H W W W W RP 5561V 999 1630 029 TPX08 H H H W H H W W H
4.2 LEGEND : R : Review SW : Spot Witness W : Witness H : Hold FORM NO. QP 545 002 2
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 11 OF 23
NO.
REPORTING FORMAT
D 1
EQUIPMENT INSTALLATION Equipment Verification(Receiving Inspection) Verify the Equipment Type/Size/Quantity Check the Physical Damage Review the Related Document Generator Installation Foundation/Level/Alignment Anchor Bolt Setting Vendor Spec Physical Damage/Loose Parts W W Related DWG RP 5561V 999 1630 033 CPX01 W H W W PP 99012 999 0001 550 RP 5561V 999 1630 007 QP 550 002 SW SW R SW -
LEGEND :
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 12 OF 23
NO.
REPORTING FORMAT
Earthing / Bonding Cleaning Electrical Test Power Transformer Installation Location/Foundation/Level/Alignment Anchor Bolt Setting Physical Damage/Loose Parts Vendor Spec Bushing joint / Seal 2.4 2.5 2.6 3 3.1 3.2 3.3 3.4 LEGEND : R : Review SW : Spot Witness W : Witness H : Hold RP 5561V 999 1630 007 RP 5561V 999 1630 021 CPX02 SP-COM-511 TPX01
W W H
W SW W
W SW W
H W H W
W SW W W
W SW W W
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 13 OF 23
NO.
REPORTING FORMAT
Oil Level / No Leak Tap change mechanism Earthing / Bonding Electrical Test - HV Transformer - LV Transformer 3.5 3.6 3.7 3.8 SP-COM-511 Vendor Spec TPX02 TPX03
W W W
W SW SW
W W W
H W
H W
H W
LEGEND :
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 14 OF 23
NO.
REPORTING FORMAT
4.
Related DWG CPX07 RP 5561V 999 1630 007 Vendor Spec W W W H W W SP-COM-511 TPX07 H SW SW SW W SW SW W W SW SW W W SW W
Bus Duct Level / Alignment Bus Bar Connection(Bolt tighting) Earthing / Bonding Cleaning Electrical Test 4.1 4.2 4.3 4.4 4.5 4.6 4.7
LEGEND :
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 15 OF 23
NO.
REPORTING FORMAT
HV/LV SWITCHGEAR/MCC Installation Location / Level / Foundation Support /Welding/Anchoring/Bolting Alignment of Total Board Bus Bar Connection Physical Damage
Related DWG RP 5561V 999 1630 007 RP 5561V 999 1630 022 RP 5561V 999 1630 023 Vendor Spec
Earthing / Bonding Mechanical operation & CTs data Cleaning Electrical Test 5.1 5.2 SP-COM-511
TPX05(LV)
LEGEND :
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 16 OF 23
NO.
REPORTING FORMAT
Battery/Charger/Inverter Installation Location / Level / Foundation Support /Welding/Anchoring/Bolting Number of Cells Inter-connected Polarity of Interconnections between Cells Bolts, Nuts Washer Assembly Tighting
Related DWG RP 5561V 999 1630 007 RP 5561V 999 1630 025 RP 5561V 999 1630 026 Vendor Spec
CPX16/17 W W W W W W SW SW W W SW SW SW SW W W SW W W SW SW W SW W
Physical Damage SP-COM-511 Earthing / Bonding Cleaning Electrical Test 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 TPX16/17
W W H
6.9
LEGEND :
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 17 OF 23
NO.
REPORTING FORMAT
Miscellaneous Equipment Installation (LV DB, Control Station, NER, Control Panel, etc) Name Plate Location / Level / Foundation Support /Welding/Anchoring/Bolting
Related DWG RP 5561V 999 1630 007 RP 5561V 999 1630 008 Vendor Spec
CPX06/15/21/ 23/24/32 W W W W W W SW SW SW SW SW SW W SW SW SW SW SW SW W
Bolts, Nuts Washer Assembly Tighting MCBs rating Physical Damage Electrical Test 7.1 7.2 7.3 7.4 7.5 7.6 7.7 LEGEND : SP-COM-511
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 18 OF 23
NO.
REPORTING FORMAT
LIGHTING AND SMALL POWER INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Physical Damage Review the Related Document Lighting and Small Power Installation Lighting Distribution Board Installation Lighting Fixture / Power Socket / Welding Socket Installation - Raceway installation R : Review SW : Spot Witness Related DWG RP 5561V 999 1640 001 RP 5561V 999 1630 029 W : Witness CPX 15 CPX18/19/25 W H : Hold FORM NO. QP 545 002 2 SW SW W W W RP 5561V 999 1640 001 QP 550 002 SW SW R SW SW -
LEGEND :
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 19 OF 23
NO.
REPORTING FORMAT
- Cable / Wire installation - Lighting Fixture / Power Socket / Welding Socket Installation - Final inspection Test
W W W
SW SW W
SW SW W
SP-COM-511 Continuity Test Insulation Resistance Test RP 5561V 999 1630 029 RP 5561V 999 1640 001 TPX18/19/25 H H W W W W
3.1 3.2
LEGEND :
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 20 OF 23
NO.
REPORTING FORMAT
F 1
HEAT TRACING INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Vendor spec Check the Physical Damage Review the Related Document Heat Tracing Installation Heating Cable Installation - Cable Type / Size / Route - Cable Tie or Tape Binding RP 5561V 999 1630 007 Related DWG Vendor spec SW R SW RP 5561V 999 1630 007 QP 550 002 SW -
CPX22 W SW SW
LEGEND :
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 21 OF 23
NO.
REPORTING FORMAT
Accessory(Junction Box, Thermostats, Sensor) Related DWG Vendor spec Test SP-COM-511 Insulation Resistance Test ( Before insulation ) Insulation Resistance Test ( After insulation) TPX22 RP 5561V 999 1630 007
SW
SW
H H
W W
W W
2.2 3 3.1
3.2 LEGEND :
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 22 OF 23
NO.
REPORTING FORMAT
G 1
CATHODIC PROTECTION INSTALLATION Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity Check the Physical Damage Review the Related Document Cathodic Protection Installation CPX33 Anode / Anode Cable Installation Cable connection/bonding Related DWG Test Box, Reference Electrode, etc Vendor spec Electrical test - Loop resistance for anode cable - Potential test for reference cell SP-COM-511 TPX33 W W W W SW W RP 5561V 999 1630 007,1300 082 W W SW W W W Vendor spec RP 5561V 999 1630 017, 1300 082 QP 550 002 SW SW R SW SW -
1.1 1.2
LEGEND :
R : Review
SW : Spot Witness
W : Witness
SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES
DISCIPLINE :
ELECTRICAL
SUBCON
4 23 OF 23
NO.
REPORTING FORMAT
TELECOMMUNICATION INSTALLATION Above item is separated from ITP for electrical. ITP for telecommunication will be issued later.