Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT.

PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

3of503of503of50

TABLE OF CONTENT
Page

1. GENERAL
1.1. 1.2. 1.3. 1.4. 2. 2.1. 2.2. 3. 3.1. 3.2. 3.3. 3.4. 3.5. 3.6. 3.7. 3.8. 3.10. 4. 4.1. 4.2. 4.3. 4.4. 4.5. 4.6. 4.7. 5. 5.1. 5.2. 5.3. 5.4. 5.5. SCOPE OF WORK REFERENCE BASIC ASSUMPTION DESIGN CRITERIA DATA INFORMATION DIMENSION OF SHIP TIDAL RANGE BREASTING DOLPHIN DIMENSION OF BREASTING DOLPHIN PRIMARY LOAD BREASTING LOAD COMBINATION CHECK STRESS RATIO & DEFLECTION CHECK CORROSION ANALYSIS MARINE GROWTH ANALYSIS DESIGN DIMENSION OF FENDER DISTANCE BETWEEN THE FENDER FOUNDATION DESIGN MOORING DOLPHIN DIMENSION OF MOORING DOLPHIN LOAD MOORING DOLPHIN LOAD COMBINATION CHECK STRESS RATIO & DEFLECTION CORROSION ANALYSIS REINFORCING CONCRETE DESIGN FOUNDATION DESIGN MAIN JETTY DIMENSION OF MAIN JETTY LOAD MAIN JETTY LOAD COMBINATION CHECK STRESS RATIO & DEFLECTION CORROSION ANALYSIS ATTACHMENT I II III IV V VI VII

4
4 4 4 5 6 6 6 7 7 8 19 22 24 26 28 28 29 30 32 32 32 34 34 34 34 34 35 35 35 42 44 32

3.9. REINFORCING CONCRETE DESIGN

LAY OUT JETTY 64 MODIFICATION BASED ON SN#24 LOCATION OF JETTY 64 3D VIEW MAIN JETTY, MOORING & BREASTING DOLPHIN DATA BORE HOLE OF JETTY 64 AREA GENERAL ATTACHMENT INPUT CALCULATION STAADPRO (Breasting Dolphin, Mooring Dolphin & Main Jetty) CALCULATION FOR THE STEEL REINFORCEMENT BETWEEN PILE CAP AND STEEL PIPE PILE

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

4of504of504of50

1. G E N E R A L 1.1. SCOPE OF WORK This calculation is made to determine the detailed design of infrastructure offshore Jetty 64 Modification. It consists of Mooring Dolphin ,Breasting Dolphin & Main Jetty for Resid Fluid Catalytic Cracking (RFCC) Project Pertamina (Persero), Cilacap Central Java, Indonesia. 1.2. REFERENCE 1.2.1 DOCUMENT REFERENCE The listed below documents are information of lay out drawings which are utilized as reference for this document : - Suplementary Notice Cilacap Resid fluid Catalytic Cracking (RFCC) Project, Number SN-024. - Report on Modification of Jetty#64 & #68, Doc No: 000-T7605/001 - Soil Investigation Cilacap RFCC Project for Jetty Area at Pertamina RU-IV Cilacap-Central Java. Job No:2724. - Design Specification for Civil and Structural Engineering Specification for Design Load (RFCC-C-CV-SP-001) Engineering Specification for Reinforced Concrete Structure Reinf (RFCC-C-CV-SP-003) Engineering Specification for Concrete Foundation (RFCC-C-CV-SP-004) Specification for Marine Concrete and Steel Piling (RFCC-A-CV-SP-002)

1.2.2 CODE & STANDARD The listed below documents are applicable codes, to be used to support this calculation. - OCDI, Technical Standards and Commentaries for Port and Harbour Facilities in 'Japan,2002 - BS 6349-4, Maritime Structure Part4: Code of practice for design of fendering & Mooring systems, 1994 - OCIMF publication: "Guide Line & Recommendations for the safe mooring of large ship at pier & sea island" - API-RP 2A, "Recommended Practice for Plannig, Designing, Contructing of Fixed Offshore Patform". - Building Code Requirements in Reinforced Concrete (ACI-318M-02) - Standar Nasional Indonesia Design Method of Earthquake Resistance for Buildigs (SNI 03-1726-2002) - Minimum Design Loads for Buildings and others structure (ASCE/SEI 7-05) - AISC, "Manual of Steel Construction: Allowable Stress Design 9th edition" 1.3. BASIC ASSUMPTIONS - For member design loading combinations refering to Building Code Requirements in Reinforced Concrete (ACI-318M) are applied. In the permanent condition, stresses due to external load shall not more than allowable stresses.But for temporary condition allowable stresses can be increased by 33,33%.

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

5of505of505of50

1.4. DESIGN CRITERIA 1.4.1 MATERIAL Classification and engineering properties of major material to be used for this Jetty 64 structure are listed below : Ref: Engineering Specification For Reincforced Concrete Structure(Ref: RFCC-C-CV-SP- Concrete: 003) 2 Concrete for structure (fc') = 310 kg/cm Cement: Portland Cement Type 1 as per ASTM C150 or equivalent and plus fly ash. Agregat size : 20mm (Min). ASTM C33 or equivalent. - Reinforcement: -Steel Pipe Pile: ASTM A615M Grade 60, JIS G3122 SD390, or equivalent 4000 kg/cm2

(ASTM A252 Grade2) Ref :Specification for Marine Concrete and Steel Piling (RFCC-A-CVSP-002) Yield strength Tensile strength = = 2460.7 kg/cm2 4218.4 kg/cm2 35000 psi 60000 psi

-Steel : Structural Steel Shapes and Plates ASTM A36 : Yield strength Tensile strength Structural Steel pipes ASTM A53 : Yield strength Tensile strength 1.4.2 LOADING PRIMARY LOAD Reference: OCIMF, Table 31F-3-13 Service or ASD load factors for Load Combination = = = = = 2460.7 kg/cm2 4218.4 kg/cm
2

2531.1 kg/cm2 4218.4 kg/cm


2

36000 psi 60000 psi 35000 psi 60000 psi

- DL (Dead Load) - LL (Live Load) - CX (Current Load - X) - CZ (Current Load - Z) - WX (Wave Load - X) - WZ (Wave Load - Z) - EX (Seismic Load - X) - EZ (Sesimic Load - Z) - Fe (Fender Load) - B (Bollard Load)

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

6of506of506of50

LC for check stress ratio

Reference: OCIMF, Table 31F-3-13 Service or ASD load factors for Load

LOADING PLATFORM/ DOLPHIN CONDITION: LC 1 = DL + LL + WAVE LOAD DIR X + CURRENT LOAD DIR X + BOLLARD + FENDER LC 2 = DL + LL + WAVE LOAD DIR Z + CURRENT LOAD DIR Z + BOLLARD + FENDER

EARTHQUAKE CONDITION: LC3 = 1.35 DL + 0.7 seismic load-X LC4 = 1.35 DL + 0.7 seismic load-Z Earthquake Load = DL + 0.25 LL

LC for check reinforcement

Reference: OCIMF, Table 31F-3-12 Service or LRFD load factors for Load

LOADING PLATFORM/ DOLPHIN CONDITION: LC 5 = 1.4DL+1.7LL+1.3(WAVE LOAD DIR X + CURRENT LOAD DIR X)+1.3MOORING & BREASTING LOA LC 6 = 1.4DL+1.7LL+1.3(WAVE LOAD DIR Z + CURRENT LOAD DIR Z)+1.3MOORING & BREASTING LOAD

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

7of507of507of50

2. 2.1

DATA INFORMATION DIMENSION OF SHIP Tab A. Vessel Particular for Jetty 64 TANKER SIZE (DWT) LOA (m) Draft (m) Beam (m) 700 54.20 4.00 11.80 3000 87.20 5.40 13.30 4500 98.50 6.20 15.70 4500 (LPG) 102 6.20 16.30

NO 1 2 3 4

Remarks 64 64 64 64

(reference: Report on Modification of Jetty #64 & 68, Doc No: 000-T7605/001)

2.2

TIDAL RANGE

TOP OFBREASTINGDOLPHIN=2m MHWS=1.15m MSL=0.00m MLWS=1.045m KEEL BARGE SEABED= VARIES

Tab.BBathymetricSurvey

BathymetricSurveyforCilacapRFCCProject.Cilacap,Central Java,Indonesia
- Using Reference Elevation MSL = 0 for Design HWS = 1.115 m MSL = 0.000 m LWS = -1.05 m - For Design Elevation Top of Jetty (TOJ) (assume. Freeboard of ship 0.8 ~ 1.5) TOJ = EL. HWS + 0.90 TOJ = 2.0 m - For Design Seabed of Jetty based on LWS Condition Seabed = EL.LWS + Draft of Ship + clearance (0.5-1m) Seabed Design = 7.7 m

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

8of508of508of50

3. 3.1

BREASTING DOLPHIN (Type BD-1, BD-2 & BD-3, equal dimension) DIMENSION OF BREASTING DOLPHIN 0.8m 2.4m 0.8m 0.8m 1.2m B 1.2m 0.8m L Plan Section
Front View

1.5m

Side View

Back View

Front View

notes: B= L= H=

4 4 1.5

m m m

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

9of509of509of50

3.2

PRIMARY LOAD BREASTING DOLPHIN

3.2.1 DEAD LOAD & SELFWEIGHT (DL)

(VerticalDirection) *TotalSelftWeightbySTAADpro *TotalFenderWeight FenderWeight(assumeSCN800=606kg) FrontalframeWeight(H2xB1xt0.15x7.85)

66.24 ton 3.86 ton ton (See General Attachment. V 0.61 Fentek Catalogue) 3.26 ton

*TotalWalkway(seecalculationforwalkwayRFCCA64CV CS028B)

9.12 ton
4.56 ton (Point Load)

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

10of5010of5010of50

(VerticalDirection) *TotalBollardWeight

35.00 ton

3.2.2 LIVE LOAD (LL) - Breasting dolphin Load - BD Area (4mx4m) - Point Load Breasting Dolphin 2 2 (1.5ton/m x 16m ) / 6 point
2 1.5 ton/m (Ref: Doc No.RFCC-A-CV-SP-002, page 7) 2 16 m

4.00 ton (Point Load)

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

11of5011of5011of50

3.2.3 SEISMIC LOAD SEISMIC DESIGN (S)

= DEAD LOAD + 0.25 LIVE LOAD = 115.66 ton = 19.28 ton/node

The site is covered by Zone 4 with the base ground acceleration 0.20g (SNI-1726-2002) Total base shear load force shall be calculated using following formula : V = Cd x Wt = (C1 x I / R) x Wt where : V = total base shear load (ton) Soil type = Soft soil(SE) (Tab.13, Page24, Soil Invest) (SNI-1726-2002, Tab.5, Page 19) (SNI-1726-2002, Tab.1, Page12) (SNI-1726-2002,Tab.6.Page21) (SNI-1726-2002,Tab.3.Page16)

Z = zone factor (for zone 4) = 0.2 I = seismic importance factor = 1.5 = seismic coefficient (from spectrum C1 = 0.85 diagram) = 8.5 R = numerical coefficient (for Concrete OMRF = Ordinary Moment Resisting Frame) Fx = (V-Ft).wi.hi wi.hi
note N Node fy (ton) wi (ton) hi (m) wi*hi (tonm)

wi*hi/S(wi* hi)

Fx (ton)

BD

19.28

19.28 115.66

17.62

339.66 2037.96

0.167

17.35

2.89

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

12of5012of5012of50

3.2.4

CURRENT & WAVE LOAD For Current - Drag Force Fd = 1/2 Cd A U^2 (OCDI 1999, Page 138) where : Fd = drag force acting on the object in the direction of the current (kN) = density of sea water = 1.026 t/m3 Cd = drag coefficient, (OCDI 1999, Tab T-7.2.1. Drag Coeff) = 1

D= A= U= Fd = Fd = Fd =

0.609 1.91226 2 1.03 1.04 0.10 0.01

m (Diameter Pile) 2 mm (Projected area of the in the direction of the current (m )) knots (flow velocity) 2 m/s kN ton (Point Load) ton/m (Member Load)

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

13of5013of5013of50

- Inertia Force 2 FL = 1/2 CL 0ALU (OCDI1999,Page139) where: FL= lift force acting on the object in the direction perpendicular to the current (kN) CL = lift coefficient (OCDI 1999, Tab. T-5.4.1) = 2

AL = projected area of the object in the direction perpendicular to the current (m2) FL = 2.1 kN FL = 0.2 ton (Point Load) FL = 0.03 ton/m (Member Load) For Wave: - Drag Force Fd = 1/2 Cd A U^2 (OCDI 1999, Page 138) where : Fd = drag force acting on the object in the direction of the current (kN) = density of sea water = 1.026 t/m3 Cd = drag coefficient, (OCDI 1999, Tab T-7.2.1. Drag Coeff) = 1

D= A= U= Fd = Fd =

0.609 1.91226 2 1.03 1.04 0.10

m (Diameter Pile) 2 mm (Projected area of the in the direction of the current (m )) knots (wave velocity) 2 m/s kN ton

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

14of5014of5014of50

- Inertia Force 2 FL = 1/2 CL 0ALU (OCDI1999,Page139) where: FL= lift force acting on the object in the direction perpendicular to the current (kN) CL = lift coefficient (OCDI 1999, Tab. T-5.4.1) = 2

AL = projected area of the object in the direction perpendicular to the current (m2) FL = 2.1 kN FL = 0.2 ton

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

15of5015of5015of50

3.2.5 FENDER LOAD (Fe) - Check Displacement of Ship (type Oil tankers) Log(Wa)= 0.332+0.956 log(DWT) Log (DWT) = Log (Wa) = (Wa) = (See General attachment-V Ref: OCDI, Technical Standards and Commentaries for Port and Harbour Facilities in 'Japan,2002, page 17)

3.65 3.82 6607 ton displacement

- Check Berthing Energy & Dimesion of fender design (See General attachment-V Ref: BSI Standard part 4, page 6)

Ef = Wa x Cm x Ce x Cc x Cs (V sin )2 f = Ef / Where: Acceleration gravity (g) = 9.8 m/s


2

6607 Ton

(D)Ship= (B)Ship= (LOA)ship=

6.20 m (for design) 16.30 m (for design) 102 m (for design)

Berthing Speed of the Ship (V) = Virtual mass factor (Cm) = =


2 2

0.2 m/s (See attach -V Ref: BSI Standard part 4, page 4) 1+2D/B (See attach -V Ref: BSI Standard part 4, page 5) 1.76
2 2 2

Eccentricity factor (Ce) = (K +R cos )/(K +R ) 0.98 (See attach -V Ref: BSI Standard part 4, page 5) Radius of rotation of the vessel (K) = (0.19Cb+0.11)LOA(Ref:BSIStandardpart4,page5) = 28 0.85 (Ref: BSI Standard part 4, Table 3, page 6) (Cb) = Assume Distance of the line paralleled to jetty measured from the (R) = 19.7 vessel center of gravity to the point of contac (usually 1/4 -1/5 of the vessel's length) Cc = 1 Berth configuation factor (Ref: OCDI, 2002, page 16) Cs = 0.9 Softerner Factor (Ref: BSI Standard part 4, page 6) cos 15 deg = 0.97 sin 15 deg = 0.26 The angle of approach with SF = 2 (PIANC 2002, table 4.2.5) H fender design = 800 mm (See General Attachment-V. Fentek Catalogue) = = 50% H (Ref: BSI Standard Table 5, Page 21) 0.4 m

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

16of5016of5016of50

Normal Energy = Abnormal Berthing Energy Ef x SF = Reactive Force = Reactive Force / 6 pile =

9.75 19.50 24.38 4.06

tm tm t t

3.2.6 MOORING LOAD (Fe)

SpringLinerequirementsforBrestingDolphin: SxMBL= (0.498Atb+0.04613TLOA)/(0.9x0.55) 342.6638 kN 34.941974 ton where: S= 2 (Totalnumberofspringlines) MBL= minimumbreakingloadofeachline MBL= 17.471 ton <35ton ResultOK MBL= 171.332 kN

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

17of5017of5017of50

3.3

LOAD COMBINATION LC for check stress ratio Reference: OCIMF, Table 31F-3-13 Service or ASD load factors for Load

LOADING PLATFORM/ DOLPHIN CONDITION: LC 1 = DL + LL + WAVE LOAD DIR X + CURRENT LOAD DIR X + BOLLARD + FENDER

LC 2 =

DL + LL + WAVE LOAD DIR Z + CURRENT LOAD DIR Z + BOLLARD + FENDER

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

18of5018of5018of50

EARTHQUAKE CONDITION: LC3 = 1.35 DL + 0.7 seismic load-X

LC4 =

1.35 DL + 0.7 seismic load-Z

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

19of5019of5019of50

LC for check reinforcement LC 5 =

Reference: OCIMF, Table 31F-3-12 Service or LRFD load factors for Load

1.4DL+1.7LL+1.3(WAVE LOAD DIR X + CURRENT LOAD DIR X)+1.3MOORING & BREASTING LOA

LC 6 =

1.4DL+1.7LL+1.3(WAVE LOAD DIR Z + CURRENT LOAD DIR Z)+1.3MOORING & BREASTING LOAD

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

20of5020of5020of50

3.4.

CHECK STRESS RATIO & DEFLECTION Check Ratio maximum 0.466 < Allowable Ratio 1

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

21of5021of5021of50

Deflection Check Node 15 17 16 20 19 18 17 16 15 20 19 18 18 15 19 16 20 17 17 16 20 15 19 18 L/C 9 9 9 9 9 9 11 11 11 11 11 11 10 10 10 10 10 10 12 12 12 12 12 12 X-Trans mm 27.41 27.41 27.41 26.87 26.87 26.87 17.28 17.28 17.28 16.81 16.81 16.81 -0.50 -0.31 -0.50 -0.31 -0.50 -0.32 -0.43 -0.42 -0.68 -0.42 -0.67 -0.67 Y-Trans mm -3.33 -1.16 -2.26 0.35 -0.77 -1.84 -3.24 -3.90 -4.50 -0.24 -0.92 -1.53 -0.59 0.36 -0.67 0.27 -0.72 0.22 -1.98 -1.91 -0.91 -1.78 -0.86 -0.74 Z-Trans mm 7.33 7.88 7.61 7.88 7.61 7.33 15.78 15.54 15.30 15.78 15.54 15.30 -5.86 -5.85 -5.76 -5.76 -5.67 -5.67 5.21 5.08 5.21 4.96 5.08 4.96 Absolute mm 28.57 28.54 28.54 28.00 27.93 27.91 23.63 23.57 23.52 23.05 22.91 22.78 5.91 5.87 5.82 5.77 5.74 5.68 5.59 5.44 5.33 5.29 5.20 5.06 X-Rotan rad 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Y-Rotan rad 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Z-Rotan rad 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Deflection Check : 1/300 or less, and more than 25 mm (for vertical) L= L= Y-Trans= 17.6 m 17600 mm -4.50 mm

<

25 mm (Allowable def)

Result OK

Deflection Check : 1/150 or less (for horizontal) X-Trans= Z-Trans= (X2 + Z2)^ 0.5 = L/500 = 27.41 7.33 28.37 mm 117.33 mm

<

117.33 mm (Allowable def)

Result OK

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

22of5022of5022of50

3.5.

CHECK CORROSION ANALYSIS Steel pipe pile exposed to weather coditions undergo corrosion. The rate of corrosion varies depending upon the level of exposure. Following is details of zones, corrosion rate and total corrosion for fifty (25) years design period of structures (Ref. BS 6349) Corrosion Rate (mm/year) 0.01 0.08 0.2 0.09 0.14 Total Corr. 50 years (mm) 0.5 4 10 4.5 3.5

Exposure Zone Below Seabed Contineous Seawater Immersion Zone: - Seabed level to low spring tide level Intertidal Low Water Zone - Low Water at spring and at neap tides Intertidal Zone - Between mean low-water and mean high-water Splash Zone - Between mean high-water to a height depending on mean wave height & exposure to wind Atmospheric Zone - Above splash zone and direct wave or spay impingement is infrequent - CONDITION PILE TOTAL CORR. 25years =(3.5 mm) 1. 610 x (16-3.5)mm 610 x 12.5mm Check Steel Ratio = Ratio < 1 Ratio = 0.602 Result = OK

0.1

SplashZoneArea

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

23of5023of5023of50

Node 15 17 16 20 19 18 17 16 15 20 19

L/C 9 9 9 9 9 9 11 11 11 11 11

X-Trans mm 34.451 34.448 34.45 33.769 33.77 33.769 21.723 21.724 21.724 21.127 21.128

Y-Trans mm -4.101 -1.393 -2.765 0.426 -0.966 -2.306 -3.976 -4.784 -5.548 -0.317 -1.152

Z-Trans mm 8.87 9.555 9.216 9.552 9.216 8.87 19.363 19.063 18.764 19.361 19.063

Absolute mm 35.81 35.776 35.768 35.097 35.018 34.991 29.37 29.295 29.237 28.658 28.48

X-Rotan rad -0.001 -0.001 -0.001 -0.001 -0.001 -0.001 -0.001 -0.001 -0.001 -0.002 -0.002

Y-Rotan rad 0 0 0 0 0 0 0 0 0 0 0

Z-Rotan rad 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

18 18 15 19 16 20 17 17 16 20 15 19 18

11 10 10 10 10 10 10 12 12 12 12 12 12

21.129 0.624 0.391 0.623 0.393 0.623 0.394 0.531 0.53 0.842 0.529 0.841 0.84

1.914 0.735 0.525 0.837 0.412 0.9 0.346 2.38 2.285 1.144 2.139 1.065 0.921

18.763 7.721 7.718 7.601 7.6 7.49 7.487 6.068 5.912 6.066 5.756 5.911 5.754

28.322 7.781 7.746 7.672 7.621 7.57 7.506 6.54 6.36 6.23 6.164 6.065 5.888

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0 0.001 0.001 0 0.001 0.001

0 0 0 0 0 0 0 0 0 0 0 0 0

0.001 0 0 0 0 0 0 0 0 0 0 0 0

Deflection Check : 1/300 or less, and more than 25 mm (for vertical) L= L= Y-Trans= 17.6 m 17600 mm -4.101 mm

<

25 mm (Allowable def)

Result OK

Deflection Check : 1/150 or less (for horizontal) X-Trans= Z-Trans= (X2 + Z2)^ 0.5 = L/150 = 34.45 19.36 39.52 mm 117.33 mm

<

117.33 mm (Allowable def)

Result OK

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

24of5024of5024of50

3.6.

MARINE GROWTH ANALYSIS Marine Growth Rate (mm/year) 50.8

Exposure Zone Splash Zone Area

Assume=

1.5 ton/m3

R1 R2

50.8mm/year MarineGrowthArea

HWL= Seabed= Lmarinegrowth= d1=


D 1= = = R1= A1 = A1 = R 2= A2 = A2 = A= A= A= V= = Weight =

1.15 m from MSL -7.7 m from MSL 8.85 m 610 mm (diameter pile) d1 + (2 x t marine growth) 610 mm + (2 x 50.8mm) 355.8 mm 177.9 3.14 x 355.8^2 397504.03 mm2 305 3.14 x 305^2 292098.5 mm2 A1 - A2 105405.53 mm2 0.11 m2 A x L x 10 year (design) 9.33 m3 13.99 ton

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

25of5025of5025of50

Check Ratio maximum 0.895 < Allowable Ratio 1

Deflection Check Node L/C X-Trans mm 9 9 9 11 11 11 12 12 12 10 10 33.769 33.77 33.77 21.126 21.128 21.13 -0.843 -0.841 -0.84 -0.623 -0.623 Y-Trans Z-Trans Absolute X-Rotan Y-Rotan Z-Rotan rad mm mm mm rad rad -0.138 18.495 38.502 -0.001 0 0.001 -1.532 18.158 38.373 -0.001 0 0.001 -2.87 17.812 38.287 -0.001 0 0.001 -1.078 31.433 37.888 -0.002 0 0.001 -1.917 31.135 37.676 -0.002 0 0.001 -2.675 30.835 37.476 -0.002 0 0.001 -1.904 18.138 18.257 -0.001 0 0 -1.83 17.983 18.096 -0.001 0 0 -1.682 17.826 17.925 -0.001 0 0 -1.464 1.452 2.154 0 0 0 -1.404 1.342 2.039 0 0 0

20 19 18 20 19 18 20 19 18 20 19 18

10

0.623

1.299

1.221

1.889

Deflection Check : 1/300 or less, and more than 25 mm (for vertical) L= 17.6 m L= 17600 mm Y-Trans= -2.675 mm < 25 mm (Allowable def) Deflection Check : 1/150 or less (for horizontal) X-Trans= 33.77 Z-Trans= 38.50 (X2 +Z2)^ 0.5 = 51.21 mm < L/500 = 117.33 mm

Result OK

117.33 mm (Allowable def)

Result OK

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

26of5026of5026of50

3.7.

DESIGN DIMENSION OF FENDER 2.2 0.8 0.15 H = 0.12 t= 0.15 Hull Pressure = Hull Pressure =

L= H=

m (L fender = tidal water height difference (HWS-LWS)) m m m (PIANC 2002, Section 4.1.6) Reactive Force / (W x H) 2 2 85 <250 8.7 ton/m = kN/m (correct)

W=1.3

(Ref: PIANC 2002, Tab 4.4.1)

3.8.

DISTANCE BETWEEN THE FENDER

Based on BS 6349-4-1994, Fig.10, distance between the fender 0.3 L ~ 0.4 L (L = Length of Ship)

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

27of5027of5027of50

For 4500 dwt based on calculation 0.3 L ~ 0.4 L = based on drawing Jetty 64 (SN-24)= correction For 3000 dwt based on calculation 0.3 L ~ 0.4 L = based on drawing Jetty 64 (SN-24)= correction 3.9. REINFORCING CONCRETE DESIGN S pile cap H pile Cap fy = f'c = = = = = 4m 1.5 m 4000 kg/cm2 280 kg/cm2

39.4 m 44.5 m 5.1 %

34.88 m 34.5 m 0.38 %

Mu = = d= b= rebar = min = m Rn

150 -

7.5

29.551 2955050 142.5 70 25

t-m kg.cm cm cm mm

(data from STAADpro)

0.0018 ( ACI - 318 - 89 ) 16.81 0.9 2.31

= fy / (0.85 x f'c) = = =

Mu bd2 2.31

Rn =

r req'd = 1/m ( 1 - 1 - 2 Rn m ) fy r req'd = 0.0006 > As req'd =


2 5.79 cm

r min

Use D25 @ 200 (As prov'd) =

24.54 cm

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

28of5028of5028of50

3.10. FOUNDATION DESIGN 3.10.1 PILE DEPTH TO FIXITY DEFINITION H= 36 m (Final Report Soil Investigation for RFCC Project at Jetty Area, Table.6, page 16) Elev = 1.235 m (assume Top of pile) Elev = 7.7 (FirmBottom) h = Topofpile+EL.FirmBottom h= 9.0 m Ie = (H - h) = 3D minimum Ie = 27.0 m s= 9.0 m Iu = 18.0 m (assume Depth of Fixity)

h h H s Ie=3S

3.10.2 CHECK COMPRESSION, TENSION & LATERAL CAPACITY OF PILE: Data Information: (Ref: See attachment IV, Final Report Soil Investigation for RFCC Project at Jetty Area, Tab.6 & 7, Page 16) - Borehole No. - Pile Type - Pile Diameter/ Dimension - Wall Thickness - Estimated Pile Length from Existing Water surface Axial Capacity Compression - Allowable SP Pile Cap SF = 2.5 = = 100 Ton 133.33333 Ton = = = = = 48 Steel Pipe Pile (Spiral Welded) 610 mm 16 mm 34 mm

(Permanent) (Temporary=4/3xPermanent)

Axial Capacity Tension - Allowable SP Pile Cap SF = 2.5 Lateral Capacity - Allowable SP Pile Cap SF = 2.5

= =

70.42 Ton 93.893333 Ton 7.5 10 Ton Ton

(Permanent) (Temporary=4/3xPermanent) (Permanent) (Temporary=4/3xPermanent)

= = Pile reaction are taken from STAAD Pro output.

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

29of5029of5029of50

Node 23 24 25 26 27 28 24 23 25

L/C 11 11 11 11 11 11 8 8 8

Force-X Mton -0.47 -1.24 -4.20 2.07 -1.28 -7.02 0 -0.856 0.856

Force-Y Mton 13.99 30.85 46.44 50.93 70.34 86.55 -12.48 -12.22 -12.22

Force-Z Mton 0.10 3.72 7.10 -3.29 -3.67 -3.96 -4.16 -4.09 -4.09

Moment-X MTon-m -19.91 -20.14 -20.02 -18.55 -18.94 -19.00 -11.19 -11.08 -11.08

Moment-Y MomentMTon-m Z MTonm -0.73 10.83 -2.09 10.13 -3.42 9.26 1.86 10.76 0.43 10.44 -1.04 9.94 0.00 0.00 0.81 0.19 -0.81 -0.19

ZDirection: Vmax= V/n+((mz*x')/(x2))+((mx*z')/(z2)) XDirection: Vmax= V/n+((mx*z')/(z2))+((mz*x')/(x2))


Horizontal H max = (Hx2 + Hz2)^ 0.5 / n PILE REACTION Vten Hmax (ton) (ton) 0.00 0.48 0.00 3.92 0.00 8.25 0.00 3.89 0.00 3.89 0.00 8.06 -0.84 4.16 -0.78 4.18 -0.78 4.18

(x,z)= (2,2)

(x,z)= (2,2)

L/C 11 11 11 11 11 11 8 8 8

Vcomp (ton) 19.91 54.62 86.60 71.57 92.94 110.30 0.00 0.00 0.00

PILE CAPACITY Vcomp Vten Hmax (ton) (ton) (ton) 133.33 93.89 10 133.33 93.89 10 133.33 93.89 10 133.33 93.89 10 133.33 93.89 10 133.33 93.89 10 100 70.42 7.5 100 70.42 7.5 100 70.42 7.5

RATIO 0.149 0.410 0.825 0.537 0.697 0.827 0.555 0.558 0.558

RESULT (R<1) OK OK OK OK OK OK OK OK OK

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

30of5030of5030of50

4. 4.1.

MOORING DOLPHIN DOLPHIN (Type MD-1, MD-2, MD-3 & MD-4 equal dimension) DIMENSION OF MOORING DOLPHIN (MD-1, MD-2, MD-3, & MD-4)

0.8m

2.4m

0.8m 0.8m 2.4m

1.2

0.8m

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

31of5031of5031of50

4.2.

PRIMARY LOAD MOORING DOLPHIN

4.2.1. DEAD LOAD & SELFT WEIGHT (DL)

*TotalSelftWeightbySTAADpro *TotalBollardWeight

38.4 ton 35.0 ton

*TotalWalkwayWeight

4.56 ton

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

32of5032of5032of50

4.2.2. LIVE LOAD (LL) - Breasting dolphin Load - BD Area (4mx4m) 2 2 (1.5ton/m x 16m ) / 4 point
2 1.5 ton/m (Ref: Doc No.RFCC-A-CV-SP-002, page 7) 2 16 m 6.00 ton (Point Load)

4.2.3. SEISMIC LOAD (EQ) Seismic Load calculation refer to 3.2.3 Seismic load Breasting Dolphin:

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

33of5033of5033of50

4.2.4. CURRENT & WAVE LOAD Current & Wave Load calculation refer to 3.2.4 Current & Wave Breasting Dolphin:

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

34of5034of5034of50

4.2.5 BOLLARD FORCE (B)

Approximatemethodsfordeterminingmooringrestraintrequirements (Ref:MooringEquipmentGuidelines,secodedition1997) a.Shipparticulars: LengthOverAll(LOA)= BreadthExtreme(B)= Depth(H)= Draught(T)= 102.00 16.30 6.20 6.20 m m m m

Atb= (BH0.02LOA+10B+20) Atb= 282.02 m2 ALf= (1.05LOA(HT)+1.4LOA+350) 492.8 m2 ALf= b.MaximumForceontheship:"oiltanks" Fxmax= (0.498Atb+0.04613TLOA)kN Fxmax= 169.6186 kN 17.30 ton FyFmax= (0.284Alf+0.02595TLOA)kN FyFmax= 156.366 kN 15.94 ton FyAmax= (0.319ALf+0.02617TLOA)kN FyAmax= 173.7531 kN 17.72 ton c.SpringLinerequirements: SxMBL= (0.498Atb+0.04613TLOA)/(0.9x0.55) 342.6638 kN 34.941974 ton where: S= 2 (Totalnumberofspringlines) MBL= minimumbreakingloadofeachline MBL= 17.471 ton <35ton ResultOK MBL= 171.332 kN d.ForwardBreastlinerequirements: BRXMBL= (0.284Alf+0.02595TLOA)/(0.7x0.55) 406.1454 kN 41.4153 ton where: BR= 2 (Totalnumberofspringlines) MBL= minimumbreakingloadofeachline MBL= 20.70765 ton <35ton ResultOK MBL= 203.0727 kN

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

35of5035of5035of50

e.AfterBreastlinerequirements: BRXMBL= (0.319ALf+0.02617TLOA)/(0.7x0.55) 451.3068 kN 46.02047 ton where: BR= 2 (Totalnumberofspringlines) MBL= minimumbreakingloadofeachline MBL= 23.0 ton <35ton ResultOK MBL= 225.653 kN

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

36of5036of5036of50

4.3.

LOAD COMBINATION Analysis Load Combination Mooring Dolphin = Breasting Dolphin CHECK STRESS RATIO & DEFLECTION Check ratio maximum 0.654 < 1

4.4.

Deflection Check Node L/C 10 10 10 10 9 9 9 9 12 12 12 X-Trans mm -0.299 -0.286 -0.289 -0.297 1.234 1.221 1.223 1.232 -0.403 -0.389 -0.389 Y-Trans mm -6.33 -6.187 2.993 2.854 -6.19 -5.703 2.857 2.366 -4.724 -4.531 0.738 Z-Trans mm 25.768 25.768 25.763 25.762 24.081 24.081 24.075 24.076 14.44 14.441 14.434 Absolute mm 26.536 26.502 25.938 25.922 24.895 24.777 24.275 24.223 15.198 15.14 14.458 X-Rotan rad -0.003 -0.003 -0.003 -0.003 -0.003 -0.003 -0.003 -0.003 -0.002 -0.002 -0.002 Y-Rotan rad 0 0 0 0 0 0 0 0 0 0 0 Z-Rotan rad 0 0 0 0 0 0 0 0 0 0 0

131 129 132 134 129 131 134 132 131 129 132 134 129 132

12 11 11

0.401 9.776 9.776

0.55 4.494 3.256

14.433 2.844 2.838

14.449 11.129 10.688

0.002 0 0

0 0 0

0 0.001 0.001

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

37of5037of5037of50

Deflection Check : 1/300 or less, and more than 25 mm (for vertical) L= 17.6 m L= 17600 mm Y-Trans= -6.33 mm < 25 mm (Allowable def) Deflection Check : 1/150 or less (for horizontal) 9.78 X-Trans= 25.77 Z-Trans= 2 2 0.5 27.56 mm < (X +Z )^ = L/500 = 117.33 mm

Result OK

117.33 mm (Allowable def)

Result OK

4.5.

CHECK CORROSION ANALYSIS Analysis Check corrosion Mooring Dolphin = Breasting Dolphin Steel pipe pile exposed to weather coditions undergo corrosion. The rate of corrosion varies depending upon the level of exposure. Following is details of zones, corrosion rate and total corrosion for fifty (25) years design period of structures (Ref. BS 6349) Corrosion Rate (mm/year) 0.01 0.08 0.2 0.09 0.14 Total Corr. 50 years (mm) 0.5 4 10 4.5 3.5

Exposure Zone Below Seabed Contineous Seawater Immersion Zone: - Seabed level to low spring tide level Intertidal Low Water Zone - Low Water at spring and at neap tides Intertidal Zone - Between mean low-water and mean high-water Splash Zone - Between mean high-water to a height depending on mean wave height & exposure to wind Atmospheric Zone - Above splash zone and direct wave or spay impingement is infrequent

0.1

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

38of5038of5038of50

4.6.

REINFORCING CONCRETE DESIGN S pile cap H pile Cap fy = f'c = = = = = 4m 1.2 m 4000 kg/cm2 280 kg/cm2

Mu = = d= b= rebar = min = m Rn

120 -

7.5

33.400 3340030 112.5 70 25

t-m kg.cm cm cm mm

(data from STAADpro)

0.0018 ( ACI - 318 - 89 ) 16.81 0.9 4.19

= fy / (0.85 x f'c) = = =

Mu 2 bd 4.19

Rn =

r req'd = 1/m ( 1 - 1 - 2 Rn m ) fy r req'd = 0.0011 > As req'd = 8.32 cm


2

r min

Use D25 @ 200 (As prov'd) =

24.54 cm

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

39of5039of5039of50

4.7.

FOUNDATION DESIGN

4.7.1 PILE DEPTH TO FIXITY DEFINITION Pile Depth to fixity definition for Mooring Dolpin = Breasting Dolphin 4.7.2 CHECK COMPRESSION, TENSION & LATERAL CAPACITY OF PILE:

Node 139 141 140 141 141 141 140 140 139

L/C 11 12 12 11 10 9 10 9 12

Force-X Mton -17.18 -15.38 15.40 -16.41 -15.20 -15.52 15.213 14.571 -12.141

Force-Y Mton 75.38 72.26 71.86 71.73 70.40 70.36 70.11 68.76 58.26

Force-Z Mton 14.09 -15.41 -15.34 -14.08 -16.59 -16.25 -16.54 -15.92 9.36

Moment-X MTon-m -3.96 -9.96 -9.99 -1.09 -20.12 -18.14 -20.14 -18.04 -13.66

MomentMoment-Y Z MTonMTon-m m -2.49 6.10 -3.02 -1.78 2.85 1.04 1.21 6.37 -5.40 -0.76 -4.48 1.15 5.28 0.21 5.21 2.26 -2.88 -2.93

ZDirection: Vmax= V/n+((mz*x')/(x2))+((mx*z')/(z2)) XDirection: Vmax= V/n+((mx*z')/(z2))+((mz*x')/(x2))


Horizontal H max = (Hx2 + Hz2)^ 0.5 / n PILE REACTION Vten Hmax (ton) (ton) 0.00 4.22 0.00 4.14 0.00 4.13 0.00 4.11 0.00 4.27 0.00 4.27 0.00 4.27 0.00 4.10 0.00 2.91

(x,z)= (5,5)

(x,z)= (5,5)

L/C 11 11 11 11 11 11 8 8 8

Vcomp (ton) 78.83 78.75 78.19 73.62 83.90 82.38 83.48 80.69 63.96

PILE CAPACITY Vcomp Vten Hmax (ton) (ton) (ton) 133.33 93.89 10 133.33 93.89 10 133.33 93.89 10 133.33 93.89 10 133.33 93.89 10 133.33 93.89 10 100 70.42 7.5 100 70.42 7.5 100 70.42 7.5

RATIO 0.591 0.591 0.586 0.552 0.629 0.618 0.835 0.807 0.640

RESULT (R<1) OK OK OK OK OK OK OK OK OK

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

40of5040of5040of50

5. 5.1

MAIN JETTY DIMENSION OF MAIN JETTY

5.2

LOAD MAIN JETTY

5.2.1 DEAD LOAD & SELFWEIGHT (DL) Mechanical Data:

(VerticalDirection)
6 ton (assume 6") 11 ton m include emergency release system

*2pcsLoadingArmsize6"

Piping data (Include Fluida) : * Pipe 8 " = * Pipe 2 " = * Pipe 12 " = * Pipe 1.5 " = * Pipe 14 " =

0.075 0.008 0.147 0.0050 0.1700 0.4 1.0 0.13 0.01 0.50 0.01 0.97 1.6

ton/m ton/m ton/m ton/m ton/m ton/m ton ton ton ton ton ton ton

* Valve 8" * Valve 2" * Valve 12" * Valve 1.5" * Valve 14"

= = = = =

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

41of5041of5041of50

Electrical&InstrumentCablePosition
= 0.004 ton/m

LoadingArmposition

Piping dataposition

Electrical &InstrumentCable position

LoadingArmposition

Piping &Electricaldata position

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

42of5042of5042of50

5.2.2 LIVE LOAD (LL)

MainJettyRefertoLiveLoadBreastingDolphin
Main Jetty = (1.5 x 6 x 6) / 9 pcs pile =
2 1.5 ton/m (Ref: Doc No.RFCC-A-CV-SP-002) 6 ton (point Load)

5.2.3 SEISMIC LOAD SEISMIC DESIGN (S) = DEAD LOAD + 0.25 LIVE LOAD = 45.14 ton = 5.02 ton/node The site is covered by Zone 4 with the base ground acceleration 0.20g (SNI-1726-2002) Total base shear load force shall be calculated using following formula : V = Cd x Wt = (C1 x I / R) x Wt where : V = total base shear load (ton) Soil type Z I C1 R = zone factor (for zone 4) = seismic importance factor = seismic coefficient (from spectrum = Soft soil(SE) (Tab.13, Page24, Soil Invest) (SNI-1726-2002, Tab.5, Page 19) (SNI-1726-2002, Tab.1, Page12) (SNI-1726-2002,Tab.6.Page21) (SNI-1726-2002,Tab.3.Page16)

= 0.2 = 1.5 = 0.85 = 8.5 = numerical coefficient (for Concrete OMRF = Ordinary Moment Resisting Frame)

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

43of5043of5043of50

Cd = structure seismic coefficient Fx = (V-Ft).wi.hi wi.hi


L/C N Node fy (ton) wi (ton)

0.150

hi (m)

wi*hi (tonm)

wi*hi/S(wi* hi)

Fx (ton)

200

5.02

5.02 45.14

17.62

88.38 795.43

0.111

6.77

0.75

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

44of5044of5044of50

5.2.4

CURRENT & WAVE LOAD For Current - Drag Force Fd = 1/2 Cd A U^2 (OCDI 1999, Page 138) where : Fd = drag force acting on the object in the direction of the current (kN) = density of sea water = 1.026 t/m3 Cd = drag coefficient, (OCDI 1999, Tab T-7.2.1. Drag Coeff) = 1

D= A= U= Fd = Fd = Fd =

0.609 1.91226 2 1.03 1.04 0.10 0.01

m (Diameter Pile) 2 mm (Projected area of the in the direction of the current (m )) knots (flow velocity) 2 m/s kN ton (Point Load) ton/m (Member Load)

- Inertia Force 2 FL = 1/2 CL 0ALU (OCDI1999,Page139) where: FL= lift force acting on the object in the direction perpendicular to the current (kN) CL = lift coefficient (OCDI 1999, Tab. T-5.4.1) = 2

AL = projected area of the object in the direction perpendicular to the current (m2) FL = 2.1 kN FL = 0.2 ton (Point Load) FL = 0.03 ton/m (Member Load) For Wave: - Drag Force Fd = 1/2 Cd A U^2 (OCDI 1999, Page 138)

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

45of5045of5045of50

where : Fd = drag force acting on the object in the direction of the current (kN) = density of sea water = 1.026 t/m3 Cd = drag coefficient, (OCDI 1999, Tab T-7.2.1. Drag Coeff) = 1

D= A= U= Fd = Fd =

0.609 1.91226 2 1.03 1.04 0.10

m (Diameter Pile) 2 mm (Projected area of the in the direction of the current (m )) knots (wave velocity) 2 m/s kN ton

- Inertia Force 2 FL = 1/2 CL 0ALU (OCDI1999,Page139) where: FL= lift force acting on the object in the direction perpendicular to the current (kN) CL = lift coefficient (OCDI 1999, Tab. T-5.4.1) = 2

2 AL = projected area of the object in the direction perpendicular to the current (m ) FL = 2.1 kN FL = 0.2 ton

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

46of5046of5046of50

Wave +CurrentLoad X

Wave +CurrentLoad Z

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

47of5047of5047of50

5.3

LOAD COMBINATION
LOADING PLATFORM CONDITION: LC1= LC2= DL + LL + WAVE LOAD DIR X + CURRENT LOAD DIR X DL + LL + WAVE LOAD DIR Z + CURRENT LOAD DIR Z

LC3= LC4=
LC1=

1.35 DL + 0.7 seismic load-X 1.35 DL + 0.7 seismic load-Z


DL + LL + WAVE LOAD DIR X + CURRENT LOAD DIR X

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

48of5048of5048of50

LC2=

DL + LL + WAVE LOAD DIR Z + CURRENT LOAD DIR Z

LC3=

1.35 DL + 0.7 seismic load-X

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

49of5049of5049of50

5.4.

CHECK STRESS RATIO & DEFLECTION

Ratio maximum 0.195

Cilacap Resid Fluid Catalytic Cracking (RFCC) Project PT. PERTAMINA (PERSERO)
Calculation For Loading Platform Mooring & Breasting Dolphin

DOC. NO. : RFCC-A-64-CV-CS-028-A REV. NO. : 2 PAGE :

50of5050of5050of50

Node 132 132 132 132 132 132 132 132 132 132

L/C 7 8 5 6 10 9 1 3 4 2

X-Trans mm Y-Trans mm Z-Trans mm 9.866 0.001 9.421 0 0.002 6.597 0.001 0.444 0 0 -1.255 -1.216 -0.372 -0.37 -1.536 -1.537 -0.694 -0.018 0.018 -0.17 -0.857 -9.783 0 -9.367 -8.134 -1.577 -0.857 0 0.441 0

Absolute mm 9.982 9.858 9.429 9.374 8.277 6.955 1.103 0.444 0.442 0.17

X-Rotan deg 0.002 0.009 0 0.008 0.008 0.003 0.001 0 0 0

Y-Rotan deg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Z-Rotan deg 0.006 -0.002 0.007 0 -0.004 0.001 -0.002 0 0 0

Deflection Check : 1/300 or less, and more than 25 mm (for vertical) L= 17.6 m L= 17600 mm Y-Trans= -1.537 mm < 25 mm (Allowable def) Deflection Check : 1/500 or less (for horizontal) X-Trans= 9.87 Z-Trans= -9.78 (X2 +Z2)^ 0.5 = 13.89 mm < L/150 = 117.33 mm

Result OK

117.33 mm (Allowable def)

Result OK

5.5.

CHECK CORROSION ANALYSIS Analysis Check corrosion Loading Platform = Breasting Dolphin REINFORCING CONCRETE DESIGN Analysis Reinforcing Loading Platform = Breasting Dolphin FOUNDATION DESIGN

5.6.

5.7.

5.7.1 PILE DEPTH TO FIXITY DEFINITION Pile Depth to fixity definition for Loading Platform = Breasting Dolphin 5.7.2 CHECK COMPRESSION, TENSION & LATERAL CAPACITY OF PILE: Check Compressio, tension & Lateral Capacity for Loading Platform = Breasting Dolphin