RENEWABLE

ENERGY IN SUMATERA UTARA PROVINCE

II. RENEWABLE ENERGY POTENTIAL


II.1 WATER ENERGY

II.1 WATER ENERGY A. WATER ENERGY POTENTIAL


Large Scale Mini Scale Micro Scale Total = 3,031.300 = 89.698 = 3,343 = 3,098.341 MW (74 LocaDon) MW (95 LocaDon) MW (72 LocaDon) MW

B. USE OF WATER ENERGY : FOR GENERATING ELECTRICITY


1. 2. 3. 4. 5.

- WATER POWER PLANT (PLTA) IN SUMATERA UTARA


PLTA Asahan I PLTA Asahan II PLTA Renun = 180 MW at Toba Samosir (Tobasa) Regency = 603 MW at Toba Samosir (Tobasa) Regency = 82 MW at Dairi Regency = 50 MW at Tapanuli Tengah Regency = 286 MW (4 x 71.50 MW)

PLTA Sipansihaporas PLTA Sigura-gura

- Minihydro Power Plant (PLTM) in Sumatera Utara


Nol 1 2 3 4 5 6 Name of PLTM PLTM Sibundong PLTM Raisan PLTM Kombih PLTM Silang PLTM Boho PLTM B. Gadis LocaDon Name Taput Taput Pakpak Barat Humbahas Samosir Madina Capacity (MW) 0,75 1,5 3,0 0,75 0,2 0,9

- Developing Stage of Mini Hidro (PLTM) Power Plant in Sumatera Utara


No 1 2 3 4 5 6 7 8 Name of PLTM PLTM Parlilitan PLTM Parluasan PLTM Pakkat PLTM Aek Hutaraja PLTM Aek Silau PLTM Aek Sipultak PLTM Aek Hasang-1 PLTM Aek Hasang-2 Regency Name Humbahas Tobasa Humbahas Humbahas Simalungun Tobasa Tobasa Tobasa Total
22/07/2010

Capacity (MW) 7,5 4,2 10 5 10 15 10 6 67,7

- Microhydro Power Plant in Sumatera Utara :


NO 1 2 3 4 5 6 7 8 9 Regency Deli Serdang Karo Simalungun Tapsel Taput Humbahas Langkat Asahan Dairi Plant Scale PLTMH PLTMH PLTMH PLTMH PLTMH PLTMH PLTMH PLTMH PLTMH PLTMH PLTMH Total Sum (Unit) 13 7 2 1 3 9 1 2 1 1 1 41 Sum of Power (KW) 303.5 190.5 25.5 20 75 72.5 50 48 10 20 18 833

10 Lab. Batu 11 Tapteng

II.2 GEOTHERMAL ENERGY Geothermal Energy PotenDal in Sumatera Utara = 3.680 MW


No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Location Berastepu Lau Debuk- Debuk/Sibayak Marike Dolok Marawa Pusuk Buhit-Danau Toba Simbolon-Samosir Pagaran Helatoba Sipoholon, Ria-ria Sarulla Sibual-buali Namorailangit Sibuhuan S. Merapi-Sampuraga Sampuraga Roburan Total Regency Karo Karo Karo Simalungun Tapanuli Utara Tapanuli Utara Tapanuli Utara Tapanuli Utara Tapanuli Utara Tapanuli Utara Tapanuli Selatan Tapanuli Utara Palas Madina Madina Madina Res (MWe) Sp 225 225 225 225 225 225 225 225 225 2025 Hp 71 100 1701 RE (MWe) Ps 131 200 556 420 320 1627 Pb Pv 39 135 210 384 Ins 12 12

Remark : SP : SpeculaDve Hp : HipotheDcal

Ps : Possible Pb : Probable

Pv : Proven Res : Resources

Pv : Reserve Ins : Installed

II.3 BIOMASS ENERGY


N Rice Husk/Sekam Padi A (ha) 1 2 3 4 5 6 7 8 9 10 11 Deli Serdang Karo Simalungun Pakpak Bharat Asahan Tj. Balai Labuhan Batu Tap. Selatan Tap. Utara Humbahas Langkat Total 153,689 20,966 22,844 5,213 71,099 253 73,157 103,961 65,649 19,247 58,778 594.856 B( Ton) 714,661 13,194 9,989.6 31,755 65,356 1,062 47,693 89,761.15 74,816.5 87,634 61,717 1,135,983.97 Coconut Shell/Batok Kelapa A (ha) 4,355 - - 77 44,649 3,233 342 5,875 - 182 6242 64,955 B (Ton) 3,695 - - 159 5,089.2 2,743 287,418 252.8 - 88 4,729 304,174 Shell of Palm/Cangkang Kelapa Sawit A (ha) 33,856 - 11,048 1,304 85,439.96 - 178,749.94 5,817 - 376 1,144.8 317,735.7 B (Ton) 486,195 - 19,312.2 5,216 70,422.12 - 69,467.68 2,303.3 - 1,220 381,6 654,517.9 Bagasse/Ampas Tebu A (ha) 848,69 - - - - - - - - - - 848,69 B (Ton) 144,409 - - - - - - - - - 96,000 240,409

o Regency

Note : A = Harvested Area (Ha) B = ProducDon (Ton/Year) Biomass Potential Of Palm Waste of Palm Production (Ton) Empty Bounch 2,570,769.75 Fiber 1,285,384.88 Shell 701,119.03 Energy Potential of Palm (Mio K.Cal) Empty Bounch 3,599,077.66 Fiber 3,599,077.66 Cangkang 2,769,420.15

Fresh Fruit Bunch (Ton) 11,685,317.08

Waste Of Palm (ber and shell) used as bahan bakar for boiler in more than 91 POMs (Palm Oil Mills) which spreaded in several Regencies. The use of steam for boiler is equivalent to 55 MVA of Steam Power Plant (PLTU).

II.4 BIOGAS ENERGY



No Regency/City 1 2 3 4 5 6 7 8 9 Medan Deli Serdang Karo Simalungun Dairi Pakpak Barat Asahan Tj. Balai L. Batu A(Head) 580 6.409 23.140 78.293 5.584 3.079 7.178 46 1.453 65.134 10.850 10.139 - 46.692 763

BIOGAS ENERGY POTENTIAL OF ANIMALS


Bualo B(Ton) 4.228 50.631 168.690 570,756 40,707 22.445 53,327 335 10,665 474,826 85.715 73,913 - 340,384 5,562 C(Mio m3) A(Head) 0,5 5,67 18,8 63,9 4,5 2,5 5,8 0,04 1,1 53,1 9,6 8,2 - 38,1 0,6 216 3.280 26.455 13,990 6,150 1,207 132 14,952 28 6,159 8,002 355 825 - 913 Cow B(Ton) 21.516 173.544 91,773 40,344 7,918 865 89,085 183 40,403 52,493 2.328 5,412 - 5,989 C(Mio m3) 2,4 19,4 10,2 4,5 0,8 0,1 10,9 0,02 4,5 5,8 0,3 0,6 - 24,2 0,67 104 A(Head) 3.670 55.984 40,621 24,044 40,137 3.528 48,114 357 23,215 507,869 17.034 44,173 - - 268,394 Pig B(Ton) 4.660 71.999 51,589 30,536 50,974 4.480 61,104 453 29,528 644,993 21.633 56,099 - - 240,860 C(jt m3) A(Head) 0,5 7,9 5,7 3,4 5,7 0,5 6,8 0,05 3,3 72,2 2,4 6,2 - - 38,1 224 17.714 46.792 11,333 557,954 2,785 1.868 121,810 2357 42,171 18,741 1.583 8,330 - 53,683 6,263 Goat B(Ton) 21.256 56.150 13,599 669,545 3,342 2.241 146,172 2.828 50,605 22,489 1.899 9,996 - 42,819,6 7,539 C( jt m3) 2,4 6,3 1,5 75 0,3 0,3 16,3 0,3 5,6 2,5 0,2 1,1 - 4,7 0,8 122

10 Taput 11 Humbahas 12 Tapteng 13 P.Sidempuan 14 Tapsel 15 Nias TOTAL

33,014 216,5718 122373 933177,8

262.135 1,933,804

170.026,5 200.473,3

910.453 1.092.541,6

II.5 SOLAR ENERGY


Pembangkit Listrik Tenaga Surya (PLTS) di SUMUT Tahun 2003-2009 : Melalui APBD-SU telah dibangun PLTS/SHS = 1.963 unit. Melalui ABBN-ESDM telah dibangun PLTS/SHS = 5.063 unit.

III. EXISTING ELECTRICITY OF SUMATERA UTARA


III.1 ELECTRICAL SYSTEM FACILITY Installed Power Capacity : 1,718 MW Capability of Power Plant : 1,410 MW Peak Load : 1,352 MW Transmission Line SUTT 150 kV : 1,227 KMs DistribuDon Line SUTM 20 kV : 20,500 KMs DistribuDon Line SKTM : 500 KMs SubstaDon : 30 unit DistribuDon Transformer : 217 unit Pole Transformer : 15,442 unit

III.2 RURAL ELECTRIFICATION Total of Villages Total of Electried Villages Total of Unelectried Villages Ratio of Electried Villages Ratio of ElectricaDon : 5,856 : 4,607 : 1,249 : 78.66 % : 77.56 %

III.3 DEVELOPMENT of ELECTRIC POWER PLANT 1. On Going : PLTA Asahan I 2 x 90 MW (IPP) : 180 MW PLTU Sumut Unit 1 (PLN) : 200 MW PLTU Sumut Unit 2 (PLN) : 200 MW PLTU Meulaboh 2 x 100 MW (PLN) : 200 MW Jumlah : 780 MW

2. AddiDonal Prospect The year of 2014 OperaDon : PLTU Kuala Tanjung, 2 x 125 MW (IPP) PLTU P. Susu 3 dan 4, 2 x 200 MW (PLN) PLTP Sarulla Unit 1, 3 x 110 MW (IPP) PLTP Sarulla Unit 2, 2 x 55 MW (IPP) PLTP Sorik Merapi, 1 x 55 MW (IPP) PLTA Asahan III, 2 x 87 MW PLTU Nias, 2 x 7 MW Total : 250 MW : 400 MW : 330 MW : 110 MW : 55 MW : 147 MW : 14 MW : 1,333 MW

3. Development of Minihydro Power Plant Untill The Year of 2010


No Type of Power Plant
1 2 3 4 5 6 7 8 PLTM PLTM PLTM PLTM PLTM PLTM PLTM PLTM

Project Name
Parlilitan Parluasan Pakkat Aek Hutaraja Aek Silau Aek Sipultak Aek Hasang-1 Aek Hasang-2

Capacity (MW)
7.5 4.2 10 5 10 15 10 6

Status
Commissioning Development Development Development Development Development Plan Plan

Regency
Humbahas Tobasa Humbahas Humbahas Simalungun Tobasa Tobasa Tobasa

Remark
IPP IPP IPP IPP IPP IPP IPP IPP

Total

67.7

4. CapDve Power
1. Industrial Sector PLTD = 123 unit, Installed Capacity = 248,785 MW PLTU = 22 unit, Installed Capacity = 61,652 MW PLTA = 1 unit, Installed Capacity = 603 MW PLTM = 6 unit, Installed Capacity = 6,244 MW Total of Installed Capacity = 919,681 MW 2. Household Sector PLTMH = 41 unit, Installed Capacity = 0,833 MW (833 KW)

5. List of Power Plant Supplied To Sumatera Utara Electrical System (Status for January 2010)
NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Name of Power Planet PLTG/U Belawan PLTG Paya Pasir PLTG Glugur PLTD TiD Kuning PLTA Sipansihaporas PLTA Renun PLTU Labuhan Angin PLTP Sibayak PLTM Kombih I,II PLTM Boho PLTM Silang PLTM Sibundong PLTM Batang Gadis I & II PLTM Raisan I & II PLTD Gunung Sitoli PLTD T. Dalam Total Installed Capacity (MW) 1.077 123 100 24,8 50 82 230 12 3 0,2 0,75 0,75 0,90 1,5 9,89 2,81 1.718 Medan Medan Medan Medan Tapanuli Tengah Dairi Tapanuli Tengah Karo Pakpak Barat Samosir Humbahas Humbahas Madina Tapanuli Utara Nias Nias selatan LocaDon

IV. FUEL AND GAS IN SUMATERA UTARA


IV.1 FUEL RESERVES 1. Langkat Regency 2. Deli Serdang Regency 3. Binjai Regency 4. Tapanuli Selatan Regency 5. Medan City Total IV.2 FUEL AND GAS PRODUCTION NO 1 2 3 Regency/City Fuel(Barrel/day) Langkat Deli Serdang Binjai Total 2.400 - 200 2.600 Gas (MMSCFD) 20 12 4 36 = 19.466 Mio barrel = 7.551 Mio barrel = 5.207 Mio barrel = 2.000 Mio barrel = 674 Mio barrel = 34.898 Mio barrel

IV.3 CONTRACTS OF FUEL AND GAS IN SUMATERA UTARA


NO 1 2 3 4 5 6 7 8 9 Operator Pertamina EP Pertamina EP PT. Chevron Pasic Indonesia PT. Mosesa Petroleum Serica East Seruway PT. Sumatera Persada Energy PT. Real To Energy Nusantara Pasic Oil & Gas, Ltd Petronas Carigali, Ltd Name of Block NAD-1 Block NAD-2 Block Siak Block Tonga East Seruway West Kampar South Block A Kisaran West Glagah Kambuna Contract Type KKS KKS PSC PSC PSC PSC PSC PSC PSC Status ProducDon ProducDon ProducDon ExploraDon ExploraDon ExploraDon ExploraDon ExploraDon ExploraDon

IV.4
NO 1 2 3 4 5 6 7 8

SUPPLY PROFILE AND DISTRIBUTION OF BBM & LPG DI SUMUT


Kapasitas Penyimpanan Penyaluran Sumber (KL) (KL) Depot LPG P.Susu 6.000 600 30 % K.Dumai, 70 % Tj.Uban Instalasi BBM Medan Group 105 6.452 70 % Impor, 30 % K.Dumai DPPU Polonia 2.380 290 IMG Depot LPG Tandem Binjai 350 108 Depot P.Susu Depot Depot BBM Kisaran Depot BBM P.Siantar Depot BBM Sibolga Depot BBM G.Sitoli 1.493 2.721 21.887 4.699 272 361 1.068 205 IMG IMG Tl. Kabung Tl. Kabung

- SPBU - Agen Premium & Solar - Agen LPG - Pangkalan Minyak Tanah

= 258 unit = 42 unit = 52 unit = 2.890 unit

IV.5 SPPBE (STASIUN PENGISIAN DAN PENGANGKUTAN BULK ELPIJI)


NO 1 2 3 4 5 6 7 8 Pengusaha PT. Trihatras NS PT. Maju Kita Bersama PT. Petro Gasindo PT. Wanantara PT. Dharma Mitra 1 PT. Citra Tunas Sempurna PT. Gasindo Alam PT. Sinar Mulia MS Total Kab/Kota Medan Medan Medan Deli Serdang Deli Serdang Deli Serdang Asahan Kapasitas Penyimpanan (MT) 40 60 100 100 75 60 100 595

Serdang Bedagai 60

Agen LPG -PSO (3 Kg) = 168 unit Agen LPG-Non PSO (12.850 Kg) = 54 unit

IV.6 REALISASI PENYALURAN BBM BERSUBSIDI DI SUMUT


NO 1 2 3


Jenis Premium Kerosine Solar Total


Tahun 2007 1.053.943 653.015 775.924 2.482.882

Satuan : Kilo Liter (KL)


Tahun 2008 1.138.925 645.075 817.952 2.601.952 Tahun 2009 1.221.641 596.840 828.642 2.647.123

IV.7 REALISASI PENYALURAN LPG NON-PSO DI SUMUT


Satuan : Kilogram (KG)

Jenis LPG Non-PSO

Nov 2009 3.973.220

Des 2009 4.250.149

Jan 2010 5.160.206

Feb 2010 5.831.094

V. UPAYA MEMACU PEMBANGUNAN SEKTOR ENERGI DI SUMATERA UTARA


1. Melakukan survei potensi energi secara berkelanjutan. 2. Mendorong pendayagunaan potensi energi alternaDf alamiah, seperD : air, panas bumi, dan surya. 3. Mendorong peran swasta dalam pengusahaan energi. 4. Memberikan kemudahan bagi para investor yang ingin berinvestasi di sektor energi. 5. Pembangunan infrastruktur untuk mempermudah akses konsumen terhadap energi