Project management has evolved as a new field with the development of two analytic
techniques for planning scheduling and controlling of projects. These are the critical path
method (CPM) and the project evaluation and review technique (PERT).
PERT and CPM are basically time anointed methods in the sense that they both lead to
determination of a time schedule. Both techniques are usually referred as “Project
scheduling” techniques.
B Planning
C Scheduling
D Controlling
A. PLANNING: The planning phase is /*** by breaking down the project into distinct
Activities. The time extras for the another are then determined and a network
(Or arrow) diagram is constructed with each of in ARCS (arrows) re-presenting of the
interdependencies between the activities of the project. The construction of the arrow
diagram in a planning phase has the advantage of studying the different jobs in details.
Perhaps suggesting improvement before the project is actually executed.
O R -MMS
Prof. Vinay Pandit
ACTIVITY: The head of the arrow indicated where task ends and the tail where task
Ends and the tail where the task begin.
EVENTS: An event represent a point in time that signifies the completion of some
Activities and the beginning of new ones. E.g. wall built, foundations dug etc.
CRITICAL PATH: It gives shortest time in which the whole project can be competed.
1. CPM is activity oriented i.e. CPM network is built on the basis of activities. Also result
Of carious calculation are considered in terms of activities of the project. On the other
hand, PERT is event oriented.
2. CPM is a deterministic model i.e. it dose not take into account the uncertainties
Involved in the estimation of time for execution of a job or an activity. It completely
Ignores the probabilistic element of the problem. PERT however is a probabilistic
Model. It uses three estimates of the activity time- optimistic, pessimistic and most
Likely with a view to take into account time uncertainty. This the expected duration of
Each activity is probabilistic indicates that there is fifty percent probability of getting
The job done within the time.
4. CPM place dual emphasis on time and cost and evaluate the trade off between project
Cost and project time. By deploying allows the project manager to manipulate project
duration within certain limits so that project duration can be shortened to an optimal
cost. On the other hand : PERT is primanly concerned with time. It helps the manager
to schedule and co-ordinate various activities so that the project can be completed on
schedule time.
FLOAT: Float is the flexibility available in any activity which can be absorbed either
by delaying that activity or by enlarging its duration.
O R -MMS
Prof. Vinay Pandit
There is no difference between float and slack. FLOAT refers to an activity and
SLACK refers to an event.
1. TOTAL FLOAT: The total float of an activity represents the amount of time by which
An activity can be delayed without delaying the project completion date.
Total float = LF-EF
= LS-ES
2. FREE FLOAT: Free float is that portion of the total float within an activity can be
Manipulated without affecting the float of subsequent activities.
4. INTERFERING FLOAT: Interfering float is that part of the total float which causes a
Reduction in the float of the successor activities.