You are on page 1of 2

URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

TRONTON 150.0 15.0 10.0 1,500.0 450,000,000

E35 HP Ton Tahun Jam Rupiah

5.

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

45,000,000 0.16275

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

43,941.26

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

600.00

Rupiah

Biaya Pasti per Jam C. 1.

44,541.26

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms H 105,862.50 Rupiah

2.

Pelumas Biaya bengkel

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2 = (H+I+K+L+M)

I J

117,000.00 26,250

Rupiah Rupiah

3. 4. 5.

Perawatan dan = perbaikan Operator Pembantu Operator

K L M P T

52,500.00 12,142.86 27,857.13 341,612.49 386,153.75

Rupiah Rupiah Rupiah Rupiah Rupiah

Biaya Operasi per Jam D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

10.00 % / Tahun 12,142.86 Rp./Jam 9,285.71 Rp./Jam 5,011.00 Liter 4,705.00 Liter 26,000.00 Liter

URAIAN ANALISA ALAT

No.

URAIAN

KODE

KOEF.

SATUAN

KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

COLD MILLING MACHINE 248.0 HP 1,000 m 5.0 Tahun 2,000.0 Jam 4,945,000,000 Rupiah

E37

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

494,500,000 0.26380

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

587,015.34

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

4,945.00

Rupiah

Biaya Pasti per Jam C. 1.

591,960.34

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms H 175,026.00 Rupiah

2.

Pelumas Biaya bengkel

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2 = (H+I+K+L+M)

I J

96,720.00 216,344

Rupiah Rupiah

3. 4. 5.

Perawatan dan = perbaikan Operator Pembantu Operator

K L M P T

309,062.50 12,142.86 27,857.13 837,152.24 1,429,112.58

Rupiah Rupiah Rupiah Rupiah Rupiah

Biaya Operasi per Jam D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

10.00 % / Tahun 12,142.86 Rp./Jam 9,285.71 Rp./Jam 5,011.00 Liter 4,705.00 Liter 26,000.00 Liter