Contoh Perhitungan Sheet Pile:

Turap dengan angkur


Diketahui:
1. Karakteristik Tanah I
= 18.8 kN/m3
= 9.6 kN/m3
= 37
c = 0 KN/m2
2. Karakteristik Tanah II
= 30
= 7.8 kN/m3
c = 0 KN/m2
Analisis gaya yang bekerja pada Sheet Pile:

Koefisien tekanan tanah aktif (Ka) :


Tanah I

Ka1 = tg2 (45-/2) = tg2 (45-37/2) = 0.25


Tanah II
Ka2 = tg2 (45-/2) = tg2 (45-30/2) = 0.33

Koefisien tekanan tanah pasif (Kp) :


Tanah I

Kp1 = tg2 (45+/2) = tg2 (45+37/2) = 4


Tanah II
Kp2 = tg2 (45+/2) = tg2 (45+30/2) = 3

Gaya dan momen akibat tekanan tanah aktif


No.

Ea (KN)

1.
2.
3.
4.
5.
6.
7.
8.
9.

10
37.6
15
112.8
43.2
3.3do
24.8do
19do
1.287do2

Lengan Terhadap A
(m)
0
0.67
5
5
6
8+0.5do
8+0.5do
8+0.5do
8+0.67do

Momen Terhadap A (KNm)


0
25.2
75
564
259.2
26.4do+1.65do2
198.4do2+12.4do2
152do+9.5do2
10.3do2+0.86do3

Maka Maktif = 923.4 + 376.8do + 33.85do2 + 0.86do3 (KNm)

Gaya dan momen akibat tekanan tanah aktif


No.

Ea (KN)

Lengan Terhadap A

Momen Terhadap A (KNm)

1.
2.
3.
4.
5.
6.
7.
8.
9.

10
37.6
15
112.8
43.2
3.3do
24.8do
19do
1.287do2

(m)
0
0.67
5
5
6
8+0.5do
8+0.5do
8+0.5do
8+0.67do

0
25.2
75
564
259.2
26.4do+1.65do2
198.4do2+12.4do2
152do+9.5do2
10.3do2+0.86do3

Maka Mpasif = -(93.6do2+7.84do3) (KNm) (Berlawanan arah jarum jam)


Mtotal

= Maktif + Mpasif
= 923.4 + 376.8do + 33.85do2 + 0.86do3 (93.6do2+7.84do3)
= -6.98do3 59.75do2 + 376.8do + 923.4
Dalam kondisi seimbang
Mtotal
= Maktif + Mpasif = 0, maka;
-6.98do3 59.75do2 + 376.8do + 923.4 = 0, atau
6.98do3 + 59.75do2 - 376.8do - 923.4 = 0
Dengan menggunakan cara coba-coba (trial and error), didapatkan do = 5.5 m.
Untuk keamanan nilai do dikalikan dengan angka keamanan 1.5 2.0 (untuk tanah granuler),
sehingga:
d = 1.5 do
= 1.5 x 5.5
= 8.25 m.
Jadi panjang turap yang masuk ke tanah adalah 8.25 m, sehingga panjang turap yang dibutuhkan
adalah:
10 + 8.25 = 18.25 m.

a v K a 2c K a
p v K p 2c K p