Site Clearing

1. Construct drain diversion where stream / river cross the proposed embankment. 2. Survey and record the existing ground level and set up control pegs. 3. Areas where M&E underground cables are present, decommissioning, dismantling and protection where necessary. 4. Excavate to remove the unsuitable material (tress, vegetations, rubbish, peat, stump, perishable material, slurry or mud) to full width and to the firm soil layer and/or to the required depths. 5. Record the depths of the excavation at confirmed firm ground layer.