Professional Documents
Culture Documents
Architecture Planning Interior Design 420 1/2 Eighth Street Augusta, GA 30901 Ph: (706) 724-2668 Fx: (706) 849-9919
PROJECT TITLE
COVER SHEET
CD 02/15/2013
MARK DATE
HPD REVIEW
DESCRIPTION
PROJECT NO: 20120606 FILE: 20130402_TG_GarageAddn_BIDSET.pln DRAWN BY: W. Palladino CHK'D BY: Al Cheatham
SHEET NO.
A.01
MATERIAL LEGEND
EARTH / COMPACTED FILL EARTH/ UNDISTURBED GRADE
SYMBOL LEGEND
0"
SPOT ELEVATION (PLAN)
ID
5" BOX GUTTER EXISTING GARDEN WALL
PROPERTY LINE (APPROXIMATE - V.I.F.)
0"
GRAVEL/ POROUS FILL CONCRETE SAND/ MORTAR / PLASTER / GROUT CONCRETE BLOCK (CMU) BRICK MASONRY STEEL ALUMINUM CONT. WOOD BLOCKING NON-CONT. WOOD BLOCKING WOOD FINISH PLYWOOD/ OSB PARTICLEBOARD GYPSUM BOARD GLASS BATT, LOOSE INSULATION SPRAY FOAM INSULATION RIGID FOAM BOARD INSULATION CARPET WOOD GLULAM LVL
XX XX
ELEVATION INDICATOR
XX XX
ELEVATION MARKER
4.77'
DOWNSPOUT FROM GUTTER TO DRAINAGE TROUGH (SEE FLOOR & ROOF PLANS)
SECTION MARKER
ABV AFF AFG AFS ASC ABRSV ABSORB ACS PNL ACST ACT ACOUS APC AWT ADDM ADDNL ADH ADJ ADMIN AGGR ACCU A/C AAP AHU ALT ALT NO ALUM/ AL AMT AMP AMPL AHR AB ANOD APT APPRD APPROX ARCH AWI AD ATM ASPH ASSY AV AUTO AUX AVG B/B BFP BDD BF BBR B PL BSMT BM BC BRG BRG PL BLW BFF BM BTWN BEV BITUM BD BLR BS BW BOT BLVD BDRY BRKT BRKR BTU BRZ BLDG BL BUR BULL BB BLKHD BN CAB CUH CTV CAP CPT CO CSMT CSWK CSG CI CIP CAT NO
ABOVE ABOVE FINISH FLOOR ABOVE FINISH GRADE ABOVE FINISH SLAB ABOVE SUSPENDED CEILING ABRASIVE ABSORPTION ACCESS PANEL ACOUSTIC ACOUSTIC CEILING TILE ACOUSTIC ACOUSTIC PANEL CEILING ACOUSTIC WALL TREATMENT ADDENDUM ADDITIONAL ADHESIVE ADJUSTABLE / ADJACENT ADMINISTRATION AGGREGATE AIR COOLED CONDENSING UNIT AIR CONDITIONING ALARM ANNUNCIATOR PANEL AIR HANDLING UNIT ALTERNATE ALTERNATE NUMBER ALUMINUM AMOUNT AMPHERE AMPLIFIER ANCHOR ANCHOR BOLT ANODIZED APARTMENT APPROVED APPROXIMATE ARCHITECT/ARCHITECTURAL ARCH. WOODWORKING INSTITUTE AREA DRAIN AUTOMATIC TELLER MACHINE ASPHALT ASSEMBLY AUDIO VISUAL AUTOMATIC AUXILIARY AVERAGE BACK TO BACK BACK FLOW PREVENTER BACK DRAFT DAMPER BARRIER FREE BASE BOARD RADIATION BASE PLATE BASEMENT BEAM BACK OF CURB BEARING BEARING PLATE BELOW BELOW FINISH FLOOR BENCH MARK BETWEEN BEVEL BITUMINOUS BOARD BOILER BOTH SIDES BOTH WAYS BOTTOM BOULEVARD BOUNDARY BRACKET BREAKER BRITISH THERMAL UNIT BRONZE BUILDING BUILDING LINE BUILT-UP ROOFING BULLETIN BULLETIN BOARD BULKHEAD BULLNOSE CABINET CABINET UNIT HEATER CABLE TELEVISION CAPACITY CARPET CASED OPENING CASEMENT CASEWORK CASING CAST IRON CAST IRON PIPE / CAST IN PLACE CATALOG NUMBER
CAB CUH CTV CAP CPT CO CSMT CSWK CSG CI CIP CAT NO CB CATW CAV CLG CLG DIFF CLG GRL CLG HT CEM CEM FIN CBB CEM PLAS CTR C TO C CER CT CTB CTF CH BD CHRF C CHWR CHWS CH CIR CRCMF CKT CKT BRKR CL CLRM CO CLR CL CLWG CLO CLOS CH COAX COEFF CFMF CW COL CLL CO COMPT CPRS CA COMPR CMPTR CONC CONC FLR CMU PCCP CP CSP CND CONF CONN CONSTR CM CONT CTR CNTR CNTOR CF CFE CF/OI CLL CTRL CJ CP COORD CNR CG CORR CU CNTR CSK CFLG COV COV PL CUB
CAB CUH CTV CAP N CPT CO CSMT XX W E INTERIOR ELEVATIONCSWK MARKER XX CSG CI S CIP CAT NO CB CATW CAV REVISION CLOUD CLG CLG DIFF CLG GRL CLG HT CEM CEM FIN CBB CEM PLAS CTR C TO C CER CT CTB CTF CH BD CHRF C CHWR CHWS CH CIR CRCMF CKT CKT BRKR CL CLRM CO CLR CL CLWG CLO CLOS CH COAX COEFF CFMF CW COL CLL CO COMPT CPRS CA COMPR CMPTR CONC CONC FLR CMU PCCP CP CSP CND CONF CONN CONSTR CM CONT CTR CNTR CNTOR CF CFE CF/OI CLL CTRL CJ CABINET CP CABINET UNIT HEATER COORD CABLE TELEVISION CNR CAPACITY CG CARPET CORR CASED OPENING CU CASEMENT CNTR CASEWORK CSK CASING CFLG CAST IRON COV CAST IRON PIPE / CAST IN PLACE COV PL CATALOG NUMBER CUB CATCH BASIN CU FT CATWALK CFM CAVITY CU YD CEILING CYL CEILING DIFFUSER C&G CEILING GRILLE CI CEILING HEIGHT DMPR CEMENT DMPF CEMENT FINISH DL CEMENTITOUS BACKER BOARD dB CEMENT PLASTER D CENTER DEL CENTER TO CENTER DEMO CERAMIC DPTN CERAMIC TILE DEPT CERAMIC TILE BASE DSGN CERAMIC TILE FLOOR DET CHALKBOARD DIAG CHAMFER DIA CHANNEL DIFF CHILLED WATER RETURN DIM CHILLED WATER SUPPLY DR CHILLER DIR CIRCLE DISC CIRCUMFERENCE DW CIRCUIT DISP CIRCUIT BREAKER DIST CLASS DISTR PNL CLASSROOM DIV CLEAN OUT DR CLEAR DR CL CLOSE DR OPNG CLEAR WIRE GLASS DBL CLOSET DBL ACT CLOSURE DH COAT HOOK DN COAXIAL CABLE DS COEFFICIENT DR COLD-FORMED METAL FRAMING DT COLD WATER PIPING DWR COLUMN DWG COLUMN LINE DF COMPANY DSP COMPARTMENT DUPL COMPRESSIBLE DTDR COMPRESSED AIR COMPRESSOR EA COMPUTER EF CONCRETE EW CONCRETE FLOOR ESMT CONCRETE MASONRY UNIT E CONCRETE PAVEMENT EP CONCRETE PIPE EOS CONCRETE SEWER PIPE ELAST CONDUIT ELEC CONFERENCE EC CONNECT EP CONSTRUCTION EWC CONSTRUCTION MANAGEMENT EL CONTINUE/ CONTINUOUS ELEV CONTOUR EMER CONTRACT ENCL CONTRACTOR ENGR CONTRACTOR FURNISHED ENTR CNTOR FURNISHED EQUIPMENT EPDM CNTOR FURNISHED, OWNER INSTALLED EQ CONTRACT LIMIT LIME EQL SP CONTROL EQUIP CTRL JOINT / CONSTR JOINT EQUIV CONTROL PANEL ESCAL COORDINATE EST CORNER EXC CORNER GUARD EXH CORRIDOR/ CORRUGATED EXH DT COPPER EXH FN COUNTER EXH GR COUNTERSINK EXH COUNTER FLASHING EAR COVER EXIST COVER PLATE EXIST GR CUBICAL ERD
DETAIL MARKER
XX XX
CABINET CABINET UNIT HEATER CABLE TELEVISION CAPACITY CARPET CASED OPENING CASEMENT CASEWORK CASING CAST IRON CAST IRON PIPE / CAST IN PLACE CATALOG NUMBER CATCH BASIN CATWALK CAVITY CEILING NEW CONCRETE DRAINAGE TROUGH CEILING DIFFUSER CEILING GRILLE CEILING HEIGHT CEMENT CEMENT FINISH CEMENTITOUS BACKER BOARD CEMENT PLASTER CENTER INTENT IS TO ALIGN W/ CENTER TO CENTER STRUCTURAL WALLS OF EXIST. CERAMIC CERAMIC TILE GARAGE (SEE FLOOR PLAN) CERAMIC TILE BASE CERAMIC TILE FLOOR CHALKBOARD CHAMFER CHANNEL CHILLED WATER RETURN CHILLED WATER SUPPLY CARPORT FOUNDATION EXPOSED CHILLER 6" ABOVE GRADE & ACTS AS CIRCLE CIRCUMFERENCE DRAINAGE TROUGH EDGE CIRCUIT CIRCUIT BREAKER CLASS CLASSROOM NEW TROUGH ENDS FLUSH GRADE CLEAN OUT CLEAR CLOSE CLEAR WIRE GLASS CLOSET CLOSURE COAT HOOK COAXIAL CABLE COEFFICIENT COLD-FORMED METAL FRAMING DIMENSIONS TO LANDSCAPE COLD WATER PIPING FEATURES ARE DERIVED FROM COLUMN COLUMN LINE OWNER PROVIDED SURVEY BY JAMES COMPANY G. SWIFT & ASSOCIATES ON 8/12/12 COMPARTMENT COMPRESSIBLE COMPRESSED AIR COMPRESSOR EA EACH COMPUTER EF EACH FACE CONCRETE EW EACH WAY CONCRETE FLOOR ESMT EASEMENT CONCRETE MASONRY UNIT E EAST CONCRETE PAVEMENT EP EDGE OF PAVEMENT CONCRETE PIPE EOS EDGE OF SLAB CONCRETE SEWER PIPE ELAST ELASTOMERIC CONDUIT ELEC ELECTRIC/ ELECTRICAL CONFERENCE EC ELECTRICAL CONTRACTOR CONNECT EP ELECTRICAL PANEL CONSTRUCTION EWC ELECTRIC WATER COOLER CONSTRUCTION MANAGEMENT EL ELEVATION CONTINUE/ CONTINUOUS ELEV ELEVATOR CONTOUR EMER EMERGENCY CONTRACT ENCL ENCLOSURE CONTRACTOR ENGR ENGINEER CONTRACTOR FURNISHED ENTR ENTRANCE/ ENTRY CNTOR FURNISHED EQUIPMENT 1" = 5' EPDM SCALE: ETHYLENE PROPYLENE DIENE MONOMER CNTOR FURNISHED, OWNER INSTALLED EQ EQUAL NORTH CONTRACT LIMIT LIME EQL SP EQUALLY SPACED CONTROL EQUIP EQUIPMENT CTRL JOINT / CONSTR JOINT EQUIV EQUIVALENT CONTROL PANEL ESCAL ESCALATOR COORDINATE EST ESTIMATE CORNER EXC EXCAVATED CORNER GUARD EXH EXHAUST CORRIDOR/ CORRUGATED EXH DT EXHAUST DUCT COPPER EXH FN EXHAUST FAN COUNTER EXH GR EXHAUST AIR GRILLE COUNTERSINK EXH EXHAUST AIR HOOD COUNTER FLASHING EAR EXHAUST AIR REGISTER COVER EXIST EXISTING COVER PLATE EXIST GR EXISTING GRADE CUBICAL ERD EXISTING ROOF DRAIN CUBIC FEET/ CUBIC FOOT EXP EXPANSION CUBIC FEET PER MINUTE EXP BT EXPANSION BOLT CUBIC YARD EJ EXPANSION JOINT CYLINDER EXP EXPOSED CURB AND GUTTER EXTN EXTENSION CURB INLET EXT EXTERIOR EIFS EXTERIOR INSULATION FINISH SYSTEM DAMPER EXTRU EXTRUSION DAMP PROOFING EGSB EXTERIOR GYPSUM SHEATHING BOARD DEAD LOAD DECIBLE FAB FABRIC DEEP FC BRK FACE BRICK DELETE / DELIVER FOC FACE OF CONCRETE/ CURB DEMOLISH, DEMOLITION FOF FACE OF FINISH DEMOUNTABLE PARTITION FOM FACE OF MASONRY DEPARTMENT FOS FACE OF STUDS DESIGN F/F FACE TO FACE DETAIL FCU FAN COIL UNIT DIAGONAL/ DIAGRAM FS FAR SIDE DIAMETER FSTNR FASTENER DIFFUSER/ DIFFERENCE FAS FASCIA DIMENSION FDR FEEDER DINING ROOM FT FEET/ FOOT DIRECTION FPM FEET PER MINUTE DISCONNECT FN FENCE DISHWASHER FRG FIBER REINFORCED GYPSUM DISPENSER FGL FIBERGLASS DISTANCE FRP FIBERGLASS REINFORCED PLASTIC DISTRIBUTION PANEL FIG FIGURE DIVIDER/ DIVISION FC FILE CABINET DOOR FIN FINISH/ FINISHED DOOR CLOSER FIN FLR FINISHED FLOOR DOOR OPENING FIN GR FINISHED GRADE DOUBLE FTF FINNED TUBE RADIATION DOUBLE ACTING FA FIRE ALARM DOUBLE HUNG FAAP FIRE ANNUNCIATOR PANEL DOWN FACP FIRE ALARM CONTROL PANEL DOWNSPOUT FDMPR FIRE DAMPER DRAIN FE FIRE EXTINGUISHER DRAIN TILE FEC FIRE EXTINGUISHER CABINET DRAWER FHC FIRE HOSE CABINET DRAWING FH FIRE HYDRANT DRINKING FOUNTAIN FRA FIRE RATED ASSEMBLY DRY STAND PIPE FR FIRE RATING/ FIRE RESISTANCE DUPLICATE FRTW FIRE RETARDANT TREATED WOOD DUTCH DOOR FPL FIREPLACE FP FIREPROOF/ FLAG POLE EACH FIXT FIXTURE EACH FACE FLASH FLASHING EACH WAY FHMS FLAT HEAD MACHINE SCREW EASEMENT FHWS FLAT HEAD WOOD SCREW EAST FLR FLOOR EDGE OF PAVEMENT FLG FLOORING EDGE OF SLAB FAR FLOOR AREA RATIO ELASTOMERIC FCO FLOOR CLEAN OUT ELECTRIC/ ELECTRICAL FD FLOOR DRAIN ELECTRICAL CONTRACTOR FLR FIN FLOOR FINISH ELECTRICAL PANEL FLR SK FLOOR SINK ELECTRIC WATER COOLER FLOUR FLUORESCENT ELEVATION FLDG FOLDING ELEVATOR FTG FOOTING EMERGENCY FDTN FOUNDATION ENCLOSURE FR FRAME ENGINEER FRMG FRAMING ENTRANCE/ ENTRY FREEZER ETHYLENE PROPYLENE DIENE MONOMER FRZ FA FRESH AIR EQUAL FR GL FRITTED GLASS EQUALLY SPACED FFA FROM FLOOR ABOVE EQUIPMENT FFB FROM FLOOR BELOW EQUIVALENT FS FULL SIZE/ FULL SCALE ESCALATOR FURN FURNISH/ FURNISHED ESTIMATE FURG FURRING/ FURRED EXCAVATED FBO FURNISHED BY OTHERS EXHAUST FF&E FURNITURE, FIXTURES & EQUIPMENT EXHAUST DUCT FUT FUTURE EXHAUST FAN EXHAUST AIR GRILLE EXHAUST AIR HOOD EXHAUST AIR REGISTER EXISTING EXISTING GRADE EXISTING ROOF DRAIN
24.60'
FAB FABRIC FC BRK FACE BRICK FOC FACE OF CONCRETE/ CURB FOF FACE OF FINISH FOM FACE OF MASONRY FOS FACE OF STUDS F/F FACE TO FACE MATCH NEW DRIVEWAY SLAB FCU FAN COIL UNIT CONCRETE & AGGREGATE TO EXIST. FS FAR SIDE FSTNR FASTENER FAS FASCIA FDR FEEDER FT FEET/ FOOT FPM FEET PER MINUTE FN FENCE FRG FIBER REINFORCED GYPSUM FGL FIBERGLASS FRP FIBERGLASS REINFORCED PLASTIC FIG FIGURE FC FILE CABINET FIN FINISH/ FINISHED FIN FLR FINISHED FLOOR FIN GR FINISHED GRADE FTF FINNED TUBE RADIATION FA FIRE ALARM FAAP 2.95' FIRE ANNUNCIATOR PANEL 33.27' FACP FIRE ALARM CONTROL PANEL FDMPR FIRE DAMPER MACH MACHINE FE FIRE EXTINGUISHER MB MACHINE BOLT FEC FIRE EXTINGUISHER CABINET MACH RM MACHINE ROOM FHC FIRE HOSE CABINET MAU MAKE UP AIR UNIT FH FIRE HYDRANT MGT MANAGEMENT FRA FIRE RATED ASSEMBLY MAINT MAINTENANCE FR FIRE RATING/ FIRE RESISTANCE MH MANHOLE FRTW FIRE RETARDANT TREATED WOOD COORD. ANY NEC. ADJUSTMENT OF SECURITY GATE WITH MFR OWNER MANUFACTURER FPL FIREPLACE MFD MANUFACTURED FP FIREPROOF/ FLAG POLE MO MASONRY OPENING FIXT FIXTURE MATL MATERIAL FLASH FLASHING MAX MAXIMUM FHMS FLAT HEAD MACHINE SCREW MECH MECHANICAL FHWS FLAT HEAD WOOD SCREW MECH RM MECHANICAL ROOM FLR FLOOR MC MECHANICAL CONTRACTOR FLG FLOORING MC MEDICINE CABINET FAR FLOOR AREA RATIO MED MEDIUM FCO FLOOR CLEAN OUT MDO MEDIUM DENSITY OVERLAY FD FLOOR DRAIN MEMB MEMBRANE FLR FIN FLOOR FINISH MWP MEMBRANE WATERPROOFING FLR SK FLOOR SINK MTL METAL FLOUR FLUORESCENT ML METAL LATH FLDG FOLDING ML&P METAL LATH AND PLASTER FTG FOOTING MT METAL THRESHOLD FDTN FOUNDATION MEZZ MEZZANINE FR FRAME MF MILL FINISH FRMG FRAMING MLWK MILLWORK FRZ FREEZER MIN MINIMUM ID IDENTIFICATION FA FRESH AIR MIRR MIRROR INCAND INCANDESCENT FR GL FRITTED GLASS MISC MISCELLANEOUS IN INCH / INCHES FFA FROM FLOOR ABOVE MR MOISTURE RESISTANCE INCL INCLUDE/ INCLUDING FFB FROM FLOOR BELOW MOD MODEL INFO INFORMATION FS FULL SIZE/ FULL SCALE MOD BIT MODIFIED BITUMEN ID INSIDE DIAMETER/ DIMENSION FURN FURNISH/ FURNISHED MON MONUMENT IF INSIDE FACE FURG FURRING/ FURRED MBH MOP/ BROOM HOLDER IFS INSIDE FACE OF STUD FBO FURNISHED BY OTHERS MOD MOTOR OPERATED DAMPER INSTL INSTALL FF&E FURNITURE, FIXTURES & EQUIPMENT MLDG MOULDING INSUL INSULATION FUT FUTURE MTD MOUNTED INT INTERIOR GA GAUGE MTG MEETING/ MOUNTING INV INVERT GAL GALLON MVBL MOVEABLE INT EL INVERT ELEVATION GPH GALLONS PER HOUR MULL MULLION JAN CLO JANITOR CLOSET GPM GALLONS PER MINUTE M THOUSAND (1000) JS JANITOR SINK GALV GALVANIZED NAT NATURAL J-BOX JUNCTION BOX GI GALVANIZED IRON NG NATURAL GAS JR JUNIOR GALV STL GALVANIZED STEEL NS NEAR SIDE/ NARROW STILE G LN GAS LINE KPL KICK PLATE NEUT NEUTRAL GEN GENERAL KW KILOWATT NRC NOISE REDUCTION COEFFICIENT GEN COND GENERAL CONDITIONS KIT KITCHEN NOM NOMINAL GC GENERAL CONTRACTOR KB KNEE BRACE NRP NON REMOVABLE GL GLASS KD KNOCK DOWN NORM NORMAL GFRC GLASS FIBER REINFORCED CONC. KOP KNOCK OUT PANEL N NORTH GFRG GLASS FIBER REINFORCED GYPSUM NIC NOT IN CONTRACT GFRP GLASS FIBER REINFORCED PLASTER LAB LABORATORY NTS NOT TO SCALE GFRP GLASS FIBER REINFORCED PLASTIC LAD LADDER NO NUMBER GLZ CMU GLAZED CONCRETE MASONRY UNIT LAM LAMINATE GSU GLAZED STRUCTURAL UNIT LAM GL LAMINATED GLASS O GL OBSCURE GLASS GLZ GLAZING LDG LANDING OFF OFFICE GB GRAB BAR LGE LARGE OCC OCCUPY GR BM GRADE BEAM LAU LAUNDRY OC ON CENTER GRTG GRATING LAV LAVATORY OPQ OPAQUE GRAN GRANITE LH LEFT HAND OPNG OPENING GT GREASE TRAP LIB LIBRARY OPP OPPOSITE GRL GRILLE LT LIGHT OPH OPPOSITE HAND G GROUND LTG LIGHTING ORIG ORIGINAL GFCI GROUND FAULT CIRCUIT INTERRUPTER LT GA LIGHT GUAGE ORN ORNAMENTAL GT GROUT LP LIGHT POLE/ LIGHTPROOF OZ OUNCE GUT GUTTER LTG PNL LIGHTING PANEL O/O OUT TO OUT GDR GUARD RAIL LTWT LIGHTWEIGHT OA OUTSIDE AIR GYP BD GYPSUM BOARD LWC LIGHTWEIGHT CONCRETE OAD OUTSIDE AIR DAMPER LMST LIMESTONE OAG OUTSIDE AIR GRILLE HD HAND DRYER LD LINEAR DIFFUSER OAI OUTSIDE AIR INTAKE HS HAND SINK LF LINEAR FEET/FOOT OD OUTSIDE DIAMETER/ DIMENSION HCP HANDICAPPED LIQ LIQUID OF OUTSIDE FACE HNDRL HANDRAIL LL LIVE LOAD OFS OUTSIDE FACE STUDS HDW HARDWARE LR LIVING ROOM OA OVERALL HDWD HARDWOOD LOC LOCATION ORD OVERFLOW ROOF DRAIN HD JT HEAD JOINT LKR LOCKER OH OVERHANG HDR HEADER LLH LONG LEG HORIZONTAL OH DR OVERHEAD DOOR HA GL HEAT ABSORBING GLASS LLV LONG LEG VERTICAL OF/CI OWNER FURNISH/ CNTROR INSTALL HVAC HEATING, VENTILATING & A/C LVR LOUVER OF/OI OWNER FURNISH/ OWNER INSTALL HTWS HEATING WATER SUPPLY LPT LOW POINT LUMBER O OXYGEN HTWR HEATING WATER RETURN LBR LUMBER HD HEAVY DUTY PT PAINT LBS POUNDS HT HEIGHT PR PAIR HEX HEXAGON MACH MACHINE PNL PANEL H HIGH MB MACHINE BOLT PTD PAPER TOWEL DISPENSER HDDE HIGH DENSITY POLYETHYLENE MACH RM MACHINE ROOM PTDR PAPER TOWEL DISPENSER & RECEPT HEPA HIGH EFFICIENCY PARTICLE AIR FILTER MAU MAKE UP AIR UNIT PTR PAPER TOWEL RECEPTACLE HID HIGH INTENSITY DISCHARGE MGT MANAGEMENT PAR PARALLEL/ PARAPET HP HIGH PRESSURE/ HIGH POINT MAINT MAINTENANCE PRKG PARKING HS HIGH STRENGTH MH MANHOLE PBD PARTICLE BOARD HV HIGH VOLTAGE MFR MANUFACTURER PTN PARTITION HWY HIGHWAY MFD MANUFACTURED PVG PAVING HO HOLD OPEN MO MASONRY OPENING PED PEDESTAL HC HOLLOW CORE MATL MATERIAL PER FT PER FOOT HM HOLLOW METAL MAX MAXIMUM PERF PERFORATED HMD HOLLOW METAL DOOR MECH MECHANICAL PERIM PERIMETER HMF HOLLOW METAL FRAME MECH RM MECHANICAL ROOM PERM PERMANENT HORIZ HORIZONTAL MC MECHANICAL CONTRACTOR PERP PERPENDICULAR HP HORSEPOWER MC MEDICINE CABINET PH PHASE HB HOSE BIB MED MEDIUM PHOTO PHOTOGRAPH HC HOSE CABINET MDO MEDIUM DENSITY OVERLAY PC PIECE HOSP HOSPITAL MEMB MEMBRANE PIL PILASTER HW HOT WATER MWP MEMBRANE WATERPROOFING PLAS PLASTER HWB HOT WATER BOILER MTL METAL PLAM PLASTIC LAMINATE HWR HOT WATER RETURN ML METAL LATH PL GL PLATE GLASS HWS HOT WATER SUPPLY ML&P METAL LATH AND PLASTER PLAT PLATFORM HR HOUR MT METAL THRESHOLD PLBG PLUMBING HSKPG HOUSEKEEPING MEZZ MEZZANINE PLYWD PLYWOOD HY HYDRANT MF MILL FINISH PT POINT OF TANGENCY HYDR HYDRAULIC MLWK MILLWORK PC POINT OF CURVATURE MIN MINIMUM PI POINT OF INTERSECTION ID IDENTIFICATION MIRR MIRROR PL POLYETHYLENE INCAND INCANDESCENT MISC MISCELLANEOUS POL POLISH/ POLISHED IN INCH / INCHES MR MOISTURE RESISTANCE PVC POLYVINYLCHLORIDE INCL INCLUDE/ INCLUDING MOD MODEL PORC PORCELAIN INFO INFORMATION MOD BIT MODIFIED BITUMEN PORT PORTABLE ID INSIDE DIAMETER/ DIMENSION MON MONUMENT POS POSITION IF INSIDE FACE MBH MOP/ BROOM HOLDER PIV POST INDICATOR VALVE IFS INSIDE FACE OF STUD MOD MOTOR OPERATED DAMPER PLF POUNDS PER LINEAR FOOT INSTL INSTALL MLDG MOULDING PSF POUNDS PER SQUARE FOOT INSUL INSULATION MTD MOUNTED PSI POUNDS PER SQUARE INCH INT INTERIOR MTG MEETING/ MOUNTING PCF POUNDS PER CUBIC FOOT INV INVERT MVBL MOVEABLE PWR POWER INT EL INVERT ELEVATION MULL MULLION
NEW SLAB EXIST. SLAB
420 1/2 Eighth Street Augusta, GA 30901 Ph: (706) 724-2668 Fx: (706) 849-9919
EXISTING GARAGE
PROJECT TITLE
PT PR PNL PTD PTDR PTR PAR PRKG PBD PTN PVG PED PER FT PERF PERIM PERM PERP PH PHOTO PC PIL PLAS PLAM PL GL PLAT PLBG PLYWD PT PC PI PL POL PVC PORC PORT POS PIV PLF PSF PSI PCF PWR PRCST PREFAB PREFIN PT PRV PRI PROJ PROP PL PA PSH PB PP PP PL QUAL QTY QT QTB QTF QTR QTR RND RAB R RWL RLG RR RECD RECPT RCPTN REC REC RDC RWD REF REFL RCP REF REG REINF REM REP REPL REQD RESIL RB RF RET RA RAD RA FAN RA GR REV RPM R RH ROW RD RFG RD RH RL RV RFG RTU RM RO RND RHMS RHWS RBR RTF PAINT PAIR PANEL PAPER TOWEL DISPENSER PAPER TOWEL DISPENSER & RECEPT PAPER TOWEL RECEPTACLE PARALLEL/ PARAPET PARKING PARTICLE BOARD PARTITION PAVING PEDESTAL PER FOOT PERFORATED PERIMETER PERMANENT PERPENDICULAR PHASE PHOTOGRAPH PIECE PILASTER PLASTER PLASTIC LAMINATE PLATE GLASS PLATFORM PLUMBING PLYWOOD POINT OF TANGENCY POINT OF CURVATURE POINT OF INTERSECTION POLYETHYLENE POLISH/ POLISHED POLYVINYLCHLORIDE PORCELAIN PORTABLE POSITION POST INDICATOR VALVE POUNDS PER LINEAR FOOT POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH POUNDS PER CUBIC FOOT POWER PRECAST PREFABRICATED PREFINISHED PRESERVATIVE TREATED PRESSURE REDUCING VALVE PRIMARY PROJECT/ PROJECTION PROPERTY PROPERTY LINE PUBLIC ADDRESS PURSE SHELF PUSH BUTTON/ PULL BOX PUSH/ PULL PUSH/ PULL PLATE QUALITY QUANTITY QUARRY TILE QUARRY TILE BASE QUARRY TILE FLOOR QUARTER QUARTER ROUND RABBETED RADIUS RAIN WATER LEADER RAILING RAILROAD RECEIVED RECEPTACLE RECEPTION RECESSED RECTANGLE/ RECTANGULAR REDUCER REDWOOD REFERENCE REFLECT REFLECTED CEILING PLAN REFRIGERATOR REGISTER REINFORCE REMOVE/ REMOVABLE REPAIR RELACE REQUIRED RESILIENT RESILIENT BASE RESILIENT FLOORING RETURN RETURN AIR RETURN AIR DUCT RETURN AIR FAN RETURN AIR GRILLE REVISED/ REVISION REVOLUTIONS PER MINUTE RISER RIGHT HAND RIGHT OF WAY ROAD ROOFING ROOF DRAIN ROOF HATCH ROOF LEADER ROOF VENTILATOR/ VENT ROOFING ROOF TOP UNIT ROOM ROUGH OPENING ROUND ROUND HEAD MACHINE SCREW ROUND HEAD WOOD SCREW RUBBER RUBBER TILE FLOOR
Q R
SDL SAN SND SNDU SS SCHED SJ SCRN SCP SLNT SHTHG SECT SVCE SHT SHFT SS SHT SM SHT MTL SV SHR SCR SIM SGL SK SKLT SM SMK SD SD SC SCWD STC S SPKR SPEC SB SP EL SPKLR SQ SF STAG SST ST STD SS SP ST PR STA STM STL STL JST STL LNTL STL PL STL RF DK STL TR STL TB STIF SD STOR STR ST STRUCT SUB SP SMP SAG SD SF SPRT SURF SUSP SW SWBD SWGR SYM SYMM SYS TK BD TAN TECH TEL TV TEMP TMPD GL TER TB TSTAT R THK THRESH THRU TBD
SADDLE SANITARY SANITARY NAPKIN DISPENSER SANITARY NAPKIN DISPOSAL UNIT SANITARY SEWER SCHEDULE SCORED JOINT SCREEN SCUPPER SEALANT SHEATHING SECTION SERVICE SHAFT SHAFT SERVICE SINK SHEET SHEET METAL SHEET METAL SHEET VINYL SHOWER SHOWER CURTAIN ROD SIMILAR SINGLE SKETCH SKYLIGHT SMALL SMOKE SMOKE DETECTOR SOAP DISPENSER SOLID CORE SOLID CORE WOOD DOOR SOUND TRANSMISSION CLASS SOUTH SPEAKER SPECIFICATIONS SPLASH BLOCK SPOT ELEVATION SPRINKLER SQUARE SQUARE FEET/ SQ FOOT STAGGERED STAINLESS STEEL STAIS/ STREET STANDARD STANDING SEAM (ROOF) STANDPIPE STATIC PRESSURE STATION STM STEEL STEEL JOIST STEEL LINTEL STEEL PLATE STEEL ROOF DECK STEEL TRUSS STEEL TUBING STIFFENER STORM DRAIN STORAGE STRAIGHT STREET STRUCTURAL SUBSTITUTE SUMP PIT SUMP PUMP SUPPLY AIR GRILLE SUPPLY DIFFUSER/ DUCT SUPPLY FAN SUPPORT SURFACE SUSPEND SWITCH SWITCHBOARD SWITCHGEAR SYMBOL SYMMETRICAL SYSTEM TACKBOARD TANGENT TECHNICAL TELEPHONE TELEVISION TEMPERATURE TEMPERED GLASS TERRAZZO TEST BORING THERMOSTAT THERMAL RESISTANCE THICK/THICKNESS THRESHOLD THROUGH TO BE DETERMINED/ DESIGNED
TK BD TAN TECH TEL TV TEMP TMPD GL TER TB TSTAT R THK THRESH THRU TBD TPD TPH T&G T&B TOC TE TO TOF TOM TOP TOR TOS TOW TOPO TB TD TDR TG XFMR TRANS TD TYP UC UCD UFD UGND UL UNFIN UH UNO UR UTIL UP VAC VB VR VAV VF VFD VAR VNR VP VS VTR VENT VIF VS VERT VEST VIB VCT VWC VCT VOL VD V WSCT W CAB WCO WH W/W WHSE WF W WTR WC WL WH WM WPM WP WR WS WH WT WWF WWM W W Wx_ W GL WM
TACKBOARD TANGENT TECHNICAL TELEPHONE TELEVISION TEMPERATURE TEMPERED GLASS TERRAZZO TEST BORING THERMOSTAT THERMAL RESISTANCE THICK/THICKNESS THRESHOLD THROUGH TO BE DETERMINED/ DESIGNED TOILET PAPER DISPENSER TOILET PAPER HOLDER TONGUE AND GROOVE TOP AND BOTTOM TOP OF CURB/ TOP OF CONCRETE TOP ELEVATION TOP OF TOP OF FOOTING TOP OF MASONRY TOP OF PARAPET TOP OF RIM TOP OF STEEL/SLAB TOP OF WALL TOPOGRAPHY TOWEL BAR TOWEL DISPENSER TOWEL DISPENSER/ RECEPTACLE TRANSFER GRILLE TRANSFORMER TRANSOM TRENCH DRAIN TYPICAL UNDERCUT UNCER CUT DOOR UNDER FLOOR DUCT UNDERGROUND UNDERWRITER'S LABORATORY UNFINISHED UNIT HEATER UNLESS NOTED OTHERWISE URINAL UTILITY UTILITY POLE VACUUM/ VACUUM LINE VACUUM BREAKER VAPOR RETARDER VARIABLE AIR VOLUME VARIABLE FREQUENCY VARIABLE FREQUENCY DRIVE VARIATION/ VARIES VENEER VENEER PLASTER VENT STACK VENT THRU ROOF VENTILATOR/ VENTILATION VERIFY IN FIELD VERSUS VERTICAL/ VERTICALLY VESTIBULE VIBRATION VINYL COMPOSITION TILE VINYL WALL COVERING VITRIFIED CLAY TILE VOLUME VOLUME DAMPER VOLTS WAINSCOT WALL CABINET WALL CLEAN OUT WALL HYDRANT WALL TO WALL WAREHOUSE WASH FOUNTAIN WASTE/ WATTS WATER WATER CLOSET WATER LINE WATER HEATER WATER METER WATER PROOF MEMBRANE WATERPROOFING WEATHER RESISTANCE WEATHERSTRIP WEEP HOLE WEIGHT WELDED WIRE FABRIC WELDED WIRE MESH WEST WIDE/ WIDTH WIDE FLANGE SECTION WIRED GLASS WIRE MESH
X Y
Z SYMBOL
& @ X C AND
' "
% +/
CD 02/15/2013
MARK DATE
HPD REVIEW
DESCRIPTION
# ()
POUND
QUANTITY
PROJECT NO: 20120606 FILE: 20130402_TG_GarageAddn_BIDSET.pln DRAWN BY: W. Palladino CHK'D BY: Al Cheatham
SHEET NO.
A.02
GENERAL NOTES
THE FOLLOWING NOTES SHALL SUPPLEMENT THE DRAWINGS AND CONTRACT DOCUMENTS. WHERE ARTICLES OR PARAGRAPHS IN THE SPECIFICATIONS AND/ OR DRAWINGS ARE SUPPLEMENTED BY ONE OR MORE OF THE FOLLOWING NOTES, THE PROVISIONS OF SUCH ARTICLE, PARAGRAPH AND/OR DETAIL SHALL REMAIN IN EFFECT AND THE SUPPLEMENTAL NOTE SHALL BE CONSIDERED AS ADDED THERETO. IF THERE IS A CONFLICT OR AMBIGUITY CREATED BY A NOTE, THE MORE STRINGENT REQUIREMENT SHALL APPLY. IT IS IMPORTANT THAT ALL PARTIES UNDERSTAND THAT CONSTRUCTION DOCUMENTS ARE NOT INTENDED TO BE A COMPLETE SET OF INSTRUCTION ON HOW TO CONSTRUCT A BUILDING. CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, PROCEDURES AND SITE SAFETY PRECAUTIONS ARE ASSIGNED RESPONSIBILITIES OF THE CONTRACTOR.
PARTITION NOTES
1. PROVIDE AND INSTALL ALL BLOCKING STIFFENERS, BRACING, BACK-UP PLATES AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL CASEWORK AND OF ALL FLOOR MOUNTED OR SUSPENDED MECHANICAL AND ELECTRICAL EQUIPMENT. 2. COORDINATE METAL STUD GAUGE WITH PREAPPROVED EQUIPMENT ANCHORAGE. WHERE A DISCREPANCY OCCURS, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. 3. PROVIDE SOLID BLOCKING WITHIN PARTITIONS AT ALL LOCATIONS WHERE ITEMS WILL BE MOUNTED ON PARTITIONS INCLUDING, BUT NOT LIMITED TO: ACCESSORIES, CASEWORK TRIM, FLASHING, WALL MOUNTED EQUIPMENT, TACK/BULLETIN/MARKER BOARDS, ETC. 4. THERE SHALL BE NO BACK-TO-BACK ELECTRICAL TELEPHONE, OR OTHER OUTLETS, EXCEPT WHERE SPECIFICALLY SHOWN. 5. PROVIDE ACOUSTIC (SOUND) SEALANT AT NON-RATED WALLS AND FIRE-RATED SEALANT AT SMOKE PARTITION AND AS REQUIRED BY TEST NUMBER. 6. PROVIDE SLIP JOINT CONNECTIONS AT PARTITIONS THAT EXTEND TO STRUCTURE ABOVE. PROVIDE BRACING ABOVE AS REQUIRED. REFERT TO STRUCTURAL DRAWINGS AND TO SLIP JOINT DETAILS. 7. ASSUME LEVEL 4 FINISH FOR ALL GYPSUM BOARD PARTITIONS, UNLESS NOTED OTHERWISE. 8. IT IS THE INTENT OF THE DESIGN THAT ALL METAL STUD PARTITIONS BE OF SUFFICIENT WIDTH TO ADEQUATELY ENCLOSE PIPING, CONDUITS, AND RECESSED EQUIPMENT. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES WITH THIS INTENT. 9. PROVIDE 24" X 24" ACCESS PANELS IN PARTITIONS WHERE REQUIRED FOR MECHANICAL EQUIPMENT EXCEPT WHERE SIZES ARE OTHERWISE NOTED.
*48" A.F.F. MAX B.F. MIN.
1'-8"
VARIES
STEP 1
START WITH ROUGH OPENING SIZED IN ACCORDANCE WITH WINDOW OR DOOR MANUFACTURER'S REQUIREMENTS. REFERENCE AIR SEALING DETAILS FOR PROPER INSTALLATION OF WALL SHEATHING TO WALL FRAMING. INSTALL HOUSE WRAP IN SHINGLE/ OVERLAPPING FASHION WITH APPROVED FASTENERS. ALIGN AND TAPE ALL FASTENERS AND PUNCTURES. HOUSE WRAP TO EXTEND CONTINUOUSLY OVER WINDOW OPENING.
STEP 8
APPLY ADHESIVE BACKED CORNER PATCHES AT HEAD AT SEAMS AND ANY PERFORATIONS.
2'-9"
5'-4"
B.F. MAX.
B.F. MAX.
3'-4"
3'-2"
3'-2"
B.F. MAX.
2'-10"
1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS, SUB-CONTRACTORS, MANUFACTURERS, SUPPLIERS: CAREFULLY AND THOROUGHLY REVIEW THESE GENERAL NOTES. IT IS YOUR RESPONSIBILITY TO KNOW AND ADHERE TO THESE REQUIREMENTS. 2. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR THE CONVENIENCE OF THE ARCHITECT AND THE CONTRACTOR. THE SEPARATIONS USED HEREIN ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE, AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE. 3. THE GENERAL CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR AND HAVE CONTROL OVER CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, PROCEDURES AND COORDINATION OF ALL PORTIONS OF THE WORK. THE GENERAL CONTRACTOR SHALL DETERMINE HOW THE WORK WILL BE DIVIDED INTO SEPARATE TRADES, HOW THE WORK WILL BE BID AND PURCHASED AND HOW THE PURCHASED PRODUCTS A N D S Y S T E M S W I L L B E C O O R D I N AT E D A N D INCORPORATED INTO THE COMPLETED WORK.. 4. ALL SUB-CONTRACTORS SHALL SUBMIT SHOP DRAWINGS, PRODUCT DATA, SAMPLES AND SIMILAR SUBMITTALS AS REQUIRED FOR ARCHITECTS APPROVAL PRIOR TO COMMENCING ANY WORK. THE CONTRACTOR WILL DETERMINE AND VERIFY MATERIALS, FIELD MEASUREMENTS AND FIELD CONSTRUCTION CRITERIA RELATED THERETO AND WILL CHECK AND COORDINATE THE INFORMATION CONTAINED WITHIN SUBMITTALS WITH THE REQUIREMENTS OF THE WORK AND OF THE CONTRACT DOCUMENTS PRIOR TO APPROVING AND SUBMITTING SHOP DRAWINGS, PRODUCT DATA, SAMPLES AND SIMILAR SUBMITTALS TO THE ARCHITECT FOR REVIEW FOR CONFORMANCE. 5. THE DRAWINGS AND SPECIFICATIONS ARE PROVIDED TO DESCRIBE THE CONCEPT OF AN INSTALLATION AND SPECIFIES THE PRODUCTS OR SYSTEMS ADVERTISED OR KNOWN TO BE CONCEPTUALLY EQUAL IN QUALITY. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DETERMINING AND DEFINING SPECIFICALLY HOW THE CONCEPTUALLY EQUAL BUT NOMINALLY DIFFERENT PRODUCTS OR SYSTEMS THAT HAVE BEEN CHOSEN FOR USE IN THE PROJECT WILL BE INCORPORATED INTO THE WORK. 6. THE ARCHITECT'S DRAWINGS WILL MOST LIKELY BE IN CONFLICT WITH THE SELECTED EQUIPMENT AND REQUIRED CLEARANCES TO THE EXTENT THAT COORDINATION IS NECESSARY AND ADVISABLE. THE CONTRACTOR IS SPECIFICALLY DIRECTED TO PROVIDE SKETCHES FOR RESOLUTION OF SUCH PREDICTABLE CONFLICTS PRIOR TO ANY REQUEST FOR INFORMATION OR CLARIFICATION FROM THE ARCHITECT. 7. EVERY EFFORT HAS BEEN MADE TO MAKE THESE DOCUMENTS CONCISE AND COORDINATED, TO DEFINE WORK IN THE MOST LOGICAL PLACE AND TO ELIMINATE REDUNDANCY. DO NOT PRESUME THAT YOUR SCOPE OF WORK IS SINGULARLY DEFINED. YOUR SCOPE OF WORK IS DEFINED THROUGHOUT THE ENTIRE SET OF DRAWINGS AND SPECIFICATIONS AND IS NOT CONTAINED IN JUST ONE SERIES OF DRAWINGS OR DIVISION OF SPECIFICATIONS. YOU MUST REVIEW THE ENTIRE SET OF CONTRACT DOCUMENTS TO DETERMINE YOUR SCOPE OF WORK. 8. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES (SUCH AS CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, ETC.) ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE ARCHITECT PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK. 9. MECHANICAL AND ELECTRICAL DRAWINGS SHOW INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL M.E. EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND STRUCTURAL DETAILING OF SHAFTS, CHASES, AND SUCH. 10. THE CONTRACTOR AND ALL SUB-CONTRACTORS SHALL VISIT THE SITE AND BECOME FAMILIAR WITH SITE CONDITIONS AS THEY MAY AFFECT CARRYING OUT THE WORK AS DESCRIBED IN THESE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL INVESTIGATE, VERIFY, AND BE RESPONSIBLE FOR ALL CONDITIONS OF THE PROJECT, AND NOTIFY THE ARCHITECT OF ANY CONDITIONS THAT REQUIRE MODIFICATION BEFORE PROCEEDING WITH THE WORK. 11. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE OWNER. 12, CONTRACTORS ARE REMINDED THAT COORDINATING THE ROUTING OF THEIR WORK WITH OTHER TRADES IS ESSENTIAL. ANY EXPENSE FOR THE REMOVAL AND RELOCATION SHALL BE AT THE EXPENSE OF THE CONTRACTOR AND NOT OF THE OWNER. 13. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT. 14. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, LABOR, AND SERVICES NECESSARY TO COMPLETE THE WORK. 15. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH THE BUILDING CODE & LOCAL AMENDMENTS. 16. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF ALL TRADES AND THE PREVENTION OF CONFLICT BETWEEN ALL TRADES. 17. WHERE APPLICABLE, PRIOR TO BEGINNING ANY WORK, THE CONTRACTOR SHALL CONDUCT A WALK THROUGH INSPECTION WITH THE OWNER TO DETERMINE IN WRITING THE CONDITION OF THE WORK ALREADY IN PLACE. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR REPLACING EQUIPMENT PRESENTLY IN PLACE THAT IS DAMAGED DURING CONSTRUCTION. 18. CONTRACTOR SHALL SUBMIT CONFIRMATION OF ORDERED MATERIALS OR ITEMS NECESSARY TO COMPLETE THE PROJECT WITH PROJECTED DELIVERY DATE GREATER THAN FOUR WEEKS.
1'-3"
1'-6"
B.F. MAX.
SOAP DISH
SOAP DISPENSER
SNDU
SND
WASTE RECEPTACLE
8"
LAV
2'-5"
GENERAL REQUIREMENTS
B.F. MIN.
4'
4'
STEP 9 STEP 2
MAKE MODIFIED "I" CUT IN HOUSE WRAP CENTERED ON WINDOW OPENING BEYOND. CUT ALONG SOLID LINE, FOLD IN AT DASHED LINE. INSTALL WINDOW TRIM BOARDS PER DETAILS. UNLESS NOTED OTHERWISE, ALL SURFACES, INCLUDING CUTS AND ENDS, TO BE COATED. INSTALL CAP FLASHING OVER AND PAST WINDOW TRIM. APPLY ADHESIVE BACKED MEMBRANE STRIP OVER FLASHING AND FASTENERS AND EXTEND PAST FLASHING ON ENDS. APPLY SHEATHING TAPE OVER MEMBRANE STRIP AND EXTEND PAST.
6'
2'-9"
5'-4"
1'-3"
CONSTRUCTION NOTES
1. CONTRACTOR SHALL, DURING CONSTRUCTION, PROVIDE SURFACE SITE DEWATERING BY TEMPORARY DITCHING SUMPING OR OTHER APPROVED METHODS TO STOP SURFACE WATER FROM RUNNING INTO FOOTING TRENCHES AND OTHER EXCAVATIONS. TEMPORARY MEASURES SHALL BE MAINTAINED UNTIL PERMANENT DRAINAGE SYSTEMS (DITCHES, SWALES, CULVERTS, CATCH BASINS, ETC.) ARE INSTALLED. ALL WORK DAMAGED BY RAIN SHALL BE CORRECTED TO THE ORIGINAL REQUIREMENTS OF THE CONTRACT DOCUMENTS WITHOUT ADDED EXPENSE TO THE OWNER.
HOOKS
TOWEL BAR
3'-7 15/16"
BARRIER FREE SHELF OR PURSE SHELF
4'
4'
CUP DISPENSER
HAND DRYER
ASH TRAY
STEP 3
4'-6" BARRIER FREE MAX.
FOLD IN HOUSE WRAP AND SECURE TO INTERIOR SIDE OF WALL WITH APPROVED FASTENER.
5'-4"
5'
5'
4'-6"
3. ALL WOOD MEMBER IN CONTACT WITH CONCRETE, MASONRY, OR IN WET LOCATIONS, INCLUDING FRAMING, BLOCKING, PLYWOOD OR OSB SHALL BE PRESSURE TREATED. ALL EXTERIOR APPLICATIONS OF PRESSURE TREATED WOOD (PT) TO BE KILN-DRIED AFTER TREATMENT "KDAT". 4. SEAL AROUND ALL PENETRATIONS THROUGH EXISTING AND PROPOSED FIRE RATED PARTITIONS. PROVIDE UL APPROVED FIRE STOP SYSTEM TO MEET REQUIRED RATING. 5. MAINTAIN RATING AT ALL BLOCKOUTS FOR ALL FIRE EXTINGUISHERS AND TOILET ACCESSORIES THAT ARE TO BE INSTALLED IN RATED WALLS. 6. PROVIDE GYPSUM BOARD CONTROL JOINTS IN PARTITIONS AND CEILINGS AT 30'-0" MAX. SPACING. COORDINATE TO MEET FIRE RESISTIVE RATINGS OF THE ASSEMBLY, FIRESTOP JOINTS AT RATED PARTITIONS. SUBCONTRACTOR MUST PROVIDE A SUBMITTAL FOR JOINT MATERIAL. 7. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER AND WHERE THE INTERSECTION IS EXPOSED TO VIEW, UNLESS INDICATED OTHERWISE ON THE DRAWINGS. 8. FIREBLOCK ALL CONCEALED SPACES, SOFFITS, SHAFTS, CHASES AND CEILING AREAS PER REQUIREMENTS OF THE APPLICABLE BUILDING CODE. 9. PROVIDE CONTINUOUS PERIMETER BUILDING INSULATION AT ALL EXTERIOR WALLS FROM SLAB TO ROOF DECK. 10. THE ARCHITECTURAL AND STRUCTURAL DRAWINGS BOTH DESCRIBE VARIOUS FLOOR SLAB SLOPE REQUIREMENTS, RECESSES, AND EDGE CONDITIONS. USE BOTH SETS OF DRAWINGS WHEN INSTALLING THE FLOOR SLAB. 11. GROUT CMU CENTER SCORE JOINT SIMILAR TO OTHER ADJACENT JOINTS.
2'-3 1/16"
2'-3 1/16"
MAX.
2'-3"
MIN.
MIN.
MAX.
3'
MIN.
1'
MAX.
2. IF APPLICABLE PER BUILDING CODE, ALL WOOD BLOCKING SHALL BE FIRE-RETARDANT WOOD.
BF HANDLE HEIGHT
6'-8"
FOLD UP HEAD FLAP AND TEMPORARILY SECURE WITH TAPE. INSTALL WOOD BACKDAM.
PROJECT TITLE
7'
PAY TELEPHONE
TELEPHONE SHELF
FIRE VALVE FIRE HOSE RACK FIRE EXTINGUISHER CABINET OR VALVE AND WALL BRACKET
WALL CABINET
ELECTRIC PANEL
VARIES
STEP 4
INSTALL FIRST PIECE OF ADHESIVE-BACKED FLASHING MEMBRANE.
2'
7'-4" OR AS NOTED
1'-6" 1'-2" BF
INSTALL SECOND PIECE OF ADHESIVE BACKED SILL FLASHING MEMBRANE. OVERLAP PRIOR FLASHING.
4"
2'-9"
INSTALL CORNER FLASHING PATCHES AT SILL. ALTERNATE: INSTALL PREFABRICATED METAL OR PLASTIC WINDOW PAN.
7'
3' STANDARD
4' MAX.
1'-5 15/16"
LIGHT SWITCH
THERMOSTAT
CLOCK
WALL SPEAKER
SIGNAGE
CHALKBOARD, TACKBOARD, MARKER BOARD, SMART PANEL OR PULL DOWN PROJECTION SCREEN
STEP 5
INSTALL WINDOW PLUMB, LEVEL AND SQUARE PER MANUFACTURER'S INSTRUCTIONS. PROVIDE AIR SEALING IN COMPLIANCE WITH NOTES AND MANUFACTURER'S INSTRUCTIONS.
GENERAL NOTES
MIN.
6'-8"
3'-11 15/16"
TO SHELF IN CABINET
3'-4"
17" - 19"
2'-3"
14. TRUSS MESH GALVANIZED JOINT REINFORCING MAY NOT BE SHOWN IN SOME DETAILS FOR CLARITY. IT SHALL BE INSTALLED IN ALL CMU JOINTS WHETHER SHOWN OR NOT. 15. ALL FLASHING IS TO BE OVERLAPPED AT JOINTS 4" MINIMUM AND SEALED WATERTIGHT. 16. CONTRACTOR SHALL ARRANGE FOR ARCHITECT TO BE PRESENT TO OBSERVE ALL FLASHING INSTALLATION PRIOR TO BEING COVERED BY NEW CONSTRUCTION. 17. ALL VERTICAL AND HORIZONTAL PIPES, CONDUITS, DUCTS, ETC. IN FINISHED ROOMS OR AREAS THROUGHOUT THE BUILDING SHALL BE FURRED IN TO MATCH THE ROOM FINISH, UNLESS OTHERWISE NOTED. 18. WHERE MECHANICAL WORK PENETRATES ANY COMPONENT OF A FIRE-RATED ASSEMBLY, PROVIDE THE APPROPRIATE FIRE AND/OR SMOKE DAMPERS. IF IT IS NOT CLEAR WHETHER DUCTWORK PENETRATES A PORTION OF THE RATED ASSEMBLY, OBTAIN CLARIFICATION FROM THE ARCHITECT PRIOR TO BIDDING. SEAL AROUND ALL PENETRATIONS THROUGH PROPOSED FIRE RATED PARTITIONS. PROVIDE UL APPROVED FIRESTOP SYSTEM TO MEET REQUIRED RATING. 19. IF APPLICABLE PER BUILDING CODE, THE FIRE SPRINKLER SYSTEM WILL BE DESIGNED BY THE I N S TA L L I N G S U B - C O N T R A C T O R . T H E G E N E R A L CONTRACTOR SHALL COORDINATE LAYOUT, CLEARANCES, AND LOCATION OF HEAD HEIGHTS WITH THE STRUCTURE, MECHANICAL DUCTWORK, ELECTRICAL LIGHTING, DRAINAGE PIPING, AND THE ARCHITECTURAL REFLECTED CEILING PLANS. THE SPRINKLER DESIGN MUST BE C O O R D I N AT E D W I T H T H E P R O V I S I O N S O F A L L ENGINEERING AND ARCHITECTURAL DOCUMENTS AND SHOULD NOT RELY SOLEY ON ONE SERIES OF DRAWINGS OR ONE DISCIPLINE. CONTRACTOR SHALL ADJUST OR ADD FIRE SPRINKLER HEADS TO ACCOMODATE PARTITION LAYOUT. HEAD SPACING AND PLACEMENT SHALL MEET CODE REQUIREMENTS. SUB-CONTRACTOR SHALL COORDINATE ANY SPRINKLER HEAD LAYOUT CONFLICTS WITH THE ARCHITECT. 20. IF APPLICABLE, AT RAINSCREEN PANEL INSTALLATION USE HORIZONTAL STRAPPING AS REQUIRES PER MANUFACTURER'S RECOMMENDATION WHERE DENSGLASS OR GYP BOARD IS USED AS EXTERIOR SHEATHING.
17" - 19"
MIN.- MAX.
1'-7"
1'-5"
MAX.
MIN.
2'
MIN.
3'-2"
13. CONTRACTOR SHALL PREPARE MASONRY WALLS TO MEET AL REQUIREMENTS OF THE FINISH INSTALLER AND MANUFACTURER TO ENSURE THAT ALL MATERIAL AND INSTALLATION WARRANTIES WILL BE IN EFFECT.
3'-8" MAX.
6'-4"
12. WHERE APPLICABLE, CMU JOINTS SHALL BE SHALLOW CONCAVE JOINTS IN ALL TOILET ROOMS.
5'-11 15/16"
6'
MAX.
1'-3"
STEP 6
BARRIER FREE SHOWER SEAT BARRIER FREE MEDICINE CABINET MEDICINE CABINET MOP STRIP AND SHELF BARRIER FREE URINAL STANDARD URINAL SHOWER HEAD AND VALVES BARRIER FREE HANDHELD SHOWER HEAD AND CONTROLS
INSTALL ADHESIVE BACKED JAMB FLASHING FIRST, OVERLAPPING NAILING FIN (IF APPLICABLE.) INSTALL ADHESIVE BACKED HEAD FLASHING, OVERLAPPING NAILING FIN (IF APPLICABLE) AND JAMB FLASHING.
WATER CLOSET
1'-5"
MIN.
1'-6"
MIN.
3" MAX.
1'-3"
MIN.
2'-10"
2'-10"
MAX.
MAX.
MAX.
2'-5"
2'-5"
2'-3"
2'-5"
MIN.
MIN.
MIN.
2'-10"
3'
3'
3'
MAX.
CD
STEP 7
FOLD DOWN HEAD HOUSE WRAP.
02/15/2013
MARK DATE
HPD REVIEW
DESCRIPTION
2'-6"
BF MIN. WATER CLOSET LAVATORY
LAVATORY
VANITY
URINAL
WATER CLOSET
DOOR HARDWARE
PROJECT NO: 20120606 FILE: 20130402_TG_GarageAddn_BIDSET.pln DRAWN BY: W. Palladino CHK'D BY: Al Cheatham
SHEET NO.
2 A.03
3 A.03
A.03
N.I.C.
N.I.C.
N.I.C.
EXIST. ROOF OVERHANG REMAINS TO EDGE OF NEW WALL FRAMING (SEE PLAN) REMOVE SHINGLES @ NEW STORAGE AREA REMOVE & INFILL EXISTING WINDOW
1'-0"
CUT BACK ROOF & SOFFIT FRAMING TO REAR EDGE OF INTEGRATED GUTTER
REMOVE SHINGLES AS NEC. FOR NEW WING WALL (SEE FIRST FLOOR PLAN)
N.I.C.
N.I.C.
N.I.C.
CD 02/15/2013
MARK DATE
HPD REVIEW
DESCRIPTION
PROJECT NO: 20120606 FILE: 20130402_TG_GarageAddn_BIDSET.pln DRAWN BY: W. Palladino CHK'D BY: Al Cheatham
REMOVE TREE REMOVE SHINGLES & SHEATHING AS NEC. FOR INT. OF NEW WALL (SEE FIRST FLOOR PLAN)
N.I.C.
SHEET NO.
A.04
1'-0"
POURED CONCRETE FOUNDATION TO 12" BELOW GRADE W/#4 CONTINUOUS REINFORCING BARS 3" FROM BOTTOM @ 16" O.C. ACROSS WIDTH AND 3/8" THREADED ANCHOR BOLTS @ WALL CENTERLINES (SEE FLOOR PLAN) 8" INTO CONCRETE @ 32" O.C. AND AT CORNERS
TRENCH FOOTING FOUNDATION STEPS STEPS (SEE DETAILS) OUTSIDE FACE OF NEW FOUNDATION ALIGNS VERTICALLY W/OUTSIDE FACE OF NEW ROUGH FRAMING ABOVE 2 A.09
N.I.C.
PROJECT TITLE
2'
9'-10 1/4"
10' 33'-7"
10'-4"
1'-4 3/4"
10'-8 1/4"
10'-8 1/4"
N.I.C.
SL O PE
POURED CONCRETE FOUNDATION TO 12" BELOW GRADE W/(2) #4 CONTINUOUS REINFORCING BARS @ BOTTOM (3" COVER) AND 3/8" THREADED ANCHOR BOLTS @ WALL CENTERLINE (SEE FLOOR PLAN) 8" INTO CONCRETE @ 32" O.C. AND AT CORNERS
25'-3 1/4"
EXPANSION JT MATERIAL @ NEW/OLD SLAB INT. (TYP) EXISTING GARAGE FOUNDATION (V.I.F.) BREAK LINE
N.I.C.
1 A.09
2'
2'
C L
C L
1 A.09
2'
2'
C L
C L
P.O.B.
1'-1 1/4"
FOUNDATION PLAN
8'
SL O PE
2 A.09
NEW 5" CONCRETE SLAB (MATCH EXIST. AGGREGATE & COLOR) W/6" STEEL MESH REINFORCEMENT
5 1/2"
2'
EXIST. FOUND.
SL O PE
1'-2 3/4"
NEW 5" CONCRETE SLAB (MATCH EXIST. AGGREGATE & COLOR) W/6" STEEL MESH REINFORCEMENT
N.I.C.
PE O SL
CD 02/15/2013
MARK DATE
HPD REVIEW
DESCRIPTION
PROJECT NO: 20120606 FILE: 20130402_TG_GarageAddn_BIDSET.pln DRAWN BY: W. Palladino CHK'D BY: Al Cheatham
SHEET NO.
BASEMENT/FOUNDATION PLAN
SCALE: 1/4" =
NORTH
A.05
1'-0"
420 1/2 Eighth Street Augusta, GA 30901 Ph: (706) 724-2668 Fx: (706) 849-9919
DOWNSPOUT FROM GUTTER ABOVE (SEE ROOF PLAN) DUMPS TO DRAINAGE TROUGH
SINGLE STUD WALL *DOES NOT* HAVE ANGLED EXTERIOR TO MATCH EXISTING
NEW STUD WALL ALIGNS WITH STRUCTURAL STUD WALL IN EXIST. GARAGE 2 A.09
3 1/2"
ALIGN
N.I.C.
PROJECT TITLE
DN
STORAGE
DN
DN
NEW DRAINAGE TROUGH BTWN NEW SLAB/FOOTINGS & EXIST. BRICK GARDEN WALL
21'-6 1/4"
3 1/2"
3'-1"
6'-2"
R.O.
3'-10"
6'-2"
R.O.
3'-10"
6'-2"
R.O.
N.I.C.
24'-4 3/4"
3 1/2"
2'-0"
3-CAR CARPORT
5 A.11 DROPPED STEEL W-SECTION BEAM - SEE STRUCTURAL PLAN NEW SLAB EXIST. SLAB EXIST. SLAB NEW SLAB 1 A.09
F.D.
F.D.
N.I.C.
10'-0"
3" DIA. STEEL PIPE COLUMN (TYP) - SEE STRUCTURAL PLAN SLOPE
4 A.11
3 1/2"
1 1/2"
P.O.B.
3 1/2" 5"
DIM. TO OUTSIDE FACE OF FOOTING
1'-1 1/4"
2 A.09
2'-9 3/4"
SLOPED THRESHOLD AT CARPORT ENTRANCE MATCH NEW DRIVEWAY SLAB & AGGREGATE TO EXIST. BREAK THRESH. 8" AT EXIST/NEW SLAB LOCATION (FOR DRAINAGE) 3 A.10
N.I.C.
US FL H
CD 02/15/2013
MARK DATE
HPD REVIEW
DESCRIPTION
PROJECT NO: 20120606 FILE: 20130402_TG_GarageAddn_BIDSET.pln DRAWN BY: W. Palladino CHK'D BY: Al Cheatham
SHEET NO.
A.06
1'-0"
420 1/2 Eighth Street Augusta, GA 30901 Ph: (706) 724-2668 Fx: (706) 849-9919
DOWNSPOUT TO DRAINAGE TROUGH BELOW 5" BOX GUTTER AT ROOF DRAINS VIA DOWNSPOUT TO TROUGH BELOW 2 A.09
N.I.C.
PROJECT TITLE
TAPERED BLOCKING AT CORNER TO PREVENT POOLING
SLOPE 1/4":1'-0"
SLOPE 1/4":1'-0"
SLOPE 1/4":1'-0"
N.I.C.
1 A.10
N.I.C.
1 A.09
1 A.09
ROOF PLAN
NEW FLASHING AT INT. OF EXISTING ROOF & NEW ROOF WHERE INTEGRATED GUTTER HAS BEEN REMOVED (SEE DETAILS)
P.O.B.
BROKEN COPPER ROOF ABOVE CROWN MOULDING (SEE DETAILS) 2 A.09 STOP & SEAL EXIST. INTEGRATED GUTTER AT EDGE OF NEW CONSTRUCTION
3 A.10
N.I.C.
CD 02/15/2013
MARK DATE
HPD REVIEW
DESCRIPTION
PROJECT NO: 20120606 FILE: 20130402_TG_GarageAddn_BIDSET.pln DRAWN BY: W. Palladino CHK'D BY: Al Cheatham
SHEET NO.
ROOF PLAN
SCALE: 1/4" =
NORTH
A.07
1'-0"
2 A.09
PROJECT TITLE
NOTE: SISTER 2x MATERIAL TO RAFTERS TO PROVIDE NAILING FOR LEVEL FINISH CEILING IN CARPORT BELOW (SEE SECTIONS)
1 A.09
2 A.09
CD 02/15/2013
MARK DATE
HPD REVIEW
DESCRIPTION
PROJECT NO: 20120606 FILE: 20130402_TG_GarageAddn_BIDSET.pln DRAWN BY: W. Palladino CHK'D BY: Al Cheatham
SHEET NO.
A.08
1'-0"
CARPORT ROOF ASSEMBLY: 1. 60 MIL EPDM SELF-ADHERED ROOF MEMBRANE, LAID UP SHINGLE-STYLE PER MANUFACTURER INSTRUCTIONS, TO FORM A CONTINUOUS, SELF-FLASHING DRAINAGE PLANE, ON 2. 3/4" EXTERIOR GRADE T&G ROOF SHEATHING WITH MEMBRANE MAN. APPROVED FASTENERS, ON, 5/4 PT WOOD (ALT: MILLED COMPOSITE) PLANK FINISH WRAP (W-SECTION BEAM WITHIN) 3. 2x8 RAFTERS @ 16" O.C., WITH 4. 2x MATERIAL AS NEC. TO PROVIDE A LEVEL NAILING SURFACE, FOR 5. 1x4 V-GROOVE T&G PT PLANK (ALT: MILLED COMPOSITE BOARD) FINISH BOARDS, WITH 6. EXTERIOR RATED ALKYD PRIMER & PAINT.
1 A.11
CARPORT WALL ASSEMBLY (EXTERIOR): 1. 5" REVEAL CEDAR LAP SIDING (INTENT IS TO MATCH REVEAL HGT OF EXIST. SHINGLES), ON 2. DRAINAGE MATRIX UNDERLAYMENT, LAID UP SHINGLE STYLE PER MANUFACTURER INSTRUCTIONS TO FORM A CONTINUOUS, SELF-FLASHING DRAINAGE PLANE, ON 3. 1/2" EXTERIOR BUILDING SHEATHING, ON 4. 2x4 WALL ASSEMBLY @ 16" O.C. (PT WHERE IN CONTACT WITH CONCRETE), WITH 5. 1/2" PLYWOOD WALL SHEATHING (ON INTERIOR), WITH 6. 1x4 V-GROOVE PT WOOD (ALT: MILLED COMPOSITE) PLANK INTERIOR FINISH, WITH
EQ.
1'-1 3/4"
420 1/2 Eighth Street Augusta, GA 30901 Ph: (706) 724-2668 Fx: (706) 849-9919
6'-8 1/4"
5 A.11
7'-6 3/16"
8'-8 1/4"
4 A.11
8"
8"
5/4 BEADED EDGE PLANK BASE MOULD (MATCH COLUMN BASE HGT)
PROJECT TITLE
SHEET TITLE
EXIST. EAVE ASSEMBLY (BEYOND)
STORAGE WALL ASSEMBLY (EXTERIOR): 1. 5" REVEAL CEDAR LAP SIDING (INTENT TO MATCH EXISTING SHINGLE REVEAL HGT), ON 2. DRAINAGE MATRIX UNDERLAYMENT, LAID UP SHINGLE STYLE PER MANUFACTURER INSTRUCTIONS TO FORM A CONTINUOUS, SELF-FLASHING DRAINAGE PLANE, ON 3. 1/2" EXTERIOR GRADE BUILDING SHEATHING, ON 4. 2x4 WALL ASSEMBLY @ 16" O.C. (PT WHERE IN CONTACT WITH CONCRETE), WITH 5. 1/2" PLYWOOD WALL SHEATHING (ON INTERIOR).
BUILDING SECTIONS
3 A.11 2 A.11
EXT. GRADE BUILDING SHEATHING WHERE STORAGE ROOM MEETS EXISTING GARAGE WALL ASSEMBLY
CD
3/8" THREADED ANCHOR BOLTS (PER FOUNDATION PLAN) @ 32" O.C. & AT CORNERS
02/15/2013
MARK DATE
HPD REVIEW
DESCRIPTION
STORAGE WALL ASSEMBLY (CARPORT INTERIOR): POURED CONCRETE FOUNDATION (SEE FOUNDATION PLAN) 1. VERTICAL V-GROOVE PT WOOD T&G PLANK (ALT: V-GROOVE MILLED COMPOSITE PLANK), ON 2. BUILDING FELT, LAID UP SHINGLE STYLE (6" OVERLAP) TO FORM A CONTINUOUS, SELF-FLASHING DRAINAGE PLANE, ON 3. 1/2" EXTERIOR GRADE BUILDING SHEATHING, ON 4. 2x4 WALL ASSEMBLY @ 16" O.C. (PT WHERE IN CONTACT WITH CONCRETE), WITH
PROJECT NO: 20120606 FILE: 20130402_TG_GarageAddn_BIDSET.pln DRAWN BY: W. Palladino CHK'D BY: Al Cheatham
SHEET NO.
2 A.09
A.09
N.I.C.
TAPERED BLOCKING AT THIS CORNER OF ROOF (HIDDEN BY EXIST. EAVE) EXISTING NEW COPPER PARAPET CAP
DOWNSPOUT TO DRAINAGE TROUGH 5" BOX GUTTER COPPER PARAPET CAP 5" REVEAL CEDAR LAP SIDING (INTENT TO MATCH EXIST. SHINGLE REVEAL)
PROJECT TITLE
1 A.10
WEST ELEVATION
SCALE: 1/4" = 1'-0"
2 A.10
NORTH ELEVATION
SCALE: 1/4" = 1'-0"
N.I.C.
NEW EXISTING
EXTERIOR ELEVATIONS
COPPER PARAPET CAP 5" REVEAL CEDAR LAP SIDING COPPER ROOF FLASHING
5" REVEAL (MATCH EXIST. SHAKE REVEAL) CEDAR LAP SIDING BEADED EDGE PT 1x4 DOOR CASING BLACK DOOR HANDLES AND LOCKS (COORD. W/ARCHITECT) BEADED EDGE 1x6 BASE MOULD 1x4 V-GROOVE PT WALL FINISH (ALT: MILLED COMPOSITE PLANK)
FLUSH BOLT ON LEFT LEAF (TYP) DEADBOLT ON RIGHT LEAF (TYP) ALIGN DOOR HANDLES @ 4'-5" 5/4 PT WOOD PILASTER TREATMENT PT WOOD (ALT. PVC) PILASTER TRIM (COORD. W/ARCHITECT)
1'-6"
4'-5"
CD 02/15/2013
MARK
N.I.C.
HPD REVIEW
DESCRIPTION
DATE
3 A.10
SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
PROJECT NO: 20120606 FILE: 20130402_TG_GarageAddn_BIDSET.pln DRAWN BY: W. Palladino CHK'D BY: Al Cheatham
SHEET NO.
A.10
MEMBRANE ADHESIVE SEAM FLASHING BROKEN METAL FLASHING EPDM ROOF MEMBRANE
COPPER RUNS 4" UP PARAPET WALL BEHIND DRAINAGE WRAP MANUFACTURER APPROVED EPDM FASTENERS & SEALANT PULL BACK EXIST. SHINGLE ROOF TO ALLOW EPDM MEMBRANE TO RUN BENEATH EDGE - NOTE: DO NOT FASTEN LAST ROW OF SHINGLES THROUGH EPDM MEMBRANE EPDM RUNS 6" UNDER SHINGLE ROOF 12 5" BOX GUTTER BROKEN COPPER WRAP ALIGN EDGE OF COPPER ROOF VERTICALLY WITH EXISTING (BEYOND)
1'-5 1/4"
4"
V.I.F.
6"
5"
3/4" EXTERIOR GRADE T&G ROOF SHEATHING (W/ROOF MEMBRANE MAN. APPROVED FASTENERS TO RAFTERS BELOW) DRAINAGE MATRIX WRAP
INSERT 1/2" BACKER ROD BENEATH EPDM @ CORNER (ACCOUNTS FOR MOVEMENT)
4"
1 1/4"
1'-6 1/4"
3/4"
1"
6"
1"
8"
2 1/4"
1 A.11
2 A.11
3 A.11
PROJECT TITLE
EXPANSION JOINT MATERIAL 6" STEEL MESH REINFORCEMENT (2) #4 REINFORCING BARS CONT. 3/8" THREADED ANCHOR BOLTS
6"
6"
2' 1'
2' 1' 45
SLAB DEPTH
SHEET TITLE
2' 45
2'
MATCH EXIST.
DETAILS
STEEL POST C.L. (4) #4 STEEL REINFORCING BAR EACH WAY 6" STEEL MESH REINFORCEMENT (4) #4 STEEL REINFORCING BAR EACH WAY (2) #4 REINFORCING BARS CONT.
4 A.11
5 A.11
CD 02/15/2013
MARK DATE
HPD REVIEW
DESCRIPTION
PROJECT NO: 20120606 FILE: 20130402_TG_GarageAddn_BIDSET.pln DRAWN BY: W. Palladino CHK'D BY: Al Cheatham
SHEET NO.
A.11
NEW 120/240V 60A FLUSH WALL MOUNTED PANEL. WITH MINIMUM SIX(6) 20A/1P BREAKERS
2 A.09
NEW CONDUIT SHOULD BE HIDDEN FROM VIEW IN STORAGE AREA AND ABOVE FINISH CEILING
WP MOTION
PROJECT TITLE
a,b
WP
WP
b
WP WP
1 A.09
1 A.09
42"
ELECTRICAL PLAN
SCALE: 1/4" =
NORTH
b
EXISTING PANEL CAN TO BE REMOVED. PROVIDE NEW 100 MAIN BREAKER PANEL AT LOCATION. REFEED EXISTING KITCHEN PANEL WITH NEW 100A/2P BREAKER. PROVIDE NEW 40A/2P BREAKER TO SERVE NEW PANEL TO BE LOCATED IN CARPORT. CEILING MOUNTED MOTION SENSOR SWITCH (TYP. OF (3))
WP MOTION
ELECTRICAL PLAN
2 A.09
CD 02/15/2013
MARK DATE
HPD REVIEW
DESCRIPTION
PROJECT NO: 20120606 FILE: 20130402_TG_GarageAddn_BIDSET.pln DRAWN BY: W. Palladino CHK'D BY: Al Cheatham
SHEET NO.
E.01
1'-0"