You are on page 1of 1

-

Check if the space in front of ECR is enough for all the exhaust pipes and fire pipe. Check if the funnel is enough to accommodate exhaust silencers. The crane cannot lift the spud can. Co2 room space should be checked. Why there is 2 sea chests SB, PS between fr.17 & fr.19 (one is enough). Forward mooring winches should be adjusted to prevent intersection of the wires. FO TK PS is very small (2 frames), better if merged with void.

You might also like