The document details the steps involved in lifting and securing a 100 metric ton caisson onto a barge for transport, including lowering the caisson onto the barge deck, welding it in place, securing anchor piles and guyed wire reels, and final preparations to load the AJK topside unit and related equipment for offshore installation on April 25.
The document details the steps involved in lifting and securing a 100 metric ton caisson onto a barge for transport, including lowering the caisson onto the barge deck, welding it in place, securing anchor piles and guyed wire reels, and final preparations to load the AJK topside unit and related equipment for offshore installation on April 25.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
The document details the steps involved in lifting and securing a 100 metric ton caisson onto a barge for transport, including lowering the caisson onto the barge deck, welding it in place, securing anchor piles and guyed wire reels, and final preparations to load the AJK topside unit and related equipment for offshore installation on April 25.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd