CONTRACT NO.

NRA N-002-250-2011/1
IMPROVEMENTS TO UMGENI ROAD INTERCHANGE (KM 21.5) NATIONAL ROUTE 2, SECTION 25
SCHEDULE A: ROAD CONSTRUCTION: SECTION 7500 GROUND ANCHORS
SECTION 7500: GROUND ANCHORS
B75.01

Establishment on site for ground anchors and


sprayed concrete walls

75.02

Moving to, and setting up the equipment at each


for drilling the holes

Unit

Quantity

Rate

L/sum

No.

755

Amount

Icj Rate

454,377.00
358.33

270,539.15

Amount

454,377.00
358.33

B75.09 Rockbolts

270,539.15

1,470.00

(a) 6,0 m long x 25 mm dia

No.

35

4639.00

162,365.00

3949.00

138,215.00

80.00

(b) 6,0 m long x 32 mm dia

No.

720

5182.00

3,731,040.00

4557.00

3,281,040.00

1,390.00

B75.10 Welded mesh reinforcement

(a) Type reference 245

4,850

82.27

399,009.50

36.50

177,025.00

(b) Extra over Item B75.10(a) for galvanising

4,850

37.48

181,778.00

28.00

135,800.00

No.

10

15,375.00

153,750.00

15,375.00

153,750.00

B75.11 Establishment on site for sprayed concrete


B75.12 Sprayed concrete:

(a) 100mm thick (35 MPa as per Table 7504/2)

4,850

471.00

2,284,350.00

465.00

2,255,250.00

(b) Extra over B75.12 (a) for sprayed concrete to


be crafted to a simulated artificial or mock rock
finish (see cuttings at Edwin Swales Interchange)

4,850

494.34

2,397,549.00

494.34

2,397,549.00

B75.13 Pressure relief holes

No.

Rate only

77.00

B75.14 Install and fix wick drains


(a) 100mm at 6m intervals
(b) Wick drain outlet to toe drain
B75.15 Galvanised mild steel anchor bars
(R8 -400 mm long)
B75.16 Rockbolt "spider " steel reinforcing: galvanised 4 Y16 bars 600mm long

1,350

101

136,350.00

101.00

136,350.00

No.

125

106

13,250.00

106.00

13,250.00

No.

350

96

33,600.00

96.00

33,600.00

No.

755

112

84,560.00

112.00

84,560.00

TOTAL CARRIED FORWARD TO SUMMARY

10,302,517.65

1470

9,531,305.15

eo mesh

700

35

24,500.00

eo concrete

700

100

70,000.00
9,625,805.15 Total Cost
4850 Total Area