DAFTAR HARGA SATUAN UPAH

DINAS PEKERJAAN UMUM KABUPATEN REMBANG


TAHUN 2013
EDISI JANUARI 2013
NO.

JENIS PEKERJAAN

SATUAN

HARGA SATUAN
(Rp)

Pekerja

Org

36,000.00

Penjaga

Org

36,000.00

Tukang

Org

51,000.00

Tukang Batu

Org

51,000.00

Tukang Besi

Org

51,000.00

Tukang Cat

Org

51,000.00

Tukang Gali

Org

48,000.00

Tukang Kayu

Org

51,000.00

Tukang Leideng

Org

51,000.00

10

Tukang Plitur

Org

48,000.00

11

Sopir

Org

48,000.00

12

Mekanik

Org

45,000.00

13

Operator terlatih

Org

51,000.00

14

P e m b . Sopir

Org

36,000.00

15

Pembantu Mekanik

Org

45,000.00

16

Pembantu Operator

Org

42,000.00

17

Kepala Tukang

Org

51,000.00

18

Kepala Tukang Batu

Org

54,000.00

19

K e p . T u k a n g Besi

Org

54,000.00

20

K e p . T u k a n g Cat

Org

54,000.00

21

Kepala Tukang Gali

Org

54,000.00

22

K e p . T u k a n g Kayu

Org

54,000.00

23

Kepala Tukang Ledeng

Org

54,000.00

24

Kepala Tukang Plitur

Org

54,000.00

25

Mandor Lapangan

Org

48,000.00

Rembang,

KETERANGAN

Januari 2013

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 010 234 645 / 19620715 199011 1 002

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

EDISI JANUARI 2013

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

DAFTAR HARGA SATUAN BAHAN


DINAS PEKERJAAN UMUM KABUPATEN REMBANG
TAHUN 2013
EDISI JANUARI 2013
NO.

J E N I S

1
I

B A H A N
2

BAHAN DASAR
BATU KALI
1 Batu Alam
2 Batu Apung
3 Batu Belah
4 Batu Kali Bulat
5 Batu Grosok (pudel)
6 Batu Pecah 0,5/1
7 Batu Pecah 1/1
8 Batu Pecah 1/2
9 Batu Pecah 2/3
10 Batu Pecah 3/5
11 Batu Pecah 5/7
12 Batu Tempel
13 Batu Bolder
2 KERIKIL
1 Kerikil Biasa
2 Kerikil Sawur/Koral
3 BATU BATA
1 Bata Merah Lokal
2 Batako Besar (10/20/40)
3 Batako Kecil (7/11/25)
4 Batako Sedang (12/15/30)
4 PASIR
1 Pasir Beton (Cepu)
2 Pasir Beton (Muntilan)
3 Pasir Kwarsa
4 Pasir Pasang (Cepu)
5 Pasir Urug (Timbunan )
6 Sirtu (tidak di ayak)
7 Sirtu Royalty
8 Abu Batu
9 Abu Batu (Tayu)

HARGA
SATUAN
4.00

m2
kg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m3

99,000.00
20,200.00
125,000.00
138,700.00
140,000.00
287,000.00
262,000.00
274,000.00
272,000.00
229,000.00
152,000.00
101,000.00
238,000.00

m3
m3

31,000.00
30,000.00

bh
bh
bh
bh

500.00
4,300.00
1,200.00
3,300.00

m3
m3
m3
m3
m3
m3
m3
m3
m3

250,000.00
355,000.00
134,000.00
230,000.00
68,000.00
117,000.00
50,000.00
129,000.00
232,000.00

m3
m3
m3
m3

55,000.00
61,000.00
37,000.00
76,000.00

kg
m3

3,000.00
215,600.00

kg
zak
zak
kg
kg
kg
zak
zak
zak

1,750.00
70,000.00
87,500.00
1,275.00
1,550.00
2,350.00
62,000.00
77,500.00
117,500.00

m3
m3
m3
m3
m3
m3
m3

912,500.00
975,000.00
1,006,250.00
1,037,500.00
1,062,500.00
1,125,000.00
1,162,500.00

m3

140,000.00

bh
pak

6,900.00
285,000.00

bh
bh
bh
bh

3,000.00
4,800.00
10,000.00
10,000.00

bh

1,300.00

SATUAN

II
1

TANAH
1 Tanah Biasa
2 Tanah Liat
3 Tanah Padas
4 Timbunan Pilihan (tanah pilihan)
KAPUR
1 Kapur Labor
2 Kapur Pasang (Padam)
PORTLAND CEMENT
1 Portland Cement/PC
2 Portland Cement/PC(40 kg)
3 Portland Cement/PC(50kg)
4 Portland Cement/PC Curah
5 Portland Pozzolan Cement/PPC
6 Portland Pozzolan Cement/PPC-Warna
7 Portland Pozzolan Cement/PPC ( 40kg)
8 Portland Pozzolan Cement/PPC(50kg)
9 Portland Pozzolan Cement/PPC (50kg)-warna
BETON
1 Adukan Beton K125 ready mix
2 Adukan Beton K175 ready mix
3 Adukan Beton K200 ready mix
4 Adukan Beton K225 ready mix
5 Adukan Beton K250 ready mix
6 Adukan Beton K300 ready mix
7 Adukan Beton K325 ready mix
TRAS (TANAH KAPUR)
1 Tras
BAHAN

PENUTUP ATAP

SIRAP
1 Sirap
2 Sirap( 100 lbr )
GENTENG BETON
1 Genteng Beton Warna (standard)
2 Genteng Beton
3 Genteng Kerpus Beton
4 Genteng Kerpus Beton Warna (standard)
GENTENG TANAH LIAT
1 Genteng biasa

146907750.xls.ms_office

KET.
5

NO.
1

J E N I S

B A H A N

2
2 Genteng Jatiwangi
3 Genteng Keramik
4 Genteng Mantili Besar
5 Geneteng Mantili Kecil
6 Genteng Pres
7 Genteng Kerpus Jatiwangi
8 Genteng Kerpus Keramik
9 Genteng Kerpus Lokal
10 Genteng Kerpus Mantili
ASBES GELOMBANG
1 Asbes gelombang ( 80 x 210 ) cm
2 Asbes gelombang besar 5 mm ( 120 x 240 ) cm
3 Asbes gelombang besar 5 mm ( 90 x 180 ) cm
4 Asbes gelombang Kecil 5 mm ( 120 x 240 ) cm
5 Asbes gelombang Kecil 5 mm ( 90 x 180 ) cm
6 Asbes gelombang ( 80 x 180 ) cm
7 Asbes gelombang ( 80 x 240 ) cm

146907750.xls.ms_office

3
bh
bh
bh
bh
bh
bh
bh
bh
bh

HARGA
SATUAN
4.00
4,200.00
12,200.00
1,500.00
1,300.00
1,100.00
11,600.00
21,300.00
3,500.00
3,500.00

bh
lbr
lbr
lbr
lbr
lbr
lbr

50,000.00
117,000.00
97,000.00
89,000.00
59,000.00
53,000.00
68,000.00

SATUAN

KET.
5

NO.

J E N I S

1
6

B A H A N

2
ASBES PLAT
1 Asbes Plat 100cm X 100 cm X 5 mm
2 Asbes Plat 100cm X 200 cm X 5 mm
3 Asbes Plat 100cm X 240 cm X 5 mm
4 Sekrup asbes
SENG PLAT
1 Seng Plat BJLS 0,30 panjang 180 cm
2 Seng Plat BJLS 0,30 panjang 240 cm
3 Seng Plat BWG 0, 28 x 80
4 Seng Plat BWG 28 x 90
SENG GELOMBANG
1 Seng gel. Kecil 0,70 x 1,80 m
2 Seng gel. Kecil 0,70 x 2,10 m
3 Seng gel. BJLS 0,28 panjang 180 cm
4 Seng gel. BJLS 0,30 panjang 180 cm
5 Seng gel. BJLS 0,28 panjang 240 cm

9 SENG TALANG
1 Seng talang BJLS 26 lebar 0,60
2 Seng talang BJLS 26 lebar 0,90
3 Seng talang BJLS 26 lebar 1,20
III . B A H A N K A Y U
1 JATI
1 Kayu jati (balok/pesagen)
2 Kayu jati (papan)
3 Usuk kayu jati (3x5x400)
4 Usuk kayu jati (4x6x400)
5 Usuk kayu jati (5x7x400)
6 Reng kayu jati (2x3x400)
7 Reng kayu jati (2x4x400)
2 BENGKIRAI
1 Kayu bengkirai (balok/pesagen)
2 Kayu bengkirai (papan)
3 Usuk kayu bengkirai (3x5x400)
4 Usuk kayu bengkirai (4x6x400)
5 Usuk kayu bengkirai (5x7x400)
6 Reng kayu bengkirai (2x3x400)
7 Reng kayu bengkirai (2x4x400)
3 MERANTI
1 Kayu meranti (balok/pesagen)
2 Kayu meranti (papan)
3 Usuk kayu meranti (3x5x400)
4 Usuk kayu meranti (4x6x400)
5 Usuk kayu meranti (5x7x400)
6 Reng kayu meranti (3x5x400)
7 Reng kayu meranti (3x5x400)
4 KAMPER
1 Kayu Kamper (balok /pesagen)
2 Kayu kamper (papan)
3 Usuk kayu kamper (3x5x400)
4 Usuk kayu kamper (4x6x400)
5 Usuk kayu kamper (5x7x400)
6 Reng kayu kamper (2x3x400)
7 Reng kayu kamper (2x4x400)
5 KRUING
1 Kayu Kruing (balok /pesagen)
2 Kayu Kruing (papan)
3 Usuk kayu Kruing (3x5x400)
4 Usuk kayu Kruing (4x6x400)
5 Usuk kayu Kruing (5x7x400)
6 Reng kayu Kruing (2x3x400)
7 Reng kayu Kruing (2x4x400)
6 MERBAU
1 Kayu Merbau (balok /pesagen)
2 Kayu Merbau (papan)
3 Usuk kayu Merbau (3x5x400)
4 Usuk kayu Merbau (4x6x400)
5 Usuk kayu Merbau (5x7x400)
6 Reng kayu Merbau (2x3x400)
7 Reng kayu Merbau (2x4x400)
7 LANAN
1 Kayu Lanan (balok /pesagen)
2 Kayu Lanan (papan)
3 Usuk kayu Lanan (3x5x400)
4 Usuk kayu Lanan (4x6x400)
5 Usuk kayu Lanan (5x7x400)
6 Reng kayu Lanan (2x3x400)
7 Reng kayu Lanan (2x4x400)
8 MAHONI

146907750.xls.ms_office

HARGA
SATUAN
4.00

bh
bh
bh
bh

21,000.00
58,000.00
75,000.00
1,600.00

m'
m'
m'
m'

60,300.00
78,300.00
46,300.00
51,900.00

lbr
lbr
lbr
lbr
lbr

59,000.00
69,000.00
60,000.00
60,300.00
75,000.00

m'
m'
m'

25,800.00
36,800.00
55,900.00

m3
m3
btg
btg
btg
pak
pak

16,844,000.00
16,844,000.00
101,000.00
162,000.00
236,000.00
1,010,000.00
1,347,500.00

m3
m3
btg
btg
btg
pak
pak

11,250,000.00
11,250,000.00
68,000.00
108,000.00
158,000.00
675,000.00
900,000.00

m3
m3
btg
btg
btg
pak
pak

3,609,000.00
3,609,000.00
22,000.00
35,000.00
51,000.00
217,500.00
287,500.00

m3
m3
btg
btg
btg
pak
pak

9,769,000.00
9,769,000.00
59,000.00
94,000.00
137,000.00
585,000.00
782,500.00

m3
m3
btg
btg
btg
pak
pak

8,000,000.00
8,800,000.00
48,000.00
77,000.00
112,000.00
480,000.00
640,000.00

m3
m3
btg
btg
btg
pak
pak

11,000,000.00
11,000,000.00
66,000.00
106,000.00
154,000.00
660,000.00
880,000.00

m3
m3
btg
btg
btg
pak
pak

3,609,000.00
3,609,000.00
22,000.00
35,000.00
51,000.00
217,500.00
287,500.00

SATUAN

KET.
5

NO.
1

10

11

J E N I S

B A H A N

2
1 Kayu Mahoni (balok /pesagen)
2 Kayu Mahoni (papan)
3 Usuk kayu Mahoni (3x5x400)
4 Usuk kayu Mahoni (4x6x400)
5 Usuk kayu Mahoni (5x7x400)
6 Reng kayu Mahoni (2x3x400)
7 Reng kayu Mahoni (2x4x400)
ANGSANA
1 Kayu Angsana (balok /pesagen)
2 Kayu Angsana (papan)
3 Usuk kayu Angsana (3x5x400)
4 Usuk kayu Angsana(4x6x400)
5 Usuk kayu Angsana (5x7x400)
6 Reng kayu Angsana (2x3x400)
7 Reng kayu Angsana (2x4x400)
DOLKEN
1 Kayu dolken sengon 8 - 10 cm, 4 M
2 Kayu perancah
LAIN-LAIN
1 Kayu randu (papan )
2 Kayu hutan lokal (Keras)
3 Kayu hutan lokal (Menengah)
4 Bambu diameter 6-8/600 cm
5 Bambu Apus
6 Glugu
7 Lis kayu 2/3
8 List Kayu Profil

IV . BAHAN PENUTUP DINDING / LANTAI


1 UBIN (TEGEL BIASA)
1 Tegel polos 20 X 20 cm
2 Tegel polos 30 X 30 cm
3 Tegel warna 20 X 20 cm
2 KERAMIK
1 Keramik 10 x 20 cm
2 Keramik 20 x 20 cm
3 Keramik 20 x 25 cm
4 Keramik putih (KW-1) 30x30 cm
5 Keramik putih (KW-2) 30x30 cm
6 Keramik warna (KW-1) 30x30 cm
7 Keramik putih (KW-2) 30x30 cm
3 MARMER
1 Marmer Itali
2 Marmer Kalimantan
3 Marmer Tulung Agung

146907750.xls.ms_office

3
m3
m3
btg
btg
btg
pak
pak

HARGA
SATUAN
4.00
3,988,000.00
3,988,000.00
24,000.00
38,000.00
56,000.00
240,000.00
320,000.00

m3
m3
btg
btg
btg
pak
pak

2,475,000.00
2,475,000.00
15,000.00
24,000.00
35,000.00
147,500.00
197,500.00

btg
m3

39,000.00
2,269,000.00

m3
m3
m3
btg
btg
m'
m'
m'

663,000.00
5,340,000.00
2,850,000.00
18,800.00
4,600.00
226,900.00
7,200.00
8,400.00

m2
m2
m2

26,000.00
34,000.00
32,000.00

m2
m2
m2
m2
m2
m2
m2

48,000.00
53,000.00
58,000.00
50,000.00
47,000.00
56,000.00
52,500.00

m2
m2
m2

1,519,000.00
1,121,000.00
668,000.00

SATUAN

KET.
5

HARGA
SATUAN
4.00

m2
m2
m2
m2

556,000.00
509,000.00
529,000.00
507,000.00

m2
m2

266,000.00
144,000.00

V.BAHAN CETAK
1 BUIS BETON O dan U
1 Buis beton 100 cm - 100 cm
2 Buis beton 15 cm - 100 cm
3 Buis beton 20 cm - 100 cm
4 Buis beton 25 cm - 100 cm
5 Buis beton 30 cm - 100 cm
6 Buis beton 40 cm - 100 cm
7 Buis beton 50 cm - 100 cm
8 Buis beton 60 cm - 100 cm
9 Buis beton 80 cm - 100 cm
10 Buis betonU 15 cm - 100 cm
11 Buis beton U 20 cm - 100 cm
12 Buis beton U 30 cm - 100 cm

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

323,000.00
43,000.00
61,000.00
64,000.00
76,000.00
97,000.00
119,000.00
141,000.00
215,000.00
59,000.00
47,000.00
57,000.00

VI . B A H A N B E S I
1 BESI BETON
1 Besi beton polos
2 Besi beton prestress
3 Besi beton ulir

kg
kg
kg

12,200.00
20,400.00
16,700.00

2 BESI PLAT
1 Besi Strip

kg

17,800.00

3 BAJA
1 Baja profil "IWF"
2 Baja profil " L" dan "C"

kg
kg

21,300.00
20,400.00

4 KAWAT
1 Kawat bronjong
2 Kawat Ikat beton/bendrat
3 Kawat las listrik

kg
kg
kg

20,400.00
20,000.00
36,300.00

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

5,000.00
7,800.00
12,400.00
16,100.00
25,100.00
37,500.00
54,700.00
79,900.00
116,100.00
192,600.00
250,400.00
390,200.00
613,100.00
963,300.00
1,665,000.00

m'
m'
m'
m'
m'
m'
m'
m'
m'

6,400.00
7,600.00
9,500.00
16,100.00
17,600.00
25,900.00
33,000.00
47,900.00
71,500.00

m'
m'
m'

131,200.00
178,300.00
334,100.00

lbr
lbr
lbr
lbr

108,000.00
61,000.00
80,000.00
101,000.00

NO.

J E N I S

B A H A N

1
2
4 GRANITO
1 Granito 40 x 40 polished (import)
2 Granito 40 x 40 polished (lokal)
3 Granito 60 x 60 polished (import)
4 Granito 60 x 60 polished (lokal)
5 GRANIT
1 Granit import
2 Granit lokal

VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
1 Pipa PVC. S. 12,5 1/2"
2 Pipa PVC. S. 12,5 3/4"
3 Pipa PVC. S. 12,5 1"
4 Pipa PVC. S. 12,5 1-1/4"
5 Pipa PVC. S. 12,5 1-1/2"
6 Pipa PVC. S. 12,5 2"
7 Pipa PVC. S. 12,5 2-1/2"
8 Pipa PVC. S. 12,5 3"
9 Pipa PVC. S. 12,5 4"
10 Pipa PVC. S. 12,5 5"
11 Pipa PVC. S. 12,5 6"
12 Pipa PVC. S. 12,5 8"
13 Pipa PVC. S. 12,5 10"
14 Pipa PVC. S. 12,5 12"
15 Pipa PVC. S. 12,5 16"
2 Pipa PVC AW
1 Pipa PVC. AW 1/2"
2 Pipa PVC. AW 3/4"
3 Pipa PVC. AW 1"
4 Pipa PVC. AW 1 1/4"
5 Pipa PVC. AW 1 1/2"
6 Pipa PVC. AW 2"
7 Pipa PVC. AW 2 1/2"
8 Pipa PVC. AW 3"
9 Pipa PVC. AW 4"
3 PIPA MEDIUM B Galvanis -SII
1 Pipa Galvanis ( 1" )
2 Pipa Galvanis ( 1 1/2" )
3 Pipa Galvanis ( 2" )
VIII . B A H A N L A N G I T - L A N G I T
1 PLY WOOD
1 Teak wood 120 x 240 tb. 4mm
2 Tripleks 120 X 240 tb 3 mm
3 Tripleks 120 X 240 tb 4 mm
4 Tripleks 120 X 240 tb 6 mm

146907750.xls.ms_office

SATUAN

KET.
5

NO.

J E N I S

1
5
6
7
8
9

146907750.xls.ms_office

B A H A N

2
Multipleks 120 X 240 tb 9 mm
Multipleks 120 X 240 tb 12 mm
Harpleks 30 x 200
Harpleks 40 x 200
Harpleks 50 x 200

SATUAN
3
lbr
lbr
lbr
lbr

HARGA
SATUAN
4.00
148,700.00
223,100.00
10,000.00
13,000.00
17,000.00

KET.
5

2
Harpleks 60 x 200
Harpleks 90 x 180 ( 5 mm)
Harpleks 120 x 240 ( 5 mm)
Gypsum 6 mm
Gypsum 9 mm
Gypsum 12 mm
Gypsum 20 mm
Eternit 4 mm ( 100 x 100)
Formika ukuran pintu

3
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
lbr

HARGA
SATUAN
4.00
20,000.00
33,000.00
121,000.00
61,000.00
66,000.00
81,000.00
91,000.00
28,000.00
278,000.00

IX . BOX CULVERT
1 BC 100.50.120.15 (Bottom)
2 BC 100.50.120.15 (Top)
3 BC 150.50.120.15 (Bottom)
4 BC 150.50.120.15 (Top)
5 BC 150.75.120.15 (Bottom)
6 BC 150.75.120.15 (Top)
7 BC 200.50.120.20 (Bottom)
8 BC 200.50.120.20 (Top)
9 BC 200.75.120.20 (Bottom)
10 BC 200.75.120.20 (Top)
11 BC 300.50.120.20 (Bottom)
12 BC 300.50.120.20 (Top)
13 BC 380.175.120.20(Bottom)
14 BC 380.175.120.20 (Top)
15 BC 380.175.120.25 (Bottom)
16 BC 380.175.120.25 (Top)
17 BC 400.100.120.25 (Bottom)
18 BC 400.100.120.25 (Top)
19 BC 400.175.120.25 (Bottom)
20 BC 400.175.120.25 (Top)
21 BC 400.75.120.25 (Bottom)
22 BC 3400.75.120.25 (Top)
23 BC 420.150.120.25 (Bottom)
24 BC 420.150.120.25 (Top)
25 BC 780.175.120.25Bottom)
26 BC 780.175.120.25 (Top)

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

3,240,000.00
3,240,000.00
4,075,000.00
4,075,000.00
4,860,000.00
4,860,000.00
6,480,000.00
6,480,000.00
7,560,000.00
7,560,000.00
8,640,000.00
8,640,000.00
15,768,000.00
15,768,000.00
19,710,000.00
19,710,000.00
16,200,000.00
16,200,000.00
20,250,000.00
20,250,000.00
14,850,000.00
14,850,000.00
19,440,000.00
19,440,000.00
30,510,000.00
30,510,000.00

bh
bh

4,860,000.00
5,184,000.00

bh
bh

4,239,000.00
6,782,000.00

kg
kg
kg
kg
kg
ltr
kg
kg
kg
kg
kg
kg
bh
liter
liter
Kg

24,700.00
23,300.00
48,800.00
61,700.00
85,600.00
13,100.00
22,400.00
27,700.00
38,000.00
27,400.00
27,700.00
84,000.00
8,400.00
33,100.00
26,100.00
40,200.00

kg
kg
kg
kg
kg
kg
bh

1,000.00
21,200.00
22,000.00
28,300.00
23,500.00
28,300.00
20,500.00

kg
kg
ltr
lbr
buah
buah
buah

59,400.00
55,300.00
17,700.00
3,900.00
6,800.00
4,100.00
4,100.00

NO.

J E N I S

1
10
11
12
13
14
15
16
17
18

X.

B A H A N

U-GUTTER
1 U-Gutter 100.100.120
2 Cover 240.120.20

XI . CIRCLE CULVERT
1 1. CC 50.250
2 2. CC 80.250
XII . B A H A N F I N I S H I N G
1 KAYU
1 Menie
2 Plamur kayu
3 Cat kayu (cukup)
4 Cat kayu (baik)
5 Sirlax
6 Spiritus
7 Dempul
8 Plinkut
9 Wood filer (INFRA)
10 Oker putih
11 Oker warna
12 Melamin
13 Kuwas 3"
14 Thinner Super daimaru
15 Thinner A
16 Cat Foxi
2 TEMBOK
1 Kapur sirih
2 Plamur tembok
3 Cat Tembok dalam (cukup)
4 Cat Tembok dalam (baik)
5 Cat Tembok luar (cukup)
6 Cat Tembok luar (baik)
7 Roll cat
3

BESI
1
2
3
4
5
6
7

146907750.xls.ms_office

Cat besi (baik)


Cat besi (cukup)
Minyak cat
Amplas / Ambril
Amplas Besi
Ampelas Dico no.120
Ampelas Dico no.280

SATUAN

KET.
5

3
buah

HARGA
SATUAN
4.00
7,400.00

XIII . B A H A N K A C A
1 Kaca Bening 5 mm
2 Kaca Rayband 5mm

m2
m2

106,000.00
117,000.00

XIV . BAHAN INSTALASI LISTRIK


1 Stop Kontak

bh

8,700.00

bh
bh
bh
bh

170,000.00
73,500.00
16,500.00
55,000.00

bh
bh
bh
bh

6,500.00
8,000.00
11,500.00
21,000.00

bh
bh
bh
bh

643,000.00
136,000.00
552,000.00
287,000.00

NO.

J E N I S

B A H A N
2

Amplas Norton No 3

XV . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM
1 Kunci tanam besar
2 Kunci tanam kecil
3 Kunci Almari
4 Kunci Sloot
2 ENGSEL DAN GERENDEL
1 Engsel H
2 Engsel Nylon
3 Grendel
4 Hak Angin

SATUAN

XVI . BAHAN SANITAIR


1
2
3
4

146907750.xls.ms_office

Kloset duduk porselin


Kloset jongkok porselin
Westafel Counter Top
Bak Cuci Stainlist

KET.
5

NO.

J E N I S

1
XVII . ALAT
1
2
3
4
5
6
7
8

B A H A N

2
PENGIKAT KAYU
Paku - ukuran 1" s/d 4"
Paku - ukuran 1/4" s/d 1"
Paku - payung
Paku - sekrup
Mur Baut 3/8 "
Lem kayu (fox)
Tali Ijuk
Lem kuning (aica aibon)

XVIII . POMPA AIR DAN TANGKI AIR


1 Mesin pompa 1 lt / dt
2 Mesin pompa 1-1/2 lt / dt
3 Tangki air fiber glass 3.000 lt 5mm
XIX . PAVING BLOCK
1 Paving Blok Hexagonal Kecil t: 6 cm, K300 (ALDAS)
2 Paving Blok Hexagonal Kecil t: 6 cm, K400 (ALDAS)
3 Paving Blok Hexagonal Kecil t: 8 cm, K300 (ALDAS)
4 Paving Blok Hexagonal Kecil t: 8 cm, K400 (ALDAS)
5 Paving Blok Hexagonal Kecil t: 8 cm, K500 (ALDAS)
6 Paving Block Holland t=6 cm K175 (lokal)
7 Paving Block Holland t=6 cm K200 (lokal)
8 Paving Block Holland t=6 cm K225 (lokal)
9 Paving Block Holland t=6 cm K250 (lokal)
10 Paving Block Holland t=6 cm K300 (aldas)
11 Paving Block Holland t=6 cm K300 (lokal)
12 Paving Block Holland t=6 cm K400 (ALDAS)
13 Paving Block Holland t=8 cm K175 (lokal)
14 Paving Block Holland t=8 cm K200 (lokal)
15 Paving Block Holland t=8 cm K225 (lokal)
16 Paving Block Holland t=8 cm K250 (lokal)
17 Paving Block Holland t=8 cm K300 (aldas)
18 Paving Block Holland t=8 cm K300 (lokal)
19 Paving Block Holland t=8 cm K400 (ALDAS)
20 Paving Block Holland t=8 cm K500 (ALDAS)
21 Paving Block Warna 6 cm K175 (lokal)
22 Paving Block Warna 8 cm K175 (lokal)
23 Kanstin 10x 20 x 50 (ALDAS)
24 Kanstin 10/12,5X 25 x 50 (ALDAS)
25 Kanstin 10/12,5X 30 x 50 (ALDAS)

SATUAN
3

HARGA
SATUAN
4.00

kg
kg
kg
kg
buah
bh
kg
kg

17,500.00
18,500.00
28,600.00
25,100.00
5,400.00
20,100.00
15,100.00
58,400.00

buah
buah
buah

2,916,000.00
5,103,000.00
7,477,000.00

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh

97,500.00
100,500.00
133,000.00
143,000.00
153,000.00
62,500.00
75,000.00
87,500.00
96,875.00
97,500.00
109,375.00
100,500.00
75,000.00
90,000.00
105,000.00
116,250.00
133,000.00
131,250.00
143,000.00
153,000.00
65,000.00
77,500.00
12,000.00
20,000.00
24,000.00

lbr
lbr
lbr
lbr
lbr
lbr
unit
unit
unit

534,200.00
444,700.00
623,200.00
534,200.00
979,500.00
890,000.00
213,000.00
247,000.00
264,000.00

XXI. FOLDING GATE


1 Folding Gate tb : 0,4 mm
2 Folding Gate tb : 0,5 mm
3 Folding Gate tb : 0,8 mm

m2
m2
m2

475,000.00
515,000.00
550,000.00

XXII. ROLLING DOOR


1 Rolling door (Alumunium ) tb : 0,5 mm
2 Rolling door (Alumunium ) tb : 0,8 mm
3 Rolling door (Besi ) tb : 0,8 mm

m2
m2
m2

345,000.00
375,000.00
275,000.00

XX

PAGAR BRC
1 Pagar BRC 90 A1
2 Pagar BRC 90 A2
3 Pagar BRC 120 A1
4 Pagar BRC 120 A2
5 Pagar BRC 150 A1
6 Pagar BRC 150 A2
7 Pipa Tiang BRC 90-2"
8 Pipa Tiang BRC 120-2"
9 Pipa Tiang BRC 150-2"

XX . L A I N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

146907750.xls.ms_office

-LAIN
Alat bantu (set@ 3 alat )
Aspal bitumen
Minyak aspal
Bensin / premium
Solar (minyak diesel)
Minyak tanah
Olie (minyak pelumas)
Stempet
Gebalan rumput
Wiremesh MS
Kayu bakar
Pintu Ronsel Doble 150 x 150 x 300
Pintu Ronsel Doble 200 x 200 x 300
Pintu Ronsel Engkel 100 x 100 x 300
Pintu Intake 30 x 40 x 300
Pintu Intake 40 x 40 x 300
Pintu Intake 50 x 50 x 300

lot
kg
ltr
ltr
liter
ltr
liter
Kg
m2
m2
m3
buah
buah
buah
buah
buah
buah

15,100.00
12,000.00
2,400.00
4,500.00
4,500.00
10,000.00
22,000.00
22,100.00
15,100.00
80,000.00
107,000.00
41,250,000.00
45,375,000.00
18,906,000.00
4,538,000.00
4,916,000.00
5,294,000.00

KET.
5

NO.

J E N I S

1
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

B A H A N

2
Pintu Intake 60 x 60 x 300
Pintu Intake 80 x 80 x 300
Pintu Intake 90 x 100 x 300
Pintu Intake 100 x 100 x 300
Nomenklatur Marmer ( 15 x 30 )
Nomenklatur Marmer ( 30 x 40 )
Pile Scale ( 12 x 100 )
Pile Scale ( 20 x 100 )
Lapisan kedap air
Peralatan
Jendela nako lengkap
Minyak Beton & bekisting
Alumunium sheet 0,3 mm ( 90 x 180 )
Shear Connector
Pemeliharaan Alat (Walls)
Peralatan (oksigen,solar,elpiji,kawat las )
Sewa Alat
Sewa Alat (Crane)
Sewa Dump Truck
Sewa Excavator 0,90 m3
Sewa Excavator 0,90 m3 + operator
Sewa Walls

SATUAN
3
buah
buah
buah
buah
buah
buah
buah
buah
kg
hr
/lb
ltr

HARGA
SATUAN
4.00
6,806,000.00
7,563,000.00
8,319,000.00
10,588,000.00
149,400.00
598,300.00
374,000.00
598,000.00
64,100.00
3,600.00
60,000.00
24,200.00
144,000.00
12,100.00
50,000.00
165,000.00
100,000.00
700,000.00
275,000.00
1,025,000.00
252,000.00
150,000.00

Rembang,

KET.
5

Januari 2013

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 010 234 645 / 19620715 199011 1 002

146907750.xls.ms_office

DAFTAR HARGA SATUAN PEKERJAAN


DINAS PEKERJAAN UMUM KABUPATEN REMBANG
TAHUN 2013

HARGA SATUAN
NO.

KODE

URAIAN PEKERJAAN

BAHAN
(Rp)

II

PEKERJAAN PERSIAPAN

A.1

1M' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

A.2

1M' Pengukuran dan Pemasangan Bouwplank

A.3

1M2 Pembuatan Kantor Sementara dg Lantai Plesteran

A.4

1M2 Pembuatan Gudang Semen dan Alat-alat

A.5

1M2 Membersihkan Lapangan dan Perataan

A.6

1M2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm

A.7

1M3 Bongkaran Beton Bertulang

A.8

1M3 Bongkaran Dinding Tembok Bata Merah

A.9

1 M3 MEMBONGKAR DINDING BATA / BATU (Batu / bata dipakai lagi)

A.10

1 M3 MEMBONGKAR DINDING BATA / BATU (bongkaran tidak dipakai lagi)

A.11

1M2 MEMBONGKAR PLESTERAN DINDING

A.12

1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran tidak dipakai lagi)

A.13

1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran dipakai lagi)

A.14

1M2 MEMBONGKAR RANGKA ATAP/RENG KASO (bongkaran tidak dipakai lagi)

A.15

1M2 MEMBONGKAR RANGKA ATAP / RENG KASO (bongkaran dipakai lagi)

A.16

1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran dipakai lagi)

A.17

1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran tidak dipakai lagi)

A.18

1M2 MEMBONGKAR PLAFOND (bongkaran dipakai lagi)

A.19

1M2 MEMBONGKAR PLAFOND (bongkaran tidak dipakai lagi)

399,054.00
157,950.00
1,063,685.00
956,765.00
22,575.00

PEKERJAAN TANAH

B.1

1M3 Galian Tanah Biasa Sedalam 1 m

B.2

1M3 Galian Tanah Keras Sedalam 1 m

B.3

1M3 Galian Tanah Cadas Sedalam 1 m

B.4

1M3 Galian Tanah Lumpur Sedalam 1 m

B.5

1M2 Pekerjaan Striping Setinggi 1 m

B.6

1M3 Membuang Tanah Sejauh 30 m'

B.7

1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)

B.8

1M3 Pemadatan Tanah

B.9

1M3 Urugan Pasir

B.9a

1M3 Urugan Tanah Biasa (Tanah Tersedia)

B.10

1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL

B.11

1M2 Pemasangan Lapisan Ijuk tebal 10 cm

B.12

1M3 Urugan Sirtu

B.13

1 M3 Galian Tanah Biasa Sedalam 2 meter

B.14

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA

B.15

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA

B.16

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA

B.17

1 M3 PEK. GALIAN TANAH BANYAK TERDAPAT BATU-BATU BUNDAR

81,600.00
114,134.00
90,600.00
140,400.00

MAX KEDALAMAN 1 M' TENAGA MANUSIA


B.18

1 M3 PEK. GALIAN TANAH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA

B.19

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT BERAT

B.20

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT BERAT

B.21

MENGANGKUT HASIL GALIAN DENGAN DUMP TRUCK . M3/KM.

B.22

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR MAX 1,5 KM ( DENGAN DUMP TRUCK )

KURANG DARI 1,5 KM.


B.23

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK

JARAK ANTARA 1,5 S/D 3 KM.


B.24

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK

JARAK ANTARA 3 S/D 5 KM.


B.25

1 M3 MERATAKAN TANAH

B.26

1 M3 PEK. URUGAN TANAH PILIHAN

B.27

1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TL

104,120.00

B.28

1 M3 PEK. LAPISAN PUDEL 1 KP : 5 PS

273,120.00

B.29

1 M3 MERATAKAN TANAH DAN DITIMBRIS

B.30

1 M2 MENGAMBIL DAN PASANGAN GEBALAN

B.31

1 M' MENGANGKUT GEBALAN RUMPUT

B.32

1 M2 PEKERJAAN GEBALAN RUMPUT SAMPAI TUMBUH

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

91,200.00

13

18,120.00

HARGA SATUAN
NO.

KODE

URAIAN PEKERJAAN

BAHAN
(Rp)

B.33

1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3)

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

14

HARGA SATUAN
NO.

KODE

URAIAN PEKERJAAN

BAHAN
(Rp)

III

PEKERJAAN PONDASI

C.1

1M3 Pasang Pondasi Batu Kali 1Pc : 3 Ps

574,650.00

C.1a

1 M3 PASANGAN BATU BELAH 1 : 4

509,750.00

C.2

1M3 Pasang Pondasi Batu Kali 1Pc : 5 Ps

485,920.00

C.3

1M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps

389,403.20

C.4

1M3 Pasang Pondasi Batu Kosong

179,376.00

C.4a

1M3 Pasang Batu Bolder

C.5

1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR &

261,800.00
2,140,132.00

40% Batu Belah

IV

VI

C.6

1M3 Pasang Pondasi Sumuran diameter 100 cm

C.7

1M' Pembuatan Tiang Pancang (40x40) cm, Beton Bertulang

C.8

SEBUAH TIANG PANCANG DICINCIN DAN DILANCIPKAN (KAYU HUTAN)

C.9

1 M' TIANG DIPANCANGKAN DIDALAM TANAH LUNAK

C.10

1 M' TIANG DIPANCANGKAN DIDALAM TANAH BIASA

C.11

1 M' TIANG DIPANCANGKAN DIDALAM TANAH KERAS

C.12

1 M' TIANG DIPANCANGKAN DIDALAM TANAH PASIR

C.13

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 3 MM

319,999.32

C.14

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 4 MM

456,000.00

C.15

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 5 MM

625,999.32

PEKERJAAN

595,742.00
1,060,741.00
39,000.00

DINDING

D.1

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Ps

73,112.50

D.2

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Ps

66,473.50

D.3

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps

56,709.00

D.4

1 M2 PASANGAN 1/2 BATA MERAH 1 : 4

62,715.00

D.5

1 M2 PASANGAN 1/2 BATA MERAH 1 : 5

D.6

1 M2 PASANGAN BATU TEMPEL + SIARAN

127,530.00

D.7

1 M3 PASANGAN BATA MERAH 1 PC : 2 PS

645,704.00

D.8

1 M3 PASANGAN BATA MERAH 1 PC : 4 PS

539,672.00

D.9

1 M3 PASANGAN BATA MERAH 1 PC : 3 KP : 10 PS

431,082.00

D.10

1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA (1 PC : 3 PS)

72,444.00

D.11

1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA (1 PC : 5 PS)

68,970.00

D.12

1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA Dengan pasir kwarsa (1 PC : 3 PS)

69,333.60

D.13

1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA Dengan pasir kwarsa (1 PC : 5 PS)

66,378.00

PEKERJAAN

60,354.00

PLESTERAN

E.1

1M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm

17,318.00

E.2

1M2 Plesteran 1 Pc : 2 Kp : 8 Ps Tebal 15 mm

10,328.00

E.3

1M2 Plesteran 1 Pc : 3 Kp : 10 Ps Tebal 15 mm

E.4

1M2 Plesteran 1 Pc : 3 Ps Tebal 20 mm

23,200.40

E.4a

1M2 Plesteran 1 Pc : 3 Ps Tebal 10 mm

12,618.62

E.5

1M2 Berapen 1 Pc : 5 Ps Tebal 15 mm

14,015.20

E.6

1M' Plesteran Skoning 1 Pc : 2 Ps lebar 10 mm

E.7

1M2 Plesteran Ciprat 1 Pc : 2 Ps

E.8

1M2 Finishing Siar Pas. Batu Kali Adukan 1 Pc : 2 Ps

E.9

1M2 Acian

7,365.60

8,076.00
8,076.00
12,587.00
5,037.50

PEKERJAAN KAYU

F.1

1M3 Membuat Kosen Pintu & Jendela Kayu klas I

18,570,375.00

F.2

1M3 Membuat Kosen Pintu & Jendela Kayu Bengkirai

12,416,975.00

F.3

1M2 Membuat Pintu Klamp Standard Kayu Bengkirai

450,875.00

F.4

1M2 Membuat Daun Pintu Panel Kayu Bengkirai

451,005.00

F.5

1M2 Membuat Pintu & Jendela Kaca Kayu Bengkirai

F.6

1M2 Membuat Pintu & Jendela Jalusi Kayu Kelas I (Jati)

F.7

1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s/d 90cm

F.8

1M2 Membuat Pintu Plywood rangkap, rangka expose kayu Bengkirai

F.9

1M2 Membuat Jalusi mati Kosen Kayu Kelas I (Jati)

F.10

1M2 Membuat Jalusi mati Kosen Kayu Bengkirai

677,625.00

F.11

1M2 Membuat Pintu Teakwood Rangkap Rangka Kayu Kelas I (jati)

535,655.00

F.12

1M2 Membuat Pintu Teakwood Rangkap Lapis Formika Rangka ekspose

530,383.00

399,780.00
1,088,066.00
399,825.00
406,575.00
1,013,265.00

Kayu Bengkirai
F.13

1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM/WC )

435,300.00

F.14

1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/WC )

413,180.00

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

15

HARGA SATUAN
NO.

KODE

URAIAN PEKERJAAN

BAHAN
(Rp)

F.15

1M3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkirai


Bentang 6 M

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

16

12,656,000.00

HARGA SATUAN
NO.

KODE

URAIAN PEKERJAAN

BAHAN
(Rp)

VII

F.16

1M3 Memasang Konstruksi Kuda-kuda Ekspose Kayu Jati

18,893,400.00

F.17

1M3 Memasang Konstruksi Gording Kayu Bengkirai

12,694,500.00

F.18

1M2 Pasang Pintu Plywood & Formika Rangka Kayu Bengkirai

559,055.00

F.19

1M2 Pasang Pintu Formika Double, Rangka Kayu Jati

740,787.40

F.20

1M2 Memasang Rangka Atap Genteng Keramik, Kayu Bengkirai

141,625.00

F.21

1M2 Memasang Rangka Atap Genteng Beton, Kayu Bengkirai

F.22

1M2 Pasang Rangka Atap Sirap Kayu Bengkirai

F.23

1M' Pasang Listplank Uk. (3x20)cm Kayu Bengkirai

82,750.00

F.24

1M' Pasang Listplank Uk. (3x30)cm Kayu Bengkirai

124,625.00

F.25

1M' Pasang Listplank Uk. 2x(3x20)cm Kayu Bengkirai

165,750.00

F.26

1M2 Pasang Rangka Dinding Pemisah Kayu Bengkirai

317,625.00

F.27

1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengkirai

421,761.00

F.28

1M2 Pasang Dinding Lambriziring dari Papan jati

123,423.00

F.29

1M2 Pasang Plywood tebal 4mm unt Dinding

52,450.00

F.30

1M2 Pasang Dinding Bilik, Rangka Kayu Klas III / IV

79,676.20

149,500.00
1,859,750.00

PEKERJAAN BETON

G.1

1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87

790,188.57

G.2

1M3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78

836,240.40

G.3

1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72

872,329.20

G.4

1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87

770,406.80

G.5

1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66

915,067.80

G.6

1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm,w/c = 0,61

1,010,599.30

G.7

1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58

1,038,767.40

G.8

1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm,w/c = 0,56

1,058,346.90

G.9

1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53

1,092,193.00

G.10

1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm,w/c = 0,52

1,102,648.20

G.11

1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm,w/c = 0,49

1,142,337.80

G.12

1M3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48

1,156,073.80

G.13

1KG Pembesian dg Besi Polos

G.13a

110 KG Besi Beton Terpasang (polos)

G.13b

125 KG Besi Beton Terpasang (polos)

G.14

1KG Kabel Presstresed Polos/strand

21,620.00

G.15

1M2 Pasang Bekisting untuk Pondasi

98,430.00

G.16

1M2 Pasang Bekisting untuk Sloof

109,775.00

G.17

1M2 Pasang Bekisting untuk Kolom

286,780.00

G.18

1M2 Pasang Bekisting untuk Balok

297,607.00

G.19

1M2 Pasang Bekisting untuk Lantai

442,780.00

G.20

1M2 Pasang Bekisting untuk Dinding

321,135.00

G.21

1M2 Pasang Bekisting untuk Tangga

262,880.00

G.22

1 M2 Pasang Bekisting Jembatan Cor

89,901.60

G.23

1 M2 BEKESTING DENGAN PAPAN

122,809.00

G.24

1 M2 BEKESTING DENGAN MULTIPLEX 9 MM

G.25

1 M3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)

3,333,970.00

G.26

1 M3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)

4,161,890.00

G.27

1 M3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)

7,678,540.00

G.28

1 M3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)

5,944,160.00

G.29

1 M3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)

5,762,480.00

G.30

1 M3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)

5,413,320.00

G.31

1 M3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)

5,445,225.00

G.32

1 M' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm

G.33

1 M' Membuat Ring Balok Beton Bertulang (10 x 15) cm

G.34

1 M3 PAS. BETON K-175 READY MIX 6 M3 BERIKUT SLANG

975,000.00

G.35

1 M3 PAS. BETON K-225 READY MIX 6 M3 BERIKUT SLANG

1,037,500.00

G.36

1 M3 PAS. BETON K-300 READY MIX 6 M3 BERIKUT SLANG

1,125,000.00

G.37

1 KG PEK. ERECTION KONST. KUDA-KUDA BESI

G.38

1 KG PEKERJAAN BAJA IWF

42,180.00

G.39

1 KG PEKERJAAN KONSTUKSI BESI SIKU / PROFIL

43,065.00

G.40

1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM

26,675.00

G.41

1 TITIK MELUBANG KONSTRUKSI BESI DENGAN BOR

G.42

1 M2 PEKERJAAN WIREMESH M8

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

13,110.00

119,951.90

60,479.00
66,962.00

207.00

84,430.00

17

HARGA SATUAN
NO.

KODE

URAIAN PEKERJAAN

BAHAN
(Rp)

VIII

IX

PEKERJAAN PENUTUP ATAP

H.1

1 M2 Pasang Atap Genteng Mantili Kecil

32,500.00

H.2

1 M2 Pasang Atap Genteng Mantili Besar

30,000.00

H.3

1 M' Pasang Genteng Bubung Mantili

37,260.00

H.4

1 M2 Pasang Atap Asbes Gelombang (80 x 210 cm) x 5 mm

33,432.00

H.5

1 M2 Pasang Atap Genteng Beton

H.6

1 M2 Pasang Atap Sirap

H.7

1 M' Pasang Bubungan Beton

59,975.00

H.8

1 M' Pasang Bubungan Sirap

65,180.00

H.9

1 M2 Pasang Atap Seng Gelombang BJLS 28

42,370.00

H.10

1 M' Pasang Bubungan Seng

18,830.00

53,325.00
417,700.00

PEKERJAAN LANGIT - LANGIT

I.1

1 M2 Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm

23,285.00

I.2

1 M2 Memasang Langit-langit Tripleks Uk (120x240) cm,

30,555.00

Tebal 3 mm, 4 mm & 6 mm

I.3

1 M2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm

I.4

1 M2 Langit-langit Gypsum Board, tebal 9 mm

I.5

1 M' List Langit-Langit Kayu Profil

I.6

1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Bengkirai

I.6a

1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Kruing

70,700.00

I.7

1M2 Pasang Rangka Langit-langit (60x60) cm, kayu Bengkirai

187,750.00

252,845.00
26,785.00
9,005.00
176,750.00

PEKERJAAN SANITASI, JALAN DAN SALURAN

J.1

1 UNIT Memasang Closet Duduk Porselin

643,000.00

J.2

1 UNIT Memasang Closet Jongkok

147,600.00

J.3

1 UNIT Memasang Wastafel

729,200.00

J.4

1 M' Memasang Pipa Beton, 15 cm - 20 cm

62,879.50

J.5

1 M' Memasang Pipa Beton, 30 cm - 100 cm

118,562.00

J.6

1 M' Memasang Pipa PVC type AW "

J.7

1 M' MEMASANG PIPA PVC type AW 3/4"

10,336.00

J.8

1 M' MEMASANG PIPA type AW PVC 1"

12,920.00

J.9

1 M' MEMASANG PIPA PVC type AW 11/4"

21,896.00

J.10

1 M' MEMASANG PIPA PVC type AW 11/2"

23,936.00

J.11

1 M' Memasang Pipa PVC type AW 2"

35,224.00

J.12

1 M' MEMASANG PIPA PVC type AW 21/2"

44,880.00

J.13

1 M' Memasang Pipa PVC type AW 3"

65,144.00

J.14

1 M' Pasangan Pipa PVC 1"

1,092.00

J.15

1 M' Pasangan Pipa PVC 1 1/4"

2,184.00

J.16

1 M' Pasangan Pipa PVC 1 1/2"

4,392.00

J.17

1 M' Pasangan Pipa PVC 2"

J.18

1 M' Pasangan Pipa PVC 4"

J.19

1 M' Pasangan Pipa PVC 6"

J.20

1 M2 PASANG PAVING BLOK 6 CM K : 300

J.21

1 M2 PASANG PAVING BLOK 6 CM K : 175

86,125.00

J.22

1 M2 PASANG PAVING BLOK 8 CM K ; 300

157,330.00

J.23

1 M2 PASANG PAVING BLOK 8 CM K: 175

98,750.00

J.24

1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 175

88,650.00

J.25

1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 250

120,843.75

1 M2 PASANGAN PAVING BLOK WARNA 8 CM K: 175

101,275.00

J.26
J.27

8,704.00

2,296.80
19,996.08
25,416.96
121,475.00

1 M2 LAPISAN PENGISI / PENUTUP DENGAN ASPAL PANAS TEBAL 3 CM

49,966.00

J.28

MENGGILAS JALAN 1 HARI DIPERLUKAN

J.28a

MENGGILAS 1 M2 LAPIS KULIT PENAHAN

J.28b

MENGGILAS 1 M2 LAPIS KULIT PERTEGARAN

J.28c

MENGGILAS LAPIS AUS ( PENETRASI )

J.28d

MENGGILAS RINGAN 1 M2 OPERPENTING

J.29

100 M2 PENGASPALAN SHEET (LATASIR) TEBAL 1 CM JERENG

1,828,300.00

J.30

1M2 ASPAL SAND SHEET TEBAL 2 CM JERENG ( 1 CM PADAT )

48,962.00

J.31

1M2 ASPAL SAND SHEET TEBAL 3 CM JERENG ( 2 CM PADAT )

70,443.00

J.32

1 M3 PASIR DIBAWAH ALAS JALAN TIAP 1 M3 LAPIS PASIR

81,600.00

J.33

1 M2 PAS ONDERLAG BATU BELAH TEBAL 15 CM

28,400.00

J.34

1 M2 PAS BATU LAPIS ATAS TEBAL 6 CM

13,520.00

J.35

1 BTG/4 M PENGADAAN DAN PEMASANGAN CERUCUK

39,000.00

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

18

HARGA SATUAN
NO.

KODE

URAIAN PEKERJAAN

BAHAN
(Rp)

XI

J.36

1 UNIT BOX PRECAST 100 x 100 x 120 x 15 , TERPASANG

6,606,000.00

J.37

1 UNIT BOX PRECAST 150 x 100 x 120 x 15 , TERPASANG

8,276,000.00

J.38

1 UNIT BOX PRECAST 150 x 150 x 120 x 15 , TERPASANG

9,871,200.00

J.39

1 UNIT BOX PRECAST 200 x 150 x 120 x 20 , TERPASANG

15,372,000.00

J.40

1 UNIT BOX PRECAST 300 x 100 x 120 x 20 , TERPASANG

17,658,000.00

J.41

1 UNIT BOX PRECAST 380 x 350 x 120 x 20 , TERPASANG

32,166,000.00

J.42

1 UNIT BOX PRECAST 420 x 300 x 120 x 25 , TERPASANG

39,510,000.00

J.43

1 UNIT RPC 500 x 2500, TERPASANG

230,900.00

J.44

1 UNIT RPC 800 x 2500, TERPASANG

230,900.00

PEKERJAAN BESI & ALLUMUNIUM

K.1

1 Kg Memasang Besi Profil

K.2

1 Kg Memasang Rangka Kuda-kuda Baja IWF

24,942.00

K.3

1 M' Memasang Talang Datar/Jurai , Seng BJLS 26 Lebar 90 cm

K.4

1 M' Memasang Talang U 15 cm, Seng Plaat BJLS 26 lebar 45 cm

24,495.00

Lebar 45 cm

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

19

252,667.50
36,175.00

HARGA SATUAN
NO.

KODE

URAIAN PEKERJAAN

BAHAN
(Rp)

XII

XIII

XIV

PEKERJAAN KUNCI dan KACA

L.1

1 BUAH Pasang Kunci Tanam Biasa

73,500.00

L.2

1 BUAH Pasang Kunci Tanam Kamar Mandi

73,500.00

L.3

1 BUAH Pasang Engsel Pintu

8,000.00

L.4

1 BUAH Pasang Engsel Jendela Kupu-kupu

8,000.00

L.5

1 BUAH Pasang Engsel Angin

L.6

1 BUAH Pasang Kait Angin

21,000.00

L.7

1 BUAH Pasang Kunci Selot

55,000.00

L.8

1 BUAH Pasang Kunci Lemari

16,500.00

L.9

1 M2 Pasang Kaca tebal 5 mm

128,700.00

6,500.00

PEKERJAAN PENUTUP LANTAI & DINDING

M.1

1 M2 Pasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm

M.2

1 M2 Pasang lantai Ubin Granito Uk. 40 x 40 cm

45,225.00

M.3

1 M2 Pasang Lantai Keramik 30 x 30 cm

83,375.00

M.4

1 M2 Pasang Lantai Keramik 20 x 20 cm

83,277.00

M.5

1M2 Memasang Lantai Marmer ukuran 1.00x1.00 m

M.6

1 M2 Pasang Dinding Keramik 10x20 cm,

M.7

1 M2 Pasang Dinding Keramik 20x20 cm,

M.8

1M2 Memasang Dinding Marmer ukuran 1.00x1.00 m

742,919.50

598,675.00

705,932.00
73,017.50
78,017.50

M.9

1 M2 Pasang Dinding Batu Paros / Batu Tempel Hitam

137,362.50

M.10

1 M2 DINDING GRANIT IMPORT

362,470.00

M.11

1 M2 LANTAI GRANIT IMPORT

362,470.00

M.12

1 M2 LANTAI GRANITO UKURAN 60 X 60 POLISHED

622,685.00

M.13

1 M2 DINDING GRANITO UKURAN 60 X 60 POLISHED

M.14

1 M2 LANTAI MARMER ITALY

1,640,530.00

M.15

1 M2 DINDING MARMER ITALY

1,640,530.00

622,685.00

PEKERJAAN PENGECATAN

N.1

1 M2 Mendempul dan Menggosok Kayu

N.2

1 M2 Pengecatan Bidang Lama

22,280.00

2,536.00

N.3

1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)

32,773.00

1 lap.Cat Dasar & 2 lap.Cat Penutup


N.4

1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)

38,326.00

1 lap.Cat Dasar & 3 lap.Cat Penutup


N.5

1 M2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar

11,678.00

2 lap. Cat Penutup)


N.6

1 M2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)

7,294.00

N.7

1 M2 Pengecatan Permukaan Baja dg Meni Besi

3,054.00

N.8

1 M2 Pengecatan Permukaan Baja dg Meni Besi & Perancah

N.9

1 M2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara

7,592.00
20,236.00

manual sistem 3 lapis Cat Konvensional dg tebal 200 um


N.10

1 M2 PLITURAN BANGUNAN ( BIASA )

17,843.00

N.11

1 M2 PLITURAN MEUBELAIR

60,731.00

Rembang,

Januari 2013

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 010 234 645 / 19620715 199011 1 002

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

20

R HARGA SATUAN PEKERJAAN


KERJAAN UMUM KABUPATEN REMBANG
TAHUN 2013
EDISI JANUARI 2013
HARGA SATUAN

HARGA SATUAN

TOTAL

UPAH

ALAT

HARGA SATUAN

(Rp)

(Rp)

(Rp)

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

26,640.00

9,480.00

425,694.00
167,430.00

243,600.00

1,307,285.00

151,200.00

1,107,965.00

6,000

6,000.00

17,840.40

40,415.00

255,996.00

255,996.00

241,596.00

241,596.00

112,320.00

112,320.00

81,600.00

81,600.00

5,100.00

5,100.00

4,080.00

4,080.00

20,400.00

20,400.00

10,350.00

10,350.00

13,800.00

13,800.00

501,600.00

501,600.00

316,200.00

316,200.00

21,000.00

21,000.00

6,120.00

6,120.00

16,320.00

16,320.00

37,536.00

37,536.00

56,880.00

56,880.00

45,360.00

45,360.00

2,040.00

2,040.00

12,360.00

12,360.00

5,440.00

5,440.00

20,400.00

20,400.00

11,280.00

92,880.00

11,280.00

11,280.00

55,200.00

169,334.00

6,120.00

96,720.00

10,200.00

150,600.00

21,432.00

21,432.00

29,964.00

755.00

30,719.00

38,496.00

755.00

39,251.00

47,028.00

755.00

47,783.00

56,400.00

3,775.00

60,175.00

28,500.00

3,775.00

32,275.00

703.80

8,388.61

9,092.00

846.00

10,952.90

11,798.00

968.40

4,241.95

5,210.00

1,314.00

5,764.89

7,078.00

2,197.20

9,625.89

11,823.00

3,072.00

13,458.95

16,530.00

9,480.00

1,887.50

11,367.00

11,280.00

1,510.00

103,990.00

64,680.00

168,800.00

64,680.00

337,800.00

9,480.00

1,887.50

11,367.00

6,120.00

188.75

6,308.00

2,040.00

188.75

2,228.00

7,920.00

188.75

26,228.00

21

HARGA SATUAN

HARGA SATUAN

TOTAL

UPAH

ALAT

HARGA SATUAN

(Rp)

(Rp)

(Rp)

6
-

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

7
-

22

94,048.00

HARGA SATUAN

HARGA SATUAN

TOTAL

UPAH

ALAT

HARGA SATUAN

(Rp)

(Rp)

(Rp)

91,440.00

666,090.00

91,440.00

601,190.00

91,440.00

577,360.00

91,440.00

480,843.00

49,068.00

228,444.00

1,127.40

14,040.00

276,967.00

156,660.00

2,296,792.00

106,440.00

702,182.00

76,188.00

1,136,929.00

12,930.00

151.00

52,081.00

69,120.00

151.00

69,271.00

86,402.40

188.75

86,591.00

103,680.00

226.50

103,906.00

77,760.00

188.75

77,948.00

109,682.10

429,681.00

115,479.90

571,479.00

122,981.10

748,980.00

17,160.00

90,272.00

17,160.00

83,633.00

17,160.00

73,869.00

17,880.00

80,595.00

17,880.00

78,234.00

55,076.50

182,606.00

257,400.00

903,104.00

257,400.00

797,072.00

257,400.00

688,482.00

14,760.00

87,204.00

14,760.00

83,730.00

14,760.00

84,093.00

14,760.00

81,138.00

15,411.00

32,729.00

15,216.00

25,544.00

15,411.00

22,776.60

21,240.00

44,440.40

12,054.00

24,672.00

9,732.00

23,747.20

6,186.00

14,262.00

15,264.00

23,340.00

19,416.00

32,003.00

11,424.00

16,461.00

1,358,400.00

19,928,775.00

1,358,400.00

13,775,375.00

72,684.00

523,559.00

179,400.00

630,405.00

143,520.00

543,300.00

219,600.00

1,307,666.00

136,320.00

536,145.00

143,520.00

550,095.00

132,000.00

1,145,265.00

132,000.00

809,625.00

143,520.00

679,175.00

171,720.00

702,103.00

84,744.00

520,044.00

91,944.00

505,124.00

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

23

HARGA SATUAN

HARGA SATUAN

TOTAL

UPAH

ALAT

HARGA SATUAN

(Rp)

(Rp)

(Rp)

916,800.00

7
-

13,572,800.00
-

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

24

HARGA SATUAN

HARGA SATUAN

TOTAL

UPAH

ALAT

HARGA SATUAN

(Rp)

(Rp)

(Rp)

1,358,400.00

20,251,800.00

498,240.00

13,192,740.00

171,720.00

730,775.00

185,040.00

925,827.00

9,480.00

151,105.00

9,480.00

158,980.00

11,376.00

1,871,126.00

15,390.00

98,140.00

15,120.00

139,745.00

19,860.00

185,610.00

34,620.00

352,245.00

31,164.00

452,925.00

124,560.00

247,983.00

5,192.40

57,642.40

6,660.00

86,336.00
-

78,921.00

869,109.00

104,328.00

940,568.00

78,921.00

951,250.00

54,768.00

825,174.00

77,340.00

992,407.00

77,340.00

1,087,939.00

77,340.00

1,116,107.00

77,340.00

1,135,686.00

77,340.00

1,169,533.00

77,340.00

1,179,988.00

100,380.00

1,242,717.00

100,380.00

1,256,453.00

666.00

13,776.00
1,515,360.00
1,722,000.00

476.40

22,096.00

34,632.00

133,062.00

34,632.00

144,407.00

43,956.00

330,736.00

43,956.00

341,563.00

43,956.00

486,736.00

43,956.00

60,400.00

425,491.00

43,956.00

306,836.00

8,604.00

98,505.00

28,950.00

151,759.00

22,470.00

142,421.00

351,543.00

3,685,513.00

399,411.00

4,561,301.00

497,781.00

8,176,321.00

431,421.00

6,375,581.00

351,705.00

6,114,185.00

351,543.00

5,764,863.00

399,411.00

5,844,636.00

10,296.00

70,775.00

16,521.00

83,483.00

108,630.00

679.50

1,084,309.00

108,630.00

679.50

1,146,809.00

108,630.00

679.50

1,234,309.00

952.20

3.02

47,040.00

4,860.00

47,925.00

1,005.00

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

1,162.00

4,860.00

27,680.00

3,030.00

25,000.00

28,030.00

7,905.00

92,335.00

25

HARGA SATUAN

HARGA SATUAN

TOTAL

UPAH

ALAT

HARGA SATUAN

(Rp)

(Rp)

(Rp)

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

10,041.00

42,541.00

9,168.00

39,168.00

25,776.00

63,036.00

9,681.00

43,113.00

13,320.00

66,645.00

20,460.00

438,160.00

26,640.00

86,615.00

18,888.00

84,068.00

7,992.00

50,362.00

9,690.00

28,520.00

5,124.00

28,409.00

8,352.00

38,907.00

68,160.00

321,005.00

6,660.00

33,445.00

4,764.00

13,769.00

23,100.00

199,850.00

23,100.00

93,800.00

24,600.00

212,350.00

182,634.00

825,634.00

201,180.00

348,780.00

63,495.00

792,695.00

9,324.00

72,203.50

25,308.00

143,870.00

4,766.40

13,470.00

5,244.00

15,580.00

5,721.60

18,641.00

6,194.40

28,090.00

6,672.00

30,608.00

7,149.60

42,373.00

8,940.90

53,820.00

10,726.80

75,870.00

7,080.00

15.10

8,187.00

11,670.00

30.20

13,884.00

10,767.00

377.50

15,536.00

14,160.00

45.30

16,502.00

14,523.00

755.00

35,274.00

23,865.00

1,132.50

50,414.00

25,320.00

755.00

147,550.00

25,320.00

755.00

112,200.00

25,320.00

755.00

183,405.00

25,320.00

755.00

124,825.00

25,320.00

755.00

114,725.00

25,320.00

755.00

146,918.00

25,320.00

755.00

127,350.00

3,840.00

646.80

54,452.00

345,000.00

178,525.00

523,525.00

3,490.00

1,745.00

1,047.00

130.00

319,800.00

2,148,100.00

1,797.00

50,759.00

1,797.00

72,240.00

14,364.00

1,812.00

97,776.00

14,412.00

2,412.00

45,224.00

2,882.40

2,412.00

18,814.40

12,456.00

1,510.00

52,966.00

26

HARGA SATUAN

HARGA SATUAN

TOTAL

UPAH

ALAT

HARGA SATUAN

(Rp)

(Rp)

(Rp)

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

173,400.00

15,100.00

177,000.00

15,100.00

8,468,100.00

190,500.00

15,100.00

10,076,800.00

204,000.00

15,100.00

15,591,100.00

217,500.00

15,100.00

17,890,600.00

231,000.00

15,100.00

32,412,100.00

244,500.00

15,100.00

39,769,600.00

150,300.00

15,100.00

396,300.00

150,300.00

15,100.00

396,300.00

5,688.00

30,630.00

5,688.00

30,183.00

29,430.00

282,097.00

22,656.00

58,831.00

27

6,794,500.00

HARGA SATUAN

HARGA SATUAN

TOTAL

UPAH

ALAT

HARGA SATUAN

(Rp)

(Rp)

(Rp)

26,640.00

100,140.00

26,070.00

99,570.00

9,038.40

17,038.40

6,240.00

14,240.00

12,480.00

18,980.00

9,038.40

30,038.00

12,048.00

67,048.00

15,062.40

31,562.00

9,038.40

137,738.00

17,724.00

62,949.00

16,392.00

615,067.00

43,500.00

126,875.00

43,500.00

126,777.00

43,500.00

749,432.00

48,420.00

121,437.00

48,420.00

126,437.00

64,260.00

807,179.00

43,500.00

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

180,862.00

204,600.00

7,248.00

574,318.00

101,100.00

483.20

464,053.00

43,500.00

362.40

666,547.00

48,600.00

604.00

671,889.00

101,100.00

483.20

1,742,113.00

201,000.00

7,248.00

1,848,778.00

3,816.00

6,352.00

6,870.00

29,150.00

3,423.00

36,196.00

8,211.00

46,537.00

4,393.20

16,071.00

3,496.80

10,790.00

11,508.00

14,562.00

22,050.00

29,642.00

84,600.00

104,836.00

26,655.00

44,498.00

26,655.00

87,386.00

28

DAFTAR ANALISA SATUAN PEKERJAAN


DINAS PEKERJAAN UMUM KABUPATEN REMBANG
TAHUN 2013
edisi Jan 2013
No. KODE
1

KOEF

SAT.

URAIAN PAKERJAAN

HARGA SAT.
Rp
7

JUMLAH
Rp
8=(4X7)

PEKERJAAN PERSIAPAN

A.1

1M' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m


Material
1.2500
2.5000
1.2000
0.0050
0.0090
0.0720
0.0600
0.4500

Btg
Kg
Lbr
m3
m3
m3
Kg
Kg

Kayu Dolken sengon diameter 8 - 10 / 400 cm


Portalnd Pozzolan Cement/PPC
Seng Gelombang Kecil 0,90 x 1,80 m
Pasir Pasang (Cepu)
Batu pecah 1/2
Usuk Kayu Meranti 5/7X4m
Paku u kuran 1' s/d 4 "
Menie

Upah
0.2000
0.4000
0.0200
0.0200

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang Kayu
Mandor

A.2

39,000.00
1,550.00
59,000.00
230,000.00
274,000.00
3,609,000.00
17,500.00
24,700.00
Jumlah Bahan

48,750.00
3,875.00
70,800.00
1,150.00
2,466.00
259,848.00
1,050.00
11,115.00
399,054.00

51,000.00
36,000.00
54,000.00
48,000.00
Jumlah Upah

10,200.00
14,400.00
1,080.00
960.00
26,640.00

Jumlah Bahan + Upah + Alat

425,694.00

8,000,000.00
17,500.00
8,800,000.00
Jumlah Bahan

96,000.00
350.00
61,600.00
157,950.00

51,000.00
36,000.00
54,000.00
48,000.00
Jumlah Upah

5,100.00
3,600.00
540.00
240.00
9,480.00

Jumlah Bahan + Upah + Alat


1M2 Pembuatan Kantor Sementara dg Lantai Plesteran

167,430.00

1M' Pengukuran dan Pemasangan Bouwplank


Material
0.0120
0.0200
0.0070

m3
Kg
m3

Kayu 5/7x 4m Kayu Kruing


Paku -ukuran 1" s/d 4"
Kayu Kruing Papan

Upah
0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang Kayu
Mandor

A.3
Material
1.2500
0.1800
0.8500
1.1000
35.0000
0.2500
0.1500
30.0000
0.2500
2.0000
0.0800
0.1500
0.3000
0.0600

Btg
m3
Kg
Kg
Kg
m3
m3
buah
Lbr
daun
m2
buah
buah
Lbr

Upah
2.0000
1.0000
2.0000
0.3000
0.0500

OH
OH
OH
OH
OH

A.4

Kayu Dolken 8 - 10 / 4 m
Kayu lanan (balok/pesagen)
Paku ukuran 1" s/d 4"
Besi Strip
Portalnd Pozzolan Cement/PPC
Pasir pasang (cepu)
Batu pecah 1/2
Batu bata Merah
Seng Plat BJLS 0,30 panjang 180 cm
Jendela Nako lengkap
Kaca Bening 5 mm
Kunci Tanam Kecil
Engsel H
Teakwood 120 x 240 tb 4 mm

Tukang Kayu
Tukang Batu
Pekerja
Kepala Tukang kayu
Mandor

39,000.00
3,609,000.00
17,500.00
17,800.00
1,550.00
230,000.00
274,000.00
500.00
60,300.00
60,000.00
106,000.00
73,500.00
6,500.00
108,000.00
Jumlah Bahan

48,750.00
649,620.00
14,875.00
19,580.00
54,250.00
57,500.00
41,100.00
15,000.00
15,075.00
120,000.00
8,480.00
11,025.00
1,950.00
6,480.00
1,063,685.00

51,000.00
51,000.00
36,000.00
54,000.00
48,000.00
Jumlah Upah

102,000.00
51,000.00
72,000.00
16,200.00
2,400.00
243,600.00

Jumlah Bahan + Upah + Alat

1,307,285.00

39,000.00
3,609,000.00
17,500.00
1,550.00
230,000.00
274,000.00
60,300.00
Jumlah Bahan

66,300.00
757,890.00
5,250.00
16,275.00
6,900.00
13,700.00
90,450.00
956,765.00

51,000.00
36,000.00
54,000.00
48,000.00
Jumlah Upah

102,000.00
36,000.00
10,800.00
2,400.00
151,200.00

Jumlah Bahan + Upah + Alat

1,107,965.00

1M2 Pembuatan Gudang Semen dan Alat-alat


Material
1.7000
0.2100
0.3000
10.5000
0.0300
0.0500
1.5000

Btg
m3
Kg
Kg
m3
m3
Lbr

Kayu Dolken diameter 8 - 10 / 400 cm


Kayu lanan (balok/pesagen)
Paku ukuran 1' s/d 4"
Portalnd Pozzolan Cement/PPC
Pasir Pasang (Cepu)
Batu pecah 1/2
Seng plat BJLS 0,30 Panjang 180 cm

Upah
2.0000
1.0000
0.2000
0.0500

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

29

A.5

1M2 Membersihkan Lapangan dan Perataan


Material
0.1000
0.0500

OH
OH

A.6

Pekerja
Mandor

36,000.00
48,000.00
Jumlah Upah

3,600.00
2,400.00
6,000.00

Jumlah Bahan + Upah + Alat


1M2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm

6,000.00

Material
1.0000
0.2500

Btg
Kg

Bambu diameter 6 - 8 / 600 cm


Tali Ijuk

Upah
0.1700
0.2500
0.0020
0.0013

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

30

18,800.00
15,100.00
Jumlah Bahan

18,800.00
3,775.00
22,575.00

51,000.00
36,000.00
54,000.00
48,000.00
Jumlah Upah

8,670.00
9,000.00
108.00
62.40
17,840.40

A.7
Upah
6.6670
0.3330

OH
OH

A.8

40,415.00

36,000.00
48,000.00
Jumlah Upah

240,012.00
15,984.00
255,996.00

Jumlah Bahan + Upah + Alat

255,996.00

36,000.00
48,000.00
Jumlah Upah

240,012.00
1,584.00
241,596.00

Jumlah Bahan + Upah + Alat


1 M3 MEMBONGKAR DINDING BATA / BATU (Batu / bata dipakai lagi)

241,596.00

Pekerja
Mandor

36,000.00
48,000.00
Jumlah Upah

108,000.00
4,320.00
112,320.00

Jumlah Bahan + Upah + Alat


1 M3 MEMBONGKAR DINDING BATA / BATU (bongkaran tidak dipakai lagi)

112,320.00

Pekerja
Mandor

1M3 Bongkaran Dinding Tembok Bata Merah


Upah
6.6670
0.0330

OH
OH

A.9
Upah
3.0000 Org
0.0900 Org

A.10
Upah
2.0000 Org
0.2000 Org

A.11

Pekerja
Mandor

Pekerja
Mandor

36,000.00
48,000.00
Jumlah Upah

72,000.00
9,600.00
81,600.00

Jumlah Bahan + Upah + Alat

81,600.00

36,000.00
48,000.00
Jumlah Upah

4,500.00
600.00
5,100.00

Jumlah Bahan + Upah + Alat

5,100.00

1M2 MEMBONGKAR PLESTERAN DINDING


Upah
0.1250 Org
0.0125 Org

A.12

pekerja
Mandor

1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran tidak dipakai lagi)


Upah
0.1000 Org
0.0100 Org

A.13
Upah
0.5000 Org
0.0500 Org

A.14

pekerja
Mandor

36,000.00
48,000.00
Jumlah Upah

3,600.00
480.00
4,080.00

Jumlah Bahan + Upah + Alat


1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran dipakai lagi)

4,080.00

pekerja
Mandor

36,000.00
48,000.00
Jumlah Upah

18,000.00
2,400.00
20,400.00

Jumlah Bahan + Upah + Alat

20,400.00

1M2 MEMBONGKAR RANGKA ATAP/RENG KASO (bongkaran tidak dipakai lagi)


Upah
0.1500
0.0750
0.0075
0.0150

Org
Org
Org
Org

A.15

Pekerja
Tukang Kayu
Kepala tukang kayu
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,400.00
3,825.00
405.00
720.00
10,350.00

Jumlah Bahan + Upah + Alat

10,350.00

1M2 MEMBONGKAR RANGKA ATAP / RENG KASO (bongkaran dipakai lagi)


Upah
0.2000
0.1000
0.0100
0.0200

Org
Org
Org
Org

A.16

Pekerja
Tukang Kayu
Kepala tukang kayu
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
5,100.00
540.00
960.00
13,800.00

Jumlah Bahan + Upah + Alat

13,800.00

1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran dipakai lagi)


Upah
4.0000
6.0000
0.6000
0.4000

Org
Org
Org
Org

A.17

Pekerja
Tukang Kayu
Kepala tukang kayu
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

144,000.00
306,000.00
32,400.00
19,200.00
501,600.00

Jumlah Bahan + Upah + Alat

501,600.00

1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran tidak dipakai lagi)


Upah
4.0000 Org
3.0000 Org
0.4000 Org

A.18

Jumlah Bahan + Upah + Alat


1M3 Bongkaran Beton Bertulang

Pekerja
Tukang Kayu
Mandor

36,000.00
51,000.00
48,000.00
Jumlah Upah

144,000.00
153,000.00
19,200.00
316,200.00

Jumlah Bahan + Upah + Alat

316,200.00

1M2 MEMBONGKAR PLAFOND (bongkaran dipakai lagi)

Upah
0.1000 Org
Pekerja
0.3000 Org
Tukang Kayu
0.0300 Org
Kepala tukang kayu
0.0100 Org
Mandor
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

31

36,000.00
51,000.00
54,000.00
48,000.00

3,600.00
15,300.00
1,620.00
480.00

A.19

A.21

II

21,000.00

Jumlah Bahan + Upah + Alat

21,000.00

1M2 MEMBONGKAR PLAFOND (bongkaran tidak dipakai lagi)


Upah
0.1500 Org
0.0150 Org

A.20

Jumlah Upah

Pekerja
Mandor

Biaya setiap jarak pengangkutan/langsiran 1 m3 Upah

Biaya setiap jarak pengangkutan / langsiran 1 zak semen

= K : (

= K : (

36,000.00
48,000.00
Jumlah Upah

5,400.00
720.00
6,120.00

Jumlah Bahan + Upah + Alat

6,120.00

a
( L + 75 ))
275.0000

Keterangan :
K = Biaya
a = Upah Pekerja
L = Jarak angkut

a
( L + 75 ))/25
275.0000

Keterangan :
K = Biaya
a = Upah Pekerja
L = Jarak angkut

PEKERJAAN TANAH

B.1

1M3 Galian Tanah Biasa Sedalam 1 m


Upah
0.400
0.040

OH
OH

Pekerja
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

32

36,000.00
48,000.00
Jumlah Upah

14,400.00
1,920.00
16,320.00

Jumlah Bahan + Upah + Alat

16,320.00

B.2

1M3 Galian Tanah Keras Sedalam 1 m


Upah
1.000
0.032

OH
OH

B.3

Pekerja
Mandor

36,000.00
48,000.00
Jumlah Upah

36,000.00
1,536.00
37,536.00

Jumlah Bahan + Upah + Alat

37,536.00

36,000.00
48,000.00
Jumlah Upah

54,000.00
2,880.00
56,880.00

Jumlah Bahan + Upah + Alat

56,880.00

36,000.00
48,000.00
Jumlah Upah

43,200.00
2,160.00
45,360.00

Jumlah Bahan + Upah + Alat

45,360.00

36,000.00
48,000.00
Jumlah Upah

1,800.00
240.00
2,040.00

Jumlah Bahan + Upah + Alat

2,040.00

36,000.00
48,000.00
Jumlah Upah

11,880.00
480.00
12,360.00

Jumlah Bahan + Upah + Alat

12,360.00

1M3 Galian Tanah Cadas Sedalam 1 m


Upah
1.500
0.060

OH
OH

B.4

Pekerja
Mandor

1M3 Galian Tanah Lumpur Sedalam 1 m


Upah
1.200
0.045

OH
OH

B.5

Pekerja
Mandor

1M2 Pekerjaan Striping Setinggi 1 m


Upah
0.050
0.005

OH
OH

B.6

Pekerja
Mandor

1M3 Membuang Tanah Sejauh 30 m'


Upah
0.330
0.010

OH
OH

Suppl. B 6

Pekerja
Mandor

1 M3 PEK. PEMBUANGAN LEBIH DARI RADIUS 30 M


Keterangan :
MENGGUNAKAN RUMUS = K :

a
275

B.7
B.8

( L + 75 )

K = Biaya
a = Upah Pekerja
L = Jarak pembuangan

1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)


1M3 Pemadatan Tanah
Upah
0.500
0.050

OH
OH

B.9

Pekerja
Mandor

5,440.00

36,000.00
48,000.00
Jumlah Upah

18,000.00
2,400.00
20,400.00

Jumlah Bahan + Upah + Alat

20,400.00

68,000.00
Jumlah Bahan

81,600.00
81,600.00

36,000.00
48,000.00
Jumlah Upah

10,800.00
480.00
11,280.00

Jumlah Bahan + Upah + Alat

92,880.00

36,000.00
48,000.00
Jumlah Upah

10,800.00
480.00
11,280.00

Jumlah Bahan + Upah + Alat

11,280.00

68,000.00
215,600.00
61,000.00
Jumlah Bahan

27,200.00
29,106.00
57,828.00
114,134.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

28,800.00
20,400.00
2,160.00
3,840.00
55,200.00

Jumlah Bahan + Upah + Alat

169,334.00

15,100.00
Jumlah Bahan

90,600.00
90,600.00

36,000.00
48,000.00
Jumlah Upah

5,400.00
720.00
6,120.00

Jumlah Bahan + Upah + Alat

96,720.00

1M3 Urugan Pasir


Material
1.200

m3

Pasir Urug

Upah
0.300
0.010

OH
OH

Pekerja
Mandor

B.9a

1M3 Urugan Tanah Biasa (Tanah Tersedia)


Upah
0.300
0.010

OH
OH

B.10

Pekerja
Mandor

1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL


Material
0.400
0.135
0.948

m3
m3
m3

Pasir Urug
Kapur Padam
Tanah Liat

Upah
0.800
0.400
0.040
0.080

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

B.11

1M2 Pemasangan Lapisan Ijuk tebal 10 cm


Material
6.000

kg

Ijuk

Upah
0.150
0.015

OH
OH

Pekerja
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

33

B.12

1M3 Urugan Sirtu


Material
1.200
Upah
0.250
0.025

m3

Sirtu

OH
OH

Pekerja
Mandor

B.13

117,000.00
Jumlah Bahan

140,400.00
140,400.00

36,000.00
48,000.00
Jumlah Upah

9,000.00
1,200.00
10,200.00

Jumlah Bahan + Upah + Alat

150,600.00

36,000.00
48,000.00
Jumlah Upah

18,936.00
2,496.00
21,432.00

Jumlah Bahan + Upah + Alat

21,432.00

1 M3 Galian Tanah Biasa Sedalam 2 meter


Upah
0.526
0.052

B.14

OH
OH

Pekerja
Mandor

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA


Upah
0.735 org
0.073 org

Pekerja
Mandor

Alat
0.050 lot

Alat bantu

B.15

36,000.00
48,000.00
Jumlah Upah

26,460.00
3,504.00
29,964.00

15,100.00
Jumlah Alat

755.00
755.00

Jumlah Bahan + Upah + Alat

30,719.00

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA


Upah
0.944 org
0.094 org

Pekerja
Mandor

Alat
0.050 lot

Alat bantu

B.16

36,000.00
48,000.00
Jumlah Upah

33,984.00
4,512.00
38,496.00

15,100.00
Jumlah Alat

755.00
755.00

Jumlah Bahan + Upah + Alat

39,251.00

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA


Upah
1.153 org
0.115 org

Pekerja
Mandor

Alat
0.050 lot

Alat bantu

36,000.00
48,000.00
Jumlah Upah

41,508.00
5,520.00
47,028.00

15,100.00
Jumlah Alat

755.00
755.00

Jumlah Bahan + Upah + Alat


1 M3 PEK. GALIAN TANAH BANYAK TERDAPAT BATU-BATU BUNDAR
MAX KEDALAMAN 1 M' TENAGA MANUSIA

47,783.00

Upah
1.500 org
0.050 org

Pekerja
Mandor

36,000.00
48,000.00
Jumlah Upah

54,000.00
2,400.00
56,400.00

Alat
0.250 lot

Alat bantu

15,100.00
Jumlah Alat

3,775.00
3,775.00

Jumlah Bahan + Upah + Alat

60,175.00

B.17

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

34

B.18

1 M3 PEK. GALIAN TANAH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA


Upah
0.625 org
0.125 org

Pekerja
Mandor

Alat
0.250 lot

Alat bantu

B.19

36,000.00
48,000.00
Jumlah Upah
15,100.00

22,500.00
6,000.00
28,500.00
3,775.00

Jumlah Alat

3,775.00

Jumlah Bahan + Upah + Alat

32,275.00

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT BERAT


Alat
0.0046
0.7043
0.0183
0.0046

unit
liter
liter
Kg

Sewa Excavator 0,9 m3


Solar
Olie (minyak pelumas)
Stempet

1,025,000.00
4,500.00
22,000.00
22,100.00
Jumlah Alat

4,715.00
3,169.35
402.60
101.66
8,388.61

Upah
0.0046
0.0046
0.0046
0.0023

org
org
org
org

Operator Terlatih
Pemb. Operator Alat Berat
Pekerja
Mandor

51,000.00
42,000.00
36,000.00
48,000.00
Jumlah Upah

234.60
193.20
165.60
110.40
703.80

Jumlah Bahan + Upah + Alat

9,092.00

B.20

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT BERAT


Alat
0.0060
0.9210
0.0239
0.0060

unit
liter
liter
Kg

Sewa Excavator 0,9 m3


Solar
Olie (minyak pelumas)
Stempet

1,025,000.00
4,500.00
22,000.00
22,100.00
Jumlah Alat

6,150.00
4,144.50
525.80
132.60
10,952.90

Upah
0.0060
0.0060
0.0060
0.0015

org
org
org
org

Operator terlatih
Pemb. Operator
Pekerja
Mandor

51,000.00
42,000.00
36,000.00
48,000.00
Jumlah Upah

306.00
252.00
216.00
72.00
846.00

Jumlah Bahan + Upah + Alat

11,798.00

B.21

MENGANGKUT HASIL GALIAN DENGAN DUMP TRUCK . M3/KM.


Alat
0.0101
0.2515
0.0101
0.0050

buah
liter
liter
Kg

Upah
0.0101 org
0.0101 org
0.0025 org

B.22

Sewa Dump Truck


Solar
Olie (minyak pelumas)
Stempet

Sopir
Pekerja
Mandor

275,000.00
4,500.00
22,000.00
22,100.00
Jumlah Alat

2,777.50
1,131.75
222.20
110.50
4,241.95

48,000.00
36,000.00
48,000.00
Jumlah Upah

484.80
363.60
120.00
968.40

Jumlah Bahan + Upah + Alat

5,210.00

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR MAX 1,5 KM ( DENGAN DUMP TRUCK )
KURANG DARI 1,5 KM.
Alat
0.0137
0.3430
0.0137
0.0069

buah
liter
liter
Kg

Upah
0.0137 org
0.0137 org
0.0034 org

B.23

Sewa Dump Truck


Solar
Olie (minyak pelumas)
Stempet

Sopir
Pekerja
Mandor

275,000.00
4,500.00
22,000.00
22,100.00
Jumlah Alat

3,767.50
1,543.50
301.40
152.49
5,764.89

48,000.00
36,000.00
48,000.00
Jumlah Upah

657.60
493.20
163.20
1,314.00

Jumlah Bahan + Upah + Alat

7,078.00

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


JARAK ANTARA 1,5 S/D 3 KM.
Alat
0.0229
0.5717
0.0229
0.0114

buah
liter
liter
Kg

Upah
0.0229 org
0.0229 org
0.0057 org

B.24

Dump Truck
Solar
Olie
Stempet

Sopir
Pekerja
Mandor

275,000.00
4,500.00
22,000.00
22,100.00
Jumlah Alat

6,297.50
2,572.65
503.80
251.94
9,625.89

48,000.00
36,000.00
48,000.00
Jumlah Upah

1,099.20
824.40
273.60
2,197.20

Jumlah Bahan + Upah + Alat

11,823.00

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


JARAK ANTARA 3 S/D 5 KM.
Alat

0.0320 buah
Dump Truck
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

35

275,000.00

8,800.00

0.8003 liter
0.0320 liter
0.0160 Kg

Solar
Olie
Stempet

4,500.00
22,000.00
22,100.00
Jumlah Alat

3,601.35
704.00
353.60
13,458.95

Upah
0.0320 org
0.0320 org
0.0080 org

Sopir
Pekerja
Mandor

48,000.00
36,000.00
48,000.00
Jumlah Upah

1,536.00
1,152.00
384.00
3,072.00

Jumlah Bahan + Upah + Alat

16,530.00

36,000.00
48,000.00
Jumlah Upah

9,000.00
480.00
9,480.00

15,100.00
Jumlah Alat

1,887.50
1,887.50

Jumlah Bahan + Upah + Alat

11,367.00

76,000.00
Jumlah Bahan

91,200.00
91,200.00

36,000.00
48,000.00
Jumlah Upah

10,800.00
480.00
11,280.00

15,100.00
Jumlah Alat

1,510.00
1,510.00

Jumlah Bahan + Upah + Alat

103,990.00

215,600.00
61,000.00
Jumlah Bahan

43,120.00
61,000.00
104,120.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

36,000.00
25,500.00
2,700.00
480.00
64,680.00

Jumlah Bahan + Upah + Alat

168,800.00

B.25

1 M3 MERATAKAN TANAH
Upah
0.2500 org
0.0100 org

Pekerja
Mandor

Alat
0.1250 lot

Alat bantu

B.26

1 M3 PEK. URUGAN TANAH PILIHAN


Material
1.2000 m3

Tanah pilihan

Upah
0.3000 org
0.0100 org

Pekerja
Mandor

Alat
0.1000 lot

Alat bantu

B.27

1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TL


Material
0.2000 m3
1.0000 m3
Upah
1.0000
0.5000
0.0500
0.0100

org
org
org
org

Kapur padam
Tanah liat

Pekerja
Tukang batu
Kepala tukang batu
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

36

B.28

1 M3 PEK. LAPISAN PUDEL 1 KP : 5 PS


Material
1.0000 m3
0.2000 m3
Upah
1.0000
0.5000
0.0500
0.0100

Pasir pasang
Kapur padam

org
org
org
org

230,000.00
43,120.00
273,120.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

36,000.00
25,500.00
2,700.00
480.00
64,680.00

Jumlah Bahan + Upah + Alat

337,800.00

36,000.00
48,000.00
Jumlah Upah

9,000.00
480.00
9,480.00

15,100.00
Jumlah Alat

1,887.50
1,887.50

Jumlah Bahan + Upah + Alat

11,367.00

36,000.00
48,000.00
Jumlah Upah

5,400.00
720.00
6,120.00

15,100.00
Jumlah Alat

188.75
188.75

Jumlah Bahan + Upah + Alat

6,308.00

36,000.00
48,000.00
Jumlah Upah

1,800.00
240.00
2,040.00

15,100.00
Jumlah Alat

188.75
188.75

Jumlah Bahan + Upah + Alat

2,228.00

Pekerja
Tukang batu
Kepala tukang batu
Mandor

B.29

1 M3 MERATAKAN TANAH DAN DITIMBRIS


Upah
0.2500 org
0.0100 org

Pekerja
Mandor

Alat
0.1250 lot

Alat bantu

B.30

1 M2 MENGAMBIL DAN PASANGAN GEBALAN


Upah
0.1500 org
0.0150 org

Pekerja
Mandor

Alat
0.0125 lot

Alat bantu

B.31

1 M' MENGANGKUT GEBALAN RUMPUT


Upah
0.0500 org
0.0050 org

Pekerja
Mandor

Alat
0.0125 lot

Alat bantu

B.32

1 M2 PEKERJAAN GEBALAN RUMPUT SAMPAI TUMBUH


Material
1.2000 m2

Gembalan rumput biasa

15,100.00
Jumlah Bahan

18,120.00
18,120.00

36,000.00
48,000.00
Jumlah Upah

7,200.00
720.00
7,920.00

15,100.00
Jumlah Alat

188.75
188.75

Jumlah Bahan + Upah + Alat

26,228.00

1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3)
Pekerjaan galian (10 org) 50 % (Analis B1)
8,160.00
Pek. Galian tanah berbatu (10 org) 50 % (Analis B17)
30,087.50
Pek. Grading plant (10) 50 % (5 x Analis B5)
1,020.00
Tanah Biasa
55,000.00
JUMLAH
PEKERJAAN PONDASI

4,896.00
18,052.50
5,100.00
66,000.00
94,048.00

Upah
0.2000 org
0.0150 org

Pekerja
Mandor

Alat
0.0125 lot

Alat bantu

B.33
0.6000
0.6000
5.0000
1.2000
III

230,000.00
215,600.00
Jumlah Bahan

m3
m3
m3
m3

C
C.1

1M3 Pasang Pondasi Batu Kali 1Pc : 3 Ps


Material
1.200
202.000
0.485
Upah
1.500
0.600
0.060
0.075

C.1a

m3
Kg
m3

Batu Belah 15/20


Portland Sement
Pasir Pasang

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

125,000.00
1,550.00
230,000.00
Jumlah Bahan

150,000.00
313,100.00
111,550.00
574,650.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

54,000.00
30,600.00
3,240.00
3,600.00
91,440.00

Jumlah Bahan + Upah + Alat

666,090.00

125,000.00
1,550.00
230,000.00
Jumlah Bahan

137,500.00
252,650.00
119,600.00
509,750.00

1 M3 PASANGAN BATU BELAH 1 : 4


Material
1.1000 m3
163.0000 kg
0.5200 m3

Batu Belah 15/20


PC (50 kg)
Pasir pasang

Upah
1.5000 org
Pekerja
0.6000 org
Tukang batu
0.0600 org
Kepala tukang batu
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
0.0750 org
Mandor

37

36,000.00
51,000.00
54,000.00
48,000.00

54,000.00
30,600.00
3,240.00
3,600.00

C.2

91,440.00
601,190.00

125,000.00
1,550.00
230,000.00
Jumlah Bahan

150,000.00
210,800.00
125,120.00
485,920.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

54,000.00
30,600.00
3,240.00
3,600.00
91,440.00

Jumlah Bahan + Upah + Alat

577,360.00

125,000.00
1,550.00
215,600.00
230,000.00
Jumlah Bahan

150,000.00
94,550.00
31,693.20
113,160.00
389,403.20

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

54,000.00
30,600.00
3,240.00
3,600.00
91,440.00

Jumlah Bahan + Upah + Alat

480,843.00

1M3 Pasang Pondasi Batu Kali 1Pc : 5 Ps


Material
1.200
136.000
0.544
Upah
1.500
0.600
0.060
0.075

m3
Kg
m3

Batu Belah 15/20


Portland Sement
Pasir Pasang

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

C.3

1M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps


Material
1.200
61.000
0.147
0.492

Jumlah Upah
Jumlah Bahan + Upah + Alat

Upah
1.500
0.600
0.060
0.075

m3
kg
m3
m3

Batu Belah 15/20


Portland Sement
Kapur Pasang
Pasir Pasang

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

38

C.4

1M3 Pasang Pondasi Batu Kosong


Material
1.200
0.432

Upah
0.700
0.390
0.039
0.039

m3
m3

Batu Belah 15/20


Pasir Urug

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

C.4a

125,000.00
68,000.00
Jumlah Bahan

150,000.00
29,376.00
179,376.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

25,200.00
19,890.00
2,106.00
1,872.00
49,068.00

Jumlah Bahan + Upah + Alat

228,444.00

238,000.00
Jumlah Bahan

261,800.00
261,800.00

1,025,000.00
4,500.00
22,000.00
22,100.00
Jumlah Alat

10,250.00
3,217.50
462.00
110.50
14,040.00

51,000.00
42,000.00
36,000.00
48,000.00
Jumlah Upah

459.00
378.00
180.00
110.40
1,127.40

Jumlah Bahan + Upah + Alat

276,967.00

1M3 Pasang Batu Bolder


Material
1.100

m3

Batu Bolder

Alat + BBM
0.010
0.715
0.021
0.005

unit
ltr
ltr
kg

Sewa Excavator 0.90 m3


Solar (minyak diesel)
Olie (minyak pelumas)
Stempet

Upah
0.009
0.009
0.005
0.002

OH
OH
OH
OH

Operator terlatih
Pembantu Operator
Pekerja
Mandor

C.5

1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR &
40% Batu Belah
Material
0.480
126.000
194.000
0.312
0.468
1.800
Upah
3.000
0.850
0.085
0.015

m3
Kg
Kg
m3
m3
Kg

Batu Belah 15/20


Besi Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kawat Beton

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

C.6

125,000.00
12,200.00
1,550.00
250,000.00
274,000.00
20,000.00
Jumlah Bahan

60,000.00
1,537,200.00
300,700.00
78,000.00
128,232.00
36,000.00
2,140,132.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

108,000.00
43,350.00
4,590.00
720.00
156,660.00

Jumlah Bahan + Upah + Alat

2,296,792.00

125,000.00
1,750.00
230,000.00
274,000.00
Jumlah Bahan

56,250.00
339,500.00
71,760.00
128,232.00
595,742.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

85,680.00
15,300.00
1,620.00
3,840.00
106,440.00

Jumlah Bahan + Upah + Alat

702,182.00

1M3 Pasang Pondasi Sumuran diameter 100 cm


Material
0.450
194.000
0.312
0.468
Upah
2.380
0.300
0.030
0.080

m3
Kg
m3
m3

Batu Belah 15/20 cm


Portland Semen
Pasir Pasang
Koral Beton

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

C.7

1M' Pembuatan Tiang Pancang (40x40) cm, Beton Bertulang


Material
0.019
0.094
0.150
60.500
45.000
0.900
0.032
0.120
0.090
0.240
Upah
1.000
0.670
0.067
0.050

C.8

m3
m3
m3
Kg
Kg
Kg
m3
Kg
Lt
Kg

Pasir Urug (Timbunan)


Pasir Beton (Cepu)
Koral Beton
Portland Semen
Besi Beton
Kawat beton
Kayu Kamper(balok pesagen)
Paku uk. 1" s/d 4"
Minyak Bekisting
Plamur Tembok

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

68,000.00
250,000.00
274,000.00
1,750.00
12,200.00
20,000.00
9,769,000.00
17,500.00
24,200.00
21,200.00
Jumlah Bahan

1,292.00
23,500.00
41,100.00
105,875.00
549,000.00
18,000.00
312,608.00
2,100.00
2,178.00
5,088.00
1,060,741.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

36,000.00
34,170.00
3,618.00
2,400.00
76,188.00

Jumlah Bahan + Upah + Alat

1,136,929.00

SEBUAH TIANG PANCANG DICINCIN DAN DILANCIPKAN (KAYU HUTAN)


Material

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
Kayu dolken
1.000 btg

sengon 8 - 10 cm, 4 M39

39,000.00

39,000.00

Upah
0.1250
0.0125
0.1500
0.0100

org
org
org
org

Alat
0.0100 lot

C.9

Jumlah Bahan

39,000.00

51,000.00
54,000.00
36,000.00
48,000.00
Jumlah Upah

6,375.00
675.00
5,400.00
480.00
12,930.00

15,100.00
Jumlah Alat

151.00
151.00

Jumlah Bahan + Upah + Alat

52,081.00

Tukang Kayu
Kepala Tukang
Pekerja
Mandor

alat bantu

1 M' TIANG DIPANCANGKAN DIDALAM TANAH LUNAK


Upah
0.0400
0.0040
1.8000
0.0430

org
org
org
org

Alat
0.0100 lot

C.10

Tukang Kayu
Kepala Tukang
Pekerja
Mandor

51,000.00
54,000.00
36,000.00
48,000.00
Jumlah Upah

2,040.00
216.00
64,800.00
2,064.00
69,120.00

15,100.00
Jumlah Alat

151.00
151.00

Jumlah Bahan + Upah + Alat

69,271.00

alat bantu

1 M' TIANG DIPANCANGKAN DIDALAM TANAH BIASA


Upah
0.0500
0.0050
2.2500
0.0538

org
org
org
org

Alat
0.0125 lot

C.11

Tukang Kayu
Kepala Tukang
Pekerja
Mandor

51,000.00
54,000.00
36,000.00
48,000.00
Jumlah Upah

2,550.00
270.00
81,000.00
2,582.40
86,402.40

15,100.00
Jumlah Alat

188.75
188.75

Jumlah Bahan + Upah + Alat

86,591.00

alat bantu

1 M' TIANG DIPANCANGKAN DIDALAM TANAH KERAS


Upah
0.0600 org

Tukang Kayu

51,000.00

0.0060 org

Kepala Tukang

54,000.00

324.00

2.7000 org

Pekerja

36,000.00

97,200.00

0.0645 org

Mandor

48,000.00
Jumlah Upah

3,060.00

3,096.00
103,680.00

Alat
0.0150 lot

alat bantu

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

40

15,100.00

226.50

Jumlah Alat

226.50

Jumlah Bahan + Upah + Alat

103,906.00

C.12

1 M' TIANG DIPANCANGKAN DIDALAM TANAH PASIR


Upah
0.0600 org

Tukang Kayu

51,000.00

0.0060 org

Kepala Tukang

54,000.00

324.00

1.9800 org

Pekerja

36,000.00

71,280.00

0.0645 org

Mandor

48,000.00
Jumlah Upah

3,060.00

3,096.00
77,760.00

Alat
0.0125 lot

alat bantu

C.13

15,100.00

188.75

Jumlah Alat

188.75

Jumlah Bahan + Upah + Alat

77,948.00

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 3 MM


Material
1.2000 m3

Batu belah

8.3333 kg

Kawat bronjong

125,000.00

150,000.00

20,400.00

169,999.32

Jumlah Bahan

319,999.32

Upah
0.6667 org

penganyam

51,000.00

34,001.70

2.0333 org

Pekerja

36,000.00

73,198.80

0.0517 org

Mandor

48,000.00

C.14

2,481.60

Jumlah Upah

109,682.10

Jumlah Bahan + Upah + Alat

429,681.00

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 4 MM


Material
1.2000 m3

Batu belah

15.0000 kg

Kawat bronjong

125,000.00

150,000.00

20,400.00

306,000.00

Jumlah Bahan

456,000.00

Upah
0.7333 org

penganyam

51,000.00

37,398.30

2.1000 org

Pekerja

36,000.00

75,600.00

0.0517 org

Mandor

48,000.00

C.15

2,481.60

Jumlah Upah

115,479.90

Jumlah Bahan + Upah + Alat

571,479.00

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 5 MM


Material
1.2000 m3

Batu belah

23.3333 kg

Kawat bronjong

125,000.00

150,000.00

20,400.00

475,999.32

Jumlah Bahan

625,999.32

Upah

IV

0.8333 org

tukang besi

51,000.00

42,498.30

2.1667 org

Pekerja

36,000.00

78,001.20

0.0517 org

Mandor

48,000.00

PEKERJAAN

D.1

2,481.60

Jumlah Upah

122,981.10

Jumlah Bahan + Upah + Alat

748,980.00

500.00

35,000.00

1,550.00

29,372.50

DINDING

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Ps


Material
70.0000

Buah

18.9500

Kg

Bata Merah 5 x 11 x 22
Portland Semen

0.0380

m3

Pasir Pasang

230,000.00

8,740.00

Jumlah Bahan

73,112.50

Upah
0.3000

OH

Pekerja

36,000.00

10,800.00

0.1000

OH

Tukang Batu

51,000.00

5,100.00

0.0100

OH

Kepala Tukang

54,000.00

540.00

0.0150

OH

Mandor

48,000.00

720.00

Jumlah Upah

17,160.00

Jumlah Bahan + Upah + Alat

90,272.00

500.00

35,000.00

1,550.00

22,273.50

D.2

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Ps


Material
70.0000

Buah

14.3700

Kg

Bata Merah 5 x 11 x 22
Portland Semen

0.0400

m3

Pasir Pasang

230,000.00

9,200.00

Jumlah Bahan

66,473.50

Upah
0.3000

OH

Pekerja

36,000.00

10,800.00

0.1000

OH

Tukang Batu

51,000.00

5,100.00

0.0100

OH

Kepala Tukang

54,000.00

540.00

48,000.00

720.00

0.0150
OH
Mandor
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

41

D.3

Jumlah Upah

17,160.00

Jumlah Bahan + Upah + Alat

83,633.00

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps


Material
70.0000

Buah

4.5000

Kg

Bata Merah 5 x 11 x 22
Portland Semen

0.0500

m3

Pasir Pasang

0.0150

m3

Kapur Padam

500.00

35,000.00

1,550.00

6,975.00

230,000.00

11,500.00

215,600.00

3,234.00

Jumlah Bahan

56,709.00

Upah
0.3000

OH

Pekerja

36,000.00

10,800.00

0.1000

OH

Tukang Batu

51,000.00

5,100.00

0.0100

OH

Kepala Tukang

54,000.00

540.00

0.0150

OH

Mandor

48,000.00

720.00

Jumlah Upah

17,160.00

Jumlah Bahan + Upah + Alat

73,869.00

D.4

1 M2 PASANGAN 1/2 BATA MERAH 1 : 4


Material
70.0000 bh

Bata merah

500.00

35,000.00

11.5000 kg

P C (50 kg)

1,550.00

17,825.00

0.0430 m3

Pasir pasang

230,000.00
Jumlah Bahan

9,890.00
62,715.00

Upah
0.3200 org

Pekerja

36,000.00

11,520.00

0.1000 org

Tukang batu

51,000.00

5,100.00

0.0100 org

Kepala tukang batu

54,000.00

540.00

0.0150 org

Mandor

48,000.00

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

42

720.00

Jumlah Upah

17,880.00

Jumlah Bahan + Upah + Alat

80,595.00

D.5

1 M2 PASANGAN 1/2 BATA MERAH 1 : 5


Material
70.0000 bh
9.6800 kg
0.0450 m3
Upah
0.3200
0.1000
0.0100
0.0150

org
org
org
org

D.6

Bata merah
P C (50 kg)
Pasir pasang

35,000.00
15,004.00
10,350.00
60,354.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

11,520.00
5,100.00
540.00
720.00
17,880.00

Jumlah Bahan + Upah + Alat

78,234.00

101,000.00
77,500.00
230,000.00
Jumlah Bahan

111,100.00
9,300.00
7,130.00
127,530.00

36,000.00
51,000.00
54,000.00
48,000.00
15,100.00
Jumlah Upah

6,750.00
11,475.00
20,250.00
16,224.00
377.50
55,076.50

Jumlah Bahan + Upah + Alat

182,606.00

500.00
77,500.00
230,000.00
Jumlah Bahan

250,000.00
319,114.00
76,590.00
645,704.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

162,000.00
76,500.00
8,100.00
10,800.00
257,400.00

Jumlah Bahan + Upah + Alat

903,104.00

500.00
77,500.00
230,000.00
Jumlah Bahan

250,000.00
196,292.00
93,380.00
539,672.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

162,000.00
76,500.00
8,100.00
10,800.00
257,400.00

Jumlah Bahan + Upah + Alat

797,072.00

500.00
77,500.00
215,600.00
230,000.00
Jumlah Bahan

250,000.00
72,726.00
23,716.00
84,640.00
431,082.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

162,000.00
76,500.00
8,100.00
10,800.00
257,400.00

Jumlah Bahan + Upah + Alat

688,482.00

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1 M2 PASANGAN BATU TEMPEL + SIARAN


Material
1.1000 m2
0.1200 zak
0.0310 m3
Upah
0.1875
0.2250
0.3750
0.3380
0.0250

org
org
org
org
lot

D.7

Batu tempel
PC (50 kg)
Pasir pasang

Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

1 M3 PASANGAN BATA MERAH 1 PC : 2 PS


Material
500.0000 bh
4.1176 zak
0.3330 m3
Upah
4.5000
1.5000
0.1500
0.2250

org
org
org
org

D.8

Bata merah
P C (50 kg)
Pasir pasang

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1 M3 PASANGAN BATA MERAH 1 PC : 4 PS


Material
500.0000 bh
2.5328 zak
0.4060 m3
Upah
4.5000
1.5000
0.1500
0.2250

org
org
org
org

D.9

Bata merah
P C (50 kg)
Pasir pasang

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1 M3 PASANGAN BATA MERAH 1 PC : 3 KP : 10 PS


Material
500.0000
0.9384
0.1100
0.3680
Upah
4.5000
1.5000
0.1500
0.2250

bh
zak
m3
m3

Bata merah
P C (50 kg)
Kapur pasang
Pasir pasang

org
org
org
org

Pekerja
Tukang batu
Kepala tukang batu
Mandor

D.10

1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA (1 PC : 3 PS)


Material
12.0000 bh
8.6400 kg
0.0324 m3
Upah
0.2400
0.1000
0.0100
0.0100

org
org
org
org

Bataco Besar (10/20/40)


P C (50 kg)
Pasir pasang

4,300.00
1,550.00
230,000.00
Jumlah Bahan

51,600.00
13,392.00
7,452.00
72,444.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

8,640.00
5,100.00
540.00
480.00
14,760.00

Jumlah Bahan + Upah + Alat

87,204.00

Pekerja
Tukang batu
Kepala tukang batu
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

D.11

500.00
1,550.00
230,000.00
Jumlah Bahan

43

1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA (1 PC : 5 PS)

Material
12.0000 bh
7.2000 kg
0.0270 m3
Upah
0.2400
0.1000
0.0100
0.0100

Bataco Besar (10/20/40)


P C (50 kg)
Pasir pasang

org
org
org
org

Pekerja
Tukang batu
Kepala tukang batu
Mandor

D.12

51,600.00
11,160.00
6,210.00
68,970.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

8,640.00
5,100.00
540.00
480.00
14,760.00

Jumlah Bahan + Upah + Alat

83,730.00

1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA Dengan pasir kwarsa (1 PC : 3 PS)
Material
12.0000 bh
8.6400 kg
0.0324 m3
Upah
0.2400
0.1000
0.0100
0.0100

Bataco Besar (10/20/40)


P C (50 kg)
Pasir kwarsa

org
org
org
org

Pekerja
Tukang batu
Kepala tukang batu
Mandor

D.13

4,300.00
1,550.00
134,000.00
Jumlah Bahan

51,600.00
13,392.00
4,341.60
69,333.60

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

8,640.00
5,100.00
540.00
480.00
14,760.00

Jumlah Bahan + Upah + Alat

84,093.00

1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA Dengan pasir kwarsa (1 PC : 5 PS)
Material
12.0000 bh
7.2000 kg
0.0270 m3
Upah
0.2400
0.1000
0.0100
0.0100

4,300.00
1,550.00
230,000.00
Jumlah Bahan

Bataco Besar (10/20/40)


P C (50 kg)
Pasir kwarsa

org
org
org
org

Pekerja
Tukang batu
Kepala tukang batu
Mandor

PEKERJAAN

E.1

4,300.00
1,550.00
134,000.00
Jumlah Bahan

51,600.00
11,160.00
3,618.00
66,378.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

8,640.00
5,100.00
540.00
480.00
14,760.00

Jumlah Bahan + Upah + Alat

81,138.00

PLESTERAN

1M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm


Material
7.7600
0.0230

Kg
m3

Portland Semen
Pasir Pasang

1,550.00
230,000.00
Jumlah Bahan

12,028.00
5,290.00
17,318.00

Upah
0.2000
0.1500
0.0015
0.0100

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
7,650.00
81.00
480.00
15,411.00

Jumlah Bahan + Upah + Alat

32,729.00

E.2

1M2 Plesteran 1 Pc : 2 Kp : 8 Ps Tebal 15 mm


Material
3.0000
0.0050
0.0200

Kg
m3
m3

Portland Semen
Kapur Padam
Pasir Pasang

1,550.00
215,600.00
230,000.00
Jumlah Bahan

4,650.00
1,078.00
4,600.00
10,328.00

Upah
0.2200
0.1200
0.0120
0.0110

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,920.00
6,120.00
648.00
528.00
15,216.00

Jumlah Bahan + Upah + Alat

25,544.00

E.3

1M2 Plesteran 1 Pc : 3 Kp : 10 Ps Tebal 15 mm


Material
1.8400
0.0060
0.0140

Kg
m3
m3

Portland Semen
Kapur Padam
Pasir Pasang

1,550.00
215,600.00
230,000.00
Jumlah Bahan

2,852.00
1,293.60
3,220.00
7,365.60

Upah
0.2000
0.1500
0.0015
0.0100

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
7,650.00
81.00
480.00
15,411.00

Jumlah Bahan + Upah + Alat

22,776.00

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

44

E.4

1M2 Plesteran 1 Pc : 3 Ps Tebal 20 mm


Material
10.3680
0.0310

Kg
m3

Portland Semen
Pasir Pasang

1,550.00
230,000.00
Jumlah Bahan

16,070.40
7,130.00
23,200.40

Upah
0.2600
0.2000
0.0200
0.0125

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

9,360.00
10,200.00
1,080.00
600.00
21,240.00

Jumlah Bahan + Upah + Alat

44,440.00

E.4a

1M2 Plesteran 1 Pc : 3 Ps Tebal 10 mm


Material
5.1733
0.0200

Kg
m3

Portland Semen
Pasir Pasang

1,550.00
230,000.00
Jumlah Bahan

8,018.62
4,600.00
12,618.62

Upah
0.1500
0.1200
0.0010
0.0100

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,400.00
6,120.00
54.00
480.00
12,054.00

Jumlah Bahan + Upah + Alat

24,672.00

E.5

1M2 Berapen 1 Pc : 5 Ps Tebal 15 mm


Material
5.1840
0.0260

Kg
m3

Portland Semen
Pasir Pasang

1,550.00
230,000.00
Jumlah Bahan

8,035.20
5,980.00
14,015.20

Upah
0.1500
0.0700
0.0070
0.0080

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,400.00
3,570.00
378.00
384.00
9,732.00

Jumlah Bahan + Upah + Alat

23,747.00

E.6

1M' Plesteran Skoning 1 Pc : 2 Ps lebar 10 mm


Material
4.320
0.006

kg
m3

Portland Semen
Pasir Pasang

1,550.00
230,000.00
Jumlah Bahan

6,696.00
1,380.00
8,076.00

Upah
0.0570
0.0380
0.0380
0.0030

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

2,052.00
1,938.00
2,052.00
144.00
6,186.00

Jumlah Bahan + Upah + Alat

14,262.00

E.7

1M2 Plesteran Ciprat 1 Pc : 2 Ps


Material
4.3200
0.0060

Kg
m3

Portland Semen
Pasir Pasang

1,550.00
230,000.00
Jumlah Bahan

6,696.00
1,380.00
8,076.00

Upah
0.2500
0.1000
0.0100
0.0130

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

9,000.00
5,100.00
540.00
624.00
15,264.00

Jumlah Bahan + Upah + Alat

23,340.00

E.8

1M2 Finishing Siar Pas. Batu Kali Adukan 1 Pc : 2 Ps


Material
6.3400
0.0120

Kg
m3

Portland Semen
Pasir Pasang

1,550.00
230,000.00
Jumlah Bahan

9,827.00
2,760.00
12,587.00

Upah
0.3000
0.1400
0.0140
0.0150

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

10,800.00
7,140.00
756.00
720.00
19,416.00

Jumlah Bahan + Upah + Alat

32,003.00

1,550.00
Jumlah Bahan

5,037.50
5,037.50

E.9

1M2 Acian
Material
3.2500

Kg

Portland Semen

Upah
0.1500
OH
Pekerja
0.1000
OH
Tukang batu
0.0100
OH
Kepala Tukang
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
0.0080
OH
Mandor

45

36,000.00
51,000.00
54,000.00
48,000.00

5,400.00
5,100.00
540.00
384.00

VI

F
F.1

Jumlah Upah

11,424.00

Jumlah Bahan + Upah + Alat

16,461.00

16,844,000.00
17,500.00
20,100.00
Jumlah Bahan

18,528,400.00
21,875.00
20,100.00
18,570,375.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

216,000.00
1,020,000.00
108,000.00
14,400.00
1,358,400.00

Jumlah Bahan + Upah + Alat

19,928,775.00

11,250,000.00
17,500.00
20,100.00
Jumlah Bahan

12,375,000.00
21,875.00
20,100.00
12,416,975.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

216,000.00
1,020,000.00
108,000.00
14,400.00
1,358,400.00

Jumlah Bahan + Upah + Alat

13,775,375.00

11,250,000.00
17,500.00
Jumlah Bahan

450,000.00
875.00
450,875.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

12,600.00
53,550.00
5,670.00
864.00
72,684.00

Jumlah Bahan + Upah + Alat

523,559.00

PEKERJAAN K A Y U
1M3 Membuat Kosen Pintu & Jendela Kayu klas I
Material
1.1000
1.2500
1.0000

m3
Kg
Kg

Kayu Klas I (Jati) , Balok


Paku Biasa 2" - 5 "
Lem Kayu

Upah
6.0000
20.0000
2.0000
0.3000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.2

1M3 Membuat Kosen Pintu & Jendela Kayu Bengkirai


Material
1.1000
1.2500
1.0000

m3
Kg
Kg

Kayu Bengkirai, Balok


Paku Biasa 2" - 5 "
Lem Kayu

Upah
6.0000
20.0000
2.0000
0.3000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.3

1M2 Membuat Pintu Klamp Standard Kayu Bengkirai


Material
0.0400
0.0500

m3
Kg

Kayu Bengkirai, papan


Paku Biasa 2" - 5 "

Upah
0.3500
1.0500
0.1050
0.0180

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

46

F.4

1M2 Membuat Daun Pintu Panel Kayu Bengkirai


Material
0.0400
0.0500

m3
kg

Kayu Bengkirai, papan


Lem Kayu

Upah
1.0000
2.5000
0.2500
0.0500

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.5

11,250,000.00
20,100.00
Jumlah Bahan

450,000.00
1,005.00
451,005.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

36,000.00
127,500.00
13,500.00
2,400.00
179,400.00

Jumlah Bahan + Upah + Alat

630,405.00

11,250,000.00
20,100.00
Jumlah Bahan

393,750.00
6,030.00
399,780.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

28,800.00
102,000.00
10,800.00
1,920.00
143,520.00

Jumlah Bahan + Upah + Alat

543,300.00

1M2 Membuat Pintu & Jendela Kaca Kayu Bengkirai


Material
0.0350
0.3000

m3
kg

Kayu Bengkirai, papan


Lem Kayu

Upah
0.8000
2.0000
0.2000
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.6

1M2 Membuat Pintu & Jendela Jalusi Kayu Kelas I (Jati)


Material
0.0640
0.5000

m3
kg

Kayu Kelas I (Jati), papan


Lem Kayu

Upah
1.0000
3.0000
0.3000
0.3000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.7

16,844,000.00
20,100.00
Jumlah Bahan

1,078,016.00
10,050.00
1,088,066.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

36,000.00
153,000.00
16,200.00
14,400.00
219,600.00

Jumlah Bahan + Upah + Alat

1,307,666.00

1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s/d 90cm
Material
0.0250
0.0300
0.5000
1.0000

m3
Kg
Kg
Lbr

Kayu Bengkirai, papan


Paku Biasa 1/2" - 1"
Lem Kayu
Teakwood 120 x 240 tebal 4 mm

Upah
0.6000
2.0000
0.2000
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.8

11,250,000.00
17,500.00
20,100.00
108,000.00
Jumlah Bahan

281,250.00
525.00
10,050.00
108,000.00
399,825.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

21,600.00
102,000.00
10,800.00
1,920.00
136,320.00

Jumlah Bahan + Upah + Alat

536,145.00

1M2 Membuat Pintu Plywood rangkap, rangka expose kayu Bengkirai


Material
0.0256
0.0300
0.5000
1.0000
Upah
0.8000
2.0000
0.2000
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

m3
Kg

Kayu Bengkirai, papan


Paku Biasa 1/2" - 1"

Kg

Lem Kayu

Lbr

Teakwood 120 x 240 tebal 4 mm

F.9

11,250,000.00
17,500.00
20,100.00
108,000.00
Jumlah Bahan

288,000.00
525.00
10,050.00
108,000.00
406,575.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

28,800.00
102,000.00
10,800.00
1,920.00
143,520.00

Jumlah Bahan + Upah + Alat

550,095.00

16,844,000.00
17,500.00
Jumlah Bahan

1,010,640.00
2,625.00
1,013,265.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

18,000.00
102,000.00
10,800.00
1,200.00
132,000.00

Jumlah Bahan + Upah + Alat

1,145,265.00

11,250,000.00
17,500.00
Jumlah Bahan

675,000.00
2,625.00
677,625.00

36,000.00

18,000.00

1M2 Membuat Jalusi mati Kosen Kayu Kelas I (Jati)


Material
0.0600
0.1500

m3
Kg

Kayu Kelas I (Jati), papan


Paku Biasa 1/2" - 1"

Upah
0.5000
2.0000
0.2000
0.0250

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.10

1M2 Membuat Jalusi mati Kosen Kayu Bengkirai


Material
0.0600
0.1500

m3
Kg

Upah
0.5000

OH

Kayu Bengkirai, papan


Paku Biasa 1/2" - 1"

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

Pekerja

47

2.0000
0.2000
0.0250

OH
OH
OH

F.11

Tukang Kayu
Kepala Tukang
Mandor

51,000.00
54,000.00
48,000.00
Jumlah Upah

102,000.00
10,800.00
1,200.00
132,000.00

Jumlah Bahan + Upah + Alat

809,625.00

1M2 Membuat Pintu Teakwood Rangkap Rangka Kayu Kelas I (jati)


Material
0.0250
0.0300
0.3000
1.0000

m3
Kg
Kg
Lbr

Kayu Kelas I (Jati), papan


Paku Biasa 1/2" - 1"
Lem Kayu
Teakwood 120 x 240 tebal 4 mm

Upah
0.8000
2.0000
0.2000
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

48

16,844,000.00
17,500.00
20,100.00
108,000.00
Jumlah Bahan

421,100.00
525.00
6,030.00
108,000.00
535,655.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

28,800.00
102,000.00
10,800.00
1,920.00
143,520.00

Jumlah Bahan + Upah + Alat

679,175.00

F.12

1M2 Membuat Pintu Teakwood Rangkap Lapis Formika Rangka ekspose


Kayu Bengkirai
Material
0.0250
0.0300
0.0800
1.0000
0.5000

m3
Kg
Kg
Lbr
Lbr

Kayu Bengkirai, papan


Paku Biasa 1/2" - 1"
Lem Kayu
Teakwood 120 x 240 tebal 4 mm
Formika uk. Pintu

Upah
0.8000
2.5000
0.2500
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.13

11,250,000.00
17,500.00
20,100.00
108,000.00
278,000.00
Jumlah Bahan

281,250.00
525.00
1,608.00
108,000.00
139,000.00
530,383.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

28,800.00
127,500.00
13,500.00
1,920.00
171,720.00

Jumlah Bahan + Upah + Alat

702,103.00

1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM/WC )


Material
0.0150
1.0000
1.2000
0.2000
0.5000

m3
lbr
m2
kg
kg

Rangka kayu bengkirai (ram pintu)


Triplek 4 mm
Aluminium sheet 0,3 mm
Paku triplek
Lem putih ( FOX )

Upah
0.3000
1.3000
0.1300
0.0130

org
org
org
org

Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

F.14

11,250,000.00
80,000.00
144,000.00
18,500.00
20,100.00
Jumlah Bahan

168,750.00
80,000.00
172,800.00
3,700.00
10,050.00
435,300.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

10,800.00
66,300.00
7,020.00
624.00
84,744.00

Jumlah Bahan + Upah + Alat

520,044.00

1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/WC )


Material
0.0150
1.0000
0.5000
0.2000
0.5000
0.2000

m3
lbr
lbr
kg
kg
kg

Rangka kayu bengkirai (ram pintu)


Triplek 4 mm ukuran pintu
Formika
Paku triplek
Lem putih ( FOX )
Lem kuning ( aica aibon )

Upah
0.5000
1.3000
0.1300
0.0130

org
org
org
org

Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

F.15

11,250,000.00
80,000.00
278,000.00
18,500.00
20,100.00
58,400.00
Jumlah Bahan

168,750.00
80,000.00
139,000.00
3,700.00
10,050.00
11,680.00
413,180.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

18,000.00
66,300.00
7,020.00
624.00
91,944.00

Jumlah Bahan + Upah + Alat

505,124.00

1M3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkirai


Bentang 6 M
Material
1.1000
15.0000
0.8000

m3
Kg
Kg

Kayu Bengkirai, balok


Besi Strip
Paku Biasa 2" - 5"

Upah
4.0000
12.0000
1.2000
2.0000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.16

11,250,000.00
17,800.00
17,500.00
Jumlah Bahan

12,375,000.00
267,000.00
14,000.00
12,656,000.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

144,000.00
612,000.00
64,800.00
96,000.00
916,800.00

Jumlah Bahan + Upah + Alat

13,572,800.00

1M3 Memasang Konstruksi Kuda-kuda Ekspose Kayu Jati


Material
1.1000
15.0000
5.6000

m3
Kg
Kg

Kayu Jati, balok


Besi Strip
Paku Biasa 2" - 5"

Upah
6.0000
20.0000
2.0000
0.3000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.17

16,844,000.00
17,800.00
17,500.00
Jumlah Bahan

18,528,400.00
267,000.00
98,000.00
18,893,400.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

216,000.00
1,020,000.00
108,000.00
14,400.00
1,358,400.00

Jumlah Bahan + Upah + Alat

20,251,800.00

11,250,000.00
17,800.00
17,500.00
Jumlah Bahan

12,375,000.00
267,000.00
52,500.00
12,694,500.00

36,000.00
51,000.00

86,400.00
367,200.00

1M3 Memasang Konstruksi Gording Kayu Bengkirai


Material
1.1000
15.0000
3.0000

m3
Kg
Kg

Kayu Bengkirai, balok


Besi Strip
Paku Biasa 2" - 5"

Upah
2.4000
OH
Pekerja
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
7.2000
OH
Tukang Kayu

49

0.7200
0.1200

OH
OH

Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

50

54,000.00
48,000.00
Jumlah Upah

38,880.00
5,760.00
498,240.00

Jumlah Bahan + Upah + Alat

13,192,740.00

F.18

1M2 Pasang Pintu Plywood & Formika Rangka Kayu Bengkirai


Material
0.0196
0.0300
0.3000
0.5000
1.0000

m3
Kg
Kg
Lbr
Lbr

Kayu Bengkirai, papan


Paku Biasa 1/2" - 1"
Lem Kayu
Teakwood 120 x 240 tebal 4 mm
Formika

Upah
0.8000
2.5000
0.2500
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.19

11,250,000.00
17,500.00
20,100.00
108,000.00
278,000.00
Jumlah Bahan

220,500.00
525.00
6,030.00
54,000.00
278,000.00
559,055.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

28,800.00
127,500.00
13,500.00
1,920.00
171,720.00

Jumlah Bahan + Upah + Alat

730,775.00

16,844,000.00
17,500.00
20,100.00
108,000.00
278,000.00
Jumlah Bahan

330,142.40
525.00
24,120.00
108,000.00
278,000.00
740,787.40

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

36,000.00
132,600.00
14,040.00
2,400.00
185,040.00

Jumlah Bahan + Upah + Alat

925,827.00

1M2 Pasang Pintu Formika Double, Rangka Kayu Jati


Material
0.0196
0.0300
1.2000
1.0000
1.0000

m3
Kg
Kg
Lbr
Lbr

Kayu Jati, papan


Paku Biasa 1/2" - 1"
Lem Kayu
Teakwood 120 x 240 tebal 4 mm
Formika

Upah
1.0000
2.6000
0.2600
0.0500

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.20

1M2 Memasang Rangka Atap Genteng Keramik, Kayu Bengkirai


Material
0.0086
0.0036
0.2500

m3
m3
Kg

Kayu Klas II (Bengkirai), Kaso-kaso (5x7) cm


Reng (2x3) cm
Paku Biasa 2" - 5"

Upah
0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.21

11,250,000.00
11,250,000.00
17,500.00
Jumlah Bahan

96,750.00
40,500.00
4,375.00
141,625.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

3,600.00
5,100.00
540.00
240.00
9,480.00

Jumlah Bahan + Upah + Alat

151,105.00

1M2 Memasang Rangka Atap Genteng Beton, Kayu Bengkirai


Material
0.0086
0.0043
0.2500

m3
m3
Kg

Kayu Bengkirai Kaso-kaso (5x7) cm


Reng (2x3) cm
Paku Biasa 2" - 5"

Upah
0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.22

11,250,000.00
11,250,000.00
17,500.00
Jumlah Bahan

96,750.00
48,375.00
4,375.00
149,500.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

3,600.00
5,100.00
540.00
240.00
9,480.00

Jumlah Bahan + Upah + Alat

158,980.00

11,250,000.00
17,500.00
Jumlah Bahan

1,856,250.00
3,500.00
1,859,750.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

4,320.00
6,120.00
648.00
288.00
11,376.00

Jumlah Bahan + Upah + Alat

1,871,126.00

11,250,000.00
17,500.00
Jumlah Bahan

81,000.00
1,750.00
82,750.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

3,600.00
10,200.00
1,350.00
240.00
15,390.00

Jumlah Bahan + Upah + Alat

98,140.00

1M2 Pasang Rangka Atap Sirap Kayu Bengkirai


Material
0.1650
0.2000

m3
Kg

Kayu Bengkirai, balok


Paku Biasa 2" - 5"

Upah
0.1200
0.1200
0.0120
0.0060

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.23

1M' Pasang Listplank Uk. (3x20)cm Kayu Bengkirai


Material
0.0072
0.1000

m3
Kg

Kayu Bengkirai, papan


Paku Biasa 2" - 5"

Upah
0.1000
0.2000
0.0250
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.24
1M' Pasang Listplank Uk. (3x30)cm
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
51 Kayu Bengkirai

Material
0.0110
0.0500

m3
Kg

Kayu Bengkirai, papan


Paku Biasa 2" - 5"

Upah
0.1000
0.2000
0.0200
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.25

11,250,000.00
17,500.00
Jumlah Bahan

123,750.00
875.00
124,625.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

3,600.00
10,200.00
1,080.00
240.00
15,120.00

Jumlah Bahan + Upah + Alat

139,745.00

11,250,000.00
17,500.00
Jumlah Bahan

163,125.00
2,625.00
165,750.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,400.00
12,750.00
1,350.00
360.00
19,860.00

Jumlah Bahan + Upah + Alat

185,610.00

1M' Pasang Listplank Uk. 2x(3x20)cm Kayu Bengkirai


Material
0.0145
0.1500

m3
Kg

Kayu Bengkirai, papan


Paku Biasa 2" - 5"

Upah
0.1500
0.2500
0.0250
0.0075

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

52

F.26

1M2 Pasang Rangka Dinding Pemisah Kayu Bengkirai


Material
0.0280
0.1500

m3
Kg

Kayu Bengkirai, balok


Paku Biasa 2" - 5"

Upah
0.1500
0.4500
0.0450
0.0800

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.27

315,000.00
2,625.00
317,625.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,400.00
22,950.00
2,430.00
3,840.00
34,620.00

Jumlah Bahan + Upah + Alat

352,245.00

1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengkirai


Material
0.0280
0.1500
0.8600
0.5600

m3
Kg
Lbr
Kg

Kayu Bengkirai, balok


Paku Biasa 2" - 5"
Teakwood tebal 4mm
Lem kayu

Upah
0.1500
0.4500
0.0450
0.0080

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.28

11,250,000.00
17,500.00
108,000.00
20,100.00
Jumlah Bahan

315,000.00
2,625.00
92,880.00
11,256.00
421,761.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,400.00
22,950.00
2,430.00
384.00
31,164.00

Jumlah Bahan + Upah + Alat

452,925.00

16,844,000.00
17,500.00
25,100.00
Jumlah Bahan

117,908.00
1,750.00
3,765.00
123,423.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

21,600.00
91,800.00
9,720.00
1,440.00
124,560.00

Jumlah Bahan + Upah + Alat

247,983.00

108,000.00
18,500.00
Jumlah Bahan

43,200.00
9,250.00
52,450.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

900.00
3,825.00
405.00
62.40
5,192.40

Jumlah Bahan + Upah + Alat

57,642.00

18,800.00
3,609,000.00
18,500.00
8,400.00
Jumlah Bahan

28,200.00
50,526.00
925.00
25.20
79,676.20

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

3,600.00
2,550.00
270.00
240.00
6,660.00

Jumlah Bahan + Upah + Alat

86,336.00

1M2 Pasang Dinding Lambriziring dari Papan jati


Material
0.0070
0.1000
0.1500

m3
Kg
Kg

Kayu Jati, balok


Paku Biasa 2" - 5"
Paku Sekrup 3,5"

Upah
0.6000
1.8000
0.1800
0.0300

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.29

1M2 Pasang Plywood tebal 4mm unt Dinding


Material
0.4000
0.5000

Lbr
Kg

Teakwood 10x240 tebal 4mm


Paku Biasa 1/4" - 1"

Upah
0.0250
0.0750
0.0075
0.0013

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.30

VII

11,250,000.00
17,500.00
Jumlah Bahan

1M2 Pasang Dinding Bilik, Rangka Kayu Klas III / IV


Material
1.5000
0.0140
0.0500
0.0030

m2
m3
Kg
m'

Bambu diameter 6-8 / 600 cm


Kayu Klas Meranti (balok/pesagen)
Paku Biasa 1/4" - 1"
List Kayu profil

Upah
0.1000
0.0500
0.0050
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN PERKERASAN DAN BETON

G.1

1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87
Material
247.0000
0.6207
0.7400
Upah
1.6500
0.2750
0.0280
0.0830

Kg
m3
m3

Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1,750.00
250,000.00
274,000.00
Jumlah Bahan

432,250.00
155,178.57
202,760.00
790,188.57

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

59,400.00
14,025.00
1,512.00
3,984.00
78,921.00

Jumlah Bahan + Upah + Alat

869,109.00

G.2
1M3 Membuat Beton mutu f'c=9,853Mpa (K125), slum (122)cm, w/c = 0,78
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

Material
276.0000
0.5914
0.7496
Upah
1.6500
0.2750
0.0280
0.0830

Kg
m3
m3

Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.3

1,750.00
250,000.00
274,000.00
Jumlah Bahan

483,000.00
147,850.00
205,390.40
836,240.40

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

84,150.00
14,850.00
1,344.00
3,984.00
104,328.00

Jumlah Bahan + Upah + Alat

940,568.00

1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72
Material
299.0000
0.5707
0.7533
Upah
1.6500
0.2750
0.0280
0.0830

Kg
m3
m3

Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

54

1,750.00
250,000.00
274,000.00
Jumlah Bahan

523,250.00
142,675.00
206,404.20
872,329.20

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

59,400.00
14,025.00
1,512.00
3,984.00
78,921.00

Jumlah Bahan + Upah + Alat

951,250.00

G.4

1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
Material
230.0000
0.6379
0.7607
Upah
1.2000
0.2000
0.0200
0.0060

Kg
m3
m3

Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.5

1,750.00
250,000.00
274,000.00
Jumlah Bahan

402,500.00
159,475.00
208,431.80
770,406.80

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

43,200.00
10,200.00
1,080.00
288.00
54,768.00

Jumlah Bahan + Upah + Alat

825,174.00

1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
Material
326.0000
0.5429
0.7622
Upah
1.6500
0.2500
0.0250
0.0800

Kg
m3
m3

Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.6

1,750.00
250,000.00
274,000.00
Jumlah Bahan

570,500.00
135,725.00
208,842.80
915,067.80

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

59,400.00
12,750.00
1,350.00
3,840.00
77,340.00

Jumlah Bahan + Upah + Alat

992,407.00

1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm,w/c = 0,61
Material
352.0000
0.5221
0.7637
Upah
1.6500
0.2500
0.0250
0.0800

Kg
m3
m3

Portland Semen
Pasir Beton (Muntilan)
Batu pecah 1/2

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.7

1,750.00
355,000.00
274,000.00
Jumlah Bahan

616,000.00
185,345.50
209,253.80
1,010,599.30

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

59,400.00
12,750.00
1,350.00
3,840.00
77,340.00

Jumlah Bahan + Upah + Alat

1,087,939.00

1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
Material
371.0000
0.4986
0.7756
Upah
1.6500
0.2500
0.0250
0.0800

Kg
m3
m3

Portland Semen
Pasir Beton (Muntilan)
Batu pecah 1/2

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.8

1,750.00
355,000.00
274,000.00
Jumlah Bahan

649,250.00
177,003.00
212,514.40
1,038,767.40

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

59,400.00
12,750.00
1,350.00
3,840.00
77,340.00

Jumlah Bahan + Upah + Alat

1,116,107.00

1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm,w/c = 0,56
Material
384.0000
0.4943
0.7696
Upah
1.6500
0.2500
0.0250
0.0800

Kg
m3
m3

Portland Semen
Pasir Beton (Muntilan)
Batu pecah 1/2

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.9

1,750.00
355,000.00
274,000.00
Jumlah Bahan

672,000.00
175,476.50
210,870.40
1,058,346.90

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

59,400.00
12,750.00
1,350.00
3,840.00
77,340.00

Jumlah Bahan + Upah + Alat

1,135,686.00

1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53
Material
406.0000
0.4886
0.7600

1,750.00
355,000.00
274,000.00
Jumlah Bahan

710,500.00
173,453.00
208,240.00
1,092,193.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

59,400.00
12,750.00
1,350.00
3,840.00
77,340.00

Jumlah Bahan + Upah + Alat

1,169,533.00

1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm,w/c = 0,52
Material
413.0000
Kg
Portland Semen
1,750.00
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
55
0.4864
m3
Pasir Beton (Muntilan)
355,000.00

722,750.00
172,672.00

Upah
1.6500
0.2500
0.0250
0.0800

Kg
m3
m3

Portland Semen
Pasir Beton (Muntilan)
Batu pecah 1/2

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.10

0.7563

m3

Batu pecah 1/2

274,000.00
Jumlah Bahan

207,226.20
1,102,648.20

Upah
1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

59,400.00
12,750.00
1,350.00
3,840.00
77,340.00

Jumlah Bahan + Upah + Alat

1,179,988.00

G.11

1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm,w/c = 0,49
Material
439.0000
0.4786
0.7452
Upah
2.1000
0.3500
0.0350
0.1050

Kg
m3
m3

Portland Semen
Pasir Beton (Muntilan)
Batu pecah 1/2

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

56

1,750.00
355,000.00
274,000.00
Jumlah Bahan

768,250.00
169,903.00
204,184.80
1,142,337.80

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

75,600.00
17,850.00
1,890.00
5,040.00
100,380.00

Jumlah Bahan + Upah + Alat

1,242,717.00

G.12

1M3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48
Material
448.0000
0.4764
0.7407
Upah
2.1000
0.3500
0.0350
0.1050

Kg
m3
m3

Portland Semen
Pasir Beton (Muntilan)
Batu pecah 1/2

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.13

1,750.00
355,000.00
274,000.00
Jumlah Bahan

784,000.00
169,122.00
202,951.80
1,156,073.80

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

75,600.00
17,850.00
1,890.00
5,040.00
100,380.00

Jumlah Bahan + Upah + Alat

1,256,453.00

12,200.00
20,000.00
Jumlah Bahan

12,810.00
300.00
13,110.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

252.00
357.00
37.80
19.20
666.00

a = Jumlah Bahan + Upah + Alat

13,776.00

1KG Pembesian dg Besi Polos


Material
1.0500
0.0150

Kg
Kg

Besi Beton (polos)


Kawat Beton

Upah
0.0070
0.0070
0.0007
0.0004

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

G.13a 110 KG Besi Beton Terpasang (polos)


G.13b 125 KG Besi Beton Terpasang (polos)
G.14

a x 110
a x 125

1,515,360.00
1,722,000.00

1KG Kabel Presstresed Polos/strand


Material
1.0500
0.0100

Kg
Kg

Besi presstred polos


Kawat Beton

Upah
0.0050
0.0050
0.0005
0.0003

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

G.15

20,400.00
20,000.00
Jumlah Bahan

21,420.00
200.00
21,620.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

180.00
255.00
27.00
14.40
476.40

Jumlah Bahan + Upah + Alat

22,096.00

2,269,000.00
17,500.00
24,200.00
Jumlah Bahan

90,760.00
5,250.00
2,420.00
98,430.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

18,720.00
13,260.00
1,404.00
1,248.00
34,632.00

Jumlah Bahan + Upah + Alat

133,062.00

1M2 Pasang Bekisting untuk Pondasi


Material
0.0400
0.3000
0.1000

m3
Kg
Ltr

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting

Upah
0.5200
0.2600
0.0260
0.0260

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

G.15a

1M2 Pasang Bekisting untuk Sloof, Ringbalk, Kolom, Balok Lantai dengan Papan
Material
0.3996
0.4000

m3
Kg

Kayu Perancah
Paku Biasa 1" - 4"

Upah
0.3000
0.5000
0.0500
0.0100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

G.16

2,269,000.00
17,500.00
Jumlah Bahan

906,692.40
7,000.00
913,692.40

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

10,800.00
25,500.00
2,700.00
480.00
39,480.00

Jumlah Bahan + Upah + Alat

953,172.00

2,269,000.00
17,500.00
24,200.00
Jumlah Bahan

102,105.00
5,250.00
2,420.00
109,775.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

18,720.00
13,260.00
1,404.00
1,248.00
34,632.00

Jumlah Bahan + Upah + Alat

144,407.00

2,269,000.00

90,760.00

1M2 Pasang Bekisting untuk Sloof


Material
0.0450
0.3000
0.1000

m3
Kg
Ltr

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting

Upah
0.5200
0.2600
0.0260
0.0260

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

G.17

1M2 Pasang Bekisting untuk Kolom


Material

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
0.0400
m3
Kayu Perancah

57

0.4000
0.2000
0.0150
0.3500
2.0000

Kg
Ltr
m3
Lbr
Btg

Paku Biasa 1" - 4"


Minyak Bekisting
Kayu meranti (balok/pesagen)
Multipleks 120 x240 tb. 9 mm
Dolken sengon diameter 8 - 10 cm / 4 m

Upah
0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

G.18

17,500.00
24,200.00
3,609,000.00
148,700.00
39,000.00
Jumlah Bahan

7,000.00
4,840.00
54,135.00
52,045.00
78,000.00
286,780.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

23,760.00
16,830.00
1,782.00
1,584.00
43,956.00

Jumlah Bahan + Upah + Alat

330,736.00

2,269,000.00
17,500.00
24,200.00
3,609,000.00
148,700.00
39,000.00
Jumlah Bahan

90,760.00
7,000.00
4,840.00
64,962.00
52,045.00
78,000.00
297,607.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

23,760.00
16,830.00
1,782.00
1,584.00
43,956.00

Jumlah Bahan + Upah + Alat

341,563.00

1M2 Pasang Bekisting untuk Balok


Material
0.0400
0.4000
0.2000
0.0180
0.3500
2.0000

m3
Kg
Ltr
m3
Lbr
Btg

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting
Kayu meranti (balok/pesagen)
Multipleks 120 x240 tb. 9 mm
Dolken sengon diameter 8 - 10 cm / 4 m

Upah
0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

58

G.19

1M2 Pasang Bekisting untuk Lantai


Material
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000

m3
Kg
Ltr
m3
Lbr
Btg

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting
Kayu meranti (balok/pesagen)
Multipleks 120 x240 tb. 9 mm
Dolken sengon diameter 8 - 10 cm / 4 m

Upah
0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

G.20

2,269,000.00
17,500.00
24,200.00
3,609,000.00
148,700.00
39,000.00
Jumlah Bahan

90,760.00
7,000.00
4,840.00
54,135.00
52,045.00
234,000.00
442,780.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

23,760.00
16,830.00
1,782.00
1,584.00
43,956.00

Jumlah Bahan + Upah + Alat

486,736.00

2,269,000.00
17,500.00
24,200.00
3,609,000.00
148,700.00
39,000.00
Jumlah Bahan

68,070.00
7,000.00
4,840.00
72,180.00
52,045.00
117,000.00
321,135.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

23,760.00
16,830.00
1,782.00
1,584.00
43,956.00

15,100.00
Jumlah Alat

60,400.00
60,400.00

Jumlah Bahan + Upah + Alat

425,491.00

2,269,000.00
17,500.00
24,200.00
3,609,000.00
148,700.00
39,000.00
Jumlah Bahan

68,070.00
7,000.00
3,630.00
54,135.00
52,045.00
78,000.00
262,880.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

23,760.00
16,830.00
1,782.00
1,584.00
43,956.00

Jumlah Bahan + Upah + Alat

306,836.00

2,269,000.00
17,500.00
39,000.00
Jumlah Bahan

59,901.60
10,500.00
19,500.00
89,901.60

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,400.00
2,550.00
270.00
384.00
8,604.00

Jumlah Bahan + Upah + Alat

98,505.00

3,609,000.00
2,269,000.00
17,500.00
Jumlah Bahan

61,353.00
54,456.00
7,000.00
122,809.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

10,800.00
7,650.00
8,100.00
2,400.00
28,950.00

Jumlah Bahan + Upah + Alat

151,759.00

3,609,000.00
148,700.00
17,500.00
Jumlah Bahan

61,353.00
51,598.90
7,000.00
119,951.90

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

4,320.00
7,650.00
8,100.00
2,400.00
22,470.00

Jumlah Bahan + Upah + Alat

142,421.00

1M2 Pasang Bekisting untuk Dinding


Material
0.0300
0.4000
0.2000
0.0200
0.3500
3.0000

m3
Kg
Ltr
m3
Lbr
Btg

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting
Kayu meranti (balok/pesagen)
Multipleks 120 x240 tb. 9 mm
Dolken sengon diameter 8 - 10 cm / 4 m

Upah
0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Alat
4.0000

lot

Alat bantu (set @ 3 alat )

G.21

1M2 Pasang Bekisting untuk Tangga


Material
0.0300
0.4000
0.1500
0.0150
0.3500
2.0000

m3
Kg
Ltr
m3
Lbr
Btg

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting
Kayu meranti (balok/pesagen)
Multipleks 120 x240 tb. 9 mm
Dolken sengon diameter 8 - 10 cm / 4 m

Upah
0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

G.22

1 M2 Pasang Bekisting Jembatan Cor


Material
0.0264
0.6000
0.5000

m3
Kg
Btg

Kayu Perancah
Paku Biasa 1" - 4"
Dolken sengon diameter 8 - 10 cm / 4 m

Upah
0.1500
0.0500
0.0050
0.0080

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

G.23

1 M2 BEKESTING DENGAN PAPAN


Material
0.0170
0.0240
0.4000

m3
m3
kg

Kaso lanan 5/7 (2x pakai) 50 %


Kayu Perancah
Paku Biasa 1" - 4"

Upah
0.3000
0.1500
0.1500
0.0500

org
org
org
org

Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

G.24

1 M2 BEKESTING DENGAN MULTIPLEX 9 MM


Material
0.0170
0.3470
0.4000

m3
lbr
kg

Kaso lanan 5/7 (2x pakai) 50 %


Multiplex 9 mm (2x pakai) 75 %
Paku

Upah
0.1200
0.1500
0.1500
0.0500

org
org
org
org

Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
G.25
1 M3 Membuat

59
Pondasi Beton Bertulang
(150 kg Besi + Bekisting)

Material
0.2000
1.5000
0.4000
157.5000
2.2500
336.0000
0.5400
0.8100
Upah
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

60

2,269,000.00
17,500.00
24,200.00
12,200.00
20,000.00
1,550.00
250,000.00
274,000.00
Jumlah Bahan

453,800.00
26,250.00
9,680.00
1,921,500.00
45,000.00
520,800.00
135,000.00
221,940.00
3,333,970.00

36,000.00
51,000.00
51,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

190,800.00
14,025.00
66,300.00
53,550.00
14,148.00
12,720.00
351,543.00

Jumlah Bahan + Upah + Alat

3,685,513.00

G.26

1 M3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)


Material
0.2700
2.0000
0.6000
210.0000
3.0000
336.0000
0.5400
0.8100
Upah
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

G.27

2,269,000.00
17,500.00
24,200.00
12,200.00
20,000.00
1,550.00
250,000.00
274,000.00
Jumlah Bahan

612,630.00
35,000.00
14,520.00
2,562,000.00
60,000.00
520,800.00
135,000.00
221,940.00
4,161,890.00

36,000.00
51,000.00
51,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

203,400.00
14,025.00
79,560.00
71,400.00
17,442.00
13,584.00
399,411.00

Jumlah Bahan + Upah + Alat

4,561,301.00

1 M3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)


Material
0.4000
4.0000
2.0000
315.0000
4.5000
336.0000
0.5400
0.8100
0.1500
3.5000
20.0000
Upah
7.0500
0.2750
1.6500
2.1000
0.4030
0.3530

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2
Kayu Meranti (balok/pesagen)
Multipleks 120 x 240 tb. 9 mm
Dolken sengon diameter 8 / 4mm

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

G.28

2,269,000.00
17,500.00
24,200.00
12,200.00
20,000.00
1,550.00
250,000.00
274,000.00
3,609,000.00
148,700.00
39,000.00
Jumlah Bahan

907,600.00
70,000.00
48,400.00
3,843,000.00
90,000.00
520,800.00
135,000.00
221,940.00
541,350.00
520,450.00
780,000.00
7,678,540.00

36,000.00
51,000.00
51,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

253,800.00
14,025.00
84,150.00
107,100.00
21,762.00
16,944.00
497,781.00

Jumlah Bahan + Upah + Alat

8,176,321.00

1 M3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)


Material
0.3200
3.2000
1.6000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1400
2.8000
18.0000
Upah
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2
Kayu Meranti (balok/pesagen)
Multipleks 120 x 240 tb. 9 mm
Dolken sengon diameter 8 / 4mm

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

G.29

2,269,000.00
17,500.00
24,200.00
12,200.00
20,000.00
1,550.00
250,000.00
274,000.00
3,609,000.00
148,700.00
39,000.00
Jumlah Bahan

726,080.00
56,000.00
38,720.00
2,562,000.00
60,000.00
520,800.00
135,000.00
221,940.00
505,260.00
416,360.00
702,000.00
5,944,160.00

36,000.00
51,000.00
51,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

228,600.00
14,025.00
84,150.00
71,400.00
17,982.00
15,264.00
431,421.00

Jumlah Bahan + Upah + Alat

6,375,581.00

1 M3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)


Material
0.3200
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1200
2.8000
32.0000

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2
Kayu Meranti (balok/pesagen)
Multipleks 120 x 240 tb. 9 mm
Dolken sengon diameter 8 / 4mm

Upah
5.3000
OH
Pekerja
0.2750
OH
Tukang batu
1.3000
OH
Tukang Kayu
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
1.0500
OH
Tukang Besi

61

2,269,000.00
17,500.00
24,200.00
12,200.00
20,000.00
1,550.00
250,000.00
274,000.00
3,609,000.00
148,700.00
39,000.00
Jumlah Bahan

726,080.00
56,000.00
38,720.00
1,921,500.00
45,000.00
520,800.00
135,000.00
221,940.00
433,080.00
416,360.00
1,248,000.00
5,762,480.00

36,000.00
51,000.00
51,000.00
51,000.00

190,800.00
14,025.00
66,300.00
53,550.00

0.2650
0.2650

OH
OH

Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

62

54,000.00
48,000.00
Jumlah Upah

14,310.00
12,720.00
351,705.00

Jumlah Bahan + Upah + Alat

6,114,185.00

G.30

1 M3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)


Material
0.2400
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1600
2.8000
24.0000
Upah
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2
Kayu Meranti (balok/pesagen)
Multipleks 120 x 240 tb. 9 mm
Dolken sengon diameter 8 / 4mm

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

G.31

2,269,000.00
17,500.00
24,200.00
12,200.00
20,000.00
1,550.00
250,000.00
274,000.00
3,609,000.00
148,700.00
39,000.00
Jumlah Bahan

544,560.00
56,000.00
38,720.00
1,921,500.00
45,000.00
520,800.00
135,000.00
221,940.00
577,440.00
416,360.00
936,000.00
5,413,320.00

36,000.00
51,000.00
51,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

190,800.00
14,025.00
66,300.00
53,550.00
14,148.00
12,720.00
351,543.00

Jumlah Bahan + Upah + Alat

5,764,863.00

1 M3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)


Material
0.2500
3.0000
1.2000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1050
2.5000
14.0000
Upah
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

Kayu Perancah
Paku Biasa 1" - 4"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2
Kayu Meranti (balok/pesagen)
Multipleks 120 x 240 tb. 9 mm
Dolken sengon diameter 8 / 4mm

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

G.32

2,269,000.00
17,500.00
24,200.00
12,200.00
20,000.00
1,550.00
250,000.00
274,000.00
3,609,000.00
148,700.00
39,000.00
Jumlah Bahan

567,250.00
52,500.00
29,040.00
2,562,000.00
60,000.00
520,800.00
135,000.00
221,940.00
378,945.00
371,750.00
546,000.00
5,445,225.00

36,000.00
51,000.00
51,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

203,400.00
14,025.00
79,560.00
71,400.00
17,442.00
13,584.00
399,411.00

Jumlah Bahan + Upah + Alat

5,844,636.00

1 M' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm


Material
0.0020
0.0100
3.0000
0.4500
4.0000
0.0060
0.0090

m3
Kg
Kg
Kg
Kg
Kg
m3

Kayu Perancah
Paku Biasa 1" - 4"
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2

Upah
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

G.33

2,269,000.00
17,500.00
12,200.00
20,000.00
1,550.00
250,000.00
274,000.00
Jumlah Bahan

4,538.00
175.00
36,600.00
9,000.00
6,200.00
1,500.00
2,466.00
60,479.00

36,000.00
51,000.00
51,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

6,480.00
1,020.00
1,020.00
1,020.00
324.00
432.00
10,296.00

Jumlah Bahan + Upah + Alat

70,775.00

1 M' Membuat Ring Balok Beton Bertulang (10 x 15) cm


Material
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150

m3
Kg
Kg
Kg
Kg
Kg
m3

Kayu Perancah
Paku Biasa 1" - 4"
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Batu pecah 1/2

Upah
0.2970
0.0330
0.0330
0.0330
0.0100
0.0050

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

63

2,269,000.00
17,500.00
12,200.00
20,000.00
1,550.00
250,000.00
274,000.00
Jumlah Bahan

6,807.00
350.00
43,920.00
1,000.00
8,525.00
2,250.00
4,110.00
66,962.00

36,000.00
51,000.00
51,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

10,692.00
1,683.00
1,683.00
1,683.00
540.00
240.00
16,521.00

Jumlah Bahan + Upah + Alat

83,483.00

G.34

1 M3 PAS. BETON K-175 READY MIX 6 M3 BERIKUT SLANG


Material
1.0000 m3
Upah
2.5000
0.2500
0.1000
0.0100

org
org
org
org

Alat
0.0450 lot

Adukan K-175 Ready Mix

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Alat bantu (Slang + Tes Lab.)

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

64

975,000.00
Jumlah Bahan

975,000.00
975,000.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

90,000.00
12,750.00
5,400.00
480.00
108,630.00

15,100.00
Jumlah Alat

679.50
679.50

Jumlah Bahan + Upah + Alat

1,084,309.00

G.35

1 M3 PAS. BETON K-225 READY MIX 6 M3 BERIKUT SLANG


Material
1.0000 m3
Upah
2.5000
0.2500
0.1000
0.0100

org
org
org
org

Alat
0.0450 lot

G.36

Adukan K-225 Ready Mix

1,037,500.00
Jumlah Bahan

1,037,500.00
1,037,500.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

90,000.00
12,750.00
5,400.00
480.00
108,630.00

15,100.00
Jumlah Alat

679.50
679.50

Jumlah Bahan + Upah + Alat

1,146,809.00

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Alat bantu (Slang + Tes Lab.)

1 M3 PAS. BETON K-300 READY MIX 6 M3 BERIKUT SLANG


Material
1.0000 m3
Upah
2.5000
0.2500
0.1000
0.0100

org
org
org
org

Alat
0.0450 lot

G.37

Adukan K-300 Ready Mix

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Alat bantu (Slang + Tes Lab.)

1,125,000.00
Jumlah Bahan

1,125,000.00
1,125,000.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

90,000.00
12,750.00
5,400.00
480.00
108,630.00

15,100.00
Jumlah Alat

679.50
679.50

Jumlah Bahan + Upah + Alat

1,234,309.00

700,000.00
4,500.00
22,000.00
Jumlah Bahan

140.00
45.00
22.00
207.00

36,000.00
51,000.00
51,000.00
48,000.00
51,000.00
42,000.00
Jumlah Upah

36.00
51.00
10.20
4.80
10.20
840.00
952.20

15,100.00
Jumlah Alat

3.02
3.02

Jumlah Bahan + Upah + Alat

1,162.00

21,300.00
150,000.00
Jumlah Bahan

23,430.00
18,750.00
42,180.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

2,160.00
1,530.00
810.00
360.00
4,860.00

Jumlah Bahan + Upah + Alat

47,040.00

20,400.00
165,000.00
Jumlah Bahan

22,440.00
20,625.00
43,065.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

2,160.00
1,530.00
810.00
360.00
4,860.00

Jumlah Bahan + Upah + Alat

47,925.00

1 KG PEK. ERECTION KONST. KUDA-KUDA BESI


Material
0.0002 ls
0.0100 lt
0.0010 lt

0.0010
0.0010
0.0002
0.0001
0.0002
0.0200

org
org
org
org
org
org

Alat
0.0002 lot

G.38

Sewa alat (Crane)


Solar (minyak diesel)
Olie (Minyak Pelumas)

Pekerja
Tukang besi profil
Kepala tukang besi profil
Mandor
Operator terlatih
Pembantu operator

Alat bantu

1 KG PEKERJAAN BAJA IWF


Material
1.1000 kg
0.1250 lot
Upah
0.0600
0.0300
0.0150
0.0075

org
org
org
org

G.39

Besi IWF
Peralatan (oksigen,solar,elpiji,kawat las)

Pekerja
Tukang besi profil
Kepala tukang besi
Mandor

1 KG PEKERJAAN KONSTUKSI BESI SIKU / PROFIL


Material
1.1000 kg
0.1250 lot
Upah
0.0600
0.0300
0.0150
0.0075

org
org
org
org

G.40

Besi profil/besi siku


Peralatan (oksigen,solar,elpiji,kawat las)

Pekerja
Tukang besi profil
Kepala tukang besi profil
Mandor

1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM


Alat + BBM
0.0400
0.0300
0.0040
0.2500

kg
lt
lt
ls

Kawat las listrik


Solar (minyak diesel)
Olie (Minyak Pelumas)
Sewa Alat

Upah
0.0100 org
Pekerja
0.0050 org
Tukang besi profil
0.0050 org
Kepala tukang besi profil
0.0025 org
Mandor
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

36,300.00
4,500.00
22,000.00
100,000.00
Jumlah Bahan

65

36,000.00
51,000.00
54,000.00
48,000.00

1,452.00
135.00
88.00
25,000.00
26,675.00
360.00
255.00
270.00
120.00

G.41

1,005.00
27,680.00

1 TITIK MELUBANG KONSTRUKSI BESI DENGAN BOR


Material
0.0500
0.0200
0.0030
0.0010

org
org
org
org

Pekerja
Tukang besi profil
Kepala tukang besi profil
Mandor

Alat
0.2500 lot

Sewa Alat

G.42

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

1,800.00
1,020.00
162.00
48.00
3,030.00

100,000.00
Jumlah Alat

25,000.00
25,000.00

Jumlah Bahan + Upah + Alat

28,030.00

80,000.00
36,300.00
Jumlah Bahan

80,800.00
3,630.00
84,430.00

36,000.00
51,000.00
48,000.00
Jumlah Upah

3,600.00
3,825.00
480.00
7,905.00

Jumlah Bahan + Upah + Alat

92,335.00

1,300.00
Jumlah Bahan

32,500.00
32,500.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,400.00
3,825.00
432.00
384.00
10,041.00

Jumlah Bahan + Upah + Alat

42,541.00

1 M2 PEKERJAAN WIREMESH M8
Material
1.0100 m2
0.1000 kg

Wiremesh M8
Kawat las listrik

Upah
0.1000 org
0.0750 org
0.0100 org

VIII

Jumlah Upah
Jumlah Bahan + Upah + Alat

Pekerja
Tukang besi profil
Mandor

PEKERJAAN PENUTUP ATAP

H.1

1 M2 Pasang Atap Genteng Mantili Kecil


Material
25.0000

Buah

Upah
0.1500
0.0750
0.0080
0.0080

OH
OH
OH
OH

Genteng mantili kecil

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

66

H.2

1 M2 Pasang Atap Genteng Mantili Besar


Material
20.0000

Buah

Upah
0.1500
0.0600
0.0060
0.0080

OH
OH
OH
OH

H.3

Genteng Mantili Besar

1,500.00
Jumlah Bahan

30,000.00
30,000.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,400.00
3,060.00
324.00
384.00
9,168.00

Jumlah Bahan + Upah + Alat

39,168.00

3,500.00
1,550.00
230,000.00
Jumlah Bahan

17,500.00
12,400.00
7,360.00
37,260.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

14,400.00
10,200.00
1,080.00
96.00
25,776.00

Jumlah Bahan + Upah + Alat

63,036.00

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M' Pasang Genteng Bubung Mantili


Material
5.0000
8.0000
0.0320

Buah
Kg
m3

Upah
0.4000
0.2000
0.0200
0.0020

OH
OH
OH
OH

H.4

Genteng Bubung Mantili


Portland Semen
Pasir Pasang

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Pasang Atap Asbes Gelombang (80 x 210 cm) x 5 mm


Material
0.6000
0.1200

Lbr
Kg

Asbes Gelombang (80 x 120) cm


Paku Payung

Upah
0.1400
0.0750
0.0080
0.0080

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

H.5

50,000.00
28,600.00
Jumlah Bahan

30,000.00
3,432.00
33,432.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,040.00
3,825.00
432.00
384.00
9,681.00

Jumlah Bahan + Upah + Alat

43,113.00

4,800.00
17,500.00
Jumlah Bahan

52,800.00
525.00
53,325.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
5,100.00
540.00
480.00
13,320.00

Jumlah Bahan + Upah + Alat

66,645.00

6,900.00
18,500.00
Jumlah Bahan

414,000.00
3,700.00
417,700.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,976.00
12,750.00
1,350.00
384.00
20,460.00

Jumlah Bahan + Upah + Alat

438,160.00

10,000.00
17,500.00
1,550.00
230,000.00
Jumlah Bahan

35,000.00
875.00
16,740.00
7,360.00
59,975.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

14,400.00
10,200.00
1,080.00
960.00
26,640.00

Jumlah Bahan + Upah + Alat

86,615.00

25,800.00
18,500.00
17,500.00
11,250,000.00
Jumlah Bahan

10,320.00
1,110.00
8,750.00
45,000.00
65,180.00

1 M2 Pasang Atap Genteng Beton


Material
11.0000
0.0300

bh
Kg

Genteng Beton Standrad


Paku Biasa 1" - 4"

Upah
0.2000
0.1000
0.0100
0.0100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

H.6

1 M2 Pasang Atap Sirap


Material
60.0000
0.2000

Lbr
Kg

Genteng Sirap
Paku Biasa 1/4" - 1"

Upah
0.1660
0.2500
0.0250
0.0080

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

H.7

1 M' Pasang Bubungan Beton


Material
3.5000
0.0500
10.8000
0.0320

Buah
Kg
Kg
m3

Upah
0.4000
0.2000
0.0200
0.0200

OH
OH
OH
OH

H.8

Genteng Kerpus Beton


Paku Biasa 1" - 4"
Portland Semen
Pasir Pasang

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M' Pasang Bubungan Sirap


Material
0.4000
0.0600
0.5000
0.0040

Lbr
Kg
Kg
m3

Seng Talang BJLS 26 lebar 0.60


Paku Biasa 1/4" - 1"
Paku Biasa 1" - 4"
Kayu Bengkirai Papan Tebal 3 cm

Upah
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

67

0.1250
0.2500
0.0250
0.0060

OH
OH
OH
OH

H.9

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

4,500.00
12,750.00
1,350.00
288.00
18,888.00

Jumlah Bahan + Upah + Alat

84,068.00

60,000.00
18,500.00
Jumlah Bahan

42,000.00
370.00
42,370.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

4,320.00
3,060.00
324.00
288.00
7,992.00

Jumlah Bahan + Upah + Alat

50,362.00

1 M2 Pasang Atap Seng Gelombang BJLS 28


Material
0.7000
0.0200

Lbr
Kg

Seng gelombang BJLS 0.28 panjang 180 cm


Paku Biasa 1/4" - 1"

Upah
0.1200
0.0600
0.0060
0.0060

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

68

H.10

IX

1 M' Pasang Bubungan Seng


Material
0.3000
0.0400

Lbr
Kg

Seng gelombang BJLS 0.30 panjang 180 cm


Paku Biasa 1/4" - 1"

Upah
0.1500
0.0700
0.0080
0.0060

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

60,300.00
18,500.00
Jumlah Bahan

18,090.00
740.00
18,830.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,400.00
3,570.00
432.00
288.00
9,690.00

Jumlah Bahan + Upah + Alat

28,520.00

PEKERJAAN LANGIT - LANGIT

I.1

1 M2 Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm


Material
1.1000
0.0100

Lbr
Kg

Plat Asbes 100 x 100 cm tebal 5 mm


Paku Biasa 1/4" - 1"

Upah
0.0300
0.0700
0.0070
0.0020

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

I.2

21,000.00
18,500.00
Jumlah Bahan

23,100.00
185.00
23,285.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

1,080.00
3,570.00
378.00
96.00
5,124.00

Jumlah Bahan + Upah + Alat

28,409.00

1 M2 Memasang Langit-langit Tripleks Uk (120x240) cm,


Tebal 3 mm, 4 mm & 6 mm
Material
0.3750
0.0300

Lbr
Kg

Tripleks 120 x 240 tb. 4 mm


Paku Biasa 1/4" - 1"

Upah
0.0700
0.1000
0.0100
0.0040

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

I.3

80,000.00
18,500.00
Jumlah Bahan

30,000.00
555.00
30,555.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

2,520.00
5,100.00
540.00
192.00
8,352.00

Jumlah Bahan + Upah + Alat

38,907.00

1 M2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm


Material
0.0150
0.0100

m3
Kg

Kayu Jati,Papan
Paku Biasa 1/4" - 1"

Upah
0.6000
0.8000
0.0800
0.0300

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

I.4

16,844,000.00
18,500.00
Jumlah Bahan

252,660.00
185.00
252,845.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

21,600.00
40,800.00
4,320.00
1,440.00
68,160.00

Jumlah Bahan + Upah + Alat

321,005.00

1 M2 Langit-langit Gypsum Board, tebal 9 mm


Material
0.3640
0.1100

Lbr
Kg

Gypsum 9 mm
Paku Sekrup

66,000.00
25,100.00
Jumlah Bahan

24,024.00
2,761.00
26,785.00

Upah
0.1000
0.0500
0.0050
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

3,600.00
2,550.00
270.00
240.00
6,660.00

Jumlah Bahan + Upah + Alat

33,445.00

8,400.00
18,500.00
Jumlah Bahan

8,820.00
185.00
9,005.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

1,800.00
2,550.00
270.00
144.00
4,764.00

Jumlah Bahan + Upah + Alat

13,769.00

I.5

1 M' List Langit-Langit Kayu Profil


Material
1.0500
0.0100

m1
Kg

List Kayu Profil


Paku Biasa 1/4" - 1"

Upah
0.0500
0.0500
0.0050
0.0030

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

I.6

1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Bengkirai


Material
0.0154
0.2000

m3
Kg

Kayu Bengkirai, balok


Paku Biasa 1" - 4"

Upah
0.1500
OH
Pekerja
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
0.2500
OH
Tukang Kayu

69

11,250,000.00
17,500.00
Jumlah Bahan

173,250.00
3,500.00
176,750.00

36,000.00
51,000.00

5,400.00
12,750.00

0.0250
0.0750

OH
OH

I.6a

54,000.00
48,000.00
Jumlah Upah

1,350.00
3,600.00
23,100.00

Jumlah Bahan + Upah + Alat

199,850.00

1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Kruing


Material
0.0084
0.2000

m3
Kg

Kayu Kruing, balok


Paku Biasa 1" - 4"

Upah
0.1500
0.2500
0.0250
0.0750

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

I.7

Kepala Tukang
Mandor

8,000,000.00
17,500.00
Jumlah Bahan

67,200.00
3,500.00
70,700.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,400.00
12,750.00
1,350.00
3,600.00
23,100.00

Jumlah Bahan + Upah + Alat

93,800.00

1M2 Pasang Rangka Langit-langit (60x60) cm, kayu Bengkirai


Material
0.0163
0.2500

m3
Kg

Kayu Bengkirai, balok


Paku Biasa 1" - 4"

Upah
0.2000
0.3000
0.0300
0.0100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

J
J.1

11,250,000.00
17,500.00
Jumlah Bahan

183,375.00
4,375.00
187,750.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
15,300.00
1,620.00
480.00
24,600.00

Jumlah Bahan + Upah + Alat

212,350.00

643,000.00
Jumlah Bahan

643,000.00
643,000.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

118,800.00
56,100.00
54.00
7,680.00
182,634.00

Jumlah Bahan + Upah + Alat

825,634.00

PEKERJAAN SANITASI, JALAN DAN SALURAN


1 UNIT Memasang Closet Duduk Porselin
Material
1.0000 Buah
Upah
3.3000
1.1000
0.0010
0.1600

OH
OH
OH
OH

Kloset Duduk

Pekerja
Tukang Batu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

70

J.2

1 UNIT Memasang Closet Jongkok


Material
1.0000
6.0000
0.0100

Buah
Kg
m3

Kloset Jongkok
Portland Semen
Pasir Pasang

136,000.00
1,550.00
230,000.00
Jumlah Bahan

136,000.00
9,300.00
2,300.00
147,600.00

Upah
1.0000
1.5000
1.5000
0.1600

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

36,000.00
76,500.00
81,000.00
7,680.00
201,180.00

Jumlah Bahan + Upah + Alat

348,780.00

552,000.00
552,000.00
1,550.00
230,000.00
Jumlah Bahan

552,000.00
165,600.00
9,300.00
2,300.00
729,200.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

43,200.00
7,395.00
8,100.00
4,800.00
63,495.00

Jumlah Bahan + Upah + Alat

792,695.00

J.3

1 UNIT Memasang Wastafel


Material
1.0000
0.3000
6.0000
0.0100

Buah
Kg
m3

Upah
1.2000
0.1450
0.1500
0.1000

OH
OH
OH
OH

J.4

Wastafel
Perlengkapan 30% Harga Wastafel
Portland Semen
Pasir Pasang

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M' Memasang Pipa Beton, 15 cm - 20 cm


Material
1.1000
0.0270
0.6800
0.0560
0.0240

Buah
m3
Kg
m3
m3

Pipa Beton
Batu Bata
Portland Semen
Pasir Pasang
Pasir Urug

43,000.00
500.00
1,550.00
230,000.00
68,000.00
Jumlah Bahan

47,300.00
13.50
1,054.00
12,880.00
1,632.00
62,879.50

Upah
0.1400
0.0700
0.0070
0.0070

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,040.00
3,570.00
378.00
336.00
9,324.00

Jumlah Bahan + Upah + Alat

72,203.00

J.5

1 M' Memasang Pipa Beton, 30 cm - 100 cm


Material
1.1000
0.5500
10.3000
0.0610
0.0690

Buah
m3
Kg
m3
m3

Pipa Beton
Batu Bata
Portland Semen
Pasir Pasang
Pasir Urug

76,000.00
500.00
1,550.00
230,000.00
68,000.00
Jumlah Bahan

83,600.00
275.00
15,965.00
14,030.00
4,692.00
118,562.00

Upah
0.3800
0.1900
0.0190
0.0190

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

13,680.00
9,690.00
1,026.00
912.00
25,308.00

Jumlah Bahan + Upah + Alat


J.6

1 M' Memasang Pipa PVC type AW "


Material
1.0100
0.3500
Upah
0.0360
0.0600
0.0060
0.0018

m'

Pipa PVC
Perlengkapan 35% Harga Pipa

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

J.7

6,464.00
2,240.00
8,704.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

1,296.00
3,060.00
324.00
86.40
4,766.40

Jumlah Bahan + Upah + Alat

13,470.00

7,600.00
7,600.00
Jumlah Bahan

7,676.00
2,660.00
10,336.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

1,425.60
3,366.00
356.40
96.00
5,244.00

Jumlah Bahan + Upah + Alat

15,580.00

1 M' MEMASANG PIPA PVC type AW 3/4"


Material
1.0100
0.3500
Upah
0.0396
0.0660
0.0066
0.0020

J.8

6,400.00
6,400.00
Jumlah Bahan

m'

Pipa PVC
Perlengkapan 35% Harga Pipa

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

1 M' MEMASANG PIPA type AW PVC 1"

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
Material

71

1.0100
0.3500
Upah
0.0432
0.0720
0.0072
0.0022

m'

Pipa PVC
Perlengkapan 35% Harga Pipa

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

J.9

9,500.00
9,500.00
Jumlah Bahan

9,595.00
3,325.00
12,920.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

1,555.20
3,672.00
388.80
105.60
5,721.60

Jumlah Bahan + Upah + Alat

18,641.00

16,100.00
16,100.00
Jumlah Bahan

16,261.00
5,635.00
21,896.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

1,684.80
3,978.00
421.20
110.40
6,194.40

Jumlah Bahan + Upah + Alat

28,090.00

1 M' MEMASANG PIPA PVC type AW 11/4"


Material
1.0100
0.3500
Upah
0.0468
0.0780
0.0078
0.0023

m'

Pipa PVC
Perlengkapan 35% Harga Pipa

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

72

J.10

1 M' MEMASANG PIPA PVC type AW 11/2"


Material
1.0100
0.3500
Upah
0.0504
0.0840
0.0084
0.0025

m'

Pipa PVC
Perlengkapan 35% Harga Pipa

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

J.11

17,600.00
17,600.00
Jumlah Bahan

17,776.00
6,160.00
23,936.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

1,814.40
4,284.00
453.60
120.00
6,672.00

Jumlah Bahan + Upah + Alat

30,608.00

25,900.00
25,900.00
Jumlah Bahan

26,159.00
9,065.00
35,224.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

1,944.00
4,590.00
486.00
129.60
7,149.60

Jumlah Bahan + Upah + Alat

42,373.00

33,000.00
33,000.00
Jumlah Bahan

33,330.00
11,550.00
44,880.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

2,430.00
5,737.50
610.20
163.20
8,940.90

Jumlah Bahan + Upah + Alat

53,820.00

47,900.00
47,900.00
Jumlah Bahan

48,379.00
16,765.00
65,144.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

2,916.00
6,885.00
729.00
196.80
10,726.80

Jumlah Bahan + Upah + Alat

75,870.00

16,320.00
11,280.00
Jumlah Bahan

979.20
112.80
1,092.00

51,000.00
36,000.00
48,000.00
Jumlah Upah

2,040.00
2,160.00
2,880.00
7,080.00

15,100.00
Jumlah Alat

15.10
15.10

Jumlah Bahan + Upah + Alat

8,187.00

16,320.00
11,280.00
Jumlah Bahan

1,958.40
225.60
2,184.00

51,000.00
36,000.00
48,000.00
Jumlah Upah

8,670.00
2,520.00
480.00
11,670.00

15,100.00
Jumlah Alat

30.20
30.20

Jumlah Bahan + Upah + Alat

13,884.00

16,320.00
11,280.00
Jumlah Bahan

3,264.00
1,128.00
4,392.00

51,000.00

3,315.00

1 M' Memasang Pipa PVC type AW 2"


Material
1.0100
0.3500
Upah
0.0540
0.0900
0.0090
0.0027

m'

Pipa PVC
Perlengkapan 35% Harga Pipa

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

J.12

1 M' MEMASANG PIPA PVC type AW 21/2"


Material
1.0100
0.3500
Upah
0.0675
0.1125
0.0113
0.0034

m'

Pipa PVC
Perlengkapan 35% Harga Pipa

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

J.13

1 M' Memasang Pipa PVC type AW 3"


Material
1.0100
0.3500
Upah
0.0810
0.1350
0.0135
0.0041

m'

Pipa PVC
Perlengkapan 35% Harga Pipa

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

J.14

1 M' Pasangan Pipa PVC 1"


Material
0.0600
0.0100

m
m

Galian Tanah (B.1)


Urugan Tanah (B.9a)

Upah
0.0400
0.0600
0.0600

OH
OH
OH

Tukang Ledeng
Pekerja
Mandor

Alat
0.0010

lot

Alat Bantu

J.15

1 M' Pasangan Pipa PVC 1 1/4"


Material
0.1200
0.0200

m
m

Galian Tanah (B.1)


Urugan Tanah (B.9a)

Upah
0.1700
0.0700
0.0100

OH
OH
OH

Tukang Pipa
Pekerja
Mandor

Alat
0.0020

lot

Alat Bantu

J.16

1 M' Pasangan Pipa PVC 1 1/2"


Material
0.2000
0.1000

m
m

Upah
0.0650

OH

Galian Tanah (B.1)


Urugan Tanah (B.9a)

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

Tukang Pipa

73

0.1950
0.0090

OH
OH

Pekerja
Mandor

Alat
0.0250

lot

Alat Bantu

J.17

36,000.00
48,000.00
Jumlah Upah

7,020.00
432.00
10,767.00

15,100.00
Jumlah Alat

377.50
377.50

Jumlah Bahan + Upah + Alat

15,536.00

16,320.00
11,280.00
Jumlah Bahan

1,958.40
338.40
2,296.80

51,000.00
36,000.00
48,000.00
Jumlah Upah

10,200.00
3,240.00
720.00
14,160.00

15,100.00
Jumlah Alat

45.30
45.30

Jumlah Bahan + Upah + Alat

16,502.00

16,320.00
92,880.00
11,280.00
Jumlah Bahan

6,528.00
10,309.68
3,158.40
19,996.08

15,100.00
Jumlah Alat

755.00
755.00

36,000.00
54,000.00
51,000.00
48,000.00
Jumlah Upah

9,180.00
432.00
4,335.00
576.00
14,523.00

Jumlah Bahan + Upah + Alat

35,274.00

16,320.00
92,880.00
11,280.00
Jumlah Bahan

9,139.20
12,724.56
3,553.20
25,416.96

15,100.00
Jumlah Alat

1,132.50
1,132.50

36,000.00
54,000.00
51,000.00
48,000.00
Jumlah Upah

14,400.00
1,620.00
6,885.00
960.00
23,865.00

Jumlah Bahan + Upah + Alat

50,414.00

97,500.00
230,000.00
Jumlah Bahan

98,475.00
23,000.00
121,475.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
15,300.00
1,620.00
1,200.00
25,320.00

15,100.00
Jumlah Alat

755.00
755.00

Jumlah Bahan + Upah + Alat

147,550.00

62,500.00
230,000.00
Jumlah Bahan

63,125.00
23,000.00
86,125.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
15,300.00
1,620.00
1,200.00
25,320.00

15,100.00
Jumlah Alat

755.00
755.00

Jumlah Bahan + Upah + Alat

112,200.00

1 M' Pasangan Pipa PVC 2"


Material
0.1200
0.0300

m
m

Galian Tanah (B.1)


Urugan Tanah (B.9a)

Upah
0.2000
0.0900
0.0150

OH
OH
OH

Tukang Pipa
Pekerja
Mandor

Alat
0.0030

lot

Alat Bantu

1 M' Pasangan Pipa PVC 4"

J.18
Material
0.4000
0.1110
0.2800

m
m
m

Galian Tanah (B.1)


Urugan Pasir (B.9)
Urugan Tanah (B.9a)

Alat
0.0500

lot

Alat Bantu

Upah
0.2550
0.0080
0.0850
0.0120

OH
OH
OH
OH

Pekerja
Kepala Tukang
Tukang Ledeng
Mandor

1 M' Pasangan Pipa PVC 6"

J.19
Material
0.5600
0.1370
0.3150

m
m
m

Galian Tanah (B.1)


Urugan Pasir (B.9)
Urugan Tanah (B.9a)

Alat
0.0750

lot

Alat Bantu

Upah
0.4000
0.0300
0.1350
0.0200

OH
OH
OH
OH

Pekerja
Kepala Tukang
Tukang Ledeng
Mandor

J.20

1 M2 PASANG PAVING BLOK 6 CM K : 300


Material
1.0100 m2
0.1000 m3
Upah
0.2000
0.3000
0.0300
0.0250

Org
Org
Org
Org

Alat
0.0500 lot

J.21

Paving blok 6 Holand cm K : 300 (ALDAS)


Pasir pasang

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Peralatan

1 M2 PASANG PAVING BLOK 6 CM K : 175


Material
1.0100 m2
0.1000 m3
Upah
0.2000
0.3000
0.0300
0.0250

Org
Org
Org
Org

Alat
0.0500 lot

Paving blok Holand 6 cm K : 175 (lokal)


Pasir pasang

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Peralatan

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

74

J.22

1 M2 PASANG PAVING BLOK 8 CM K ; 300


Material
1.0100 m2
0.1000 m3
Upah
0.2000
0.3000
0.0300
0.0250

Org
Org
Org
Org

Alat
0.0500 lot

J.23

Paving blok Holand 8 cm K : 300 (ALDAS)


Pasir pasang

133,000.00
230,000.00
Jumlah Bahan

134,330.00
23,000.00
157,330.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
15,300.00
1,620.00
1,200.00
25,320.00

15,100.00
Jumlah Alat

755.00
755.00

Jumlah Bahan + Upah + Alat

183,405.00

75,000.00
230,000.00
Jumlah Bahan

75,750.00
23,000.00
98,750.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
15,300.00
1,620.00
1,200.00
25,320.00

15,100.00
Jumlah Alat

755.00
755.00

Jumlah Bahan + Upah + Alat

124,825.00

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Peralatan

1 M2 PASANG PAVING BLOK 8 CM K: 175


Material
1.0100 m2
0.1000 m3
Upah
0.2000
0.3000
0.0300
0.0250

Org
Org
Org
Org

Alat
0.0500 lot

J.24

Paving blok Holand 8 cm K : 175


Pasir pasang

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Peralatan

1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 175


Material
1.0100 m2
0.1000 m3
Upah
0.2000
0.3000
0.0300
0.0250

Org
Org
Org
Org

Alat
0.0500 lot

J.25

Paving blok warna 6 cm K : 175


Pasir pasang

65,000.00
230,000.00
Jumlah Bahan

65,650.00
23,000.00
88,650.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
15,300.00
1,620.00
1,200.00
25,320.00

15,100.00
Jumlah Alat

755.00
755.00

Jumlah Bahan + Upah + Alat

114,725.00

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Peralatan

1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 250


Material
1.0100 m2
0.1000 m3
Upah
0.2000
0.3000
0.0300
0.0250

Org
Org
Org
Org

Alat
0.0500 lot

Paving blok warna 6 cm K : 250(NUSA JAYA)


Pasir pasang

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Peralatan

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

75

96,875.00
230,000.00
Jumlah Bahan

97,843.75
23,000.00
120,843.75

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
15,300.00
1,620.00
1,200.00
25,320.00

15,100.00
Jumlah Alat

755.00
755.00

Jumlah Bahan + Upah + Alat

146,918.00

J.26

1 M2 PASANGAN PAVING BLOK WARNA 8 CM K: 175


Material
1.0100 m2
0.1000 m3
Upah
0.2000
0.3000
0.0300
0.0250

Paving blok warna 8 cm K : 175


Pasir pasang

Org
Org
Org
Org

77,500.00
230,000.00
Jumlah Bahan

78,275.00
23,000.00
101,275.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
15,300.00
1,620.00
1,200.00
25,320.00

15,100.00
Jumlah Alat

755.00
755.00

Jumlah Bahan + Upah + Alat

127,350.00

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Alat
0.0500 lot

Peralatan

J.27

1 M2 LAPISAN PENGISI / PENUTUP DENGAN ASPAL PANAS TEBAL 3 CM


Material
0.0300
0.0140
0.0050
3.0000
0.0050

m3
m3
m3
kg
m3

Batu pecah mesin 2/3


Batu pecah mesin 1/2
Batu pecah mesin 0.5/1
Aspal Bitumen
Kayu bakar

Upah
0.1000 org
0.0050 org

Pekerja
Mandor

Alat
0.0025 hr
0.0180 lot

Sewa walls
Peralatan

J.28

272,000.00
274,000.00
287,000.00
12,000.00
107,000.00
Jumlah Bahan

8,160.00
3,836.00
1,435.00
36,000.00
535.00
49,966.00

36,000.00
48,000.00
Jumlah Upah

3,600.00
240.00
3,840.00

150,000.00
15,100.00
Jumlah Alat

375.00
271.80
646.80

Jumlah Bahan + Upah + Alat

54,452.00

51,000.00
42,000.00
36,000.00
36,000.00
Jumlah Upah

51,000.00
42,000.00
36,000.00
216,000.00
345,000.00

MENGGILAS JALAN 1 HARI DIPERLUKAN


Upah
1.0000
1.0000
1.0000
6.0000
Alat
20.0000
0.5000
0.5000
0.5000
0.2500

org
org
org
org

Operator terlatih
Pembantu Operator
Penjaga
Pekerja

ltr
ltr
ltr
ltr
ltr
hari

Solar
Oli Sae 40
Oli Sae 50
Oli Sae 140
Stenveet
Pemeliharaan Alat

4,500.00
22,000.00
22,000.00
22,000.00
22,100.00
Jumlah Alat

90,000.00
11,000.00
11,000.00
11,000.00
5,525.00
50,000.00
178,525.00

Jumlah Bahan + Upah + Alat

523,525.00

1 Bulan dihitung 25 hari menggilas


a=
J.28a
J.28b
J.28c
J.28d

MENGGILAS 1 M2 LAPIS KULIT PENAHAN


MENGGILAS 1 M2 LAPIS KULIT PERTEGARAN
MENGGILAS LAPIS AUS ( PENETRASI )
MENGGILAS RINGAN 1 M2 OPERPENTING

J.29

25.0000 hari
ax
ax
ax
ax

13,088,125.00

2 / 7.500
1 / 7.500
2/25000
0,25/25000

3,490.00
1,745.00
1,047.00
130.00

100 M2 PENGASPALAN SHEET (LATASIR) TEBAL 1 CM JERENG


Material
125.0000 kg
1.0000 m3
0.9000 m3

Aspal bitumen
Abu batu
Kayu bakar

Upah
0.4000 org
8.3500 org

12,000.00
232,000.00
107,000.00
Jumlah Bahan

1,500,000.00
232,000.00
96,300.00
1,828,300.00

48,000.00
36,000.00
Jumlah Upah

19,200.00
300,600.00
319,800.00

Jumlah Bahan + Upah + Alat

2,148,100.00

Mandor
Pekerja

J.30

1M2 ASPAL SAND SHEET TEBAL 2 CM JERENG ( 1 CM PADAT )


Material
0.0200
0.5000

m
x

100 m2 Pengaspalan Sand sheet tebal 1 cm jereng


Aspal bitumen

2,148,100.00
12,000.00
Jumlah Bahan

42,962.00
6,000.00
48,962.00

Upah
1.0000
0.0050

m2
hr

Menggilas Lapis Aus (penetrasi)


Sewa Walls

1,047.00
150,000.00
Jumlah Bahan

1,047.00
750.00
1,797.00

Jumlah Bahan + Upah + Alat

50,759.00

J.31

1M2 ASPAL SAND SHEET TEBAL 3 CM JERENG ( 2 CM PADAT )


Material
0.0300
0.5000

m
x

100 m2 Pengaspalan Sand sheet tebal 1 cm jereng


Aspal bitumen

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
Upah

76

2,148,100.00
12,000.00
Jumlah Bahan

64,443.00
6,000.00
70,443.00

1.0000
0.0050

m2
hr

J.32

Menggilas Lapis Aus (penetrasi)


Sewa Walls

1,047.00
150,000.00
Jumlah Bahan

1,047.00
750.00
1,797.00

Jumlah Bahan + Upah + Alat

72,240.00

1 M3 PASIR DIBAWAH ALAS JALAN TIAP 1 M3 LAPIS PASIR


Material
1.2000 kg

Pasir Urug (timbunan)

Upah
0.3750 m3
0.0180 org

Pekerja
Mandor

Alat
0.1200 org

Peralatan

J.33

68,000.00
Jumlah Bahan

81,600.00
81,600.00

36,000.00
48,000.00
Jumlah Upah

13,500.00
864.00
14,364.00

15,100.00
Jumlah Alat

1,812.00
1,812.00

Jumlah Bahan + Upah + Alat

97,776.00

68,000.00
125,000.00
Jumlah Bahan

3,400.00
25,000.00
28,400.00

36,000.00
48,000.00
Jumlah Upah

13,500.00
912.00
14,412.00

150,000.00
15,100.00
Jumlah Alat

600.00
1,812.00
2,412.00

Jumlah Bahan + Upah + Alat

45,224.00

68,000.00
152,000.00
Jumlah Bahan

1,360.00
12,160.00
13,520.00

36,000.00
48,000.00
Jumlah Upah

2,700.00
182.40
2,882.40

150,000.00
15,100.00
Jumlah Alat

600.00
1,812.00
2,412.00
4,824.00

Jumlah Bahan + Upah + Alat

18,814.40

1 M2 PAS ONDERLAG BATU BELAH TEBAL 15 CM


Material
0.0500 kg
0.2000 m3

Pasir Urug (timbunan)


Batu Belah

Upah
0.3750 m3
0.0190 org

Pekerja
Mandor

Alat
0.0040 hr
0.1200 org

Sewa walls
Peralatan

J.34

1 M2 PAS BATU LAPIS ATAS TEBAL 6 CM


Material
0.0200 kg
0.0800 m3

Pasir Urug / Sirtu


Batu Pecah 4/6 5/7

Upah
0.0750 m3
0.0038 org

Pekerja
Mandor

Alat
0.0040 hr
0.1200 org

Sewa walls
Peralatan

J.35

1 BTG/4 M PENGADAAN DAN PEMASANGAN CERUCUK


Material
1.0000 kg
Upah
0.0400
0.0040
0.2500
0.0250

m3
m3
m3
org

Alat
0.1000 org

J.36

Kayu Dolken

39,000.00
Jumlah Bahan

39,000.00
39,000.00

51,000.00
54,000.00
36,000.00
48,000.00
Jumlah Upah

2,040.00
216.00
9,000.00
1,200.00
12,456.00

15,100.00
Jumlah Alat

1,510.00
1,510.00

Jumlah Bahan + Upah + Alat

52,966.00

Tukang Kayu
Kepala Tukang
Pekerja
Mandor

Alat Bantu

1 UNIT BOX PRECAST 100 x 100 x 120 x 15 , TERPASANG


Material
1.0000 kg
1.0000 kg
0.5000 kg

BC 100.50.120.15 (Bottom)
BC 100.50.120.15 (Top)
Excavator (+ operator)

Upah
1.0000 m3
3.0000 m3
0.3000 org

Tukang
Pekerja
Mandor

Alat
1.0000 org

Alat Bantu

J.37

3,240,000.00
3,240,000.00
252,000.00
Jumlah Bahan

3,240,000.00
3,240,000.00
126,000.00
6,606,000.00

51,000.00
36,000.00
48,000.00
Jumlah Upah

51,000.00
108,000.00
14,400.00
173,400.00

15,100.00
Jumlah Alat

15,100.00
15,100.00

Jumlah Bahan + Upah + Alat

6,794,500.00

1 UNIT BOX PRECAST 150 x 100 x 120 x 15 , TERPASANG


Material
1.0000 kg
1.0000 kg
0.5000 kg

BC 150.50.120.15 (Bottom)
BC 150.50.120.15 (Top)
Excavator (+ operator)

Upah
1.0000 m3
Tukang
3.1000 m3
Pekerja
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
0.3000 org
Mandor

77

4,075,000.00
4,075,000.00
252,000.00
Jumlah Bahan

4,075,000.00
4,075,000.00
126,000.00
8,276,000.00

51,000.00
36,000.00
48,000.00

51,000.00
111,600.00
14,400.00

Alat
1.0000 org

J.38

Jumlah Upah

177,000.00

15,100.00
Jumlah Alat

15,100.00
15,100.00

Jumlah Bahan + Upah + Alat

8,468,100.00

Alat Bantu

1 UNIT BOX PRECAST 150 x 150 x 120 x 15 , TERPASANG


Material
1.0000 kg
1.0000 kg
0.6000 kg

BC 150.75.120.15 (Bottom)
BC 150.75.120.15 (Top)
Excavator (+ operator)

Upah
1.1000 m3
3.2000 m3
0.4000 org

Tukang
Pekerja
Mandor

Alat
1.0000 org

Alat Bantu

J.39

4,860,000.00
4,860,000.00
252,000.00
Jumlah Bahan

4,860,000.00
4,860,000.00
151,200.00
9,871,200.00

51,000.00
36,000.00
48,000.00
Jumlah Upah

56,100.00
115,200.00
19,200.00
190,500.00

15,100.00
Jumlah Alat

15,100.00
15,100.00

Jumlah Bahan + Upah + Alat

10,076,800.00

1 UNIT BOX PRECAST 200 x 150 x 120 x 20 , TERPASANG


Material
1.0000 kg
1.0000 kg
1.0000 kg

BC 200.75.120.20 (Bottom)
BC 200.75.120.20 (Top)
Excavator (+ operator)

Upah
1.2000 m3
3.3000 m3
0.5000 org

Tukang
Pekerja
Mandor

Alat
1.0000 org

Alat Bantu

J.40

7,560,000.00
7,560,000.00
252,000.00
Jumlah Bahan

7,560,000.00
7,560,000.00
252,000.00
15,372,000.00

51,000.00
36,000.00
48,000.00
Jumlah Upah

61,200.00
118,800.00
24,000.00
204,000.00

15,100.00
Jumlah Alat

15,100.00
15,100.00

Jumlah Bahan + Upah + Alat

15,591,100.00

1 UNIT BOX PRECAST 300 x 100 x 120 x 20 , TERPASANG


Material
1.0000 kg
1.0000 kg
1.5000 kg

BC 300.50.120.20 (Bottom)
BC 300.50.120.20 (Top)
Excavator (+ operator)

Upah
1.3000 m3
3.4000 m3
0.6000 org

Tukang
Pekerja
Mandor

Alat
1.0000 org

Alat Bantu

J.41

8,640,000.00
8,640,000.00
252,000.00
Jumlah Bahan

8,640,000.00
8,640,000.00
378,000.00
17,658,000.00

51,000.00
36,000.00
48,000.00
Jumlah Upah

66,300.00
122,400.00
28,800.00
217,500.00

15,100.00
Jumlah Alat

15,100.00
15,100.00

Jumlah Bahan + Upah + Alat

17,890,600.00

1 UNIT BOX PRECAST 380 x 350 x 120 x 20 , TERPASANG


Material
1.0000 kg
1.0000 kg
2.5000 kg

BC 380.175.120.20 (Bottom)
BC 380.175.120.20 (Top)
Excavator (+ operator)

Upah
1.4000 m3
3.5000 m3
0.7000 org

Tukang
Pekerja
Mandor

Alat
1.0000 org

Alat Bantu

J.42

15,768,000.00
15,768,000.00
252,000.00
Jumlah Bahan

15,768,000.00
15,768,000.00
630,000.00
32,166,000.00

51,000.00
36,000.00
48,000.00
Jumlah Upah

71,400.00
126,000.00
33,600.00
231,000.00

15,100.00
Jumlah Alat

15,100.00
15,100.00

Jumlah Bahan + Upah + Alat

32,412,100.00

1 UNIT BOX PRECAST 420 x 300 x 120 x 25 , TERPASANG


Material
1.0000 kg
1.0000 kg
2.5000 kg

BC 420.150.120.25 (Bottom)
BC 420.150.120.25 (Top)
Excavator (+ operator)

Upah
1.5000 m3
3.6000 m3
0.8000 org

Tukang
Pekerja
Mandor

Alat
1.0000 org

Alat Bantu

J.43

1 UNIT RPC 500 x 2500, TERPASANG


Material

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

78

19,440,000.00
19,440,000.00
252,000.00
Jumlah Bahan

19,440,000.00
19,440,000.00
630,000.00
39,510,000.00

51,000.00
36,000.00
48,000.00
Jumlah Upah

76,500.00
129,600.00
38,400.00
244,500.00

15,100.00
Jumlah Alat

15,100.00
15,100.00

Jumlah Bahan + Upah + Alat

39,769,600.00

1.0000 kg
0.4500 kg

RPC 500 x 2500


Excavator (+ operator)

Upah
1.0000 m3
2.4250 m3
0.2500 org

Tukang
Pekerja
Mandor

Alat
1.0000 org

Alat Bantu

J.44

117,500.00
113,400.00
230,900.00

51,000.00
36,000.00
48,000.00
Jumlah Upah

51,000.00
87,300.00
12,000.00
150,300.00

15,100.00
Jumlah Alat

15,100.00
15,100.00

Jumlah Bahan + Upah + Alat

396,300.00

117,500.00
252,000.00
Jumlah Bahan

117,500.00
113,400.00
230,900.00

51,000.00
36,000.00
48,000.00
Jumlah Upah

51,000.00
87,300.00
12,000.00
150,300.00

15,100.00
Jumlah Alat

15,100.00
15,100.00

Jumlah Bahan + Upah + Alat

396,300.00

20,400.00
24,700.00
Jumlah Bahan

23,460.00
1,482.00
24,942.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

2,160.00
3,060.00
324.00
144.00
5,688.00

Jumlah Bahan + Upah + Alat

30,630.00

1 UNIT RPC 800 x 2500, TERPASANG


Material
1.0000 kg
0.4500 kg

XI

117,500.00
252,000.00
Jumlah Bahan

RPC 800 x 2500


Excavator (+ operator)

Upah
1.0000 m3
2.4250 m3
0.2500 org

Tukang
Pekerja
Mandor

Alat
1.0000 org

Alat Bantu

K
K.1

PEKERJAAN BESI & ALLUMUNIUM


1 Kg Memasang Besi Profil
Material
1.1500
0.0600

Kg
Kg

Besi Profil
Meni Besi

Upah
0.0600
0.0600
0.0060
0.0030

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

K.2

1 Kg Memasang Rangka Kuda-kuda Baja IWF


Material
1.1500

kg

Besi Baja IWF

21,300.00
Jumlah Bahan

24,495.00
24,495.00

Upah
0.0600
0.0600
0.0060
0.0030

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

2,160.00
3,060.00
324.00
144.00
5,688.00

Jumlah Bahan + Upah + Alat

30,183.00

K.3

1 M' Memasang Talang Datar/Jurai , Seng BJLS 26 Lebar 90 cm


Material
1.0500
0.0150
0.0190

Lbr
Kg
m3

Seng Plat BJLS 26 lebar 0.90


Paku Biasa 1/4" - 1 "
Kayu bengkirai (papan)

Upah
0.2000
0.4000
0.0250
0.0100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

79

36,800.00
18,500.00
11,250,000.00
Jumlah Bahan

38,640.00
277.50
213,750.00
252,667.50

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

7,200.00
20,400.00
1,350.00
480.00
29,430.00

Jumlah Bahan + Upah + Alat

282,097.00

K.4

XII

1 M' Memasang Talang U 15 cm, Seng Plaat BJLS 26 lebar 45 cm


Lebar 45 cm
Material
1.0500
0.0100
0.5000

Lbr
Kg
Kg

Seng Plat BJLS 26 lebar 0.60


Paku Biasa 1/4" - 1"
Besi strip

Upah
0.1500
0.3000
0.0300
0.0070

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L
L.1

25,800.00
18,500.00
17,800.00
Jumlah Bahan

27,090.00
185.00
8,900.00
36,175.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

5,400.00
15,300.00
1,620.00
336.00
22,656.00

Jumlah Bahan + Upah + Alat

58,831.00

73,500.00
Jumlah Bahan

73,500.00
73,500.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

360.00
25,500.00
540.00
240.00
26,640.00

Jumlah Bahan + Upah + Alat

100,140.00

73,500.00
Jumlah Bahan

73,500.00
73,500.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

180.00
25,500.00
270.00
120.00
26,070.00

Jumlah Bahan + Upah + Alat

99,570.00

8,000.00
Jumlah Bahan

8,000.00
8,000.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

540.00
7,650.00
810.00
38.40
9,038.40

Jumlah Bahan + Upah + Alat

17,038.00

PEKERJAAN KUNCI dan KACA


1 BUAH Pasang Kunci Tanam Biasa
Material
1.0000

Buah

Upah
0.0100
0.5000
0.0100
0.0050

OH
OH
OH
OH

L.2

Kunci Tanam Biasa

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 BUAH Pasang Kunci Tanam Kamar Mandi


Material
1.0000

Buah

Upah
0.0050
0.5000
0.0050
0.0025

OH
OH
OH
OH

L.3

Kunci Tanam Kamar Mandi

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 BUAH Pasang Engsel Pintu


Material
1.0000

Buah

Upah
0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

L.4

Engsel Pintu

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 BUAH Pasang Engsel Jendela Kupu-kupu


Material
1.0000

Buah

Engsel Jendela

8,000.00
Jumlah Bahan

8,000.00
8,000.00

Upah
0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

360.00
5,100.00
540.00
240.00
6,240.00

Jumlah Bahan + Upah + Alat

14,240.00

6,500.00
Jumlah Bahan

6,500.00
6,500.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

720.00
10,200.00
1,080.00
480.00
12,480.00

Jumlah Bahan + Upah + Alat

18,980.00

21,000.00
Jumlah Bahan

21,000.00
21,000.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

540.00
7,650.00
810.00
38.40
9,038.40

Jumlah Bahan + Upah + Alat

30,038.00

L.5

1 BUAH Pasang Engsel Angin


Material
1.0000

Buah

Upah
0.0200
0.2000
0.0200
0.0100

OH
OH
OH
OH

L.6

Engsel Angin

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 BUAH Pasang Kait Angin


Material
1.0000

Buah

Upah
0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Kait Angin

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

80

L.7

1 BUAH Pasang Kunci Selot


Material
1.0000

Buah

Upah
0.0200
0.2000
0.0200
0.0010

OH
OH
OH
OH

L.8

Kunci Selot

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

55,000.00
Jumlah Bahan

55,000.00
55,000.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

720.00
10,200.00
1,080.00
48.00
12,048.00

Jumlah Bahan + Upah + Alat

67,048.00

16,500.00
Jumlah Bahan

16,500.00
16,500.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

900.00
12,750.00
1,350.00
62.40
15,062.40

Jumlah Bahan + Upah + Alat

31,562.00

117,000.00
Jumlah Bahan

128,700.00
128,700.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

540.00
7,650.00
810.00
38.40
9,038.40

Jumlah Bahan + Upah + Alat

137,738.00

1 BUAH Pasang Kunci Lemari


Material
1.0000

Buah

Upah
0.0250
0.2500
0.0250
0.0013

OH
OH
OH
OH

L.9

Kunci Lemari

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Kaca tebal 5 mm


Material
1.1000

m2

Kaca rayband tebal 5mm

Upah
0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

81

XIII

M
M.1

PEKERJAAN PENUTUP LANTAI dan DINDING


1 M2 Pasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm
Material
1.0000
10.4000
0.0135

m2
Kg
m3

Tegel polos 20x20 cm


Portland Semen
Pasir Pasang

Upah
0.2700
0.1300
0.0130
0.0140

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

M.2

26,000.00
1,550.00
230,000.00
Jumlah Bahan

26,000.00
16,120.00
3,105.00
45,225.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

9,720.00
6,630.00
702.00
672.00
17,724.00

Jumlah Bahan + Upah + Alat

62,949.00

509,000.00
1,550.00
230,000.00
2,350.00
Jumlah Bahan

570,080.00
15,190.00
10,350.00
3,055.00
598,675.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

9,000.00
6,120.00
648.00
624.00
16,392.00

Jumlah Bahan + Upah + Alat

615,067.00

50,000.00
1,550.00
230,000.00
2,350.00
Jumlah Bahan

54,000.00
15,500.00
10,350.00
3,525.00
83,375.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

22,320.00
17,850.00
1,890.00
1,440.00
43,500.00

Jumlah Bahan + Upah + Alat

126,875.00

53,000.00
1,550.00
230,000.00
2,350.00
Jumlah Bahan

53,000.00
16,120.00
10,350.00
3,807.00
83,277.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

22,320.00
17,850.00
1,890.00
1,440.00
43,500.00

Jumlah Bahan + Upah + Alat

126,777.00

668,000.00
1,550.00
230,000.00
2,350.00
Jumlah Bahan

681,360.00
12,694.50
10,350.00
1,527.50
705,932.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

22,320.00
17,850.00
1,890.00
1,440.00
43,500.00

Jumlah Bahan + Upah + Alat

749,432.00

48,000.00
1,550.00
230,000.00
2,350.00
Jumlah Bahan

48,000.00
14,415.00
4,140.00
6,462.50
73,017.50

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

21,600.00
22,950.00
2,430.00
1,440.00
48,420.00

1 M2 Pasang lantai Ubin Granito Uk. 40 x 40 cm


Material
1.1200
9.8000
0.0450
1.3000

m2
Kg
m3
Kg

Ubin Granito 40x40 cm polished (lokal)


Portland Semen
Pasir Pasang
Semen Warna

Upah
0.2500
0.1200
0.0120
0.0130

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

M.3

1 M2 Pasang Lantai Keramik 30 x 30 cm


Material
1.0800
10.0000
0.0450
1.5000

m2
Kg
m3
Kg

Ubin Keramik (kw I) 30 x 30 cm


Portland Semen
Pasir Pasang
Semen Warna

Upah
0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

M.4

1 M2 Pasang Lantai Keramik 20 x 20 cm


Material
1.0000
10.4000
0.0450
1.6200

m2
Kg
m3
Kg

Ubin Keramik 20 x 20 cm
Portland Semen
Pasir Pasang
Semen Warna

Upah
0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

M.5

1M2 Memasang Lantai Marmer ukuran 1.00x1.00 m


Material
1.0200
8.1900
0.0450
0.6500

m2
Kg
m3
Kg

Marmer Tulung agung


Portland Semen
Pasir Pasang
Semen Warna

Upah
0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

M.6

1 M2 Pasang Dinding Keramik 10x20 cm,


Material
1.0000
9.3000
0.0180
2.7500

m2
Kg
m3
Kg

Keramik 10x20 cm
Portland Semen
Pasir Pasang
Semen Warna

Upah
0.6000
0.4500
0.0450
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

82

M.7

Jumlah Bahan + Upah + Alat

121,437.00

53,000.00
1,550.00
230,000.00
2,350.00
Jumlah Bahan

53,000.00
14,415.00
4,140.00
6,462.50
78,017.50

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

21,600.00
22,950.00
2,430.00
1,440.00
48,420.00

Jumlah Bahan + Upah + Alat

126,437.00

1 M2 Pasang Dinding Keramik 20x20 cm,


Material
1.0000
9.3000
0.0180
2.7500

m2
Kg
m3
Kg

Keramik 20x20 cm
Portland Semen
Pasir Pasang
Semen Warna

Upah
0.6000
0.4500
0.0450
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

83

M.8

1M2 Memasang Dinding Marmer ukuran 1.00x1.00 m


Material
1.0200
2.0000
12.4400
0.0250
0.6500

Buah
Kg
Kg
m3
Kg

Marmer
Paku 1" - 4" cm
Portland Semen
Pasir Pasang
Semen Warna

668,000.00
17,500.00
1,550.00
230,000.00
2,350.00
Jumlah Bahan

681,360.00
35,000.00
19,282.00
5,750.00
1,527.50
742,919.50

Upah
0.7200
0.6500
0.0650
0.0350

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

25,920.00
33,150.00
3,510.00
1,680.00
64,260.00

Jumlah Bahan + Upah + Alat

807,179.00

M.9

1 M2 Pasang Dinding Batu Paros / Batu Tempel Hitam


Material
1.1000
11.7500
0.0350

m2
Kg
m3

Batu Tempel
Portland Semen
Pasir Pasang

101,000.00
1,550.00
230,000.00
Jumlah Bahan

111,100.00
18,212.50
8,050.00
137,362.50

Upah
0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

22,320.00
17,850.00
1,890.00
1,440.00
43,500.00

Jumlah Bahan + Upah + Alat

180,862.00

M.10

1 M2 DINDING GRANIT IMPORT


Material
1.0200
0.2600
0.0300
1.0000

m2
zak
m3
lot

Granit import
P C (50 kg)
Pasir pasang
Campuran kedap air

266,000.00
77,500.00
230,000.00
64,100.00
Jumlah Bahan

271,320.00
20,150.00
6,900.00
64,100.00
362,470.00

Upah
1.0000
3.0000
0.2000
0.1000

org
org
org
org

Pekerja
Tukang batu
Kepala tukang batu
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

36,000.00
153,000.00
10,800.00
4,800.00
204,600.00

Alat
0.4800

lot

Alat bantu

15,100.00
Jumlah Alat

7,248.00
7,248.00

Jumlah Bahan + Upah + Alat

574,318.00

M.11

1 M2 LANTAI GRANIT IMPORT


Material
1.0200
0.2600
0.0300
1.0000

m2
zak
m3
lot

Granit import
P C (50 kg)
Pasir pasang
Campuran kedap air

266,000.00
77,500.00
230,000.00
64,100.00
Jumlah Bahan

271,320.00
20,150.00
6,900.00
64,100.00
362,470.00

Upah
0.5000
1.5000
0.1000
0.0250

org
org
org
org

Pekerja
Tukang batu
Kepala tukang batu
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

18,000.00
76,500.00
5,400.00
1,200.00
101,100.00

Alat
0.0320

lot

Alat bantu

15,100.00
Jumlah Alat

483.20
483.20

Jumlah Bahan + Upah + Alat

464,053.00

507,000.00
77,500.00
230,000.00
64,100.00
Jumlah Bahan

547,560.00
20,150.00
6,900.00
48,075.00
622,685.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

9,000.00
30,600.00
2,700.00
1,200.00
43,500.00

15,100.00
Jumlah Alat

362.40
362.40

Jumlah Bahan + Upah + Alat

666,547.00

M.12

M.13

1 M2 LANTAI GRANITO UKURAN 60 X 60 POLISHED


Material
1.0800
0.2600
0.0300
0.7500

m2
zak
m3
lot

Granito 60 x 60 polished lokal


P C (50 kg)
Pasir pasang
Campuran kedap air

Upah
0.2500
0.6000
0.0500
0.0250

org
org
org
org

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Alat
0.0240

lot

Alat bantu

1 M2 DINDING GRANITO UKURAN 60 X 60 POLISHED

Material
1.0800
m2
Granito 60 x 60 polished lokal
0.2600
zak
P C (50 kg)
\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office
0.0300
m3
Pasir pasang

84

507,000.00
77,500.00
230,000.00

547,560.00
20,150.00
6,900.00

0.7500

lot

Campuran kedap air

64,100.00
Jumlah Bahan

48,075.00
622,685.00

Upah
0.2500
0.7000
0.0500
0.0250

org
org
org
org

Pekerja
Tukang batu
Kepala tukang batu
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

9,000.00
35,700.00
2,700.00
1,200.00
48,600.00

Alat
0.0400

lot

Alat bantu

15,100.00
Jumlah Alat

604.00
604.00

Jumlah Bahan + Upah + Alat

671,889.00

M.14

1 M2 LANTAI MARMER ITALY


Material
1.0200
0.2600
0.0300
1.0000

m2
zak
m3
lot

marmer italy
P C (50 kg)
Pasir pasang
Campuran kedap air

1,519,000.00
77,500.00
230,000.00
64,100.00
Jumlah Bahan

1,549,380.00
20,150.00
6,900.00
64,100.00
1,640,530.00

Upah
0.5000
1.5000
0.1000
0.0250

org
org
org
org

Pekerja
Tukang batu
Kepala tukang batu
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

18,000.00
76,500.00
5,400.00
1,200.00
101,100.00

Alat
0.0320

lot

Alat bantu

15,100.00
Jumlah Alat

483.20
483.20

Jumlah Bahan + Upah + Alat

1,742,113.00

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

85

M.15

XIV

1 M2 DINDING MARMER ITALY


Material
1.0200
0.2600
0.0300
1.0000

m2
zak
m3
lot

marmer italy
P C (50 kg)
Pasir pasang
Campuran kedap air

1,519,000.00
77,500.00
230,000.00
64,100.00
Jumlah Bahan

1,549,380.00
20,150.00
6,900.00
64,100.00
1,640,530.00

Upah
1.0000
3.0000
0.2000
0.0250

org
org
org
org

Pekerja
Tukang batu
Kepala tukang batu
Mandor

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

36,000.00
153,000.00
10,800.00
1,200.00
201,000.00

Alat
0.4800

lot

Alat bantu

15,100.00
Jumlah Alat

7,248.00
7,248.00

Jumlah Bahan + Upah + Alat

1,848,778.00

22,400.00
17,700.00
3,900.00
Jumlah Bahan

1,792.00
354.00
390.00
2,536.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

1,440.00
2,040.00
216.00
120.00
3,816.00

Jumlah Bahan + Upah + Alat

6,352.00

23,300.00
48,800.00
61,700.00
Jumlah Bahan

3,495.00
8,296.00
10,489.00
22,280.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

2,520.00
3,825.00
405.00
120.00
6,870.00

Jumlah Bahan + Upah + Alat

29,150.00

24,700.00
23,300.00
48,800.00
61,700.00
Jumlah Bahan

4,940.00
3,495.00
8,296.00
16,042.00
32,773.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

2,520.00
459.00
324.00
120.00
3,423.00

Jumlah Bahan + Upah + Alat

36,196.00

24,700.00
23,300.00
48,800.00
61,700.00
Jumlah Bahan

4,940.00
3,495.00
8,296.00
21,595.00
38,326.00

36,000.00
51,000.00
54,000.00
48,000.00
Jumlah Upah

2,520.00
5,355.00
216.00
120.00
8,211.00

Jumlah Bahan + Upah + Alat

46,537.00

PEKERJAAN PENGECATAN

N.1

1 M2 Mendempul dan Menggosok Kayu


Material
0.0800
0.0200
0.1000

Kg
Kg
lbr

Dempul Jadi
Minyak Cat
Amplas

Upah
0.0400
0.0400
0.0040
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

N.2

1 M2 Pengecatan Bidang Lama


Material
0.1500
0.1700
0.1700

Kg
Kg
Kg

Plamir
Cat Dasar
Cat Penutup

Upah
0.0700
0.0750
0.0075
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

N.3

1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)


1 lap.Cat Dasar & 2 lap.Cat Penutup
Material
0.2000
0.1500
0.1700
0.2600

Kg
Kg
Kg
Kg

Cat Meni
Plamir
Cat Dasar
Cat Penutup 2 kali

Upah
0.0700
0.0090
0.0060
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

N.4

1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)


1 lap.Cat Dasar & 3 lap.Cat Penutup
Material
0.2000
0.1500
0.1700
0.3500

Kg
Kg
Kg
Kg

Cat Meni
Plamir
Cat Dasar
Cat Penutup 2 kali

Upah
0.0700
0.1050
0.0040
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

N.5

1 M2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar


2 lap. Cat Penutup)
Material
0.1000

Kg

Plamir

21,200.00

2,120.00

0.1000

Kg

Cat Dasar

22,000.00

2,200.00

0.2600

Kg

Cat Penutup 2 kali

28,300.00

7,358.00

Jumlah Bahan

11,678.00

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

86

Upah
0.0200

OH

Pekerja

36,000.00

720.00

0.0630

OH

Tukang Cat

51,000.00

3,213.00

0.0063

OH

Kepala Tukang

54,000.00

340.20

0.0025

OH

Mandor

48,000.00

120.00

Jumlah Upah

4,393.20

Jumlah Bahan + Upah + Alat

16,071.00

N.6

1 M2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)


Material
0.1000

Kg

Cat Dasar

22,000.00

2,200.00

0.1800

Kg

Cat Penutup 2 kali

28,300.00

5,094.00

Jumlah Bahan

7,294.00

Upah
0.0280

OH

Pekerja

36,000.00

1,008.00

0.0420

OH

Tukang Cat

51,000.00

2,142.00

0.0042

OH

Kepala Tukang

54,000.00

226.80

0.0025

OH

Mandor

48,000.00

120.00

Jumlah Upah

3,496.80

Jumlah Bahan + Upah + Alat

10,790.00

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

87

N.7

1 M2 Pengecatan Permukaan Baja dg Meni Besi


Material
0.1000

Kg

Meni Besi

24,700.00

0.0100

Kg

Lem kuning (aica aibon)

58,400.00

2,470.00
584.00

Jumlah Bahan

3,054.00

Upah
0.0200

OH

Pekerja

36,000.00

720.00

0.2000

OH

Tukang Cat

51,000.00

10,200.00

0.0020

OH

Kepala Tukang

54,000.00

108.00

0.0100

OH

Mandor

48,000.00

480.00

Jumlah Upah

11,508.00

Jumlah Bahan + Upah + Alat

14,562.00

N.8

1 M2 Pengecatan Permukaan Baja dg Meni Besi & Perancah


Material
0.1000

Kg

Meni Besi

24,700.00

0.0100

Kg

Perekat / Lem

58,400.00

2,470.00
584.00

0.0020

m3

Perancah Kayu

2,269,000.00

4,538.00

Jumlah Bahan

7,592.00

Upah
0.2500

OH

Pekerja

36,000.00

9,000.00

0.2250

OH

Tukang Cat

51,000.00

11,475.00

0.0225

OH

Kepala Tukang

54,000.00

1,215.00

0.0075

OH

Mandor

48,000.00

360.00

Jumlah Upah

22,050.00

Jumlah Bahan + Upah + Alat

29,642.00

N.9

1 M2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara


Manual sistem 3 lap. Cat Konvensional dg Tebal 200 m
Bahan
0.1100

Kg

Cat dasar

55,300.00

6,083.00

0.1700

Kg

Cat Antara

55,300.00

9,401.00

0.0800

Kg

Cat Penutup

59,400.00

4,752.00

Jumlah Bahan

20,236.00

Upah
0.5000

OH

Pekerja

36,000.00

18,000.00

0.8000

OH

Tukang Cat

51,000.00

40,800.00

0.3000

OH

Kepala Tukang

54,000.00

16,200.00

0.2000

OH

Mandor

48,000.00

9,600.00

Jumlah Upah

84,600.00

Jumlah Bahan + Upah + Alat

104,836.00

N.10

1 M2 PLITURAN BANGUNAN ( BIASA )


Bahan
0.0300

kg

Dempul plitur (dempul kasar)

22,400.00

672.00

0.2000

kg

Wood Filler (INFRA)

38,000.00

7,600.00

0.0200

kg

Oker putih

27,400.00

548.00

0.0100

kg

Oker warna

27,700.00

277.00

0.2000

kg

Batu apung (gosok)

20,200.00

4,040.00

0.0100

kg

Sirlak

85,600.00

856.00

0.1000

bh

kwas 3"

8,400.00

840.00

0.2000

ltr

Spritus

13,100.00

2,620.00

0.1000

lbr

Ampelas kayu

3,900.00
Jumlah Bahan

390.00
17,843.00

Upah
0.2500

org

Pekerja

36,000.00

9,000.00

0.2850

org

Tukang cat

51,000.00

14,535.00

0.0400

org

Kepala tukang cat

54,000.00

2,160.00

0.0200

org

Mandor

48,000.00

N.11

960.00

Jumlah Upah

26,655.00

Jumlah Bahan + Upah + Alat

44,498.00

1 M2 PLITURAN MEUBELAIR
Bahan
0.0300

kg

Dempul plitur (dempul kasar)

22,400.00

672.00

0.2000

kg

Wood Filler (INFRA)

38,000.00

7,600.00

0.3500

kg

Melamik

84,000.00

29,400.00

0.0200

kg

Oker putih

27,400.00

548.00

0.0100

kg

Oker warna

27,700.00

277.00

0.1000

kg

Batu apung (gosok)

20,200.00

2,020.00

0.2000

kg

Sirlak

85,600.00

17,120.00

0.0100

bh

kwas 3"

8,400.00

84.00

0.2000

ltr

Spritus

13,100.00

2,620.00

3,900.00

390.00

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

0.1000

lbr

Ampelas kayu

88

Jumlah Bahan

60,731.00

Upah
0.2500

org

Pekerja

36,000.00

9,000.00

0.2850

org

Tukang cat

51,000.00

14,535.00

0.0400

org

Kepala tukang cat

54,000.00

2,160.00

0.0200

org

Mandor

48,000.00

960.00

Jumlah Upah

26,655.00

Jumlah Bahan + Upah + Alat

87,386.00

Rembang,

Januari 2013

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 010 234 645 / 19620715 199011 1 002

\\vboxsrv\conversion_tmp\scratch_2\146907750.xls.ms_office

89

DAFTAR ANALISE

STANDAR NASIONAL INDONESIA


DINAS PEKERJAAN UMUM KABUPATEN REMBANG

TAHUN 2013