PEKERJAAN
: 1 (satu)
: Pembangunan PSU perumahan Panam Permata Regency, Villa Permata Panam,
dan Cipta Palutan Regency
LOKASI
: Panam - Pekanbaru
TAHUN ANGGARAN
: APBN 2012
URAIAN PEKERJAAN
NO
JUMLAH HARGA
I. PEKERJAAN PERSIAPAN
A PEKERJAAN PERSIAPAN
30,352,043.50
B PEKERJAAN PERKERASAN BETON
5,086,011,305.38
C PEKERJAAN SALURAN
D PEKERJAAN AKHIR
1,650,000.00
JUMLAH
5,118,013,348.88
PPN 10%
511,801,334.89
JUMLAH TOTAL
5,629,814,683.76
DIBULATKAN
5,629,815,000.00
Terbilang : Lima Liliyar Enam Ratus Dua Puluh Sembilan Juta Delapan Rarus Lima Belas ribu rupiah.
lokasi
: Panam - Pekanbaru
Tahun Anggaran
: APBN 2012
Kegiatan
Pekerjaan Jalan
1. panjang jalan
ROW 5 M
PENAWARAN
NO
URAIAN PEKERJAAN
SAT
VOL
harga
jumlah harga
satuan
I.
PEKERJAAN PERSIAPAN
m1
3,103.00
7,364.50
22,852,043.5000
m2
12.00
250,000.00
3,000,000.0000
bh
3.00
500,000.00
1,500,000.0000
Monilisasi
ls
1.00
3,000,000.00
3,000,000.0000
B.
M3
2,327.25
1,643,400.00
3,824,602,650.0000
m2
15,515.00
4,620.00
71,679,300.0000
m3
775.75
1,193,128.75
925,569,627.8125
m2
1,244.00
55,632.50
69,206,830.0000
m1
3,881.25
9,195.01
35,688,132.5625
m1
3,881.25
41,034.40
159,264,765.0000
C.
PEKERJAAN SALURAN
m2
m2
m2
m1
D.
PEKERJAAN PENYELESAIAN
ls
1.00
150,000.00
150,000.0000
Pembersihan Lapangan
LS
1.00
1,500,000.00
1,500,000.0000
3,163.00
sub total
30,352,043.5000
5,086,011,305.3750
1,650,000.0000
Rp
5,118,013,348.88
URAIAN
1 M'
KODE
SATUAN
VOLUME
HARGA SATUAN
JUMLAH (RP)
M.020
m3
0.00200
2,300,000.00
4,600.00
M.040
Kg
0.0500
36,000.00
1,800.00
Tukang Kayu
L.073
oh
0.0020
60,000.00
120.00
Tukang batu
L.079
oh
0.0020
60,000.00
120.00
Buruh Lapangan
L.101
oh
0.0010
55,000.00
55.00
Upah
Peralatan
Sub jumlah
6,695.00
669.50
No.
1
URAIAN
1 bh
KODE
SATUAN
VOLUME
7,364.50
HARGA SATUAN
JUMLAH (RP)
SNI-T1
m3
0.09000
K.719
m3
0.0830
Dihit
m3
0.0500
Pas. Triplek
Dihit
m2
1.8900
Pas. Pengecatan
SNI-CAT8
m2
1.8900
Pas. Penyablonan
ls
ls
1.0000
Pemberesan Lapangan
ls
ls
1.0000
No.
1
URAIAN
1 M'
KODE
SATUAN
32,000.00
#REF!
2,880.00
#REF!
Sub jumlah
#REF!
#REF!
#REF!
VOLUME
HARGA SATUAN
JUMLAH (RP)
Upah
Mandor
L.061
oh
0.0070
70,000.00
490.00
oh
0.8000
55,000.00
44,000.00
set
1.0000
1,000.00
1,000.00
Peralatan
Alat Bantu
M.170
Sub jumlah
Biaya umum dan kepentingan
Total Harga satuan
45,490.00
4,549.00
50,039.00
No.
1
URAIAN
1 m3
KODE
SATUAN
VOLUME
HARGA SATUAN
JUMLAH (RP)
M3
1.00000
920,000.00
920,000.00
70,000.00
Upah
Mandor
L.061
oh
1.0000
70,000.00
L.106
oh
1.0000
60,000.00
60,000.00
oh
8.0000
55,000.00
440,000.00
set
2.0000
2,000.00
4,000.00
Peralatan
Alat Bantu
M.170
Sub jumlah
1,494,000.00
No.
1
URAIAN
1 m1
KODE
SATUAN
VOLUME
149,400.00
1,643,400.00
HARGA SATUAN
JUMLAH (RP)
M.020
m2
1.00000
4,000.00
4,000.00
L.073
oh
1.0000
200.00
200.00
Upah
Ongkos Pasang
Peralatan
Sub jumlah
4,200.00
No.
1
URAIAN
1 m3
KODE
SATUAN
VOLUME
420.00
4,620.00
HARGA SATUAN
JUMLAH (RP)
m3
1.00000
1,070,000.00
1,070,000.00
Upah
Mandor lapangan
L.061
oh
0.0208
70,000.00
1,458.33
Kepala Tukang
L.073
oh
0.0208
65,000.00
1,354.17
L.106
oh
0.0208
60,000.00
1,250.00
oh
0.1250
55,000.00
6,875.00
Peralatan
Alat Penggetar Beton
E.089
jam
0.2300
7,500.00
1,725.00
alat bantu
M.170
ls
1.0000
2,000.00
2,000.00
Sub jumlah
Biaya umum dan kepentingan
Total Harga satuan
1,084,662.50
108,466.25
1,193,128.75
No.
1
URAIAN
1 m2
KODE
SATUAN
VOLUME
HARGA SATUAN
JUMLAH (RP)
M.180
Multi plex
Paku
m3
0.00160
2,300,000.00
3,680.00
lbr
0.45000
60,000.00
27,000.00
11,600.00
M.166
kg
0.2000
58,000.00
Kepala Tukang
L.073
oh
0.0030
65,000.00
195.00
Tukang Kayu
L.079
oh
0.0300
60,000.00
1,800.00
L.106
oh
0.0500
60,000.00
3,000.00
oh
0.0600
55,000.00
3,300.00
Upah
Peralatan
Sub jumlah
50,575.00
No.
1
URAIAN
1 m1
KODE
SATUAN
VOLUME
5,057.50
55,632.50
HARGA SATUAN
JUMLAH (RP)
M.180
jam/m
0.05000
70,000.00
3,500.00
Sealant
M.166
kg
0.1429
24,000.00
3,429.60
Mandor
L.073
oh
0.0080
70,000.00
560.00
L.106
oh
0.0067
60,000.00
402.00
oh
0.0085
55,000.00
467.50
Upah
Peralatan
Sub jumlah
8,359.10
No.
1
URAIAN
1 m1
KODE
SATUAN
VOLUME
835.91
9,195.01
HARGA SATUAN
JUMLAH (RP)
Dihit
kg
1.20000
8,200.00
kawat beton
Dihit
kg
0.0107
20,000.00
9,840.00
214.00
Dihit
0.2000
17,000.00
3,400.00
Dihit
bh
3.3000
3,000.00
9,900.00
Mandor
Dihit
oh
0.0150
70,000.00
1,050.00
Pekerja
Dihit
oh
0.0650
60,000.00
3,900.00
Tukang besi
Dihit
oh
0.1500
60,000.00
9,000.00
ls
1.0000
5,000.00
5,000.00
Upah
Peralatan
Alat bantu
Sub jumlah
Biaya umum dan kepentingan
Total Harga satuan
37,304.00
3,730.40
41,034.40
No.
1
URAIAN
1 m2
KODE
SATUAN
VOLUME
HARGA SATUAN
JUMLAH (RP)
M.020a
bh
65.00000
1,200.00
78,000.00
Semen Portland
M.040a
kg
0.2874
61,000.00
17,531.40
Pasir pasang
M.170a
set
0.0400
190,000.00
7,600.00
Mandor
oh
0.0150
70,000.00
1,050.00
Pekerja
oh
0.3200
60,000.00
19,200.00
Kepala Tukang
oh
0.0100
65,000.00
650.00
oh
0.1000
60,000.00
6,000.00
Upah
Peralatan
Alat bantu
ls
Sub jumlah
130,031.40
No.
1
URAIAN
1 m2
KODE
SATUAN
VOLUME
13,003.14
143,034.54
HARGA SATUAN
JUMLAH (RP)
M.020
m3
0.03140
190,000.00
Kerikil (beton)
M.042
m3
0.0270
250,000.00
5,966.00
6,750.00
semen
M.170
zak
0.3250
61,000.00
19,825.00
Mandor
oh
0.0260
70,000.00
1,820.00
Pekerja
oh
0.3200
60,000.00
19,200.00
Kepala Tukang
oh
0.0100
65,000.00
650.00
oh
0.0960
60,000.00
5,760.00
Upah
Peralatan
Alat bantu
ls
Sub jumlah
59,971.00
No.
1
URAIAN
1 m2
KODE
SATUAN
VOLUME
5,997.10
65,968.10
HARGA SATUAN
JUMLAH (RP)
M.020
zak
0.12960
61,000.00
7,905.60
Pasir pasang
M.042
m3
0.0190
190,000.00
3,610.00
Mandor
oh
0.0100
70,000.00
700.00
Pekerja
oh
0.2000
60,000.00
12,000.00
Kepala Tukang
oh
0.0150
65,000.00
975.00
oh
0.1500
60,000.00
9,000.00
Upah
Peralatan
Alat bantu
ls
Sub jumlah
Biaya umum dan kepentingan
Total Harga satuan
34,190.60
3,419.06
37,609.66
No.
1
URAIAN
1 m1
KODE
SATUAN
VOLUME
HARGA SATUAN
JUMLAH (RP)
1.0000
320,000.00
320,000.00
m1
1.0000
1,500.00
1,500.00
m3
0.6100
27,000.00
16,470.00
m3
0.0500
22,000.00
1,100.00
m3
0.0500
190,000.00
9,500.00
m1
1.0000
30,000.00
30,000.00
m3
0.3200
50,000.00
16,000.00
Pemberesan Lokasi
LS
1.0000
2,000.00
2,000.00
Upah
Peralatan
Alat bantu
ls
Sub jumlah
Biaya umum dan kepentingan
Total Harga satuan
76,570.00
7,657.00
84,227.00
I.
HARGA SATUAN
SATUAN
Kepala Tukang
Kepala Tukang Besi Beton
Kepala TUKANG Besi PROFIL
kepala Tukang Cat/PELITUR
Kepala Tukang Kayu
mandor
Pekerja
pekerja setengah trampil
Pekerja Terampil
Pembantu Operator
Jaga malam
Petugas Harian Tetap Bidang Kebersihan,
Ketertiban Pasar dan malam
PHT Pemeliharaan Ruas Jalan
Satgas Pembersihan
Sopir Truk
tukang batu setengah trapil
Tukang batu trampil
Tukang besi besi beton setengah trampil
Tukang besi beton trampil
Tukang besi Beton profil setengah trampil'
Tukang besi besi profil trampil
Tukang kayu setengah trampil
Tukang Kayu trampil
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
70,000.00
55,000.00
55,000.00
60,000.00
55,000.00
55,000.00
50,000.00
55,000.00
60,000.00
55,000.00
70,000.00
55,000.00
60,000.00
55,000.00
60,000.00
55,000.00
60,000.00
55,000.00
60,000.00
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
BAHAN/ MATERIAL
Bata merah bakar Kls I
Batako besar 8 x 20 x 30
batu pecah 2-3 cm
besi beton U-24 (Polos)
Bensin Premium
Box Culvert 40.40.100 (kualitas I)
Cat kayu sleve
DOP PVC 3/4" untuk DOWEL
Kawat Beton
Kayu kelas III
Lem kayu
Multiplex 3 mm 120 x 240
Paku
Pasir Beton
Pasir Pasang
Plastik Bond Breaker
Ready Mix Beton 80 tanpa pompa (selang)
PVC dia. 3/4"
Beton K.225 Tanpa ponpa pompa (selang)
Seng gelombang BJLS 30
Solar
Sealant
Semen Portland/pc (50kg/Zak)
1,200.00
6,000.00
250,000.00
8,200.00
7,000.00
320,000.00
36,000.00
3,000.00
20,000.00
2,300,000.00
30,000.00
60,000.00
58,000.00
190,000.00
190,000.00
4,000.00
1,070,000.00
17,000.00
920,000.00
65,000.00
7,000.00
24,000.00
61,000.00
bh
bh
m3
kg
ltr
m1
kg
bh
kg
m3
ltr
lbr
kg
m3
m3
m2
m3
btg
m3
lbr
ltr
kg
zak
ENGINEER ESTIMATE
NO
I.
URAIAN PEKERJAAN
SAT
VOL
HARGA
TOTAL HARGA
SUB TOTAL
SATUAN
SATUAN
HARGA SATUAN
( Rp )
( Rp )
( Rp )
A.
PEKERJAAN PENDAHULUAN
Ls
1.00
1,200,000.00
1,200,000.00
Pembersihan Lokasi
Ls
1.00
6,000,000.00
6,000,000.00
Pengukuran/Pemasangan Bouwplank
M'
311.51
6,695.00
2,085,559.45
Ls
1.00
7,000,000.00
7,000,000.00
Ls
1.00
400,000.00
400,000.00
Ls
1.00
7,000,000.00
7,000,000.00
P3/Keamanan
Ls
1.00
300,000.00
300,000.00
Ls
1.00
5,000,000.00
5,000,000.00
Mobilisasi/De-Mobilisasi
Ls
1.00
5,000,000.00
5,000,000.00
JUMLAH
B.
M3
210.20
#REF!
#REF!
M3
127.68
#REF!
#REF!
M3
11.67
#REF!
#REF!
JUMLAH
C.
Btg
2,106.00
#REF!
#REF!
M3
21.77
#REF!
#REF!
M3
12.74
#REF!
#REF!
M3
71.40
#REF!
#REF!
M3
12.20
#REF!
#REF!
M3
26.62
#REF!
#REF!
M3
12.56
#REF!
#REF!
M3
156.69
#REF!
#REF!
10
Plesteran Bata 1 : 4
M2
1,157.24
#REF!
11
Plesteran Relief
Bh
74.00
12
M3
9.00
D.
PEKERJAAN BESI
M'
22.83
975,000.00
22,259,250.00
M'
12.00
1,112,000.00
13,344,000.00
E.
PEKERJAAN CAT
Cat Dinding/Tembok
M2
1,157.24
#REF!
Cat Besi
M2
64.40
#REF!
300,000.00
#REF!
#REF!
#REF!
22,200,000.00
#REF!
JUMLAH
JUMLAH
#REF!
35,603,250.00
#REF!
#REF!
JUMLAH
TOTAL
33,985,559.45
#REF!
#REF!
ENGINEER ESTIMATE
NO
URAIAN PEKERJAAN
II
SAT
SELAT PANJANG
VOL
HARGA
TOTAL HARGA
SUB TOTAL
SATUAN
SATUAN
HARGA SATUAN
( Rp )
( Rp )
( Rp )
Pekerjaan Persiapan
1
ls
1.00
7,000,000.00
7,000,000.00
ls
1.00
5,000,000.00
5,000,000.00
ls
1.00
3,000,000.00
3,000,000.00
JUMLAH
15,000,000.00
Pekerjaan Tanah
1
M3
2.70
#REF!
M3
0.68
#REF!
#REF!
#REF!
JUMLAH
#REF!
M3
30.00
#REF!
#REF!
M3
3.97
#REF!
#REF!
Plesteran dinding 1 : 4
M2
39.98
Ls
1.00
3,000,000.00
Ls
1.00
2,700,000.00
2,700,000.00
M3
42.00
1,199,000.00
50,358,000.00
10
M2
600.00
#REF!
11
M'
86.00
#REF!
#REF!
#REF!
3,000,000.00
#REF!
#REF!
JUMLAH
#REF!
Pekerjaan Atap
1
M2
822.00
#REF!
#REF!
M2
822.00
#REF!
#REF!
M'
76.63
#REF!
#REF!
M2
21.34
#REF!
#REF!
JUMLAH
#REF!
Pekerjaan Plafond
1
M2
600.00
M2
112.23
M'
100.00
#REF!
143,000.00
#REF!
#REF!
16,048,890.00
#REF!
JUMLAH
#REF!
Pekerjaan Pengecatan
1
M2
1,320.00
#REF!
M2
112.23
#REF!
#REF!
#REF!
JUMLAH
#REF!
Bh
2.00
8,015,625.00
16,031,250.00
Bh
11.00
2,671,875.00
29,390,625.00
3,534,375.00
3,534,375.00
1,006,250.00
Bh
1.00
Bh
2.00
2,012,500.00
JUMLAH
50,968,750.00
NO
URAIAN PEKERJAAN
SAT
VOL
HARGA
TOTAL HARGA
SUB TOTAL
SATUAN
SATUAN
HARGA SATUAN
( Rp )
( Rp )
( Rp )
TTk
17.00
#REF!
#REF!
Bh
61.00
#REF!
#REF!
Bh
12.00
#REF!
Bh
1.00
Saklar Tunggal
Bh
1.00
#REF!
#REF!
Saklar Ganda
Bh
11.00
#REF!
#REF!
#REF!
#REF!
#REF!
Stop Kontak
Bh
4.00
MCB
Bh
1.00
Ls
1.00
10
3,000,000.00
2,000,000.00
#REF!
3,000,000.00
#REF!
2,000,000.00
JUMLAH
#REF!
Ls
1.00
16,000,000.00
Pembersihan Akhir
Ls
1.00
2,300,000.00
16,000,000.00
2,300,000.00
JUMLAH
TOTAL
III
18,300,000.00
#REF!
M3
789.87
#REF!
M2
1,229.46
#REF!
#REF!
#REF!
JUMLAH
#REF!
M3
21.00
#REF!
#REF!
M3
9.47
#REF!
#REF!
M2
48.00
#REF!
#REF!
JUMLAH
#REF!
Ls
1.00
7,000,000.00
7,000,000.00
Ls
2.00
1,750,000.00
3,500,000.00
Pembersihan Akhir
Ls
1.00
6,000,000.00
6,000,000.00
JUMLAH
16,500,000.00
1,088,400.00
1,088,400.0000
5,442,000.00
5,442,000.0000
6,072.37
1,891,602.4212
6,349,000.00
6,349,000.0000
362,800.00
362,800.0000
6,349,000.00
6,349,000.0000
272,100.00
272,100.0000
4,535,000.00
4,535,000.0000
4,535,000.00
4,535,000.0000
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
272,100.00
#REF!
20,135,400.0000
#REF!
884,325.00
20,189,139.7500
1,008,584.00
12,103,008.0000
#REF!
#REF!
#REF!
#REF!
-
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
-
740.0000
6,349,000.00
6,349,000.0000
4,535,000.00
4,535,000.0000
2,721,000.00
2,721,000.0000
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2,721,000.00
2,721,000.0000
2,448,900.00
2,448,900.0000
1,087,493.00
45,674,706.0000
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
129,701.00
#REF!
14,556,343.2300
#REF!
#REF!
#REF!
#REF!
#REF!
-
7,270,171.88
14,540,343.7500
2,423,390.63
26,657,296.8750
3,205,678.13
3,205,678.1250
912,668.75
1,825,337.5000
9,864.0000
#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2,721,000.00
2,721,000.0000
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1,814,000.00
1,814,000.0000
14,512,000.00
14,512,000.0000
2,086,100.00
2,086,100.0000
#VALUE!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
6,349,000.00
6,349,000.0000
1,587,250.00
3,174,500.0000
5,442,000.00
5,442,000.0000
737.68
345.43
345.43
186.92 M'
101.58
0.024
0.0960
220,800.0000
2,400,000,000.0000
2,200,000,000.0000
NO
URAIAN PEKERJAAN
BOBOT
1
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Pembersihan Lokasi
#DIV/0!
Pengukuran/Pemasangan Bouwplank
#DIV/0!
Mobilisasi/De-Mobilisasi
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
B.
#DIV/0!
#DIV/0!
#DIV/0!
C.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
Plesteran Bata 1 : 4
#REF!
10
Plesteran Relief
#REF!
11
D.
PEKERJAAN BESI
#DIV/0!
#DIV/0!
E.
PEKERJAAN CAT
Cat Dinding/Tembok
#REF!
Cat Besi
#REF!
II
#REF!
#REF!
11
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
12
13
14
15
16
17
18
19
20
21
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
22
23
24
25
26
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
27
28
29
30
31
32
33
34
35
36
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
80.000
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pekerjaan Tanah
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
60.000
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Plesteran dinding 1 : 4
#REF!
#REF!
#REF!
#REF!
10
#REF!
11
#REF!
Pekerjaan Atap
#REF!
#REF!
#REF!
#REF!
#REF!
10
#REF!
Pekerjaan Persiapan
100.000
I.
Pekerjaan Plafond
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
40.000
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pekerjaan Pengecatan
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Saklar Tunggal
#REF!
Saklar Ganda
#REF!
Stop Kontak
#REF!
MCB
#REF!
10
#REF!
#REF!
Pembersihan Akhir
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
20.000
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
III
#REF!
#REF!
Pembersihan Akhir
#REF!
JUMLAH bobot
Akumulasi bobot Rencana
100.000
1/1/1900
1/3/1900
1/5/1900
1/7/1900
1/9/1900
1/11/1900
1/13/1900
1/15/1900
1/17/1900
1/19/1900
1/21/1900
1/23/1900
1/25/1900
1/27/1900
1/29/1900
1/31/1900
2/2/1900
2/4/1900
2/6/1900
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
HARI KE :
37
38
39
40
41
42
43
44
45
46
47
48
49
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
50
51
52
53
54
55
56
57
58
59
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
60
61
62
63
#REF!
#REF!
#REF!
#REF!
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2/6/1900
2/8/1900
2/10/1900
2/12/1900
2/14/1900
2/16/1900
2/18/1900
2/20/1900
2/22/1900
2/24/1900
2/26/1900
2/28/1900
3/1/1900
3/3/1900
3/5/1900
3/7/1900
3/9/1900
3/11/1900
#REF!
#REF!
3/13/1900
#REF!
#REF!
3/15/1900
#REF!
3/17/1900
#REF!
#REF!
3/19/1900
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
79
#REF!
80
#REF!
81
#REF!
82
#REF!
83
#REF!
84
#REF!
85
#REF!
86
#REF!
87
#REF!
88
#REF!
89
#REF!
90
#REF!
91
#REF!
92
#REF!
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Series1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
3/21/1900
3/23/1900
3/25/1900
3/27/1900
3/29/1900
3/31/1900
4/2/1900
4/4/1900
4/6/1900
4/8/1900
4/10/1900
4/12/1900
4/14/1900
4/16/1900
4/18/1900
4/20/1900
4/22/1900
4/24/1900
#REF!
#REF!
4/26/1900
#REF!
#REF!
4/28/1900
100.000
\
PROYEK : PEMBANGUNAN SARANA DAN PRASARANA
KANTOR BEA CUKAI TYPE B SELAT PANJANG
NO
1
I
NOTA
TANGGAL
URAIAN
2
3
4
PRA KONSTRUKSI
1 kwitansi
17/07/2011 biaya Perjalanan Bp. Antoni dari BengkuluPekanbaru-Selat Panjang-Batam
(Pinjaman dari bp. Jannes Simbolon)
2 Nota cash
20/07/2011 Pencetakan Stempel
3 Nota Cash
Pembuatan Stempel
4 CASH
21/07/2011 Biaya Penginapan Bp. Antoni Artng
selama 4 hari
5 TK 011101548219/08/2011 Pembelian Tiket a/n Jannes Simbolon
Pku-BTH (Pembuatan Akte Kuasa Dir)
6 N0. 0232
25/08/2011 Biaya pembuatan Akta kuasa Direktur
7 No. 003642
26/08/2011 Biaya Penginapan Bp. Antoni Artng
dan bpk jannes S
8 Tiket
26/08/2011 Pembelian Tiket 2 buah bth - slt pnjng
utk bp. JANNES & ANTONI
9 Tiket
27/08/2011 Pembelian Tiket fery Selat pnjng-pku
a/n Jannes simbolon
KREDIT
5
ARANA
NG
DEBIT
6
3,500,000.00
100,000.00
120,000.00
599,600.00
485,000.00
500,000.00
168,000.00
300,000.00
100,000.00
5,872,600.00
SALDO
7
311.51 m1
74 bh
289.31 m'
B.
Galian tanah
cerucuk
Pasir Urug
cor tapak plat
cor kolom 30x30 h=2m
cor kolom 30x30 h=1.5m
80.20
370.00
2.67
10.74
18.71
1.91
m3
btg
m3
m3
m3
m3
Urugan Kembali
relief kolom (kepala & dinding)
plesteran kolom
cat tembok
20.62
66.68
74.00
179.46
179.46
m3
m3
bh
m2
m2
130.00
1,736.00
9.00
60.00
61.00
13.02
222.17
480.66
480.66
26.83
12.00
32.20
m3
btg
m3
m3
m3
m3
m2
m2
m2
m'
m'
m2
Galian tanah
cerucuk
Pasir Urug
Pas. Bat. Kali
Urugan Kembali
Sloof 15x30
Pas. Bata 1/2 batu h. 65cm
Plesteran
cat tembok
Besi hollow utk. Pagar depan h.120
pintu gerbang besi hollow h.200
cat besi hollow
0.09
0.56
0.56
0.56
0.33
0.56
1157.24
34.56
34.56
660.12
660.12
80.49
102.69
m3
m2
0.1
0.2
0.03 m3
0.11 m3
8.68