HARGA
NO URAIAN SAT. VOLUME SATUAN JUMLAH
(Rp.) (Rp.)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan dan Jalur Pipa Ls 1,00 -
Sub Total -
II PEKERJAAN BANGUNAN INTAKE
3
1 Galian Tanah M 1,92 -
3
2 Pek. Beton Bertulang 1:2:3 M 2,65 -
3 Bulu Ijuk Untuk Saringan Pipa Ls 1,00 -
III PEKERJAAN PENGADAAN PIPA DAN AKSESORIS
1 Pipa PVC S 12,5 dia 4" M' 920,00 -
2 Pipa PVC S 12,5 dia 3" M' 6.200,00 -
3 Pipa Gip 4" (Medium B) M' 750,00 -
4 Pipa Gip 3" (Medium B) M' 135,00 -
5 Pek. Pengadaan Aksesoris Pipa
a Flange Steel dia. 4 " Bh 250,00 -
b Flange Socket dia 4" Bh 1,00 -
c Bell Reducer dia 4" x 3" Bh 1,00 -
d Flange Steel dia. 3 " Bh 50,00 -
e Bend All Flange 90 dia 4" Bh 6,00 -
f Bend All Flange 45 dia 4" Bh 10,00 -
g Bell Bend 90 PVC 4 " Bh 5,00 -
h Bell Bend 45 PVC 4 " Bh 15,00 -
i Bend All Flange 90 dia 3" Bh 12,00 -
j Bend All Flange 45 dia 3" Bh 7,00 -
k Bell Bend 90 PVC 3" Bh 7,00 -
l Bell Bend 45 PVC 3" Bh 8,00 -
m Ventil Udara dia 3" Bh 4,00 -
n Baut 5/8 x 10 Cm Bh 2.688,00 -
o Valve Cover 3" Bh 2,00 -
p Karet Packing M2 10,00 -
IV PEKERJAAN PEMASANGAN PIPA DAN AKSESORIS
1 Pipa PVC S 12,5 M' 7.120,00 -
2 Pipa GIP M' 885,00 -
3 Trust Block M3 2,00 -
V PEKERJAAN PEMBUATAN BAK VENTIL UDARA 4 BH
1 Pek. Galian Tanah M3 1,18 -
2 Pek. Urugan Pasir M3 0,65 -
3 Pek. Beton Untuk dinding M3 0,50 -
VI PEKERJAAN PEMBUATAN BAK VALVE COVER 2 BH
1 Pek. Galian Tanah M3 0,59 -
2 Pek. Urugan Pasir M3 0,32 -
3 Pek. Beton tanpa tulangan M3 0,25 -
4 Pek Pengelasan dan Pemasangan Pipa Riser Leng- Ls 2,00 -
kap dengan flange dan baut
VII PEKERJAAN PEMBUATAN WASH OUT DIA. 3"
1 Beel Tee dia. 3" Bh 1,00 -
2 Flange Bell End dia 3" Bh 4,00 -
3 Gate Valve Flange dia 3" Bh 2,00 -
4 Baut 5/8 " x 10 Cm Bh 16,00 -
5 Karet Packing M2 0,25 -
Sub Total -
VIII PEKERJAAN PEMBUATAN 3 BUAH JEMBATAN PIPA
1 Galian Tanah M3 6,36 -
2 Sleng dia. 3/4 " Penggantung Pipa Gip 3 " M' 75,00 -
3 Sleng dia. 1/2 " M' 35,00 -
4 Kuku Macan Bh 60,00 -
5 Pek. Beton Bertulang 1:2:3 M3 7,35 -
6 Warvel Bh 6,00 -
IX PEKERJAAN PENGETESAN PIPA
1 Pengetesan Jaringan Pipa Jam 200,00 -
TOTAL
REKAPITULASI
PEKERJAAN : PENGEMBANGAN JARINGAN AIR BERSIH DESA HARAPAN (1 PAKET)
LOKASI : KEC. MAPPEDECENG
KABUPATEN : LUWU UTARA
T.A : 2009
NO URAIAN JUMLAH
I PEKERJAAN PERSIAPAN
REAL COST
PAJAK PPN ( 10 % )
JUMLAH
DIBULATKAN
Terbilang :
RUPIAH,-
Masamba, 2009
PENAWAR
CV...........................................
.................................................
jabatan
DAFTAR HARGA BAHAN DAN UPAH
3 Batu Kali M3
4 Dolken Btg
3
5 Kayu Klas - III M
B. BAHAN
1 Semen Portland Kg 173,000 - Rp -
2 Pasir Pasang M3 0,570 - Rp -
3 Kerikil Ayak M3 0,870 - Rp -
B. BAHAN
3
1 Kayu terentang M 0,2400 Rp -
2 Paku biasa 2" - 5" Kg 3,2000 Rp -
3 Minyak bekisting Lt 1,6000 Rp -
4 Besi beton polos Kg 150,0000 Rp -
5 Kawat beton Kg 2,2500 Rp -
6 Semen portland Kg 323,0000 Rp -
7 Pasir beton M3 0,5200 Rp -
8 Koral beton M3 0,7800 Rp -
9 Kayu borneo balok M3 0,1600 Rp -
B. BAHAN
1 Pompa Air dan Kompresor Bh 0,0020 Rp -
2 Bahan Bakar Bensin Ltr 0,0138 Rp -
3 Air Bersih M3 0,0441 Rp -