You are on page 1of 10

Rev.

CLIENTE
PEMEX

UBICACIN

Sonda de Campeche, Mexico

Fecha

Elaboro

Coordino

Reviso

Aprobo

Aprobo Cte.

PLATAFORMA

CARACTERISTICAS DE LA BOMBA
PRESIN DE SUCCIN (1)
Ps (kg/cm2) =
Ps (kpa) =
Ps (psi) =
Ps (ft) =
Ps (m) =

CARACTERSTICAS DEL FLUIDO

PRESIN DE DESCARGA (2)


64.80
Pd (kg/cm2) =
6,354.70
Pd (kpa) =
921.67
Pd (psi) =
2,403.00
Pd (ft) =

6.30
617.82
89.61
233.62
71.21

Pd (m) =

FACTOR DE SEGURIDAD
Fs (%) =
Fs =

10.00
1.10

EFICIENCIA
Eo (%) =
Eo =

ALTURA DE SUCCIN (Z)


H1 (m) =
H1 (ft) =

0.00
0.00

ALTURA DE DESCARGA (Z)


0.00
H2 (m) =
0.00
H2 (ft) =

VELOCIDAD DE SUCCIN (1)


1.88
V1 (m/s) =
6.16
V1 (ft/s) =

VELOCIDAD DE DESCARGA (2)


0.00
V1 (m/s) =
0.00
V1 (ft/s) =

ALTURAS
ALTURA MAYOR (m) =
ALTURA MENOR (m) =
ALTURA MAYOR (ft) =
ALTURA MENOR (ft) =

FACTOR DE FRICCIN
f=

DENSIDAD
D (kg/m3) =
D (lb/ft3) =

732.43

70.00
0.70

VELOCIDADES
VELOCIDAD MAYOR (m/s) =
VELOCIDAD MENOR (m/s) =
VELOCIDAD MAYOR (ft/s) =
VELOCIDAD MENOR (ft/s) =

886.24
55.33

CAUDAL POR BOMBA


32.83
Q (Mbpd) =
60.41
Q (dm3/s)=
60.42
Q (l/s) =
2.13
Q (ft3/s) =
957.69
Q (gpm) =
PRESIN DE VAPOR
0.00
Pv (kg/cm2) =
0.00
Pv (kpa) =
0.00
Pv (psi) =
Pv (psia) =
14.70
Pv (ft) =
0.00
Pv (m) =
0.00

DIMETRO DE LA TUBERA
8.00
D (in) =
0.67
D (ft) =

0.00
0.00
0.00
0.00

LONGITUD DE LA TUBERA A LA SUCCIN


0.00
H1 (m) =
0.00
H1 (ft) =

GRAVEDAD ESPECIFICA
0.886
S.G.

PRESIN ATMOSFRICA
14.7
Patm (psi) =
38.33
Patm (ft) =
Patm (m) =
11.68

1.88
0.00
6.16
0.00

T. DE SATURACIN
826.28
T (C) =
1519.304
T (F) =
1099.43
T (K) =

0.0180

TEMPERATURA DE OP.
70.00
T (C) =
158.00
T (F) =
343.15
T (K) =
CALOR ESPECFICO
0.4921
CP (kcal/kgC) =
1.1 DIFERENCIAL DE PRESION EN LA BOMBA
5,736.88
P (kpa) =
832.06
P (psig) =
58.50
P (kg/cm2) =
2,169.37
P (ft) =

SIN FACTOR DE SEGURIDAD


SUCCIN POSITIVA (1)

EL TANQUE EST POR ENCIMA


DE LA SUCCIN DE LA BOMBA
TANQUE ATMOSFRICO

hs =
hv =
hz =
hf =

ft

38.33
0.00
0.00
1.57

11.68
0.00
0.00
0.48

CON FACTOR DE SEGURIDAD


SUCCIN NEGATIVA(2)

SUCCIN POSITIVA(3)

EL TANQUE EST POR DEBAJO


DE LA SUCCIN DE LA BOMBA
TANQUE ATMOSFRICO

EL TANQUE EST POR ENCIMA


DE LA SUCCIN DE LA BOMBA
TANQUE PRESURIZADO

hs =
hv =
hz =
hf =

ft

38.33
0.00
0.00
1.57

11.68
0.00
0.00
0.48

hs =
hv =
hz =
hf =

ft

271.95
0.00
0.00
1.57

82.89
0.00
0.00
0.48

1.2 NPSH DISPONIBLE

POR ALTURAS

POR ALTURAS

36.75
11.20
14.10

NPSHd (ft) =
NPSHd (m) =
NPSHd (Psi) =

NPSHd (ft) =
NPSHd (m) =
NPSHd (Psi) =

POR ALTURAS

POR ALTURAS

36.75
11.20
14.10

NPSHd (ft) =
NPSHd (m) =
NPSHd (Psi) =

POR ALTURAS

270.38
82.41
103.70

POR ALTURAS

40.43
12.32
15.51

NPSHd (ft) =
NPSHd (m) =
NPSHd (Psi) =

40.43
12.32
15.51

NPSHd (ft) =
NPSHd (m) =
NPSHd (Psi) =

297.42
90.65
114.07

NPSHr (ft) =
NPSHr (m) =
NPSHr (Psi) =

0.59
0.18
0.23

NPSHr (ft) =
NPSHr (m) =
NPSHr (Psi) =

0.59
0.18
0.23

NPSHr (ft) =
NPSHr (m) =
NPSHr (Psi) =

0.59
0.18
0.23

NPSHr (ft) =
NPSHr (m) =
NPSHr (Psi) =

0.65
0.20
0.25

NPSHr (ft) =
NPSHr (m) =
NPSHr (Psi) =

0.65
0.20
0.25

NPSHr (ft) =
NPSHr (m) =
NPSHr (Psi) =

0.65
0.20
0.25

NPSHd (ft) =
NPSHd (m) =
NPSHd (Psi) =

1.3 NPSH REQUERIDO

ACEPTABLE

ACEPTABLE

ACEPTABLE

1.4 CARGA DE PRDIDAS POR ACCESORIOS Y TUBERA


TUBERA
0.60
1.57
ACCESORIOS
0.00
Hf (ft) =
TOTAL
1.57
Hf (ft) =
0.48
Hf (m) =
0.60
Hf (Psi) =
Hf (psig) =
Hf (ft) =

1.5 CARGA ESTTICA


Hstat (ft) =
Hstat (m) =
Hstat (psi) =

2,165.58
660.07
830.61

1.6 CARGA DINMICA


Hdyn (ft) =
Hdyn (m) =
Hdyn (psi) =

0.59
0.18
0.23

1.7 CARGA TOTAL


Hp (ft) =
Hp (m) =
Hp (psi) =

2,167.74
660.73
831.44

660.27

1.8 POTENCIA HIDRULICA

HHP (hp) =

ALTURA
CAUDAL
DENSIDAD
S.G.
465.24
464.48

CAUDAL
DIFERENCIAL DE P
464.91
464.86

ALTURA
CAUDAL
DENSIDAD
S.G.
511.76
510.93

CAUDAL
DIFERENCIAL DE P
511.40
511.34

CAUDAL
DIFERENCIAL DE P
664.16
664.08

ALTURA
CAUDAL
DENSIDAD
S.G.
731.09
729.90

CAUDAL
DIFERENCIAL DE P
730.58
730.49

1.9 POTENCIA AL FRENO

BHP (Hp) =

ALTURA
CAUDAL
DENSIDAD
S.G.
664.62
663.55

1.10 POTENCIA DEL MOTOR


948.69
HP (Hp) =

HP (Hp) =

1043.55

Wmn (lb/h) =
Wmn (kg/h) =

2,764.04
1,253.74

1.11 TEMPERATURA PERMISIBLE DE ELEVACIN (T.P.E.)


738.50
Tp (C) =
1,361.30
Tp (F) =
1,011.65
Tp (K) =

1.12 MASA SEGURA DE RECIRCULACIN


2,512.76
Wmn (lb/h) =
1,139.76
Wmn (kg/h) =

1.13RECIRCULACIN SEGURA
5.66
Qmn (gpm) =
194.13
Qmn (bpd) =

gpm
bpd

Q OPERACI.
957.69
32,831.33

Q RECIRCULA.
5.66
194.13

1.14 ANLISIS DE TEMPERATURA


T. DE OP. (C)
70

T.P.E. (C)
738.50

T. DE SAT. (C)
826.28

% RECIRCULACI.
0.59
0.59

gpm
bpd

Qmn (gpm) =
Qmn (bpd) =

6.23
213.54

Q OPERACI.
957.69
32,831.33

Q RECIRCULA.
6.23
213.54

% RECIRCULACI.
0.65
0.65

Pgina

NOTA: INDICAR EN LAS CASILLAS DE CANTIDADES, EL NMERO DE ACCESORIOS QUE CONTENGA SU SISTEMA

TABLA DE PERDIDAS POR VLVULAS Y AC

DISPOSITIVO
CODO STD 90
CODO STD 90 DE RADIO LARGO
CODO 45
TE (FLUJO EN LNEA)
TE (FLUJO REPARTIDO
RETORNO U (ESTANDAR)
RETORNO U (DE RADIO LARGO)
VLVULA (DE GLOBO)
VLVULA (DE COMPUERTA)
VLVULA (DE RETENSIN, SWING CHECK)
ENTRADA (DE BOCA CUADRADA)
ENTRADA (TIPO CAMPANA)

1"
1 1/4"
1 1/2"
2"
CANT. VALOR CANT. VALOR CANT. VALOR CANT.
0
1.60
0
2.10
0
2.40
0
0
1.60
0
2.00
0
2.30
0
0
0.80
0
1.10
0
1.30
0
0
1.00
0
1.30
0
1.50
0
0
3.30
0
4.40
0
5.20
0
0
1.60
0
2.10
0
2.40
0
0
1.60
0
2.00
0
2.30
0
0
45.00
0
54.00
0
45.00
0
0
0.00
0
0.00
0
0.00
0
0
7.20
0
10.00
0
12.00
0
0
1.80
0
2.60
0
3.10
0
0
0.20
0
0.30
0
0.30
0

ONTENGA SU SISTEMA DE BOMBEO

OR VLVULAS Y ACCESORIOS EQUIVALENTES A ft


2"
2 1/4"
3"
4"
5"
6"
8"
VALOR CANT. VALOR CANT. VALOR CANT. VALOR CANT. VALOR CANT. VALOR CANT. VALOR
3.10
0
3.60
0
4.40
0
5.90
0
7.30
0
8.90
0
12.00
2.70
0
2.90
0
3.40
0
4.20
0
5.00
0
5.70
0
7.00
1.70
0
2.00
0
2.60
0
3.50
0
4.50
0
5.60
0
7.70
1.80
0
1.90
0
2.20
0
2.80
0
3.30
0
3.80
0
4.70
6.60
0
7.50
0
9.40
0
12.00
0
15.00
0
18.00
0
24.00
3.10
0
3.60
0
4.40
0
5.90
0
7.30
0
8.90
0
12.00
2.70
0
2.90
0
3.40
0
4.20
0
5.00
0
5.70
0
7.00
70.00
0
77.00
0
94.00
0
120.00
0
150.00
0
190.00
0
260.00
2.60
0
2.70
0
2.80
0
2.90
0
3.10
0
3.20
0
3.20
17.00
0
21.00
0
27.00
0
38.00
0
50.00
0
63.00
0
90.00
4.30
0
5.20
0
6.70
0
9.50
0
13.00
0
16.00
0
23.00
0.40
0
0.50
0
0.70
0
1.00
0
1.30
0
1.60
0
2.30

TOTAL
0
0
0
0
0
0
0
0
0
0
0
0
0

Rev.

CLIENTE

Fecha

Elaboro

Reviso

Coordino

Aprobo

Aprobo Cte.

PEMEX

UBICACIN

C
D
0

Sonda de Campeche, Mexico


PLATAFORMA
PB-AC-1

Se requiere bombear 32,831.33 BPD de un fluido a 70 C con una densidad de 886.24 kg/m3 y una presin de 6.3 kg/cm2. Asumiendo una eficiencia de la bomba del 70 %.
Se desea aumentar la presin hasta 64.80 kg/cm2

solucin:
Factor de seguridad (%) =
Q (gpm) =
957.69
Flujo con factor de seguridad
Qf.s. (gpm) =
1,053.46
2.35
Qf.s. (ft3/s) =
2
6.30
Ps (kg/cm ) =
Ps (psig) =
89.61
2
64.80
Pd (kg/cm ) =
Pd (psig) =
921.67
Pa (psig) =
14.70
hz (ft) =
0.00
Pv (psig) =
0.00
hf (ft) =
1.57
Hf (m) =
0.48
HStat (m) =
660.07
HDyn (m) =
0.18
Grav. Esp. =
0.886
Efic. bomba =
70
55.33
Dens. (lb/ft3) =

10.00

Para el clculo del cabezal de la bomba se sustituyen los valores de la Carga de prdidas por friccin (Hf en m), Carga Esttica (Hstat en m) y la Carga Dinmica (HDyn en m)
en la ecuacin que acontinuacin se presenta.

CABEZAL DE LA BOMBA

Hp (m) =
Hp (ft) =

660.73
2,167.74

Para el clculo del Cabezal Neto de Succin Disponible, se sustituyen los valores de Presin atmosfrica (Pa en Psig), Presin de Succin (Ps en Psig), Carga por Elevacin
(hz en ft) positivo si el nivel del lquido est por ensima de la bomba, Presin de Vapor (Pv en Psig), la Carga por prdidas de friccin en tubera, vlvulas y accesorios (hf en ft)
y la Gravedad Especfica (Grav. Esp.) en la ecuacin que acontinuacin se describe.

CABEZAL NETO DE SUCCIN DISPONIBLE

NPSHa (ft) =
NPSHa (m) =

270.38
82.41

Para el clculo de la Potencia Hidrulica se sustituyen los valores de Flujo del lquido aplicndole el Factor de Seguridad (Qf.s. en ft 3/s), Cabezal de la Bomba (Hp en ft) y la
densidad (en lb/ft3) en la ecuacin que se describe mas adelante.

POTENCIA HIDRULICA

HHP (hp) =

512.29

Para el clculo de la Potencia al Freno se sustituyen los valores de Potencia Hidrulica (HHP en hp) y la eficiencia de la bomba, considerando ser el 70%, en la ecuacin que mas
adelante se presenta.

POTENCIA AL FRENO

BHP (hp) =

731.84

Pgina

PRESIN DE
SUCCIN
BOMBA

PRESIN DE
DESCARGA

NPSHd

Hp

HHP

m
ft
m
ft
hp
kw
kg/cm2 Psig kg/cm2 Psig
GA-3101 6.30 89.61 64.80 921.67 82.41 270.38 660.73 2,167.74 512.29 382.01

BHP
hp
kw
731.84 545.73

You might also like