IT IS A RUN OFF THE RIVER POWER PROJECT ON THE RIVER INDUS IT IS SITUATED AT A VILLAGE CALLED ALCHI, 70 KM AWAY FROM LEH THE PROJECT IS 10000 ABOVE SEA LEVEL
THE CONSTRUCTION STARTED ON JUNE 9 2005
6/22/2013 WEATHERING HEIGHT-HCC
THE POWER PLANT IS CONSTRUCTED BY HINDUSTAN CONSTRUCTION COMPANY THE POJECT INVOLVES A CONSTRUCTION OF 57 METRE HIGH CONCRETE DAM WITH 5 SPILL WAY BLOCKS OF 13 METRE EACH IT IS CAPABLE OF GENERATING 45 MW OF ELECTRICITY
6/22/2013
WEATHERING HEIGHT-HCC
ESTIMATED COST WAS RS 611.10 CRORES. FUNDING PATTERN IS AS FOLLOWS EQUITY FROM GOVERNMENT OF INDIA RS 183.3 CRORES GRANT FROM GOVERNMENT OF INDIA RS 270 CRORES COMMERCIAL LOANS RS157.71 CRORES
WEATHERING HEIGHT-HCC
6/22/2013
MOST OF THE PART OF LADAKH GET ELECTICITY FOR ONLY 4-5 HOURS DIESEL GENERATORS AND SOLAR ENERGY ARE USED AS ALTERNATIVES DUE TO INCREASE IN TOURISM IN LEH ELECTRICITY DEMAND HAS INCREASED
6/22/2013
WEATHERING HEIGHT-HCC
IT ENABLE TO REDUCE POWER SHORTAGE IN LADAKH THE PROJECT WILL BENEFIT DURING HARSH WINTER MONTHS EVEN PLANS TO EXTEND THE PROJECT TO NORTHERN GRID
6/22/2013
WEATHERING HEIGHT-HCC
6/22/2013
WEATHERING HEIGHT-HCC
PROBLEM 1:
PEOPLE WERE RESISTANT TO GO TO SUCH REMOTE AREA AND LOW OXYGEN LEVEL CAUSED PROBLEMS LIKE LETHARGY,HEADACHE,DROWSINESS AND NAUSEA
6/22/2013
WEATHERING HEIGHT-HCC
SOLUTION WORKERS WERE INSTRUCTED NOT TO SPEAK FOR MORE THAN 30 MINUTES. TAKE 10 MINUTES BREAK EVERY 30 MINUTES BLOOD PRESSURE WAS CHECKED REGULARLY
6/22/2013
WEATHERING HEIGHT-HCC
10
PROBLEM 2:
DIFFICULTY IN RADIO SIGNALS
SOLUTION
DEPLOYMENT OF VSATs FOR NETWORKING WITHIN PROJECT VSATs RUNNING ON TWO TECHNOLOGY- KUBAND, EXTENDED C-BAND MECHANICAL ENGINEERS AT THE SITE WERE TRAINED TO TAKE BASIC CARE OF VSATs
6/22/2013 WEATHERING HEIGHT-HCC
11
PROBLEM 3:
TEMPERATURE VARIED FROM 20C IN DAY to -5C IN NIGHT WHICH DAMAGED NETWORKING CABLES AS PLASTIC AND COPPER HAS DIFFERENT CONTRACTION AND EXPANSION
SOLUTION
SPECIAL TYPE OF INDUSTRIAL STRENGHT CABLES WERE USED THAT COULD WITHSTAND LARGE TEMPERATURE GRADIENT
6/22/2013 WEATHERING HEIGHT-HCC
12
PROBLEM 4:
EARTHS NEUTRAL VOLTAGE WAS -5C WHICH IS HIGHER THAN -1C ,WHICH IS REQUIRED BY VSATs TO FUNCTION, SO THERE WAS IMPROPER EARTHING
SOLUTION
SPECIAL EARTHPIT WAS CREATED WITH SAND, CHARCOAL AND DUST AND IT WAS WATERED REGULARLY
6/22/2013 WEATHERING HEIGHT-HCC
13