LABOR PRODUCTION TABLE

ITEM NO.

A.

B.
C.

WORK DESCRIPTION

MANHOURS PER QUANTITY (M.H./UNIT)


LOW

FORM WORKS INSTALLATION


WALL ON THE GROUND
WALL ABOVER GROUND
BEAMS
COLUMN
SUSPENDED SLAB
0 TO 18'
18' TO 36' UP
ELEVATED AND SHORED SLAB FORMING
FORMING ONLY
FORMING AND SHORING
WOOD WALL AND PARTITION

SQ.M.
SQ.M.
SQ.M.
SQ.M.

4.00
4.70
6.16
4.70

SQ.M.
SQ.M.

3.34
6.66

SQ.M.
SQ.M.
SQ.M.

17.20
22.00
1.00

FORMWORKS FABRICATION

SQ.M.

2.15

SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.

0.50
2.58
2.06
1.70

PC
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.

2.00
0.29
0.30
0.53
1.94
0.85
0.70
1.60
0.43
0.27
0.53
0.91

PC
S.F.

2.00
0.83

SQ.M.
SQ.M.

2.66
2.00

STRIPPING OF FORMS
WALL ON GROUND
WALL ABOVE 10'
BEAMS
COLUMNS
SUSPENDED SLAB
0 TO 18'
18' TO 36' UP
ELEVATED AND SHORED SLAB FORMING
STRIP OF FORMS
FLOOR SLAB AT GRADE STRIP OF FORMS

M.H./ UNIT

1.67
2.16
7.00
5.60

INSTALLION OF CARPENTRY WORKS


PLYWOOD PARTITION
T & G FLOORING AND SHORING
CEILING FRAME
SIDING FRAME
FLOORING FRAME
WOODEN POSS ERECTION
TRUSS FABRICATION
TRUSS INSTALLATION
GIRTS INSTALLTION
PLATES INSTALLATION
PURLINS INSTALLATION
FASCIA BOARD INSTALLATION
1/4" or 3/4" thk PLYWOOD
CUTTING BY MANUAL
ASSEMBLY
CEILNG:
FRAME INSTALLATION
PLYWOOD INSTALLLATION

CABINET BOARDING
CABINET FRAMING
WOOD WALL PARTITION
PANEL WALL
FORMING WEIGHT ANCHOR BOLT
WET FORMING
E.

F.

G.

DOORS AND WINDOWS


W-PANEL INSTALLATION
STEEL WINDOWS INSTALLATION
LOUVER WINDOWS INSTALLATION:
FIXED ASBESTOS
FIXED METAL LOUVERS
FIXED GI SHEETS
FIXED GLASS
FIXED WOODEN
ALUMINUM FRAME WINDOWS
SLIDING GLASS DOOR
HOLLOW METAL DOOR
ROLLING DOORS
FIXED WINDOW
DOOR LOCKSET
DOOR JAMB FABRICATION
DOOR JAMB INSTALLATION
CYCLONE WIRE INSTALLATION
TRADE MASONRY WORKS
GROUTING and TOL PLASTERING
PEBBLE FINISHED
MABLE INSTALLATION
1/4" x 2' x 8" RED BRICKS
GLAZED TILES
UNGLAZED TILES
GLAZED TILE WALL
CONC. BLOCK INT. WALL
CONC. BLOCK EXT. WALL
BRICKWORK
PLASTER WALL AND CEILING
HOLLOW TILE WALL
ACOUSTICAL TILE WALL
VINYL FLOOR TILE
UNGLAZED OR MOSAIC FLOOR TILE
LAYING OF CHB & ADOBE
CEMENT FINISH
CONC. HOLLOW BLOCK LAYING:
6" CHB
4" CHB
8" CHB
VIT. TILES FLOOR
VIT. TILES WALL
TINSMITHING WORK

B.F.
B.F.
SQ.M.
SQ.M.
SQ.M.
SQ.M.

0.26
0.36
1.00
14.00
9.00
7.00

PC.
PC.

0.80
4.00

SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
EACH
EACH
EACH
EACH
S.F.
SET
B.F.
B.F.
SQ.M.

9.26
6.24
9.26
6.34
6.76
20.00
24.00
20.00
50.00
0.63
3.20
0.44
0.66
6.24

SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.

3.34
2.86
4.00
10.00
21.06
8.70
6.00
9.00
8.00
1.00
6.00
4.00
2.40
3.60
17.00
2.28
1.43

SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.

3.20
2.66
4.00
10.66
11.94

CORR GI SHEETS:
LIFTING
INSTALLATION
INSTALLATION OF ASBESTOS ROOFING
INSTALLATION OF ALUMINUM GI SHEET
COPPER CLADDING ROOF DECK
FAB, GI GUTTER
GI SHEET ROOFING
FAB OF GI GUTTER
FAB. GI DOWNSPOUT
GUTTER CUT & SHAPE
INST. OF GUTTER
DOWNSPOUT CUT AND SHAPE
DOWNSPOUT INSTALLATION
CORR. GI ROOFING
CORR ALUMINUM ROOFING
BUILT UP ROOFING 4 PLY
PROTECTED METAL
CORR. ASBESTOS INST., LIFTING & HAULING
LEADERS & GUTTERS
H

I.

CONCRETE AND REBAR WORKS


PLACING CONCRETE:
SLAB ON FILL
SLIP FORM
FLR FINISH UNHARDENED
CONC. FINISH HARDENED
REBAR WORKS:
GROUND FLR. INSTALLATION
UPPER FLR. INSTALLATION
FABRICATION
MIXING MANUAL
MIXING MACHINE
MORE THAN 1.80 CU.M. POUR:
CHUTE FROM TRUCK
CRANE AND BUCKET
WHEELING
FINISHING
CONCRETE POUR ON ELEVATED AND SHORED
SLAB FORMING CHUTE & BUCKET
PLACEMENT OF REBARS ON FOOTING
FIELD FABRICATION OF REBARS
EARTH WORKS
MACHINE EXCAVATION:
SAND
SAND AND MARL
MARL
GRANULAR BACKFILL
GRANULAR SOIL BACKFILL
MANUAL FOUNDATION EXCAVATION & BACKFILL:
SAND

SQ.M.
SQ.M.
SHT.
SHT.
L.M.
SHT.
SHT.
L.M.
L.M.
L.M.
L.M.
L.M.
L.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.

2.16
6.12
2.00
1.60
1.01
6.94
1.64
1.05
1.94
0.32
1.78
0.59
0.27
3.60
3.60
17.00
4.00
3.40
1.20

CU.M.
CU.M.
SQ.M.
SQ.M.

10.00
50.00
2.00
2.86

KGS
KGS
KGS
CU.M.
CU.M.

0.14
0.16
0.20
32.00
3.60

CU.M.
CU.M.
CU.M.
SQ.M.

14.00
28.00
54.00
5.60

CU.M.
KGS
KGS

42.00
1.06
0.66

CU.M.
CU.M.
CU.M.
CU.M.
CU.M.

1.20
1.60
2.20
2.40
3.00

CU.M.

8.00

EXCAVATION OF SAND &MARL


EXCAVATION OF MARL
BACKFILL OF SAND
BACKFILL OF SAND &MARL
BACKFILL OF MARL
FLOOR SLAB & GRADE:
GRADING MANUAL
EXCAVATION AND BACKFILL
FINE GRADING & FINISHING
GRADING MANUAL
FINISHING SOIL SURFACE
DIKES
ROAD WORKS
BASE COURSE
CURBS & GUTTER
4" THK ROAD
6" THK ROAD
8" THK ROAD
TROWEL FINISH
SPECIAL TOPPING
4" STONE OR SHELL ROAD
6" STONE OR SHELL ROAD
8" STONE OR SHELL ROAD
ACID PROOFING
ASPHALT PAVING:
FINE GRADING & FINISHING
PLACE BASE COURSE
ASPHALT
ACID BLOCK OR PAVING BLOCK:
FIND GRADING
INSTALL BRICK
CRUSH STONE OR SHELL SURFACING
FINE GRADING
PLACE SPREAD AND COMPACT STONE TO 4"
OVER 9" THK
TANK CUSHION
SAND CUSHION
APHALT RETAINER RING
NON GRANULAR BACKFILL
EXCAVATION MANUAL:
COMMON EARTH
LOAN OF SAND
CLAY OR HEAVY SOIL ROCK
ROCK
MECHANICAL EXCAVATION
COMMON EARTH
ROCK W/ JACKHAMMER
BACKFILLING
COMMON MANUAL
GRAVEL FILL MANUAL
TRENCHING AND BACKFILLING OF UNDERGROUND
PIPING USING EXCAVATION MATERIALS MANUAL

CU.M.
CU.M.
CU.M.
CU.M.
CU.M.

13.00
21.00
11.00
16.00
24.00

SQ.M.
CU.M.

2.60
36.00

SQ.M.
SQ.M.
CU.M.

0.90
1.10
2.40

SQ.M.
CU.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
CU.M.

0.24
3.60
2.60
2.80
3.00
0.64
2.40
0.64
0.84
1.04
1.20

SQ.M.
SQ.M.
SQ.M.

0.84
0.40
0.40

SQ.M.
SQ.M.

0.84
8.40

SQ.M.
SQ.M.
SQ.M.

0.64
0.84
1.04

CU.M.
SQ.M.
CU.M.

1.40
0.40
4.00

CU.M.
CU.M.
CU.M.
CU.M.

16.00
2.62
3.28
5.26

CU.M.
CU.M.

13.34
33.34

CU.M.
CU.M.

1.64
10.00

FROM 0 TO 2 MTRS. DEPTH


2 TO 3
3 TO 4
4 TO 5
PLACING BINDER GRAVEL
ESCOMBRO BACKFILLING
SPREADING, TAMPING AND GRADING
MECHANICAL COMPACTION, PLATE COMPACTION
MANUAL CLEARING AND GRUBBING
CLEARING UNDERGROWTH AND TREES 12"
CLEARING UNDERGROWTH AND SHRUBS
DISPOSAL OF SOIL
MAULING OF SOIL
GRAVEL FILL
EXCAVATION CRANE AND CLAMPSHELL
WITH 8-MEN AND 2 CARPENTERS

L.M.
L.M.
L.M.
L.M.
CU.M.
CU.M.
SQ.M.
CU.M.

2.50
3.34
5.00
6.66
0.21
0.42
0.96
0.11

SQ.M.
SQ.M.
CU.M.
CU.M.
CU.M.

0.1
0.06
3.38
2.00
4.14

CU.M.

2.14

K.
TRADE: UNDERGROUND PIPING AND PLUMBING WORKS
1.00 LAYING ASBESTOS PIPES:
1//2
L.M.
3/4"
L.M.
1 1/4"
L.M.
1 1/2 TO 2"
L.M.
2 1/2"
L.M.
3"
L.M.
3 1/2"
L.M.
4"
L.M.
2.00 CAST IRON PIPE
2"
L.M.
4"
L.M.
6"
L.M.
8"
L.M.
10"
L.M.
12"
L.M.
14"
L.M.
16"
L.M.
18"
L.M.
20"
L.M.
24"
L.M.
30"
L.M.
3.00 LAYING PVC PIPE
1/2 TO 3/4"
L.M.
1 TO 1 1/4"
L.M.
1 1/2 TO 2"
L.M.
2 1/2"
L.M.
3"
L.M.
4"
L.M.
5"
L.M.
6"
L.M.
4.00 LAYING RCP 8 MEN (1 TEAM)
24"
L.M.
36"
L.M.

1.32
1.32
1.48
1.64
1.97
2.16
2.3
2.64
4.38
6.58
9.84
13.14
19.7
20.62
24.1
27.38
30.68
32.86
36.14
41.08
0.38
1.48
1.64
1.96
2.16
2.62
3.28
4.92
9.00
12.8

48"
6-18"
LAVATORY
WATER CLOSET
URINAL UTILITY STALL
URINAL PEDESTRAL TYPE
SHOWER AND INSTALL
5 MAN GROUP SHOWER
BAH TUBS
SLOPE SINK
HOT WATER HEATER
16 PERSON WASH SINK
DRINKING FOUNTAIN
EYE WASH
MISC. FIXTURES
PARTITIONS
LAYING OF 24" RCP
LAYING OF 36" RCP
LAYING OF 48" RCP
L.

L.M.
L.M.

21.34
2.66

EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
PIPE
PIPE
PIPE

16.00
24.00
48.00
32.00
20.00
72.00
48.00
28.00
28.00
52.00
26.00
16.00
4.00
16.00
8.00
12.80
21.32

S.M.
S.M.
S.M.
S.M.

5.00
24.00
10.00
10.00

S.M.
S.M.

34.00
60.00

FLG.
S.M.
L.M.
EACH
EACH
EACH
EACH
L.M.
L.M.

8.00
1.60
5.40
3.00
16.00
12.00
8.00
7.40
3.00

EACH
S.M.

1.00
2.40

TRADE INSULATION
EQUIPMENT INSTALLATION
VESSEL, EXCHANGE & TANKS

FIELD FABRICATION INSULATION


FIELD FABRICATION SHEET METAL COVER
APPLY INSULATION
APPLY SHEET METAL COVER
PUMPS, COMPRESSORS & TURBINES
FABRICATE
APPLY
PIPINGS AND COMPONENT INSULATION
FIELD FABRICATE
FIELD FABRICATESHEET METAL COVER
APPLY INSULATION
APPLY SHEET METAL COVER OR METAL COVER
FABRICATE INSTRUMENT COVER
INSTALL INSTRUMENT COVER
INSULATE PIPE HANGERS
FOR STREAM TRACED LINES
REMOVAL OF OLD OR EXISTING INSTALLATION
M.

TRADE:FIRE PROOFING
INSTALL STUDS
INSTALL MESH
POURED
FORMING
STRIP FORMS
POUR CONCRETE
CURING/PATCHING
FINISHING
TROWEL, PLASTERED

S.M.
S.M.
S.M.
S.M.
S.M.
S.M.

28.00
12.00
140.00
1.20
1.40
5.40

PNEUMATIC APPLICATION
GUNITE
APPLY FINEBRICK OR BLOCK
REMOVAL OF EXISTING OR OLD FIREPROOFING
APPLY FIREPROOFING PAINT
FIRE PROTERCTION:
FIRE PROTECTION EQUIPMENT INSTALLATION:
MONITOR
HOSE REELS AND CARTS
FIRE EXTINGUISHERS
PERSONAL EQUIPMENT:
EYE WASH
SAFETY SHOWERS
BREATHING APPARATUS
SPRINKLER SYSTEM
SPRAY NOZZLES
WATER CANNONS
N.

O.

P.

Q.

TRADE:PERMANENT FENCING
INSTALL FENCE
INSTALL GATES
TO RAIL
BARBE WIRE, 3 STRANDS
TRADE:PAINTING WORKS
NEW STRUCTURAL STEEL
OLD STRUCTURAL STEEL
NEW FLAT FLAT PLATES
SURFACE PREPARATION:
IN TERMS OF WEIGHT
IN TERMS OF AREA
SAND PREPARATION
TRADE:HEATING VENTILATING AND CONDITIONING
HEAVY PIPING
DUCT WORK INSTALL
DUCT WORK FAB.
PACKAGE UNIT AIR CONDITIONER
UNIT HEATER
FINNED CONVERTER
EXHAUST FAN PROPELLER
GRAVITY ROOF PAINT
POWER ROOF VENT
ROUND ROOF VENT
PLUMBING PIPING
MISCELLANEOUS
WATER STOP INSTALLATION
CAULKING SLAB JOINT
ASPHALTING
GROUTNG AND TOOL PLASTERING
WATER PROOFING RUBBERIZED

S.M.
PC.
S.M.
S.M.

2.40
1.60
5.00
6.00

EACH
EACH
EACH

10.00
30.00
10.00

EACH
EACH
EACH

20.00
20.00
10.00

EACH
EACH

2.00
10.00

L.M.
L.M.
L.M.
L.M.

2.40
6.00
0.60
0.60

TON
S.M.
S.M.

20.00
1.10
0.64

TON
S.M.
TON

16.00
0.86
60.00

L.M.
S.M.
S.M.
EACH
EACH
EACH
EACH
L.M.
EACH
EACH
L.M.

7.00
12.00
36.00
48.00
24.00
10.00
16.00
14.00
48.00
16.00
7.00

L.M.
L.M.
S.M.
S.M.
S.M.

1.34
0.40
1.60
3.34
1.10

COPPER CLADDING ROOF DECK


WATER PROOFING FLINKOTE
DEMOLITION OF ADOBE WALL
PAINTING
COPPER WATER STOP CUT AND SHAPE
COPPER WATER STOP CUT AND INSTALLATION
SETTING ANCHOR BOLT
SETTING ANCHOR BOXES

L.M.
S.M.
CU.M.
S.M.
L.M.
L.M.
KG
CU.M.

1.00
0.54
3.20
0.68
11.00
22.00
97.00
3.64

MANHOURS PER QUANTITY (M.H./UNIT)


AVERAGE

HIGH

2.00
2.35
3.08
2.35

1.60
1.88
2.46
1.88

1.67
3.33

1.34
2.66

9.00
11.00
0.60

6.88
8.80
0.40

1.08

0.86

0.25
1.29
1.03
0.85

0.20
1.03
0.82
0.68

0.83
1.08

0.67
0.86

3.50
2.80

2.80
2.24

1.00
0.14
0.36
0.27
0.97
0.43
0.35
0.80
0.21
0.13
0.27
0.46

0.80
0.11
0.29
0.21
0.77
0.34
0.28
0.64
0.17
0.11
0.10
0.36

1.00
0.42

0.80
0.33

1.33
1.00

1.06
0.90

0.13
0.18
0.50
7.00
4.50
3.50

0.10
0.14
0.40
5.60
3.60
2.80

0.40
2.00

0.32
1.60

4.63
3.12
4.63
3.12
3.38
10.00
12.00
10.00
25.00
0.31
1.60
0.22
0.33
3.12

3.70
2.50
3.70
2.50
2.70
8.00
9.60
8.00
20.00
0.25
1.28
0.18
0.26
2.50

1.67
1.43
2.00
5.00
10.53
4.35
3.00
4.50
4.00
0.50
3.00
2.00
1.20
1.80
9.50
1.14
0.72

1.34
1.34
1.60
4.00
8.42
3.48
2.40
3.60
3.20
0.40
3.40
1.60
0.96
1.44
6.80
0.91
0.57

1.60
1.33
2.00
5.33
5.97

1.28
1.06
1.60
4.26
4.78

1.08
3.06
1.00
9.80
0.51
3.47
0.82
0.53
0.97
0.16
9.00
0.30
0.13
1.80
1.80
8.50
2.00
1.70
0.60

0.86
2.45
0.80
0.64
0.40
2.78
0.66
0.42
1.78
0.13
0.71
0.24
0.11
1.44
1.44
6.80
1.60
1.36
0.48

5.00
25.00
1.00
1.43

4.00
20.00
0.80
1.14

0.07
0.08
0.10
16.00
1.80

0.06
0.06
0.08
12.80
1.44

7.00
14.00
27.00
2.80

5.60
11.20
21.60
2.24

21.00
0.53
0.33

16.80
0.42
0.26

0.60
0.80
1.10
1.20
1.50

0.48
0.64
0.88
0.96
1.20

4.00

3.20

6.50
10.50
5.50
8.00
12.00

5.20
8.40
4.40
6.40
9.60

1.30
18.00

1.04
14.40

0.45
0.55
1.20

0.36
0.44
0.96

0.12
1.80
1.30
1.40
1.50
0.32
1.20
0.32
0.42
0.52
0.60

0.10
1.44
1.04
1.12
1.20
0.26
0.96
0.26
0.34
0.42
0.48

0.42
0.20
0.20

0.34
0.16
0.16

0.42
4.20

0.34
3.36

0.32
0.42
0.52

0.26
0.34
0.42

0.70
0.20
2.00

0.56
0.16
1.60

8.00
1.31
1.64
2.63

6.40
1.05
1.31
2.10

6.67
16.67

5.34
13.34

0.82
5.00

0.66
4.00

1.25
1.67
2.5
3.33
0.11
0.21
0.48
0.06

1
2.34
2
2.66
0.08
0.17
0.38
0.04

0.05
0.03
1.69
1.00
2.07

0.04
0.02
1.35
0.8
1.66

1.07

0.86

0.66
0.66
0.74
0.82
0.98
1.08
1.15
1.32

0.53
0.53
0.59
0.66
0.70
0.86
0.92
1.06

2.19
3.29
4.92
6.57
9.85
10.31
12.05
13.69
15.34
16.43
18.07
20.54

1.75
2.63
3.94
5.26
7.98
8.25
9.64
10.95
12.27
13.14
14.46
16.43

0.19
0.74
0.82
0.98
1.08
1.31
1.64
2.46

0.15
0.59
0.66
0.78
0.86
1.05
1.31
1.97

4.00
6.40

3.20
5.12

10.67
1.33

8.54
1.06

8.00
12.00
24.00
16.00
10.00
36.00
24.00
14.00
14.00
26.00
13.00
9.00
2.00
8.00
4.00
6.40
10.66

6.40
9.60
19.20
12.80
8.00
28.80
19.20
11.20
11.20
20.80
10.40
6.40
1.60
6.40
3.20
5.12
8.53

2.50
12.00
5.00
5.00

2.00
9.60
4.00
4.00

17.00
30.00

13.60
24.00

4.00
0.80
2.70
1.50
8.00
6.00
4.00
3.70
1.50

3.20
0.64
2.16
1.20
6.40
4.80
3.20
2.96
1.20

0.50
1.20

0.40
0.96

14.00
6.00
70.00
0.60
0.70
2.70

11.20
4.80
56.00
0.48
0.56
2.16

1.20
0.80
2.50
3.00

0.96
0.64
2.00
2.40

5.00
15.00
5.00

4.00
12.00
4.00

10.00
10.00
5.00

8.00
8.00
4.00

1.00
5.00

80.00
4.00

1.20
3.00
0.30
0.30

0.96
2.40
0.24
0.24

1.00
0.55
0.32

9.00
44.00
26.00

8.00
30.00

6.40
0.34
24.00

3.50
6.00
18.00
24.00
12.00
5.00
8.00
7.30
24.00
8.00
3.50

2.80
4.80
14.40
19.20
9.60
4.00
6.40
5.84
19.20
6.40
2.80

0.67
0.20
0.80
1.67
0.55

0.54
0.16
0.64
0.84
0.28

0.50
0.27
1.60
0.34
6.00
11.00
49.00
1.82

0.25
0.14
0.80
0.17
0.03
0.06
0.24
0.91

A. STRIPPING OF METAL FORMS


MANHOURS PER SQ. METER OF CONTACT AREA
WOOD SHORES 215 TO 316 FLOORS
FORM HEIGHT

LOW

AVERAGE

HIGH

(METER)

3 TO 4
4 TO 5
5 TO 6
6 TO 7
7 TO 8

0.58
0.59
0.60
0.61
0.64

0.22
0.23
0.23
0.24
0.25

0.16
0.16
0.17
0.17
0.18

0.60
0.61
0.64
0.66
0.68

0.23
0.24
0.25
0.25
0.26

0.17
0.17
0.18
0.18
0.19

WOOD SHORES 368 TO 419 FLOORS

3 TO 4
4 TO 5
5 TO 6
6 TO 7
7 TO 8
CREW:
1
3
6
10

CARPENTER LEAD MAN


CARPENTERS
HELPERS
MANDAYS

TOOLS:
ONE LOT CARPENTRY TOOLS
8 TOOLS HOUR

8
24
48
80 MANHOURS

B. STEEL ERECTION FOR MULTI STOREY BUILDING FRAME


PREFAB SECTIONS, HIGHLY MECHANIZED OPERATION
MANHOURS & EQUIPMENTHOUR PER TON ERECTED:

MEDIUM FRAME
HEAVY FRAME
STEEL JOIST

LOW
36.00
32.73
40.00

MAN-HOURS
AVERAGE
13.85
12.63
15.37

CREW:
1
4
4
2
1
6
18

LEAD MAN
RIGGERS
FITTERS
WELDERS
CRANE OPERATOR
HELPERS
MANDAYS

MATERIALS : A36 WELDED CONNECTION

8
32
32
16
8
48
144 MANHOURS

HIGH
10.00
9.11
11.08

EQUIPMENT-HOURS
LOW
7.00
6.36
7.78

TOOLS:
0.50 TOWER CRANE
2.00 WELDING TRANSFORME
1.00 LOT TOOLS
3.50

C. STEEL ERECTION FOR COMMERCIAL AND MILL BUILDING FRAME


PREFAB SECTIONS, HIGHLY MECHANIZED OPERATION
MANHOURS & EQUIPMENTHOUR PER TON ERECTED:
MAN-HOURS
AVERAGE

LOW

EQUIPMENT-HOURS
LOW

HIGH

COMMERCIAL TYPE BUILDING:


LIGHT FRAME
MEDIUM FRAME
HEAVY FRAME
STEEL JOIST

46.67
40.00
35.00
43.08

18.06
15.56
13.33
16.47

13.02
11.20
9.66
11.91

18.33
15.71
13.75
16.92

35.00
31.11
35.00
32.94

13.33
11.91
10.77
12.27

9.66
8.62
7.78
9.18

13.75
12.22
13.75
12.94

MILL TYPE BUILDING:


LIGHT FRAME
MEDIUM FRAME
HEAVY FRAME
STEEL JOIST
CREW:
1
2
4
2
1
4
14

LEAD MAN
RIGGERS
FITTERS
WELDERS
CRANE OPERATOR
HELPERS
MANDAYS

MATERIALS : A36 WELDED CONNECTION

8
16
32
16
8
32
112 MANHOURS

TOOLS:
0.50
2.00
2.00
1.00
5.50

20 TON TOWER CRANE


WELDING TRANSFORME
CUTTING OUTFIT
LOT TOOLS
EQPT. DAYS

CARPENTRY TOOLS
TOOLS HOUR

EQUIPMENT-HOURS
AVERAGE HIGH
2.69
1.94
2.46
1.77
2.98
2.15

TOWER CRANE
WELDING TRANSFORMER
LOT TOOLS

4.00
16.00
8.00
28.00 TOOL HOURS

EQUIPMENT-HOURS
AVERAGE HIGH

7.10
6.11
5.24
6.47

5.12
4.40
3.79
4.68

5.24
4.68
4.23
5.00

3.79
3.38
3.06
3.61

20 TON TOWER CRANE


WELDING TRANSFORMER
CUTTING OUTFIT
LOT TOOLS
EQPT. DAYS

4.00
16.00
16.00
8.00
44.00 EQPT. HOURS

UNIT COST DERIVATION FORM

PROJECT TITLE:
LOCATION:
ITEM NO.
ESTIMATED QUANTITIES:
A.
MATERIALS:

ITEM OF WORK:
UNIT:
DESCRIPTION

B.
NO.

LABOR/MANPOWER:

C.
NO.

EQUIPMENT/TOOLS:

DESCRIPTION

DESCRIPTION

QTY.

UNIT

UNIT COST

NO.

NO.-DAYS

DAILY RATE

NO.

NO.-DAYS HOURLY RATE

E
F
G
H
I

TOTAL DIRECT COST (A+B+C)


O.C.M. (% of D)
CONTRACTIRS PROFIT (% OF D)
VAT (10% Oof B+C)
TOTAL COST (D+E+F+G)
UNIT COST ( DIRECT)

AMOUNT

AMOUNT

AMOUNT

PROBABLE OUTPUT OF HEAVY EQUIPMENT


EQUIPMENT

PROBABLE OUTPUT

A.1 DOZER 165 HP


Cutting & Stockpiling
Clearing & Grubbing
A.2 DOZER D65P-7
Stripping
Excavation
Quarrying
Pushing
B.1 LOADER -1.91 CU.M.
Loading
B.2 LOADER 950
C.

D.

30.00 cu.m./hr.
300.00 sq.m./hr

0.033 hr/m
0.003 hr/m

200.00
25.00
50.00
3.00

0.005
0.040
0.020
0.333

sq.m./hr
cu.m./hr.
cu.m./hr.
sq.m./hr

hr/m
hr/m
hr/m
hr/m

70.00 cu.m./hr.

0.014 hr/m

90.00 cu.m./hr.

0.011 hr/m

700.00 sq.m./hr
300.00 sq.m./hr
40.00 cu.m./hr.

0.001 hr/m
0.003 hr/m
0.025 hr/m

600.00 sq.m./hr

0.002 hr/m

135.00 cu.m./hr.

0.007 hr/m

24.00 cu.m./hr.

0.042 hr/m

240.00 cu.m./hr.

0.004 hr/m

24.00 cu.m./hr.

0.042 hr/m

1,600.00 sq.m./hr

0.001 hr/m

DUMP TRUCK - 10 CU.M.


Hauling (dist. = 600M)
GRADER- 130G
10 Passes
Subgrading
Spreading

E.1 ROLLER VIBRATORY


10 Passes
SHEETS FOOT ROLLER
Static Rolling 12 passes-15m3 lift
Vibratory Rolling-4 pases-15m3 lift
No.3W Road Roller-static rolling
4 passes-15 m3 lift
Tractor Drawn Roller (1-d)
Static Rolling 6 passes-20m3 lift
Tandem Roller-static rolling
6 passes-20 m3 lift
E.2 VIBRATORY COMPACTOR CA25D
G. WATER TRUCK - 10 CU.M.
Watering
ASPHALT PAVER
ASPHALT DISTRIBUTOR
PLATE COMPACTOR
Grave Bedding
Concrete Vibrator:
Vibrating Concrete
MANPOWER:

SPRAYING PHALT
8.00 cu.m./hr.

0.125 hr/m

40.00 cu.m./hr.

0.025 hr/m

MATERIALS:

Clearing & Grubbing

300

Lot Grading (Cut & Fill) m3

Trench Excavation

30

m3/hr

232.55

m3/hr

232.55

m3/hr

384.62

m3/hr

303.03

m3/hr

769.23

m3/hr

xcavation

Disposal of Unsuitable Materials m3-km

Road way Excavation (m3)

29.41 m3/hr

125.00

m3/hr

125.00

m3/hr

Embankment/Imported Backfill (m3)

142.86

125.00
333.33

Subgrade Preparation (m2)

m3/hr

769.23 sq.m./hr

m3/hr

588.23 sq.m./hr

m3/hr

1,666.67 sq.m./hr

Aggregate Sub-base Course (m3)

Aggregate Base Course (m3)

76.92

m3/hr

115.38

m3/hr

58.82

m3/hr

88.23

m3/hr

166.67

m3/hr

250.00

m3/hr

of pavement 2" thick or 0.43


concrete
Coverage = 2.33 MT/CM
Bitumil = 0.70 ltr/sq, 200 ltr/

Bituminous Asphalt Pavement (MT)

65.00

Concrete Pavement (m3)

MT/hr

32.50
MT/hr
300 SQ.M.

Asphalt Cutback MC Grade 70


Asphalt prime coat, SS-1 (.042 drum/mt)
Note:1MT of asphalt conc. Covers 8 m2
of pavement 2" thick or 0.43 m3 of asphalt
concrete
Coverage = 2.33 MT/CM
Bitumil = 0.70 ltr/sq, 200 ltr/drum

MT
drums