RESUMEN DE METRADOS DE TRANSPORTE PAGADO

(AVANCE ACUMULADO AL MES DE JULIO - 2001)

PARTIDA :
06.00.00 TRANSPORTE
OBRA
: CONSTRUCCION DE LA CARRETERA TACNA-TARATA-CANDARAVE-UMALSO
TRAMO
: Km. 24+120 Km. 53+000
EJECUTA : MUNICIPALIDAD PROVINCIAL DE TACNA
SUPERVISA: CTAR - TACNA
arch.luisc

ITEMS

PARTIDAS

UND.

METRADO
METRADO
METRADO
METRADO
DE
ACUMULADO ACUMULADO
PRESENTE
PRESUPUESTO
ACTUAL
ANTERIOR VALORIZACION

SALDO
POR
EJECUTAR

SALDO
EN
(%)

06.01.00 Transporte de material D<=1 Km.

m3xkm

110,312.10

52,381.50

52,381.50

06.02.00 Transporte de material D>=1 Km.

m3xkm

1,919,430.10

888,226.80

888,226.83

11,976.66

6,377.53

3,048.63

3,328.90

5,599.13

46.75

208,393.83

111,160.38

53,137.59

58,022.79

97,233.45

46.66

1,702.40

1,026.41

1,026.41

0.00

675.99

39.71

06.03.00 Transporte de Mezcla Asfaltica D< 1 Km.

m xkm

06.04.00 Transporte de Mezcla Asfaltica D> 1 Km.

m xkm

06.05.00 Transporte de Roca

m xkm

Nota :

57,930.60

52.52

-0.03 1,031,203.30

0.00

53.72

El Transporte de Roca, es una actividad que debe ser considerado, porque se refiere a una accion muy aparte del transprte interno
de la roca durante la ejecucion de la partida. No se debe entender que el transporte de roca este considerado dentro del la partida
enrocado para proteccion de explanaciones, es muy diferente.

RESUMEN DE METRADOS: TRANSPORTE PAGADO


(AVANCE ACUMULADO AL MES DE JUNIO - 2001)

PARTIDAS : TRANSPORTE PAGADO


OBRA
TRAMO
EJECUTA
SUPERVISA

: CONSTRUCCION DE LA CARRETERA TACNA-TARATA-CANDARAVE-UMALSO


: Km. 24+120 Km. 53+000
: MUNICIPALIDAD PROVINCIAL DE TACNA
: CTAR - TACNA

arch.luisc

ITEMS

06.01.00
06.02.00
06.03.00
06.04.00
06.05.00
NOTA

PARTIDAS

Transporte de material D<=1 Km.


Transporte de material D>=1 Km.
Transporte de Mezcla Asfaltica D< 1 Km.
Transporte de Mezcla Asfaltica D> 1 Km.
Transporte de Roca

UND.

m3xkm
m3xkm
m3xkm
m3xkm
3
m xkm

METRADO
SUB BASE

METRADO METRADO DE
BASE
CARPETA

8,331.57 44,049.92
128,806.12 759,420.67
-

6,377.53
111,160.38
-

METRADO
DE ROCA

1,026.41

METRADO
ACUM. ACTUAL

52,381.50
888,226.80
6,377.53
111,160.38
1,026.41

La partida 06.05.00 Transporte de Roca debe ser considerado en la valorizacion toda vez que es una actividad que se ha
realizado, y como toda actividad de Transporte debe ser valorizado en unidades de m3xkm. Pero sin embargo el Expediente
Tecnico manifiesta un transporte en m3., lo cual no es el correcto. Se esta valorizando el volumen de roca utilizado en el enrocado.

PLANILLA DE METRADOS
(AVANCE ACUMULADO AL MES DE JULIO - 2001)

06.00.00 TRANSPORTES
TRANSPORTE PAGADO DE MATERIAL DE BASE
06.01.00 TRANSPORTE DE MATERIAL D <= 1 Km.
06.02.00 TRANSPORTE DE MATERIAL D >= 1 Km.
arch.luisc

DEL

AL

CENTRO DE
GRAVEDAD
(Km)

34+000
35+000

35+000
36+000

34.50
35.50

3.98
4.98

2,491.78
2,338.56

2,491.78
2,338.56

9,917.29
11,646.04

36+000
44+240

37+000
44+780

36.50
44.55

5.98
7.20

2,334.73
1,166.50

2,334.73
1,166.50

13,961.70
8,398.78

8,331.57

43,923.81

PROGRESIVA

CANTERAS

Km. 23+540
Acc. 100
30.52
37.50

Km. 37+500
Acc. 300

DISTANCIA
MEDIA
(km)

VOLUMEN
TOTAL
(m3)

TOTAL
CALCULO DEL TRANSPORTE DE MATERIAL PARA SUB BASE:
D=1 km.

43,923.81
8,331.57

D<1 km.

43,923.82X1
5.27

D>1 km.

43,923.91x15.46
5.27

5.27 km.

8,331.57

m3xkm.

128,806.12

m3xkm.

MATERIAL PARA SUB BASE


(m3)

(m3-Km)

PLANILLA DE METRADOS
(AVANCE ACUMULADO AL MES DE JULIO - 2001)

06.00.00 TRANSPORTES :
TRANSPORTE PAGADO PARA MATERIAL DE BASE
06.01.00 TRANSPORTE DE MATERIAL D <= 1 Km.
06.02.00 TRANSPORTE DE MATERIAL D >= 1 Km.
arch.luisc

DEL

AL

CENTRO DE
GRAVEDAD
(Km)

24+120
25+000
26+000
27+000
28+000
29+000
30+000
31+000
32+000
33+000
34+000
34+070
35+000
36+000
37+000
38+000
39+000
40+000
41+000
42+000
43+000
44+000
44+240
44+600
44+780
45+000
46+000
47+000
48+000
49+000
50+000

25+000
26+000
27+000
28+000
29+000
30+000
31+000
32+000
33+000
34+000
34+070
35+000
36+000
37+000
38+000
39+000
40+000
41+000
42+000
43+000
44+000
44+240
44+600
44+780
45+000
46+000
47+000
48+000
49+000
50+000
50+340

24.56
25.50
26.50
27.50
28.50
29.50
30.50
31.50
32.50
33.50
34.04
34.54
35.50
36.50
37.50
38.50
39.50
40.50
41.50
42.50
43.50
44.12
44.42
44.69
44.89
45.50
46.50
47.50
48.50
49.50
50.17

PROGRESIVA

CANTERAS

KM. 23+540
Acc. 100 m.

Cantera Ficticia

34.07

44.60
KM. 44+600
Acc. 200 m.

DISTANCIA
MEDIA
(km)

VOLUMEN
BASE
(m3)

9.51
8.57
7.57
6.57
5.57
4.57
3.57
2.57
1.57
0.57
0.03
0.47
1.43
2.43
3.43
4.43
5.43
6.43
7.43
8.43
9.43
10.05
10.35
0.19
0.39
1.00
2.00
3.00
4.00
5.00
5.67

TOTAL

16,043.87
16,401.40
14,626.94
12,780.54
10,678.68
8,755.05
6,864.97
4,927.55
2,984.86
1,114.67

1,476.02
1,291.04
1,288.78
1,642.02
1,612.41
1,623.62
1,633.62
1,614.19
1,305.28
1,616.03
391.66
640.28

1,476.02
1,291.04
1,288.78
1,642.02
1,612.41
1,623.62
1,633.62
1,614.19
1,305.28
1,616.03
391.66
640.28

693.73
1,846.19
3,131.73
5,632.14
7,142.99
8,816.26
10,504.17
11,993.42
11,003.51
15,239.14
3,936.22
6,626.86

361.06
1,609.60
1,629.25
1,194.89
1,745.51
1,771.41
594.88
44,049.92

361.06
1,609.60
1,629.25
1,194.89
1,745.51
1,771.41
594.88
44,049.92

140.81
1,609.60
3,258.50
3,584.68
6,982.03
8,857.06
3,372.98
209,550.55

209,550.55
44,049.92

D<1 km.

209,550.55x1
4.76

44,049.92 m3xkm.

759,420.67 m3xkm.

209,550.55x17.24
4.76

(m3-Km)

1,687.05
1,913.82
1,932.22
1,945.29
1,917.18
1,915.77
1,922.96
1,917.34
1,901.18
1,955.56

D=1 km.

D>1 km.

(m3)

1,687.05
1,913.82
1,932.22
1,945.29
1,917.18
1,915.77
1,922.96
1,917.34
1,901.18
1,955.56

CALCULO DEL TRANSPORTE DE MATERIAL PARA BASE:


4.76

MATERIAL PARA BASE

km.

PLANILLA DE METRADOS: TRANSPORTE PAGADO DE MEZCLA ASFALTICA


arch.luisc

PLANTA DE
ASFALTO
EN FRIO

KM. 44+600
Acc. 500 m.

TOTAL

PROGRESIVA
DEL

AL

24+120
25+000
26+000
27+000
28+000
29+000
30+000
31+000
32+000
33+000
34+000
35+000
36+000
37+000
38+000
39+000
40+000
41+000
42+000
43+000
44+000
45+000
46+000
47+000
48+000
49+000
50+000

25+000
26+000
27+000
28+000
29+000
30+000
31+000
32+000
33+000
34+000
35+000
36+000
37+000
38+000
39+000
40+000
41+000
42+000
43+000
44+000
45+000
46+000
47+000
48+000
49+000
50+000
50+340

DISTANCIA
(ml)

880
1000
1000
1000
1000
1000
1000
1000
960
1000
1000
1000
1000
1000
1000
1000
1000
970
920
1000
1000
1000
1000
720
1000
1000
340

AREA
(m2)

5,280.00
6,000.00
6,000.00
6,000.00
6,000.00
6,000.00
6,000.00
6,000.00
5,760.00
6,000.00
6,000.00
6,000.00
6,000.00
6,000.00
6,000.00
6,000.00
6,000.00
5,820.00
5,520.00
6,000.00
6,000.00
6,000.00
6,000.00
4,320.00
6,000.00
6,000.00
2,040.00

AREA DE
AREA TOTAL
SOBREANCHO
(A)
(m2)
(m2)

119.30
119.08
192.03
276.44
136.53
153.03
164.80
136.68
433.92
327.82
465.17
731.94
716.86
307.42
112.06
168.10
212.46
359.44
247.88
130.14
122.61
98.01
196.26
250.47
777.54
907.07
271.41

5,399.30
6,119.08
6,192.03
6,276.44
6,136.53
6,153.03
6,164.80
6,136.68
6,193.92
6,327.82
6,465.17
6,731.94
6,716.86
6,307.42
6,112.06
6,168.10
6,212.46
6,179.44
5,767.88
6,130.14
6,122.61
6,098.01
6,196.26
4,418.01
6,196.26
6,250.47
2,817.54
161,990.26

VOLUMEN
A*0.05*1.25
(m3)

337.46
382.44
387.00
392.28
383.53
384.56
385.30
383.54
387.12
395.49
404.07
420.75
419.80
394.21
382.00
385.51
388.28
386.22
360.49
383.13
382.66
381.13
387.27
276.13
387.27
390.65
176.10
10,124.39

PLANILLA DE METRADOS
TRANSPORTE PAGADO DE MEZCLA ASFALTICA EN FRIO
OBRA
TRAMO
EJECUTA
SUPERVISA

: Construccin de la Carretera Tacna - Tarata - Candarave - Umalso


: Km. 24+120 - Km. 50+340
: Municipalidad Provincial de Tacna (MPT)
: Consejo Transitorio de Administracin Regional (CTAR-TACNA)

arch.luisc

PLANTA DE
ASFALTO
EN FRIO

KM. 44+600
Acc. 500 m.

PROGRESIVA

C.G.

DISTANCIA
MEDIA

VOLUMEN
TOTAL

MATERIAL PARA CARPETA

DEL

AL

(Km.)

(m3)

(m3)

(m3)

24+120
25+000
26+000
27+000
28+000
29+000
30+000
31+000
32+000
33+000
34+000
35+000
36+000
37+000
38+000
39+000
40+000
41+000
42+000
43+000
44+000
44+600
45+000
46+000
47+000
48+000
49+000
50+000
TOTAL

25+000
26+000
27+000
28+000
29+000
30+000
31+000
32+000
33+000
34+000
35+000
36+000
37+000
38+000
39+000
40+000
41+000
42+000
43+000
44+000
44+600
45+000
46+000
47+000
48+000
49+000
50+000
50+340

24.56
25.50
26.50
27.50
28.50
29.50
30.50
31.50
32.50
33.50
34.50
35.50
36.50
37.50
38.50
39.50
40.50
41.50
42.50
43.50
44.30
44.80
45.50
46.50
47.50
48.50
49.50
50.17

9.80
8.86
7.86
6.86
5.86
4.86
3.86
2.86
1.86
0.86
0.14
1.14
2.14
3.14
4.14
5.14
6.14
7.14
8.14
9.14
9.94

337.46
382.44
387.00
392.28
383.53
384.56
385.30
383.54
387.12
395.49
404.07
420.75
419.80
394.21
382.00
385.51

337.46
382.44
387.00
392.28
383.53
384.56
385.30
383.54
387.12
395.49
404.07
420.75
419.80
394.21
382.00
385.51
388.28
386.22
360.49
383.13
382.66

0.45
1.15
2.15
3.15
4.15
5.15
5.82

388.28
386.22
360.49
383.13
382.66
381.13
387.27
276.13
387.27
390.65
176.10

381.13
387.27
276.13
387.27
390.65
176.10
10,124.39

DISTANCIA DE TRANSPORTE DE MATERIAL PARA CARPETA ASFALTICA EN FRIO


D=1 km.

48,590.79
10,124.39

4.80

km.

D<1 km.

48,590.79 x1
4.80

10,123.08

m3xkm.

D>1 km.

48,590.79 x17.4 =
4.80

176,445.31

m3xkm.

PLANILLA DE METRADOS

PORTE PAGADO DE MEZCLA ASFALTICA EN FRIO

MATERIAL PARA CARPETA

(m3-Km)

3,307.07
3,388.44
3,041.83
2,691.02
2,247.50
1,868.98
1,487.26
1,096.93
720.04
340.12
56.57
479.65
898.38
1,237.83
1,581.50
1,981.50
2,384.03
2,757.58
2,934.41
3,501.84
3,803.67
0.00
438.29
832.62
869.80
1,607.15
2,011.87
1,024.88
48,590.79

PLANILLA DE METRADOS
(AVANCE ACUMULADO AL MES DE JULIO - 2001)

06.00.00 TRANSPORTES
06.05.00 TRANSPORTE DE ROCAS
arch.luisc

CANTERA
DE
ROCAS

Km. 43+700
Acc. 300

TOTAL

DEL

AL

CENTRO DE
GRAVEDAD
(Km)

39+400
49+706.8
49+833.6
49+830
49+990

39+438
49+780
49+880
49+910.20
50+039.40

39.42
49.72
49.86
49.95
50.01

PROGRESIVA

DISTANCIA
MEDIA
(km)

6.32
6.32
6.46
6.55
6.61

VOLUMEN
TOTAL

VOL. DE ROCAS

(m3)

(m3)

225.72
59.41
261.63
406.25
73.40
1,026.41

225.72
59.41
261.63
406.25
73.40
1,026.41