Job: Sharon Hills

Sheet No. 1 of 1
Calc by: SCS Date 11/7/2008
Check by: Date

Recharge Calculations
Required Recharge Volume
Hydrologic Proposed Target Depth Required
Soil Group Impervious Area X Factor = Recharge
(sf) (in) Volume
(cf)
A 21,240 0.60 1,062
B 0 0.35 0
C 92,693 0.25 1,931
D 653,050 0.10 5,442
Sum: 766,983 sf 8,435 cf
17.61 ac 0.19 af
Capture Area Adjustment
Pond 7 Discharges
Secondary
Primary Discahrge Total
Discharge (cfs) Discharge
Storm (cfs) RECHARGED (cfs) % Recharged
1 9.54 4.26 13.8 30.9%
2 15.99 5.88 21.87 26.9%
10 24.31 8.32 32.63 25.5%
25 25.12 10.05 35.17 28.6%
100 26.62 10.76 37.38 28.8%
Ave= 28%

Impervious Areas Contributing to Pond 7


Sub. Area (ac)
P-18 0.46
P-19 0.34
P-20 3.85
P-21 0.27
P-23 5.00
ROOFS 0.30
TOTAL= 10.22
TOTAL X AVE % TO RECHARGE= 2.87
Impervious to Re2= 0.34
Impervious to Re3= 0.07
Total= 3.28
Total Impervious Area: 17.61 ac 65%= 11.45 ac
Area contributing to Recharge systems: 3.28 ac 33%
Adjustment factor: 17.61 = 5.36
3.28
Adjusted volume: 8,435 x 5.36 = 45,230 cf
1.04 af
1 and 100 Year Storm Infiltration Volume (TR 20 w/HydroCAD)
Volume Infiltrated from Rainfall
1 year (af) 100 year (af)
Re1 4.62 5.36
Re2 0.07 0.19
Re3 0.02 0.04
Total 4.71 5.59
In the 1 year storm, 4.5 times the recharge volume is infiltrated
In the 100 year storm, 5.4 times the recharge volume is infiltrated
Job: Sharon Hills
Sheet No. 2 of 2
Calc by: SCS Date 11/7/2008
Check by: Date

Drawdown Calculations
Time= Rv
(K)(Bottom Area)

System 1
Rv= 233,482 cf K= 2.41 in/hr
Bottom Area= 24,336 sf

Time= 47.8 hours

47.8 < 72 OK

System 2
Rv= 8,276 cf K= 2.41 in/hr
Bottom Area= 2,027 sf

Time= 20.3 hours

20.3 < 72 OK

System 3
Rv= 1,742 cf K= 2.41 in/hr
Bottom Area= 590 sf

Time= 14.7 hours

14.7 < 72 OK