You are on page 1of 4

DAFTAR HARGA MATERIAL

No.

Nama Material
Baja
Base Course - A
Batu Limestone
Batu Split 1/2
Batu Split 2/3
Besi/Rebar
Bending Wire
Pasir
Semen
batu Split 1/2
batu Split 2/3
batu Split 3/5
batu Screening
Abu batu
Agregate Klass A
Agregate Klass B
Tanah Merah
Concrete Ready Mix
Concrete Ready Mix
Concrete Ready Mix
Concrete Ready Mix
Concrete Ready Mix
Concrete Ready Mix
Guard Rail pondasi tanah tinggi sisa 80cm
Guard Rail pondasi Concrete tinggi 90cm
Steel plate t=12 mm (5x20 feet)
Steel plate t=12 mm (6x20 feet)
Steel plate t=12 mm (4x8 feet)
Cast Iron Cover manhole (67kg)
Cast Iron Cover manhole (48 Kg)
Roof drain Cast Iron (8kg)
Roof drain Cast Iron (8kg)
Sikament LN (Admixture)
Marka Jalan
Prime Coat
Prime Coat
Tack Coat
Tack Coat
ATB t = 50mm
ATB hotmix
AC-WC, t=30mm
AC-WC hotmix

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Harga
22,000.00
13,000.00
165,000.00

7,850.00
7,200.00
10,500.00
175,000.00
185,000.00
175,000.00
183,000.00
153,000.00
175,000.00
160,000.00
155,000.00
710,000.00
700,000.00
680,000.00
660,000.00
675,000.00
650,000.00
450,000.00
525,000.00
7,175,000.00
8,610,000.00
2,226,800.00
1,100,000.00
875,000.00
125,000.00
145,000.00
3,800,000.00
17,000.00
8,400.00
9,000.00
9,500.00
4,000.00
9,500.00
98,050.00
950,000.00
60,310.00
970,000.00

Asphalt Drum
Asphalt Drum
Asphalt Drum
Asphalt Drum

Rp
Rp
Rp
Rp

1,100,000.00
1,000,000.00
900,000.00
950,000.00

Spun pile dia 500


Square Pile 400x4400
Spun pile dia 400 bottom
Spun pile dia 400 middle
Traffic Cone

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

434,500.00
326,000.00
254,000.00
273,00.00
150,000.00

Satuan
/kg
/kg
/m3

Tanggal Input Data


Apr-13
Apr-13
Mei-13

/Kg
/Kg
/Kg
/m3

Apr-13
Mei-13
July 13
Mei-13

/m3
/m3
/m3
/m3
/m3
/m3
/m3

July 13
July 13
July 13
July 13
July 13
July 13
July 13

/m3
/m3
/m3
/m3
/m3
/m3
/m1
/m1
/lembar
/lembar
/lembar
/set
/set
/set
/set
/drum
/meter
/meter
/m2
/liter
/m2
/liter
/m2
/ton
/m2
/ton

Apr-13
Apr-13
Apr-13
Apr-13
Apr-13
Apr-13
Apr-13
Apr-13
Apr-13
Apr-13
Apr-13
July 13
July 13
July 13
July 13
Apr-13
Agustus 2012
Apr-13
Apr-12
July 13
Apr-12
July 13
Apr-12
July 13
Apr-12
July 13

/drum, 155kg
/drum, 155kg
/drum, 155kg
/drum, 155kg

July 13
July 13
July 13
July 13

/pcs/10m
/pcs/10m
/pcs/10m
/pcs/10m
/pcs

Oct-12
Oct-12
Oct-12
Oct-12
Apr-13