CL BEAM SEE FRAMING PLANS AND/OR SCHEDULE FOR SLAB THICKNESS, REINFORCEMENT AND COMPOSITE STEEL DECK SEE

FRAMING PLANS FOR EDGE OF SLAB LOCATIONS T/SLAB EL SEE PLAN SEE TYPICAL COMPOSITE STEEL DECK AT SLAB EDGE SUPPORTS FOR REINFORCEMENT PER SPECIFICATIONS 3/4" TYP COVER

CL BEAM HEADED STUDS PER FRAMING PLANS OR GENERAL NOTES SEE GENERAL NOTES TOTAL SLAB THICKNESS SEE SPECIFICATIONS

CL BEAM 2' 6" UON


1' 6" U ON

CL BEAM 2' 6" UON


1' 6" U ON

3/4" TYP COVER

SEE FRAMING PLANS AND/OR SCHEDULE FOR SLAB THICKNESS, REINFORCEMENT AND COMPOSITE STEEL DECK SEE FRAMING PLANS FOR EDGE OF SLAB LOCATIONS T/SLAB EL SEE PLAN

CL BEAM

CONSTRUCTION JOINT LOCATION WITHIN MIDDLE THIRD OF DECK SPAN 1ST POUR
. .

CL BEAM 2ND POUR 2 PANEL LAP AT WWR 1' 0" MIN


1' 5 5/ 8"

COMPOSITE STEEL DECK SCHEDULE


SLAB MARK TOTAL SLAB DEPTH AND CONC TYPE STEEL DECK (MIN) CONCRETE TOPPING SLAB SLAB REINFORCEMENT NOTES

SEE SPECIFICATIONS GAP SEE GENERAL NOTES 1 1/2" MIN TOTAL SLAB THICKNESS

S1

6 1/4" LWC

2" 20 GA

NONE

6 x 6 W2.9 x W2.9 WWR

0"

0"

3/ 4"

3/ 4"

5/ 8"

0"
5/ 8"

9/ 16"

S2 FORMED EDGE

1 1/ 8"

1 1/ 8"

6 1/4" LWC

2" 20 GA

NONE

6"

#4@18" EW

6 1/ 4"

COMPOSITE STEEL DECK SHALL BE WELDED TO SUPPORT FRAMING. SEE GENERAL NOTES AND SPECIFICATIONS FOR INFORMATION.

COMPOSITE STEEL DECK SEE FRAMING PLANS AND/OR SCHEDULE

SEE TYPICAL COMPOSITE STEEL DECK AT SLAB EDGE


1"

SUPPORTS FOR REINFORCEMENT PER SPECIFICATIONS AS REQUIRED BY STEEL DECK SUPPLIER 1" MIN COMPOSITE STEEL DECK SHALL BE WELDED TO SUPPORT FRAMING. SEE GENERAL NOTES AND SPECIFICATIONS FOR INFORMATION.

#4@12" COMPOSITE STEEL DECK SEE FRAMING PLANS AND/OR SCHEDULE CONTINUOUS FINISH STRIP BY STEEL DECK SUPPLIER (TYP) HEADED STUDS PER FRAMING PLANS OR GENERAL NOTES NO DECK UNDER STUD AT THIS LOCATION

ROOF DECK SCHEDULE


DECK SPAN ROOF DECK MARK ROOF DECK (MIN) UNFACTORED DIAPHRAGM SHEAR (PLF) NOTES

R1

1 1/2" ROOF 20 GA TYPE B

SEE GENERAL NOTES

R2

3" ROOF 20 GA

SEE GENERAL NOTES

TYPICAL COMPOSITE STEEL DECK SPAN PERPENDICULAR TO BEAM


NOT TO SCALE

TYPICAL COMPOSITE STEEL DECK SPAN PARALLEL TO BEAM


NOT TO SCALE

TYPICAL COMPOSITE STEEL DECK CONSTRUCTION JOINT SPAN PERPENDICULAR TO BEAM


NOT TO SCALE

STEEL DECK SCHEDULE


NOT TO SCALE

CONSTRUCTION JOINT LOCATION CL BEAM 1 1/2" SEE SCHEDULE FOR SIZE AND SPACING OF REINFORCEMENT 1 #4 CONT STIFFENING ANGLE PER SCHEDULE @ 2' 6" OC BY STEEL DECK SUPPLIER SEE SCHED CONT POUR STOP TO BE DESIGNED AND PROVIDED BY STEEL DECK CONTRACTOR 1" MIN AT ANGLE ENDS 1/8 2 12
.

CL BEAM

SMITHGROUP, INC 35 EAST WACKER SUITE 2200 CHICAGO, IL 60601 T 312.641.0770 F 312.641.6728 www.smithgroup.com

L 3/4" CLEAR SEE SCHEDULE FOR SIZE AND SPACING OF REINFORCEMENT 1 #4 CONT CONT POUR STOP TO BE DESIGNED AND PROVIDED BY STEEL DECK CONTRACTOR CANTILEVER PLATE AS REQUIRED SEE SCHEDULE

3' 0" MIN UON 3/4" CLEAR

CL BEAM 1" MIN

2ND POUR
. .

1ST POUR L/8 MIN L=BEAM SPAN

3' 0" MIN UON


.

2 PANEL LAP AT WWR 1' 0" MIN


1' 6"

2" MIN

2" MAX
.

FORMED EDGE

BEAM

Affiliated Engineers
Affiliated Engineers, Inc. 5802 Research Park Boulevard Madison, Wisconsin 53719 Tel 608.238.2616 Fax 608.238.2614

DETAIL A
(DECK PARALLEL) CL BEAM L SEE SCHEDULE FOR SIZE AND SPACING OF REINFORCEMENT SKEW HOOK TO FIT 1 #4 CONT DECK CANTILEVER, POUR STOP, AND DECK CLOSURE TO BE DESIGNED AND PROVIDED BY STEEL DECK CONTRACTOR SEE NOTE 1 AND 2 NOTES: 1. WHERE BLOCKOUT OR EMBEDDED ITEM IS LOCATED AT THE SLAB EDGE, DETAIL C IS NOT PERMITTED. USE DETAIL A OR DETAIL B FOR CANTILEVERED SLAB EDGE 2. WHERE DECK CANTILEVER (DETAIL C) IS NOT CAPABLE OF SUPPORTING REQUIRED CANTILEVER SPAN 'L', USE DETAIL A OR DETAIL B SIMILAR FOR CANTILEVER SLAB EDGE 3/4" CLEAR 3' 0" MIN UON

DETAIL B
(ALTERNATE SLAB EDGE AT DECK PARALLEL CONDITION)

CANTILEVER PLATE & REINFORCEMENT SCHEDULE


DETAIL A TOTAL SLAB THICKNESS (IN) CANTILEVER SPAN 'L' CANTILEVER REINFORCEMENT (SEE NOTES) #4@12" PLATE THICKNESS (A36 MIN) 1/4" NOTE 2 #4@12" #4@12" #4@10" #4@10" 3/8" 1/4" NOTE 2 3/8" 1/4" NOTE 2 1/4 3/16 4 12 3 12 1/4 3/16 4 12 3 12 PLATE TO FLANGE WELD SIZE 3/16 SPACING 3 12 DETAIL B STIFFENING ANGLE L3x3x1/4 NOTE 2 L3x3x1/4 L3x3x1/4 NOTE 2 L3x3x1/4 L3x3x1/4 NOTE 2

TYPICAL COMPOSITE STEEL DECK CONSTRUCTION JOINT SPAN PARALLEL TO BEAM


NOT TO SCALE

UP TO 5 1/2" (2 1/2" MIN CONC THICKNESS OVER DECK) 0" MIN TO 1" MAX 6 1/4" TO 7 1/2" (3 1/4" MIN CONC THICKNESS OVER DECK)

1' 2" < L 2' 3" 1' 2" 1' 9" < L 2' 3" 11" < L 1' 9" 11" 1' 6" < L 2' 3 6" < L 1' 6" 6"

SEGMENTED BENT PL 1/4" SLOPE TO MATCH EXTERIOR CLADDING


0

SEALS AND SIGNATURES

ROOF DECK EOD ROOF DECK SEGMENTED BENT PLATE SLOPE TO MATCH EXTERIOR CLADDING
0

ROOF DECK CLOSURE, SEE 7/S5.3.1

EOD 2' 8" MAX

PJP

DETAIL C
(DECK PERPENDICULAR)

OVER 7 1/2" UP TO 11" (4 1/2" MIN CONC THICKNESS OVER DECK)

EOD SCHEDULE NOTES: 1. SEE ADDITIONAL DETAILS FOR REINF AT CURTAIN WALL SUPPORT AND AT CORNERS 2. POUR STOP TO BE DESIGNED AND PROVIDED BY STEEL DECK CONTRACTOR 3. CANTILEVER REINFORCEMENT IS IN ADDITION TO ANY REINFORCEMENT SHOWN IN NOTES, ON PLAN OR ON SLAB SCHEDULES 4. SLAB EDGE SERVICE LOADS NOT TO EXCEED 400PLF
0

VARIES SEE ARCH

C6x10.5 SUPPORTING DECK, E.S. C6x10.5 SUPPORT CHANNEL

3/16 3/16

FULL DEPTH STIFF PL, ALIGN W/ C6

TYPICAL COMPOSITE STEEL DECK AT SLAB EDGE


NOT TO SCALE

HSS ROUND COLUMN W SECTION SPACE SUPPORT CHANNELS @ 4' 0" OC WHERE REQ'D AT DECK EDGE

7
NOTES: 1. SEE GENERAL NOTES FOR HEADED STUD SIZE, LENGTH, AND MAXIMUM SPACING. NUMBER OF STUDS IS INDICATED ON FRAMING PLAN. 2. HEADED STUDS IN ONE ROW SHALL BE PLACED DIRECTLY OVER THE BEAM WEB. 3. PLACE STUDS IN A SINGLE ROW WHERE SPACING REQUIREMENTS PERMIT. STUDS SHALL BE PLACED IN TWO ROWS OR THREE ROWS ONLY WHERE REQUIRED IN ORDER TO PLACE THE TOTAL NUMBER OF STUDS. DECK SPAN 4. MAXIMUM NUMBER OF STUDS PERMITTED PER INDIVIDUAL METAL DECK RIB IS 3. 5. STUD PLACEMENT PROCEDURE FOR DECK PERPENDICULAR TO SUPPORT: PLACE A STUD IN ALTERNATING FLUTES FOR ENTIRE LENGTH OF BEAM. PLACE REMAINING STUDS IN FLUTES WITHOUT STUDS, STARTING AT THE ENDS OF THE BEAM AND CONTINUING TO BEAM CENTER. DISTRIBUTE HEADED STUDS EQUALLY FROM EACH END. IF STUDS REMAIN, PLACE A SECOND STUD IN EACH FLUTE, EQUALLY SPACED FROM EACH END TOWARD CENTER OF BEAM. IF STUDS REMAIN, PLACE A THIRD STUD IN EACH FLUTE, EQUALLY SPACED FROM EACH END TOWARD CENTER OF BEAM. 6. SUBMIT SHOP DRAWINGS SHOWING PLACEMENT OF HEADED STUDS PER SPECIFICATION. 1' 0" MIN
2 1/ 2" 1"

DECK CLOSURE AT CONFERENCE ROOM (EOD UP TO 1'-6")


1" = 1' 0" CL BEAM

DECK EDGE SUPPORT @ CONFERENCE ROOM (EOD > 1'-6" 2'-8")


NOT TO SCALE

PROJECT NORTH

BEAM AND COLUMN CL

2 5/8"
5 1/ 4"

LOCATE STUD ADJACENT TO DIMPLE (CONSIDER FERRULE)

DIMPLE

2 1/ 2"

1 1/4" MIN

BEAM CL

T/STEEL EL SEE PLAN

4" MIN

1 1/4" MIN

2 1/ 2"

3"
6"

1/4

3 12 2" MINIMUM T/STEEL EL SEE PLAN L 4 x 4 x 3/8


REV. NO.

6"

8 11/ 16"

4 1/2" MIN MAX SPACING PER GENERAL NOTES

DECK RIB THREE STUDS PER RIB TWO STUDS PER RIB

BOTTOM "DIMPLE" IN DECK RIB ONE STUD PER RIB POSSIBLE ALTERNATE ANGLE LOCATIONS / CONDITIONS

ISSUED FOR CONSTRUCTION DESCRIPTION

BY

APVD

07/03/12 DATE

BEAMS PERPENDICULAR TO DECK


MAX POSSIBLE T/SLAB EL SEE PLAN
PROJECT TITLE

Argonne
FMS
6 15/ 16"
93/ 1" 6

NATIONAL LABORATORY

BEAM PARALLEL TO DECK WITH ONE ROW


4 1/2" MIN MAX SPACING PER GENERAL NOTES 4 1/2" MIN
6"

Facilities Management Services ADVANCED PROTEIN CRYSTALLIZATION FACILITY, ARGONNE NATIONAL LABORATORY C10539.00

PROJECT NO DRAWING TITLE

6"

6/27/2012 5:19:03 PM

1 1/4" MIN
2 1/ 2"

3"
6"

2 1/ 2"

1 1/4" MIN

1 1/4" MIN

2 1/ 2"

3"
6"

3"
6"

2 1/ 2"

1 1/4" MIN

1 1/4"
2 13/ 16"

2 13/ 16"

1 1/4"

1/4

3 12 2" MINIMUM L 4 x 4 x 3/8 SEE DETAIL ABOVE FOR ALTERNATE ANGLE LOCATIONS

T/STEEL EL SEE PLAN

BEAM PARALLEL TO DECK WITH TWO ROWS

BEAM PARALLEL TO DECK WITH THREE ROWS

BEAM PARALLEL TO DECK WITH FLANGE < 6"


NOTE: USE WHERE MULTIPLE LINE SPACING IS REQUIRED AT A FLANGE WIDTH LESS THAN 6"

TYPICAL COMPOSITE AND STEEL DECK DETAILS


DESIGNED Designer DRAWN S.S. CHECKED Checker PROJECT MANAGER A/E CADD FILE S5.3.1 A/E DWG. NO. S5.3.1 CAD NO: DWG STATE BIND ORDER REV. NO. FACILITY NO(S)

CL BEAM

TYPICAL HEADED STUD SPACING DETAIL


3/4" = 1' 0"

10

TYPICAL CHANGE IN SLAB ELEVATION (BEAM AT HIGH DECK)


1" = 1' 0"

Plot Date:

ANL JESSE ADAMS DATE 08/31/11 FACILITY DOCUMENT NUMBER

J446-101-W-

S5.3.1