S10
Presupuesto
Presupuesto
Cliente
Lugar
0303006
VIVIENDA MULTIFAMILIAR - AMPLIACION
Prado Gonzales, Alberto
LIMA - LIMA - SAN MIGUEL
Item
Descripcin
01
OBRAS PRELIMINARES
01.01
01.02
02
29/04/2011
Costo al
Und.
Metrado
Precio S/.
Parcial S/.
5,000.00
glb
1.00
3,000.00
3,000.00
und
1.00
2,000.00
2,000.00
TRABAJOS PRELIMINARES
1,877.20
02.01
m2
164.27
1.04
02.02
m2
164.27
2.06
338.40
02.03
m2
44.53
30.72
1,367.96
03
03.01
MOVIMIENTO DE TIERRAS
170.84
6,480.41
1,861.01
03.01.01
m3
47.43
30.80
1,460.84
03.01.02
m3
9.17
22.66
207.79
m3
8.49
22.66
03.01.03
03.02
REFINES Y NIVELACIONES
192.38
3,377.77
03.02.01
m2
182.78
4.15
758.54
03.02.02
m2
10.80
43.66
471.53
03.02.03
m2
51.78
4.45
230.42
03.02.04
m2
287.54
6.12
1,759.74
03.02.05
m2
44.13
3.57
157.54
03.03
03.03.01
03.04
03.04.01
04
RELLENOS
RELLENO Y COMPACTADO C/MAT. PROPIO (manual)
17.42
17.72
m3
52.12
17.90
308.68
932.95
04.02
04.03
m3
ELIMINACIONES
04.01
04.02.01
308.68
932.95
3,131.67
m2
39.10
24.94
m3
6.11
148.31
975.15
906.17
SOBRECIMIENTOS CORRIDOS
906.17
234.92
04.03.01
m3
0.43
210.49
90.51
04.03.02
m2
4.52
31.95
144.41
m2
44.13
23.01
04.04
05
05.01
1,015.43
115,189.68
ZAPATAS, h = 0.45m
6,843.28
05.01.01
m3
23.56
242.11
5,704.11
05.01.02
kg
273.84
4.16
1,139.17
m3
4.83
242.11
kg
581.45
4.17
05.02
05.02.01
05.02.02
05.03
05.03.01
3,594.04
COLUMNAS
2,424.65
19,951.25
7,346.65
05.03.01.01
m3
05.03.01.02
05.03.01.03
05.03.02
1,169.39
4.56
347.87
1,586.29
m2
23.58
43.48
1,025.26
kg
1,098.63
4.31
4,735.10
2.52
358.63
3,680.45
05.03.02.01
m3
05.03.02.02
m2
19.54
44.46
868.75
05.03.02.03
kg
438.61
4.35
1,907.95
05.03.03
903.75
3,750.11
05.03.03.01
m3
2.52
363.27
915.44
05.03.03.02
m2
19.54
46.08
900.40
05.03.03.03
05.03.04
kg
438.61
4.41
1,934.27
5,174.04
05.03.04.01
m3
2.93
378.68
1,109.53
05.03.04.02
m2
28.15
46.68
1,314.04
05.03.04.03
kg
608.51
4.52
2,750.47
05.04
05.04.01
05.04.01.01
05.04.01.02
05.04.01.03
05.04.02
VIGAS Y DINTELES
38,140.18
4,041.72
m3
m2
2.90
19.51
291.19
50.13
kg
504.37
4.40
m3
05.04.02.02
05.04.02.03
8.09
295.87
2,393.59
m2
47.98
51.63
2,477.21
kg
1,533.70
4.43
m3
05.04.03.02
05.04.03.03
8.09
302.89
2,450.38
m2
47.98
53.33
2,558.77
kg
1,533.70
4.49
m3
05.04.04.02
05.04.04.03
05.05.01
7.26
308.25
2,237.90
m2
41.87
53.33
2,232.93
kg
1,318.93
4.60
6,067.08
28,175.31
2,428.65
05.05.01.01
m3
05.05.01.02
05.05.01.03
05.05.01.04
05.05.02
6,886.31
10,537.91
05.04.04.01
05.05
6,794.29
11,895.46
05.04.03.01
05.04.04
2,219.23
11,665.09
05.04.02.01
05.04.03
844.45
978.04
2.30
281.28
646.94
m2
26.30
28.68
754.28
kg
171.65
4.14
710.63
220.00
1.44
316.80
8,064.66
05.05.02.01
m3
7.51
294.94
2,215.00
05.05.02.02
m2
85.78
29.21
2,505.63
05.05.02.03
kg
552.37
4.19
2,314.43
05.05.02.04
715.00
1.44
1,029.60
05.05.03
8,224.16
05.05.03.01
m2
85.78
30.42
2,609.43
05.05.03.02
m3
7.51
300.15
2,254.13
05.05.03.03
kg
552.37
4.22
2,331.00
715.00
1.44
1,029.60
05.05.03.04
05.05.04
9,457.84
05.05.04.01
m3
8.41
302.07
2,540.41
05.05.04.02
m2
96.17
31.09
2,989.93
05.05.04.03
kg
657.02
4.22
2,772.62
05.05.04.04
802.00
1.44
1,154.88
05.06
05.06.01
1,017.96
1,017.96
05.06.01.01
m3
1.07
384.33
411.23
05.06.01.02
m2
5.34
51.65
275.81
05.06.01.03
kg
76.78
4.31
05.07
05.07.01
ESCALERAS
330.92
11,004.65
3,102.80
05.07.01.01
m3
2.76
384.33
05.07.01.02
m2
17.59
51.65
908.52
05.07.01.03
kg
263.00
4.31
1,133.53
05.07.02
1,060.75
3,902.99
05.07.02.01
m3
3.64
393.75
1,433.25
05.07.02.02
m2
22.67
52.97
1,200.83
05.07.02.03
kg
293.05
4.33
1,268.91
05.07.03
3,998.86
05.07.03.01
m3
05.07.03.02
05.07.03.03
05.08
05.08.01
3.64
404.16
1,471.14
m2
22.67
55.14
1,250.02
kg
293.05
4.36
1,277.70
CISTERNA V= 5.00m3
4,500.31
1,036.73
05.08.01.01
m3
2.31
242.11
559.27
05.08.01.02
05.08.01.03
m2
kg
1.14
101.98
46.68
4.16
53.22
424.24
05.08.02
2,460.27
05.08.02.01
m3
2.71
378.68
1,026.22
05.08.02.02
m2
12.21
46.68
569.96
05.08.02.03
kg
191.17
4.52
864.09
05.08.03
1,003.31
05.08.03.01
m3
1.01
384.33
388.17
05.08.03.02
m2
3.40
51.65
175.61
05.08.03.03
kg
101.98
4.31
439.53
05.09
1,962.70
05.09.01
m3
1.44
384.33
553.44
05.09.02
m2
10.21
51.65
527.35
05.09.03
kg
204.62
4.31
06
06.01
11,465.57
06.01.01
m2
25.92
105.45
06.01.02
m2
82.81
105.45
06.02
881.91
52,077.45
2,733.26
8,732.31
12,048.36
06.02.01
m2
29.70
58.68
1,742.80
06.02.02
m2
49.41
59.77
2,953.24
06.02.03
m2
62.01
61.01
3,783.23
06.02.04
m2
58.50
61.01
3,569.09
06.03
28,563.52
06.03.01
m2
33.01
65.48
2,161.49
06.03.02
m2
137.98
70.77
9,764.84
06.03.03
m2
114.40
72.01
8,237.94
m2
114.40
73.42
06.03.04
07
8,399.25
26,202.67
07.01
m2
73.56
15.36
1,129.88
07.02
m2
1,231.25
14.08
17,336.00
07.03
m2
99.68
14.08
1,403.49
07.04
m2
153.56
26.41
4,055.52
07.05
193.36
11.78
2,277.78
08
08.01
09
CIELORRASOS Y COBERTURAS
TARRAJEO EN CIELO RASO CON MEZCLA C:A 1:5 CON CINTA DE 1.5CM
6,910.94
m2
290.62
23.78
PISOS Y PAVIMENTOS
6,910.94
13,006.29
09.01
CONTRAPISO E=40mm BASE 3cm MEZCLA 1:5 ACABADO 1cm PASTA 1:2
m2
52.30
20.92
1,094.12
09.02
m2
52.30
57.80
3,022.94
m2
297.10
29.92
8,889.23
m2
73.55
64.36
m2
62.93
15.18
m2
51.73
258.16
m2
64.06
126.47
09.03
10
10.01
11
11.01
12
12.01
13
13.01
14
ZOCALOS
ZOCALO DE CERAMICO 30x30 cm
4,733.68
REVESTIMIENTOS
REVESTIMIENTO DE GRADAS CON CEMENTO PULIDO 1:4
955.28
CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA MDF DE 6mm CON MARCO DE MADERA CEDRO 2"x4"
955.28
13,354.62
CARPINTERIA METALICA
VENTANA DE ALUMINIO
4,733.68
13,354.62
8,101.67
CERRAJERIA
8,101.67
2,788.74
14.01
pza
57.00
14.58
831.06
14.02
pza
10.00
13.58
135.80
14.03
14.04
15
15.01
16
pza
5.00
101.72
pza
24.00
54.72
508.60
1,313.28
11,159.25
m2
64.06
174.20
PINTURA
11,159.25
17,807.88
16.01
m2
1,513.50
8.83
13,364.21
16.02
16.03
m2
m2
290.62
103.46
9.17
10.22
2,664.99
1,057.36
m2
64.06
11.26
16.04
17
17.01
SISTEMA DE DESAGUE
721.32
9,045.01
TRABAJOS PRELIMINARES
325.29
17.01.01
88.75
2.06
17.01.02
3.29
10.66
35.07
m3
3.29
32.64
107.39
17.01.03
17.02
182.83
1,968.96
17.02.01
pto
23.00
38.92
895.16
17.02.02
pto
7.00
96.51
675.57
17.02.03
pto
7.00
56.89
17.03
398.23
3,857.50
17.03.01
95.75
20.66
1,978.20
17.03.02
38.45
30.50
1,172.73
34.20
20.66
17.03.03
17.04
REGISTROS Y SUMIDEROS
706.57
1,551.13
17.04.01
14.00
36.01
504.14
17.04.02
11.00
30.65
337.15
17.04.03
4.00
177.46
709.84
17.05
583.12
17.05.01
28.00
9.16
256.48
17.05.02
15.00
10.22
153.30
17.05.03
12.00
9.62
115.44
17.05.04
3.00
19.30
17.06
17.06.01
17.06.02
18
18.01
18.01.01
18.02
VARIOS
EMPALME A RED EXISTENTE DE DESAGUE
glb
1.00
500.00
134.20
1.93
500.00
259.01
9,810.10
57.90
759.01
1,338.96
pto
21.00
63.76
1,338.96
3,512.27
18.02.01
7.40
16.15
119.51
18.02.02
101.45
16.16
1,639.43
18.02.03
29.35
17.94
526.54
22.35
54.89
1,226.79
18.02.04
18.03
VALVULAS
2,412.48
18.03.01
23.00
80.64
1,854.72
18.03.02
6.00
76.24
457.44
18.03.03
2.00
50.16
100.32
18.04
1,161.45
18.04.01
pza
79.00
6.41
506.39
18.04.02
pza
10.00
8.01
80.10
18.04.03
pza
10.00
7.11
71.10
18.04.04
pza
57.00
5.41
308.37
18.04.05
pza
3.00
8.37
25.11
18.04.06
pza
19.00
6.31
119.89
18.04.07
pza
9.00
5.61
50.49
18.00
30.70
552.60
1.00
500.00
500.00
18.05
VARIOS
1,384.94
18.05.01
18.05.02
glb
18.05.03
19
160.55
2.07
332.34
2,845.70
19.01
pto
12.00
82.65
991.80
19.02
62.40
29.71
1,853.90
20
4,142.85
20.01
20.02
u
u
6.00
6.00
217.17
219.95
1,303.02
1,319.70
20.03
6.00
149.89
899.34
20.04
3.00
206.93
620.79
21
EQUIPAMIENTO
3,850.85
21.01
2.00
650.00
1,300.00
21.02
EQUIPAMIENTO - CISTERNA
1.00
327.51
327.51
21.03
2.00
320.00
640.00
3.00
527.78
21.04
22
22.01
SALIDAS DE FUERZA
1,583.34
18,319.41
8,532.60
22.01.01
pto
50.00
142.21
7,110.50
22.01.02
pto
10.00
142.21
1,422.10
22.02
683.62
22.02.01
pto
28.00
13.49
377.72
22.02.02
pto
10.00
13.49
134.90
22.02.03
pto
12.00
14.25
171.00
22.03
6,469.58
22.03.01
pto
58.00
98.96
5,739.68
22.03.02
pto
12.00
40.55
486.60
22.03.03
pto
3.00
40.55
121.65
pto
3.00
40.55
22.03.04
22.04
SISTEMA DE COMUNICACIONES
121.65
1,823.25
22.04.01
pto
9.00
72.93
656.37
22.04.02
pto
9.00
72.93
656.37
22.04.03
pto
6.00
72.93
437.58
22.04.04
pto
1.00
72.93
22.05
72.93
810.36
22.05.01
pto
14.00
22.51
315.14
22.05.02
pto
9.00
22.51
202.59
22.05.03
pto
4.00
22.51
90.04
22.05.04
pto
4.00
22.51
90.04
22.05.05
pto
5.00
22.51
112.55
23
TUBERIAS Y CONDUCTOS
10,814.19
23.01
242.24
14.31
3,466.45
23.02
180.10
14.31
2,577.23
23.03
70.20
21.24
1,491.05
23.04
78.20
21.24
1,660.97
76.20
21.24
1,618.49
23.05
24
CABLES Y CONDUCTORES
7,338.30
24.01
484.48
5.10
2,470.85
24.02
540.30
7.65
4,133.30
24.03
49.00
7.65
374.85
24.04
42.05
6.43
270.38
24.05
12.00
7.41
25
25.01
TABLEROS E INTERRUPTORES
88.92
5,890.66
3,525.00
25.01.01
3.00
773.00
2,319.00
25.01.02
1.00
1,206.00
1,206.00
25.02
25.02.01
2,365.66
u
10.00
54.34
543.40
25.02.02
17.00
54.34
923.78
25.02.03
2.00
140.58
281.16
25.02.04
1.00
135.58
135.58
25.02.05
3.00
160.58
26
26.01
26.02
VARIOS
SISTEMA DE PUESTA A TIERRA (INC. POZOS Y CABLES DESNUDOS 70mm2)
PRUEBAS DE AISLAMIENTO Y CONTINUIDAD
COSTO DIRECTO
(10%)
---------------------------------------SUBTOTAL
IMPUESTO (IGV 18%)
===========================
TOTAL PRESUPUESTO
u
glb
1.00
1.00
1,020.65
500.00
1,020.65
500.00
362,355.15
481.74
1,520.65
36,235.52
36,235.52
--------------------434,826.19
78,268.71
==============
513,094.90