Regulation For the Installation of Electrical Wiring ,Electrical Equipment And Air Conditioning Equipment -December 2010 Edition

PROJECT NAME : Date LOCATION/AREA : PIN NUMBER : CONSULTANT NAME : CONSULTANT CONTACT PHONE /EMAIL: BP CLIENT NAME : Number BUILDING TYPE : Installed Capacity of A/C equipment(TR)= (Without counting Stand by units ) Electrical Demand load for A/C equipments in kW=

H V A C CHECKLIST

Rev

Demand load of Unitary exhaust fans(not part of A/C system) in kW= Total Air Conditioned Floor Area in m 2 = The following information is required to check the building permit application for compliance with the Building Envelope & HVAC requirements mentioned in the Regulations for the installation of electrical wiring ,Electrical equipment and Air conditioning Equipment.

Section Ref

Item

Applicability Yes No NA

Information Required

Attached Drawing Reference Number

Remarks by KAHRAMAA Engineer

THERMAL INSULATION OF BUILDING (SECTION 12) 12.2 12.3 Wall & Roof U value Window Requirements
Provide Wall & roof U value calculation sheet(Appendix : 4). Provide Window Schedule(Appendix : 4). Provide Equipment Schedule with type,capacity & efficiency.(Appendix :5) Provide System Control Diagrams(For Bulk Customer only). Provide Energy Recovery Ventilation System Schedule with Efficiency Details(For Bulk Customer only). Provide Cooling Load Summary Sheet.

HEATING ,VENTILATION AND AIR CONDITIONING (SECTION 13) 13.2 13.4.1 13.5 13.6 Min .Equipment Efficiency Cooling Equipment Control Energy Recovery Ventilation Load Calculation Special Energy Conservation Measure Considered in the Building:

Provide details Notes 1 : TCheck list to be provided with all BP applications for all major projects Consultant/Authorised Signatory signature and stamp 2 : The Checklists , Calculations and relevant drawings are to be detached By Installation engineer BP Number entered and forwarded to conservation section