Date

1-Jul
2-Jul
3-Jul
4-Jul
5-Jul
6-Jul
7-Jul
8-Jul
9-Jul
10-Jul
11-Jul
12-Jul
13-Jul
14-Jul
15-Jul
16-Jul
17-Jul
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
Waste
Total

Production(Kg)
B/C
W/C
345940
342440
505840

591290
290560
192285
578240

1652375

11960
228620

1434800

0_5
39.75
39.35
58.12
0.00
0.00
47.44
23.31
0.00
16.80
72.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
42.23
339.69

LJB 1200
Matearial used(CUB)
5_10
10_15
15_20
20.18
9.89
6.63
19.98
9.79
6.56
29.51
14.46
9.69
0.00
0.00
0.00
0.00
0.00
0.00
32.07
28.46
27.19
15.76
13.99
13.36
0.00
0.00
0.00
11.13
9.60
9.07
44.72
34.37
30.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.91
3.26
2.74
178.26
123.80
106.23

Filler
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bituman(Kg)
15845
15684
23168
0
0
21097
10367
0
7398
30894
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
124453

Date
1-Jul
2-Jul
3-Jul
4-Jul
5-Jul
6-Jul
7-Jul
8-Jul
9-Jul
10-Jul
11-Jul
12-Jul
13-Jul
14-Jul
15-Jul
16-Jul
17-Jul
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
Waste
Total

Production(Kg)
LJB 1200
CL 1500
345940
268190
342440
302430
505840
185340
0
276120
0
163010
0
159930
0
151390
0
160220
11960
235840
228620
0
0
200710
0
140550
0
0
0
0
0
0
0
0
0
259880
0
273180
0
343270
0
305440
0
3220
0
423410
0
151820
0
136220
0
63300
0
61300
0
175070
0
178710
0
177110
0
161130
0
372360
1434800

5329150

0_5
70.24
73.73
79.19
31.42
18.55
18.20
17.23
18.25
28.24
26.29
22.86
16.01
0.00
0.00
0.00
0.00
29.60
31.11
41.97
34.79
0.37
48.22
17.29
15.51
7.21
6.98
19.94
20.35
20.38
18.55
42.86
74.66
849.99

W/C
Matearial used(CUB)
5_10
10_15
15_20
31.44
25.84
12.40
32.67
27.77
13.07
37.29
25.48
13.68
11.60
16.44
5.95
6.85
9.70
3.51
6.72
9.52
3.45
6.36
9.01
3.26
6.74
9.55
3.46
10.61
14.40
5.32
13.35
6.54
4.38
8.44
11.96
4.33
5.91
8.38
3.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.93
15.49
5.61
11.49
16.28
5.89
13.63
18.00
7.41
12.84
18.20
6.59
0.14
0.19
0.07
17.80
25.23
9.14
6.38
9.05
3.28
5.73
8.12
2.94
2.66
3.77
1.37
2.58
3.65
1.32
7.36
10.43
3.78
7.51
10.65
3.86
6.21
10.13
4.25
5.65
9.22
3.86
13.05
21.30
8.93
14.28
17.48
6.68
316.20
371.79
150.81

Filler
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Bituman(Kg)
28372
29811
31826
12647
7466
7325
6934
7192
11124
10263
9010
6309
0
0
0
0
11666
12263
15409
13711
145
19007
6815
6115
2842
2752
7859
8022
7950
7233
16715
306784

LJB1200
DATE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Waste

B/C
0_ 5
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38

5_10
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23

10_15
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

W/C
15_20
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19

Filler
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Bitumen
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7

0_5
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55

5_10
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
27
25

CL1500
DATE
1
2
3
4
5
6

B/C
0_ 5
37
37
37
37
37
37

5_10
25
25
25
25
25
25

10_15
20
20
20
20
20
20

W/C
15_20
14
14
14
14
14
14

filler
4
4
4
4
4
4

Bitumen 0 _5
3.7
40
3.7
40
3.7
40
3.7
40
3.7
40
3.7
40

5_10
18
18
18
18
18
18

7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Waste

37
37
37
37
37
37
37
37
37
37
37
37
30
38
38
37
37
37
37
37
37
37
37
37
37
37

25
25
25
25
25
25
25
25
25
25
25
25
20
28
28
25
25
25
25
25
25
25
25
25
25
25

20
20
20
20
20
20
20
20
20
20
20
20
20
19
19
20
20
20
20
20
20
20
20
20
20
20

14
14
14
14
14
14
14
14
14
14
14
14
25
9
9
14
14
14
14
14
14
14
14
14
14
14

4
4
4
4
4
4
4
4
4
4
4
4
5
6
6
4
4
4
4
4
4
4
4
4
4
4

3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7

40
40
40
40
40
40
40
40
40
40
40
40
44
40
40
40
40
40
40
40
40
40
46
46
46
40

18
18
18
18
18
18
18
18
18
18
18
18
17
18
18
18
18
18
18
18
18
18
15
15
15
18

W/C
10_15
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
10
12

10_15
25
25
25
25
25
25

15_20
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8

W/C
15_20
9
9
9
9
9
9

Filler
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

filler
8
8
8
8
8
8

Bitumen
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7

Bitumen
4.9
4.9
4.9
4.8
4.8
4.8

25
25
25
25
25
25
25
25
25
25
25
25
22
25
25
25
25
25
25
25
25
25
24
24
24
25

9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
10
10
10
9

8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
5
5
5
8

4.8
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7

B/C
DATE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Waste

0_ 5
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38
38

5_10
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23
23

LBJ 1200
10_15
15_20
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19
20
19

CL 1500
Filler
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Bitumen
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7

0_5
37
37
37
37
37
37
37
37
37
37
37
37
37
37
37
37
37
37
30
38
38
37
37
37
37
37
37
37
37
37
37
37

5_10
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
20
28
28
25
25
25
25
25
25
25
25
25
25
25

W/C
DATE
1
2
3
4
5
6

0_ 5
55
55
55
55
55
55

5_10
25
25
25
25
25
25

LJB 1200
10_15
15_20
12
8
12
8
12
8
12
8
12
8
12
8

CL 1500
filler
0
0
0
0
0
0

Bitumen 0 _5
4.8
40
4.8
40
4.8
40
4.8
40
4.8
40
4.8
40

5_10
18
18
18
18
18
18

7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Waste

55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55

25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
27
25

12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
10
12

8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

4.8
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7

40
40
40
40
40
40
40
40
40
40
40
40
44
40
40
40
40
40
40
40
40
40
46
46
46
40

18
18
18
18
18
18
18
18
18
18
18
18
17
18
18
18
18
18
18
18
18
18
15
15
15
18

48

20

CL 1500
10_15
15_20
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
25
19
9
19
9
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14
20
14

10_15
25
25
25
25
25
25

CL 1500
15_20
9
9
9
9
9
9

Filler
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
5
6
6
4
4
4
4
4
4
4
4
4
4
4

filler
8
8
8
8
8
8

Bitumen
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7

Bitumen
4.9
4.9
4.9
4.8
4.8
4.8

25
25
25
25
25
25
25
25
25
25
25
25
22
25
25
25
25
25
25
25
25
25
24
24
24
25

9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
10
10
10
9

8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
5
5
5
8

4.8
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7

18

4.6

Daily Diesel Usage


1-Jul
2-Jul
3-Jul
4-Jul
5-Jul
6-Jul
7-Jul
8-Jul
9-Jul
10-Jul
11-Jul
12-Jul
13-Jul
14-Jul
15-Jul
16-Jul
17-Jul
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
Total

CL 1500

LJB 1200

Date
Production (T)
345.940
342.440
505.840
0.000
0.000
591.290
290.560
0.000
204.245
806.860
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
3087.175

Diesel Usage (L) Diesel Rate (L/T)


2015
5.8
2166
6.3
2780
5.5
646
154
3248
5.5
1450
5.0
168
1208
5.9
4465
5.5
22

63
126
127
222

34
78

56
19028

Diesel
Consumption

6.2

6.39

Remarks

Production (T) Diesel Usage (L) Diesel Rate (L/T)


268.190
1899
7.1
302.430
2260
7.5
185.340
1213
6.5
276.120
2074
7.5
163.010
1601
9.8
195.510
1790
9.2
587.450
3446
5.9
442.660
2610
5.9
348.450
2191
6.3
0.000
154
407.510
2733
6.7
140.550
885
6.3
0.000
0.000
0.000
207
305.750
1948
6.4
447.890
2672
6.0
478.880
2964
6.2
766.480
4459
5.8
456.090
2609
5.7
62.200
698
11.2
423.410
2780
6.6
340.810
2517
7.4
380.780
2311
6.1
212.980
1547
7.3
192.110
1641
8.5
536.290
3030
5.6
648.320
4651
7.2
737.610
4147
5.6
728.480
4175
5.7
842.830
4940
5.9
10878.13
70152
6.4

Total
Production

13965.305

Remarks

Low Production
Low Production

Low Production

Low Production

gvskk@maga.lk

Maga Engineering(Pvt) Ltd


200, Nawala Road

MONTHLY BITUMEN
BARRALS STOCK

Narahenpita, Colombo 5
Tel : 2808835-44 Fax : 2808846-47 Email : maga@cga.lk

Plant Complex-Mirijjawila
Date

Received
Quantity

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

1454
1454
1350
1314
1176
1106
1106
1002
1002
1102
1102
1202
1202
1202
1202
1202
1302
1166
1162
1082
1102
1102
1022
862
739
799
799
739
699
579
459

Issued Quantity
104
136
138
70
104

136
104
80
80
80
160
123
40
160
40
120
120
80

JULY - 2013
Balance
1454
1350
1214
1176
1106
1106
1002
1002
1002
1102
1102
1202
1202
1202
1202
1202
1166
1062
1082
1002
1102
1022
862
739
699
799
639
699
579
459
379

Remarks

261.72
243
218.52
211.68
199.08
199.08
180.36
180.36
180.36
198.36
198.36
216.36
216.36
216.36
216.36
216.36
209.88
191.16
194.76
180.36
198.36
183.96
155.16
133.02
125.82
143.82
115.02
125.82
104.22
82.62
68.22

29-05-2013

102

MONTHLY ASPHALT PRODUCTION REPORT

Maga Engineering(Pte) Ltd


200, Nawala Road
Narahenpita, Colombo 5
Tel : 2808835-44 Fax : 2808846-47 Email : maga@cga.lk
Plant Complex-Mirijjawila
Maga - Project

Private Projects

Date
Cathic Project

B/C

1
2
3
4
5
6
398.680
7
8
9
10 289.090
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Total 687.770

Total

W/C

BKU Rd

B/C

W/C

Hakmana Matara

Hakmana Town

B/C

B/C

W/C

W/C

Matara Weherahena

B/C

W/C

Urubokka

B/C

W/C

H.B.T. Road

B/C

W/C

Getamanna Hambanthota
rural project

B/C

W/C

Fly Over Project

B/C

W/C

H.G.M. Road (Water


Tank)
B/C

W/C

Jayavi Holdings

B/C

192.610
290.560
192.285
289.150

228.620

0.000

0.000

6.990

0.000

0.000

0.000

0.000

0.000

0.000

0.000

228.620

0.000

J.C. Sesath Bandara

0.000

964.605

4.970

0.000

Checked by

0.000

1199.190

0.000

0.000

H.A.S. Gunasoma

0.000

Pvt Daily
Total

345.940
342.440
505.840
0.000
0.000
591.290
290.560
0.000
204.245
806.860
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
3087.175

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

W/C

345.940
342.440
505.840

6.990

Maga Daily
Total

0.000

B/C

1652.375 Ton

Prepared by

W/C

1434.800 Ton

Signature

Signature

Approved by
Signature

Ajitha K Edirisinghe

3087.175 Ton

Desig. Mechanical Engineer

Desig. Assistant Plant Manager (A/P)

Desig. Assistant Genaral Manager

ALT PRODUCTION REPORT

LJB-1200
JULY - 2013

Daily Total

345.940
342.440
505.840
0.000
0.000
591.290
290.560
0.000
204.245
806.860
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
3087.175

Ajitha K Edirisinghe

tant Genaral Manager

MONTHLY ASPHALT PRODUCTION REPORT

Maga Engineering(Pte) Ltd


200, Nawala Road
Narahenpita, Colombo 5
Tel : 2808835-44 Fax : 2808846-47 Email : maga@cga.lk
Plant Complex-Mirijjawila
Maga - Project
Date

Cathic Project

B/C

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Total

Total

W/C

BKU Rd

B/C

Hakmana Matara

W/C

B/C

W/C

Hakmana Town

B/C

W/C

Matara Weherahena

B/C

W/C

Private Projects
Urubokka

B/C

W/C

H.B.T. Road

B/C

W/C

Getamanna
Hambanthota rural
project

B/C

W/C

Fly Over Project


B/C

268.190
302.430
185.340
170.400
35.580
378.640
282.440
56.280

11.980
15.510

206.800

2561.190

B/C
W/C

0.000

0.000

25.680

79.150

5548.980
5329.150
10878.130

Ton
Ton
Ton

104.150

259.880
261.200
343.270
305.440
3.220
3.000

188.990
151.160
37.580
172.710

2516.560

0.000

0.000

0.000

0.000

0.000

151.820
136.220
63.300
61.300
175.070
175.430
177.110
153.050
129.940
2424.530

Prepared by
J.C. Sesath Bandara
Signature
Desig. Mechanical Engineer

0.000

0.000

93.400
112.100
130.810
188.510
469.610
560.500
562.690
470.470
2908.640

3.280

0.000

0.000

242.420
258.230

Checked by
H.A.S. Gunasoma
Signature
Desig. Assistant Plant Manager (A/P)

0.000

104.150

0.000

Maga Daily
Total

W/C

1.610

420.410

4.660

B/C

W/C

56.330

58.980

8.080

B/C

57.420

199.100
140.550

305.750
188.010
205.700
407.700
150.650

Jayavi Holdings

1.570
3.130

159.880
159.930
151.390
160.220
230.220

5.620

W/C

H.G.M. Road
(Water Tank)

0.000

268.190
302.430
185.340
276.120
163.010
195.510
587.450
442.660
348.450
0.000
407.510
140.550
0.000
0.000
0.000
305.750
447.890
478.880
766.480
456.090
62.200
423.410
340.810
380.780
212.980
364.820
363.580
648.320
737.610
728.480
842.830
10878.130

Approved by
Ajitha K Edirisinghe
Signature
Desig. Assistant Genaral Manager

HALT PRODUCTION REPORT

CL-1500
JULY - 2013
Pvt Daily
Total

Daily Total

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

268.190
302.430
185.340
276.120
163.010
195.510
587.450
442.660
348.450
0.000
407.510
140.550
0.000
0.000
0.000
305.750
447.890
478.880
766.480
456.090
62.200
423.410
340.810
380.780
212.980
364.820
363.580
648.320
737.610
728.480
842.830
10878.130

Ajitha K Edirisinghe

t Genaral Manager

MONTHLY ASPHALT PRODUCTION REPORT

Maga Engineering(Pte) Ltd


200, Nawala Road
Narahenpita, Colombo 5
Tel : 2808835-44 Fax : 2808846-47 Email : maga@cga.lk

TOTAL
JULY - 2013

Plant Complex-Mirijjawila
Maga - Project
Date

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Total

Total

Cathic Project

BKU Rd

Hakmana Matara

Hakmana Town

Matara
Weherahena

Private Projects

Urubokka

H.B.T. Road

Getamanna
Hambanthota rural
project

Fly Over Project

H.G.M. Road
(Water Tank)

Jayavi Holdings

B/C

W/C

B/C

W/C

B/C

W/C

B/C

W/C

B/C

W/C

B/C

W/C

B/C

W/C

B/C

W/C

B/C

W/C

B/C

W/C

B/C

W/C

0.000

0.000

0.000

0.000

0.000

268.190
302.430
185.340
170.400

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

345.940
342.440
505.840
1.570
3.130

0.000

0.000

0.000

0.000

0.000

0.000

434.260
378.640
282.440
56.280
289.090

12.610

305.750
188.010
205.700
407.700
150.650

188.990
151.160
37.580
172.710

3248.960

B/C
W/C

159.880
159.930
151.390
160.220
230.220
228.620
199.100
140.550

0.000

0.000

11.980
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
8.080

15.510
0.000
58.980
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
4.660

32.670

79.150

7201.355 Ton
6763.950 Ton
13965.305 Ton

192.610
347.980
0.000
248.615
289.150
206.800

104.150

4.970
1.610

259.880
261.200
343.270
305.440
3.220
3.000

420.410

2516.560

0.000

0.000

0.000

0.000

0.000

151.820
136.220
63.300
61.300
175.070
175.430
177.110
153.050
129.940
2653.150 0.000

Prepared by
J.C. Sesath Bandara
Signature
Desig. Mechanical Engineer

0.000

93.400
112.100
130.810
188.510
469.610
560.500
562.690
470.470
3873.245

0.000

0.000

3.280
0.000
0.000
242.420
1457.420

Checked by
H.A.S. Gunasoma
Signature
Desig. Assistant Plant Manager (A/P)

0.000

104.150

Maga Daily
Total

Pvt Daily
Total

Daily Total

0.000
644.870
691.180
276.120
163.010
786.800
878.010
442.660
552.695
806.860
407.510
140.550
0.000
0.000
0.000
305.750
447.890
478.880
766.480
456.090
62.200
423.410
340.810
380.780
212.980
364.820
363.580
648.320
737.610
728.480
842.830
13965.305

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

614.130
644.870
691.180
276.120
163.010
786.800
878.010
442.660
552.695
806.860
407.510
140.550
0.000
0.000
0.000
305.750
447.890
478.880
766.480
456.090
62.200
423.410
340.810
380.780
212.980
364.820
363.580
648.320
737.610
728.480
842.830
13965.305

Approved by
Ajitha K Edirisinghe
Signature
Desig. Assistant Genaral Manager

BITUMEN BALANCE REPORT


TE

DA

1-Jul
2-Jul
3-Jul
4-Jul
5-Jul
6-Jul
7-Jul
8-Jul
9-Jul
10-Jul
11-Jul
12-Jul
13-Jul
14-Jul
15-Jul
16-Jul
17-Jul
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul

CL-1500
12527
14127
8657
12647
7466
8595
22492
17270
14605
0
16388
6309
0
0
0
10909
18374
30510
19086
2249
19007
13558
14841
8182
7419
20747
24778
27949
27476
33502
419671.3

MONTH JULY - 2013


ISSUDE
RECEIVED
Bitu:D.Plant
LJB-1200 Oth Site
C.P.C
15845
15684
23168
0
0
21097
10367
0
7398
30894
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
124453.3

47430

6120
24480
24710
18680
12370
12440

35670
51520
23760
23700

12400
18540
27570
14340
7390
21820
29300
14380

182080

14200
21060
7040
22860
13970
323670

NCE

A
BAL

106118
77746
101485
94139
106202
117416
100095
79675
98075
127593
120459
127770
121461
121461
121461
121461
110552
104578
123118
120178
115432
113183
101566
109827
124287
130484
123065
116518
112800
91891
87275
67743

Date
1-Jul
2-Jul
3-Jul
4-Jul
5-Jul
6-Jul
7-Jul
8-Jul
9-Jul
10-Jul
11-Jul
12-Jul
13-Jul
14-Jul
15-Jul
16-Jul
17-Jul
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul

Diesel
455
350
504
340
387
36
521
900
39
436
735
42

42
251
254
773
148
151
619
203
319
287
290
42
891
583
9598

Prodution
614.13
644.87
691.18
276.12
163.01
786.8
878.01
442.66
552.695
806.86
407.51
140.55
0
0
0
305.75
447.89
478.88
766.48
456.09
62.2
423.41
340.81
380.78
212.98
192.11
536.29
648.32
737.61
728.48
13122.475

Rate
0.7
0.5
0.7
1.2
2.4
0.0
0.6
2.0
0.1
0.5
1.8
0.3
#DIV/0!
#DIV/0!
#DIV/0!
0.1
0.6
0.5
1.0
0.3
2.4
0.0
1.8
0.5
1.5
0.0
0.5
0.4
0.1
1.2
#DIV/0!
0.7

Mga Engineering(Pvt) Ltd

ASPHALT REJECTION DATA SHEET

200, Nawala Road


Narahenpita, Colombo 5
Tel : 2808835-44 Fax : 2808846-47 Email maga@maga.lk

Activity Center : New Mirijjawila Crusher Plant


Year: 2013
Month:
JULY
Plant Code: MAP 003
Production
Rejection
Date
Reason for Rejection
(Ton)
(Ton)
345.940
1
342.440
2
505.840
3
0.000
4
0.000
5
591.290
6
290.560
7
0.000
8
204.245
9
806.860
10
0.000
11
0.000
12
0.000
13
0.000
14
0.000
15
0.000
16
0.000
17
0.000
18
0.000
19
0.000
20
0.000
21
0.000
22
0.000
23
0.000
24
0.000
25
0.000
26
0.000
27
0.000
28
0.000
29
0.000
30
0.000
31
3087.175
0.000
Total

Remark

Prepaired by
Siganture
Name

Mr.Sesath Bandara

Desig.

Mechanical Engineer (Asphalt Plant)

Mga Engineering(Pvt) Ltd

ASPHALT REJECTION DATA SHEET

200, Nawala Road


Narahenpita, Colombo 5
Tel : 2808835-44 Fax : 2808846-47 Email maga@maga.lk

Activity Center : New Mirijjawila Crusher Plant


Year: 2013
Month:
JULY
Plant Code: MAP 003
Production
Rejection
Date
Reason for Rejection
(Ton)
(Ton)
1
2
3
4
5
6
587.450
7
8
348.450
9
10
407.510
11
140.550
12
0.000
13
0.000
14
0.000
15
16
17
18
19
456.090
20
62.200
21
22
23
380.780
24
212.980
25
192.110
26
536.290
27
28
29
30
31
3324.410
0.000
Total

Remark

Prepaired by
Siganture
Name

Mr.Sesath Bandara

Desig.

Mechanical Engineer (Asphalt Plant)

Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Daily Total B/C Daily Total W/C Cumulative B/C Cumulative W/C
0.000
614.130
0.000
614.130
0.000
644.870
0.000
1259.000
0.000
691.180
0.000
1950.180
0.000
276.120
0.000
2226.300
0.000
163.010
0.000
2389.310
626.870
159.930
626.870
2549.240
726.620
151.390
1353.490
2700.630
282.440
160.220
1635.930
2860.850
304.895
247.800
1940.825
3108.650
578.240
228.620
2519.065
3337.270
206.800
200.710
2725.865
3537.980
0.000
140.550
2725.865
3678.530
0.000
0.000
2725.865
3678.530
0.000
0.000
2725.865
3678.530
0.000
0.000
2725.865
3678.530
305.750
0.000
3031.615
3678.530
188.010
259.880
3219.625
3938.410
205.700
273.180
3425.325
4211.590
423.210
343.270
3848.535
4554.860
150.650
305.440
3999.185
4860.300
58.980
3.220
4058.165
4863.520
0.000
423.410
4058.165
5286.930
188.990
151.820
4247.155
5438.750
244.560
136.220
4491.715
5574.970
149.680
63.300
4641.395
5638.270
130.810
61.300
4772.205
5699.570
361.220
175.070
5133.425
5874.640
469.610
178.710
5603.035
6053.350
560.500
177.110
6163.535
6230.460
567.350
161.130
6730.885
6391.590
470.470
372.360
7201.355
6763.950
13965.305