Professional Documents
Culture Documents
PERMIT
A.K.SINGH, CMFS
INDIANOIL CORPORATION LTD.
MATHURA REFINERY,
ROAD MAP
:The session will include the following
■ Presentation on MR Work Permit
system followed by discussion
■ Role of Issuing & Executing Authority
■ Exercise how to fill the permit
■ Questionnaire/QUIZ
WHY WORK PERMIT?
■ Petroleum Refinery handles
Hydrocarbons and toxic materials -
poses special risks.
■ Maint. Personnel are not adequately
familiar with process conditions.
■ Operation will determine that it is
safe to perform the designated job.
■ Basic purpose of permit system is to
prevent injuries to personnel.
WHY WORK PERMIT
Following Oil Industry Safety Directorates Standards are in Indian
Petroleum Rules :2002
OISD -105))Work permit system
OISD-116Fire Protection facilities for Petroleum Refineries and Oil/Gas Processing Plants
OISD- 117)Fire Protection Facilities for Petroleum Depots and Terminals and pipeline installations
OISD-118))Layouts for Oil and Gas Installations
OISD-141 ))Design and Construction requirements for cross country hydrocarbon pipelines
OISD –156) )Fire Protection Facilities for Ports Handling Hydrocarbons
NH3 25 35 -
SO2 2 5 -
CL2 0.5 1 30
GAS TEST CONTD.
For hot work the gas test results shall be :
■ Combustible - Below 1 % LEL
( Preferably NIL)
For confined space entry :
■ Oxygen - 19.5% minimum
■ Combustible - 10 % LEL Max.
■ Toxic gases - below TLV
. GAS TESTCONTD
Confined space With BA protection :
■ Combustible - 20% of LEL maximum
■ H2S - Less than 100 PPM
■ CO - Less than 500 PPM