S10

"CREACION DEL SISTEMA DE DRENAJE PLUVIAL EN LA LOCALIDAD DE PICHIWILLCA DISTRITO DE SAMUGARI, PROVINCIA LA MAR AYACUCHO"
Cdigo Recurso Unidad Cantidad

MANO DE OBRA 0147000032 0147010002 0147010003 0147010004 0147010008 TOPOGRAFO OPERARIO OFICIAL PEON OPERADOR DE MAQUINARIA PESADA MATERIALES CLAVOS PARA MADERA C/C 3" ALAMBRE NEGRO N16 ACERO DE REFUERZO FY=4200 GRADO 60 REJILLA DE ACERO DE 1.4x1.00M DE 5/8" PIEDRA CHANCADA DE 1/2" PIEDRA MEDIANA DE 6" ARENA GRUESA TRASLADO DE GRAVA DE 0.5" DE DIST.= 200 MTS GIGANTOGRAFIA CEMENTO PORTLAND TIPO I (42.5KG) YESO EN BOLSAS DE 25 kg ALMACEN OFICINA Y CASETA DE GUARDIANIA HORMIGON ROLLIZO DE MADERA MADERA NACIONAL MADERA TORNILLO MADERA TORNILLO FLETE TERRESTRE PETROLEO ARPIA TUBERIA PVC SAP C-5 2", PARA VENTILACION EN CONEXION PROVISIONAL DE ENERGIA ELECTRICA CAPACITACION EN MANEJO EFICIENTE DEL AGUA Y CAPACITACION EN OPERACION Y MANTENIMIENTO DE CAPACITACION EN ASISTENCIA TECNICA EN IMPLEMENTACION DE COMITE DE DEFENSA CIVIL WATER STOP DE 6" TUBERIA PVC SAP = 1 1/2" C - 5 COSTO DE MITIGACION AMBIENTAL hh hh hh hh hh 12.1440 8,056.3473 11,341.2170 17,776.3904 16.0000

0202010005 0202040009 0202970002 0203000039 0205000003 0205000011 0205010004 0205360006 0210000018 0221000000 0229030002 0230990002 0238000000 0243000028 0243000029 0243570050 0243950001 0247030001 0253030028 0261100007 0272000090 0274040004 0292010011 0292010016 0292010017 0292010018 0297010007 0299010050 0381040029

kg kg kg und m3 m3 m3 m3 und BOL BOL GLB m3 und und p2 p2 und gl m ML GLB GLB GLB GLB GLB m ML GLB

738.1705 2,703.6666 39,541.4862 1.0000 286.2944 630.8820 1,024.1154 231.8400 1.0000 9,875.4566 3.7950 1.0000 150.9440 40.0000 8.0000 2,235.8280 11,370.1880 1.0000 81.1072 120.0000 26.2500 1.0000 1.0000 1.0000 1.0000 1.0000 769.6000 26.2500 1.0000

0302810009 0337010001 0348010011 0348010088 0348010090 0348010091 0349070004

EQUIPOS CARGADOR FRONTAL HERRAMIENTAS MANUALES MEZCLADORA DE CONCRETO DE 9 -11P3 TEODOLITO WINCHA VOLQUETE 8.00 M3 VIBRADOR DE CONCRETO 4 HP 2.40"

hm %MO hm hm und hm hm

2.8000 1,330.4238 6.0720 12.0000 8.0000 1,330.4238

CALCULO DEL FLETE DE MATERIALES


OBRA
"CREACION DEL SISTEMA DE DRENAJE PLUVIAL EN LA LOCALIDAD DE PICHIWILLCA DISTRITO DE SAMUGARI, PROVINCIA LA MAR AYACUCHO"

1- DATOS GENERALES
A- POR PESO MATERIALES UNIDAD CEMENTO BL. FIERRO, CLAV. ETC KG MADERA P2 LADRILLO PANDERETA UN TRIPLAY UN CARRIZO UN YESO BL IMPERM, ASFAL, PET. GLN WATER STOP Y ARPIA ML PINTURAS, PEGAM. PETROLEO GLN TEJA ANDINA PL TAPAS, ACCESORIOS. UND OTROS KG PESO TOTAL AFECTO IGV 9,875.46 42,983.32 0.00 0.00 0.00 0.00 3.80 0.00 889.60 81.11 0.00 1.00 0.00 PESO.UNIT. PESO.TOTAL 42.50 419,706.91 1.00 42,983.32 1.50 0.00 2.20 0.00 5.00 0.00 1.00 0.00 25.00 94.88 4.00 0.00 6.00 5,337.60 4.00 324.43 5.00 0.00 7.00 7.00 1.00 0.00 468,454.13

B- POR VOLUMEN
EN AGREGADOS Y MADERA DESCRIPC. UNIDAD ARENA FINA M3 MATERIAL DE PRESTAMO M3 HORMIGN, ARENA GRUESA M3 MATERIAL ZARANDEADO M3 PIEDRA MEDIANA M3 PIEDRA GRANDE M3 PIEDRA CHANCADA M3 VOLUMEN TOTAL CAPACIDAD DEL CAMION (M3) NUMERO DE VIAJES REDONDEO

AFECTO IGV 0.00 231.84 1,175.06 0.00 630.88 0.00 286.29 2,324.08

SIN IGV FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO 0.00 DE MATERIAL DE MATERIAL DE MATERIAL DE MATERIAL DE MATERIAL DE MATERIAL DE MATERIAL

EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M. CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJES Tub, 1/2" 4,500.00 U Tub,3/4" 4,000.00 U Tub, 1" 3,360.00 U Tub,1 1/2" 1,690.00 U TUBERIAS PVC SAL Tub 2" U-PVC SAL Tub 2.5" U-PVC SAL Tub 4" U-PVC SAL Tub 6" U-PVC SAL Tub 8" U-PVC SAL Tub 10" U-PVC SAL Tub 12" U-PVC SAL Tub 14" U-PVC SAL Tub 16" U-PVC SAL Tub 24" U-PVC SAL TUBERIAS PVC SAP TUBERIA PVC SAP C-5 1 1/2" TUBERIA PVC SAP C-5 2" TUBERIA PVC SAP C-5 3" TUBERIA PVC SAP C-5 4" TUBERIA PVC SAP C-5 6" TUBERIA PVC SAP C-5 8" TUBERIA PVC SAP C-5 10" TUBERIA PVC SAP C-5 12" TUBERIA PVC SAP C-5 16"

994.00 620.00 250.00 110.00 65.00 50.00 35.00 28.00 22.00 10.00

U U U U U U U U U U

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.0000 0.0000 0.00 0.00 0.000 0.000 0.00 0.00 0.00 0.00

1,040.00 994.00 430.00 250.00 110.00 65.00 50.00 35.00 22.00

U U U U U U U U U

26.25 26.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.25 5.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.005 0.005 0.000 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0

NUMERO TOTAL DE VIAJES REDONDEO TUBERIA EN VOLUMEN

2- FLETE TERRESTRE
UNIDAD QUE DA COMPROBANTE CAPACIDAD DEL CAMION ( M3 ) COSTO POR VIAJE S/. CAPACIDAD DEL CAMION (KG) FLETE POR KG UNIDAD DE TRANSPORTE UNIDAD QUE NO DA COMPROBANTE 8.00 CAPACIDAD DEL CAMION ( M3 ) 1,500.00 COSTO POR VIAJE S/. 8,000.00 CAPACIDAD DEL CAMION (KG) 0.17

FLETE POR PESO FLETE POR VOLUMEN AGREGADOS TUBERIA COSTO FLETE TERRESTRE

AFECTO IGV 79,637.20 6.10 79,643.30

SIN IGV

FLETE POR PESO =Peso Total * Flete por peso FLETE POR VOLUMEN=No viajes*costo por viaje

0.00

3- FLETE FLUVIAL
UNIDAD DE TRANSPORTE QUE DA COMPROBANTE UNIDAD DE TRANSPORTE QUE NO DA COMPROB. CAPACIDAD DEL BOTE EN PESO (KG) CAPACIDAD DEL BOTE EN VOLUMEN (M3) COSTO POR VIAJE COSTO POR PESO AFECTO IGV FLETE POR PESO FLETE POR VOLUMEN AGREGADOS TUBERIA COSTO FLETE FLUVIAL SIN IGV FLETE POR PESO =Peso Total * Flete por peso FLETE POR VOLUMEN=No viajes*costo por viaje

4- FLETE EN ACEMILA
A- POR PESO EL FLETE EN ACEMILA EL PROYECTO CUBRIRA SOLO EN LA RED DE CONDUCCION MATERIALES UNIDAD CEMENTO BL. FIERRO, CLAV. ETC KG MADERA P2 LADRILLO PANDERETA UN TRIPLAY UN CARRIZO UN YESO BL IMPERM, ASFAL, PET. GLN WATER STOP Y CORD EXPL ML PINTURAS, PEGAM. GLN TEJA ANDINA PL TAPAS, ACCESORIOS. UND OTROS KG PESO TOTAL AFECTO IGV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PESO.UNIT. PESO.TOTAL 42.50 0.00 1.00 0.00 1.50 0.00 2.20 0.00 5.00 0.00 1.00 0.00 25.00 0.00 4.00 0.00 6.00 0.00 4.00 0.00 5.00 0.00 7.00 0.00 1.00 0.00

EN AGREGADOS Y MADERA DESCRIPC. UNIDAD ARENA FINA M3 MAT. ZARANDEADO Y PRESTAMO M3 HORMIGN, ARENA GRUESA M3 MATERIAL DE PRESTAMO M3 PIEDRA MEDIANA M3 PIEDRA GRANDE M3 PIEDRA CHANCADA M3 VOLUMEN TOTAL CAPACIDAD DEL CAMION (M3) NUMERO DE VIAJES REDONDEO

AFECTO IGV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SIN IGV FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO 0.00 DE MATERIAL DE MATERIAL DE MATERIAL DE MATERIAL DE MATERIAL DE MATERIAL DE MATERIAL

Las tuberas y maderas ser transportadas por peones Costos de transporte por viaje Acemila S/. 1.00 MATERIALES Peon S/. 2.00 Cantidad Peso total tubera de agua Peso total tubera desague CSN Peso total tubera desague PVC Numero bolsas de cemento Peso resto de materiales Agregados Total en Kilos Madera Total en pies cuadrados COSTO TOTAL DEL FLETE EN ACEMILA S/.

1.50 AGREGADO

0.00 0.00

Unidades de Capacidad de Nmero de Carga Carga Viajes 2 20 2 20 2 20 1 1 1 50 0.00 1 50 0.00 2 4

Flete no Afecto a IGV

0.00 0.00 0.00

RESUMEN DE FLETE TOTAL


FLETE TERRESTRE FLETE FLUVIAL FLETE EN ACEMILA FLETES TOTALES S/. AFECTO IGV AFECTO IGV 79,643.30

79,643.30
67,494.32

FLETE TOTAL 0.00

79,643.30