BASIS OF
ESTIMATION
PROJECTS
______________________________________________________
• OVERALL BUDGET: RM
400,000
PRELIMINARIES
WORK BELOW
LOWEST FLOOR
FINISH
PERCENTAGE = 8.50 SPECIFICATION:
%
•REINFORCED
TOTAL COST OF CONCRETE GRADE 30
ELEMENT FOR PAD FOOTINGS
= RM34000.00 •PILE CAP
•COLUMN STUMPS
COST PER M2 (GFA) •GROUND BEAMS
= RM226.67 •GROUND FLOOR
SLABS
•WATER PROOFING
MEMBRANE
FRAME
PERCENTAGE = 2.47 SPECIFICATION:
%
•REINFORCED
TOTAL COST OF CONCRETE GRADE 30
ELEMENT FOR COLUMN AND
= RM 13880.00 BEAM
• ROOF BEAM
COST PER M2 (GFA)
= RM 92.53
ROOF
PERCENTAGE = 10.90 SPECIFICATION:
%
•TIMBER ROOF
TOTAL COST OF TRUSSES
ELEMENT •CLAY ROOF TILES
= RM 43600.00 WITH A LAYER OF
INSULATION AND
COST PER M2 (GFA) SISALATION FOIL
= RM 290.67 •GUTTER
•RAINWATER
DOWNPIPE
•FASCIA BOARD
EXTERNAL WALL
TOTAL COST OF
ELEMENT
= RM 98400.00
3.PANGKIN = RM 300.00
4.GAZEBO = RM 5000.00
5.BENCHES = RM 500.00
6.TEMPAYAN = RM 2500.00
7.DECK = RM 30000.00
8.WELL = RM 1000.00
9.CLAY POT = RM 3000.00
10.LUMINAIRE = RM 4000.00
•SOFTSCAPES