KEGIATAN : REVITALISASI INFRASTRUKTUR SARANA DAN PRASARANA PENYELENGGARAAN PEKAN OLAHRAGA DAERAH ( PORDA ) JAWA BARAT PEKERJAAN : REVITALISASI INFRASTRUKTUR SARANA PRASARANA OLAH RAGA SOR TAMAN MALUKU LOKASI TAHUN : JL. MALUKU KOTA BANDUNG : 2010
NO 1 II A
URAIAN PEKERJAAN 2 PERBAIKAN LAPANGAN TENIS PEKERJAAN PERSIAPAN 1 Pek Papan Nama 2 Pek Dokumentasi dan Prijinan 3 Pek Pengadaan air dan listrik kerja 2 Pek. Pengukuran Leveling Lantai 3 Pek. Bongkaran Lapisan Beton Lap. Tenis Sub. Jumlah II.A
SAT. 3
VOL. 4
JUMLAH 6=4X5
m ls ls m m 0.960 1.000 1.000 424.000 361.760 8,250.00 750,000.00 750,000.00 1,749.00 173,243.00 7,920.00 750,000.00 750,000.00 741,576.00 62,672,387.68 64,921,883.68 m 258.400 1,100.00 284,240.00 -
PEKERJAAN LANTAI KONSTUKSI BETON 1 LAPISAN DASAR KE - 1 a Pek lapisan 1 Beton Spec. Kain Kasa L = 16 cm, Aquaproof, Lemkra D. 105
2 LAPISAN DASAR KE - 2 a Pembesian / Penulangan Spec, BRC/Wiremesh M7 1 lapis 72 Lembar kg 13,625.280 9,075.00
123,649,416.00 -
3 LAPISAN DASAR KE - 3 a Peninggian Lantai, Pengaturan Elevasi Cor Lantai Beton, Finish Plesteran Spec : Tebal Beton Rata-rata 14.27 cm Kemiringan Lantai 0.87 % Beton Ready Mix, K. 275 Sub. Jumlah II.B C PEKERJAAN FINISHING 1 LAPISAN FINISHING KE - 1 a b c Asphalt Dasar 1 / Hotmix Screening T = 2 cm Asphalt Dasar 1 / Hotmix Sand Sheet T = 1 cm Pemadatan Lapisan Hotmix dengan Wales ( 4 - 6 ton ) m m m 2,584.000 2,584.000 2,584.000 12,309.00 8,426.00 550.00 m 361.760 247,615.00
2 LAPISAN FINISHING KE - 2 a Pek. Lapisan Acrylic Filler Coat ACRONAL Spec : Acronal Latex Sintesis Pasir Silika m 2,584.000 11,750.00
30,362,000.00 -
3 LAPISAN FINISHING KE - 3 a Top Coat Playing Surface Sekw. Rebound Ace b Areal Permainan Warna Hijau Areal Luar Permainan Warna Merah m 30.120 15,710.00 m 2,584.000 16,500.00
42,636,000.00 473,185.20 -
Acrylic Line Marking Spec : Coat Warna Putih lebar garis 5 cm Pasir Silika Sub. Jumlah II.C
128,471,625.20 ls m' m' m kg m 1.000 14.761 14.761 25.979 284.690 136.430 1,500,000.00 36,511.00 3,085.00 18,370.00 4,281.00 18,370.00 1,500,000.00 538,929.74 45,536.91 477,232.76 1,218,757.89 2,506,219.10 -
PEKERJAAN LAIN-LAIN 1 Pembersihan Area Pekerjaan 2 Pek. Perbaikan Saluran Drainase 25 % 3 Pas. Grill Besi Penutup Saluran 4 Pek. Pengecatan Grill Besi 5 Pek. Perbaikan Rangka Tower Lampu 6 Pek. Pengecatan Besi Tower Lampu Sub. Jumlah II.D JUMLAH II ( PEKERJAAN PERBAIKAN LAPANGAN TENIS )
6,286,676.41 413,191,043.69