METRADO DE CARGAS
2do NIVEL:
S/C = 30 Kg/m2
1er NIVEL:
S/C = 30 Kg/m2
2 piso:
COLUMNA 1-I:
VP = 0.1m x 0.2m x 5.045m x 7.85 kg/m3 = 0.79 Kg
VS = 0.15m x 0.25m x 4.355m x 7.85 kg/m3 = 1.28 Kg
P.losa = 5.045m x 4.355m x 210kg/m2 = 4613 Kg
P. placa colaborante = 5.045m x 4.355m x 8.36kg/m2 = 183.68kg
P. tabiqueria = 5.045m x 4.355m x 150kg/m2 = 3295.65kg
P. acabado = 5.045m x 4.355m x 150kg/m2 = 3295.65kg
P. ladrillo = 5.045m x 4.355m x 70kg/m2 = 1537.97 kg
P. calaminon = 5.045m x 4.355m x 250kg/m2 = 5492.74 kg
total carga muerta = 18420.76
carga viva = 5.045m x 4.355m x 30kg/m2 = 659.13 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 18420.76) + (1.8 x 659.13)
P.C = 28292.07 kg.
COLUMNA 2-I:
VP = 0.1m x 0.2m x 10.465m x 7.85 kg/m3 = 1.64 Kg
VS = 0.15m x 0.25m x 4.355m x 7.85 kg/m3 = 1.28 Kg
P.losa = 10.465m x 4.355m x 210kg/m2 = 9570.76 Kg
P. placa colaborante = 10.465m x 4.355m x 8.36kg/m2 = 381kg
P. tabiqueria = 10.465m x 4.355m x 150kg/m2 = 6836.26kg
P. acabado = 10.465m x 4.355m x 150kg/m2 = 6836.26kg
P. ladrillo = 10.465m x 4.355m x 70kg/m2 = 3190.25 kg
P. calaminon = 10.465m x 4.355m x 250kg/m2 = 11393.76 kg
total carga muerta = 31374.95
carga viva = 10.465m x 4.355m x 30kg/m2 = 1367.25 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 31374.95) + (1.8 x 1367.25)
P.C = 49523.475 kg.
COLUMNA 3-I:
VP = 0.1m x 0.2m x 10.015m x 7.85 kg/m3 = 1.57 Kg
VS = 0.15m x 0.25m x 4.355m x 7.85 kg/m3 = 1.28 Kg
P.losa = 10.015m x 4.355m x 210kg/m2 = 9159.22 Kg
P. placa colaborante = 10.015m x 4.355m x 8.36kg/m2 = 364.62kg
COLUMNA 10-I:
VP = 0.1m x 0.2m x 10.06m x 7.85 kg/m3 = 1.58 Kg
VS = 0.15m x 0.25m x 4.355m x 7.85 kg/m3 = 1.28 Kg
P.losa = 10.06m x 4.355m x 210kg/m2 = 9200.37 Kg
P. placa colaborante = 10.06m x 4.355m x 8.36kg/m2 = 366.26kg
P. tabiquera = 10.06m x 4.355m x 150kg/m2 = 6571.70kg
P. acabado = 10.06m x 4.355m x 150kg/m2 = 6571.70kg
P. ladrillo = 10.06m x 4.355m x 70kg/m2 = 3066.79 kg
P. calaminn = 10.06m x 4.355m x 250kg/m2 = 10952.83 kg
total carga muerta = 30160.81
carga viva = 10.06m x 4.355m x 30kg/m2 = 1314.34 kg
P.C (10-I) = CM + CV
P.C (10-I) = (1.5 x 30160.81) + (1.8 x 1314.34)
P.C (10-I) = 47607.03 kg.
COLUMNA 11-I:
VP = 0.1m x 0.2m x 5.045m x 7.85 kg/m3 = 0.79 Kg
VS = 0.15m x 0.25m x 4.355m x 7.85 kg/m3 = 1.28 Kg
P.losa = 5.045m x 4.355m x 210kg/m2 = 4613 Kg
P. placa colaborante = 5.045m x 4.355m x 8.36kg/m2 = 183.68kg
P. tabiquera = 5.045m x 4.355m x 150kg/m2 = 3295.65kg
P. acabado = 5.045m x 4.355m x 150kg/m2 = 3295.65kg
P. ladrillo = 5.045m x 4.355m x 70kg/m2 = 1537.97 kg
P. calaminn = 5.045m x 4.355m x 250kg/m2 = 5492.74 kg
total carga muerta = 18420.76
carga viva = 5.045m x 4.355m x 30kg/m2 = 659.13 kg
P.C (11-I) = CM + CV
P.C (I-1) = (1.5 x 18420.76) + (1.8 x 659.13)
COLUMNA 1-H:
VP =0.15m x 0.25m x 12.515m x 7.85 kg/m3 = 3.68 Kg
VS =0.1m x 0.2m x 4.71m x 7.85 kg/m3 = 0.74 Kg
P.losa = 12.515m x 4.71m x 210kg/m2 = 12378.59 Kg
P. placa colaborante = 12.515m x 4.71m x 8.36kg/m2 = 492.78kg
P. tabiqueria = 12.515m x 4.71m x 150kg/m2 = 8841.85kg
P. acabado = 12.515m x 4.71m x 150kg/m2 = 8841.85kg
P. ladrillo = 12.515m x 4.71m x 70kg/m2 = 4126.19kg
P. calaminon = 12.515m x 4.71m x 250kg/m2 =14736.41 kg
total carga muerta = 49422.09 kg
carga viva = 12.515m x 4.71m x 30kg/m2 = 1768.37 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 49422.09) + (1.8 x1768.37)
P.C = 77316.201 kg.
COLUMNA 2-H:
VP =0.15m x 0.25m x 12.555m x 7.85 kg/m3 = 8.32 Kg
VS =0.1m x 0.2m x 9.4m x 7.85 kg/m3 = 1.476 Kg
P.losa = 12.555m x 9.4m x 210kg/m2 = 24783.57 Kg
P. placa colaborante = 12.555m x 9.4m x 8.36kg/m2 = 986.62kg
P. tabiqueria = 12.555m x 9.4m x 150kg/m2 = 17702.55kg
P. acabado = 12.555m x 9.4m x 150kg/m2 = 17702.55kg
P. ladrillo = 12.555m x 9.4m x 70kg/m2 = 8261.19kg
P. calaminon = 12.555m x 9.4m x 250kg/m2 =29504.25 kg
total carga muerta = 98950.526 kg
carga viva = 12.555m x 9.4m x 30kg/m2 = 3540.51kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 98950.526) + (1.8 x3540.51)
P.C = 154798.707 kg.
COLUMNA 3-H:
COLUMNA 5-H:
VP = 0.1m x 0.2m x 10m x 7.85 kg/m3 = 1.57 Kg
VS = 0.15m x 0.25m x 4.50m x 7.85 kg/m3 = 1.32 Kg
P.losa = 10m x 4.50m x 210kg/m2 = 9450 Kg
P. placa colaborante = 10m x 4.50m x 8.36kg/m2 = 376.20kg
P. tabiquera = 10m x 4.50m x 150kg/m2 = 6750kg
P. acabado = 10m x 4.50m x 150kg/m2 =6750kg
P. ladrillo = 10m x 4.50m x 70kg/m2 =3150 kg
P. calaminn = 10m x 4.50m x 250kg/m2 = 11250 kg
COLUMNA 7-H:
VP = 0.1m x 0.2m x 10m x 7.85 kg/m3 = 1.57 Kg
VS = 0.15m x 0.25m x 4.50m x 7.85 kg/m3 = 1.32 Kg
P.losa = 10m x 4.50m x 210kg/m2 = 9450 Kg
P. placa colaborante = 10m x 4.50m x 8.36kg/m2 = 376.20kg
P. tabiquera = 10m x 4.50m x 150kg/m2 = 6750kg
P. acabado = 10m x 4.50m x 150kg/m2 =6750kg
P. ladrillo = 10m x 4.50m x 70kg/m2 =3150 kg
P. calaminn = 10m x 4.50m x 250kg/m2 = 11250 kg
total carga muerta = 37729.09
carga viva = 10m x 4.50m x 30kg/m2 = 1350kg
P.C (7-H) = CM + CV
P.C (7-H) = (1.5 x 37729.09 ) + (1.8 x 1350)
P.C (7-H) = 59023.64 kg.
COLUMNA 8-H:
VP = 0.15m x 0.25m x 12.555m x 7.85 kg/m3 = 3.70 Kg
VS = 0.1m x 0.2m x 8.89m x 7.85 kg/m3 = 1.40 Kg
P.losa = 12.555m x 8.89m x 210kg/m2 = 23438.93 Kg
P. placa colaborante = 12.555m x 8.89m x 8.36kg/m2 = 933.09kg
P. tabiquera = 12.555m x 8.89m x 150kg/m2 = 16742.09kg
P. acabado = 12.555m x 8.89m x 150kg/m2 =16742.09kg
P. ladrillo = 12.555m x 8.89m x 70kg/m2 =7812.98 kg
P. calaminn = 12.555m x 8.89m x 250kg/m2 = 27903.49 kg
total carga muerta = 93577.77
carga viva = 12.555m x 8.89m x 30kg/m2 = 3348.42 kg
P.C (8-H) = CM + CV
P.C (8-H) = (1.5 x 93577.77 ) + (1.8 x 3348.42)
P.C (8-H) = 146393.81 kg.
COLUMNA 9-H:
VP = 0.15m x 0.25m x 12.55m x 7.85 kg/m3 = 3.69 Kg
VS = 0.1m x 0.2m x 9.37m x 7.85 kg/m3 = 1.47 Kg
P.losa = 12.55m x 9.37m x 210kg/m2 = 24694.64 Kg
P. placa colaborante = 12.55m x 9.37m x 8.36kg/m2 = 983.08kg
P. tabiquera = 12.55m x 9.37m x 150kg/m2 = 17639.03kg
P. acabado = 12.55m x 9.37m x 150kg/m2 =17639.03kg
P. ladrillo = 12.55m x 9.37m x 70kg/m2 =8231.55 kg
P. calaminn = 12.55m x 9.37m x 250kg/m2 = 29398.38 kg
total carga muerta = 98590.87
carga viva = 12.55m x 9.37m x 30kg/m2 = 3527.81kg
P.C (9-H) = CM + CV
P.C (9-H) = (1.5 x 98590.87 ) + (1.8 x 3527.81)
P.C (9-H) = 154236.36kg.
COLUMNA 10-H:
VP = 0.15m x 0.25m x 12.64m x 7.85 kg/m3 = 3.72 Kg
VS = 0.1m x 0.2m x 9.4m x 7.85 kg/m3 = 1.48 Kg
P.losa = 12.64m x 9.4m x 210kg/m2 = 24951.36 Kg
P. placa colaborante = 12.64m x 9.4m x 8.36kg/m2 = 993.30kg
P. tabiquera = 12.64m x 9.4m x 150kg/m2 = 17822.4kg
P. acabado = 12.64m x 9.4m x 150kg/m2 =17822.4kg
P. ladrillo = 12.64m x 9.4m x 70kg/m2 = 8317.12kg
P. calaminn = 12.64m x 9.4m x 250kg/m2 = 29704.00 kg
total carga muerta = 74664.42
carga viva = 12.64m x 9.4m x 30kg/m2 = 3564.48kg
P.C (10-H) = CM + CV
P.C (10-H) = (1.5 x 74664.42 ) + (1.8 x 3564.48)
P.C (10-H) = 118412.69kg.
COLUMNA 1-G:
COLUMNA 2-G:
VP =((0.2m x 0.25m x 8.09m) + (0.15m x 0.25m x 3.46)) x 7.85 kg/m3 = 4.19 Kg
VS =0.1m x 0.2m x 8.21m x 7.85 kg/m3 = 1.29 Kg
P.losa = 11.625m x 8.21m x 210kg/m2 = 20042.66 Kg
P. placa colaborante = 11.55m x 8.21m x 8.36kg/m2 = 797.89 kg
P. tabiqueria = 11.55m x 8.21m x 150kg/m2 = 14316.19 kg
P. acabado = 11.55m x 8.21m x 150kg/m2 = 14316.19 kg
P. ladrillo = 11.55m x 8.21m x 70kg/m2 = 6680.89 kg
P. calaminon = 11.55m x 8.21m x 250kg/m2 = 23860.31 kg
total carga muerta = 80019.61 kg
carga viva = 11.625m x 4.11m x 30kg/m2 = 1433.36kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 80019.61) + (1.8 x1433.36)
P.C = 122609.463 kg.
COLUMNA 3-G:
VP =((0.2m x 0.25m x 8.07m) + (0.15m x 0.25m x 3.46)) x 7.85 kg/m3 = 4.19 Kg
VS =0.1m x 0.2m x 8.19m x 7.85 kg/m3 = 1.29 Kg
P.losa = 11.53m x 8.19m x 210kg/m2 = 19830.45 Kg
COLUMNA 4-G:
VP =((0.2m x 0.25m x 8.085m) + (0.15m x 0.25m x 3.445)) x 7.85 kg/m3 = 4.19 Kg
VS =0.1m x 0.2m x 4.09m x 7.85 kg/m3 = 0.64 Kg
P.losa = 11.53m x 4.09m x 210kg/m2 = 9903.12 Kg
P. placa colaborante = 11.53m x 4.09m x 8.36kg/m2 = 394.24 kg
P. tabiqueria = 11.53m x 4.09m x 150kg/m2 = 7073.66 kg
P. acabado = 11.53m x 4.09m x 150kg/m2 = 7073.66 kg
P. ladrillo = 11.53m x 4.09m x 70kg/m2 = 3301.34 kg
P. calaminon = 11.53m x 4.09m x 250kg/m2 = 11789.43 kg
total carga muerta = 39540.28 kg
carga viva = 11.53m x 4.09m x 30kg/m2 = 1414.731kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 39540.28) + (1.8 x1414.731)
P.C = 61856.52 kg.
COLUMNA 5-G:
VP = 0.1m x 0.2m x 8.855m x 7.85 kg/m3 = 1.39 Kg
VS = 0.15m x 0.25m x 3.455m x 7.85 kg/m3 = 1.02 Kg
P.losa = 8.855m x 3.455m x 210kg/m2 = 6424.75 Kg
P. placa colaborante = 8.855m x 3.455m x 8.36kg/m2 = 256.77kg
P. tabiqueria = 9.855m x 3.455m x 150kg/m2 = 4589.10kg
P. acabado = 9.855m x 3.455m x 150kg/m2 = 4589.10kg
P. ladrillo = 9.855m x 3.455m x 70kg/m2 = 2141.58kg
P. calaminon = 9.855m x 3.455m x 250kg/m2 = 7648.51 kg
COLUMNA 10-G:
VP = (0.2m x 0.25m x 8.085m) + (0.15 x 0.25 x 3.455)x7.85 kg/m3 = 4.19 Kg
VS = 0.1m x 0.2m x 4.095m x 7.85 kg/m3 = 0.64 Kg
P.losa = 11.54m x 4.095m x 210kg/m2 = 9923.82 Kg
P. placa colaborante = 11.54m x 4.095m x 8.36kg/m2 = 395.06kg
P. tabiquera = 11.54m x 4.095m x 150kg/m2 = 7088.45kg
P. acabado = 11.54m x 4.095m x 150kg/m2 =7088.45kg
P. ladrillo = 11.54m x 4.095m x 70kg/m2 =3307.94 kg
P. calaminn = 11.54m x 4.095m x 250kg/m2 = 11814.08 kg
total carga muerta = 39622.63
carga viva = 11.54m x 4.095m x 30kg/m2 = 1417.69 kg
P.C (10-G) = CM + CV
P.C (10-G) = (1.5 x 39622.63 ) + (1.8 x 1417.69)
P.C (10-G) = 61985.79 kg.
COLUMNA 11-G:
VP = 0.1m x 0.2m x 4.11m x 7.85 kg/m3 = 0.64 Kg
VS = 0.1m x 0.2m x 3.46m x 7.85 kg/m3 = 0.54 Kg
P.losa = 4.11m x 3.46m x 210kg/m2 = 2986.33 Kg
P. placa colaborante = 4.11m x 3.46m x 8.36kg/m2 = 118.88kg
P. tabiquera = 4.11m x 3.46m x 150kg/m2 = 2133.09kg
P. acabado = 4.11m x 3.46m x 150kg/m2 =2133.09kg
P. ladrillo = 4.11m x 3.46m x 70kg/m2 =995.44 kg
P. calaminn = 4.11m x 3.46m x 250kg/m2 = 3555.15 kg
COLUMNA 5-F:
VP = 0.1m x 0.2m x 8.21m x 7.85 kg/m3 = 1.29 Kg
VS = 0.15m x 0.25m x 5.155m x 7.85 kg/m3 = 1.52 Kg
P.losa = 8.21m x 5.155m x 210kg/m2 = 8887.74Kg
P. placa colaborante = 8.21m x 5.155m x 8.36kg/m2 = 353.82kg
P. tabiquera = 8.21m x 5.155m x 150kg/m2 = 6348.38kg
P. acabado = 8.21m x 5.155m x 150kg/m2 =6348.38kg
P. ladrillo = 8.21m x 5.155m x 70kg/m2 = 2962.58kg
P. calaminn = 8.21m x 5.155m x 250kg/m2 = 10580.64 kg
total carga muerta = 35484.35
COLUMNA 9-F:
VP = 0.1m x 0.2m x 7.68m x 7.85 kg/m3 = 1.21 Kg
VS = 0.15m x 0.25m x 3.45m x 7.85 kg/m3 = 1.02 Kg
P.losa = 7.68m x 3.45m x 210kg/m2 = 5564.16Kg
P. placa colaborante = 7.68m x 3.45m x 8.36kg/m2 = 221.51kg
P. tabiquera = 7.68m x 3.45m x 150kg/m2 = 3974.40kg
P. acabado = 7.68m x 3.45m x 150kg/m2 =3974.40kg
P. ladrillo = 7.68m x 3.45m x 70kg/m2 = 1854.72kg
P. calaminn = 7.68m x 3.45m x 250kg/m2 = 6624.00 kg
total carga muerta = 22215.42
carga viva = 7.68m x 3.45m x 30kg/m2 = 794.88 kg
P.C (9-F) = CM + CV
P.C (9-F) = (1.5 x 22215.42 ) + (1.8 x 794.88)
P.C (9-F) = 34753.91kg.
COLUMNA 10-F:
VP = 0.1m x 0.2m x 7.695m x 7.85 kg/m3 = 1.21 Kg
VS = 0.15m x 0.25m x 3.455m x 7.85 kg/m3 = 1.02 Kg
P.losa = 7.695m x 3.455m x 210kg/m2 = 5583.11Kg
P. placa colaborante = 7.695m x 3.455m x 8.36kg/m2 = 222.26kg
P. tabiquera = 7.695m x 3.455m x 150kg/m2 = 3987.93kg
P. acabado = 7.695m x 3.455m x 150kg/m2 =3987.93kg
P. ladrillo = 7.695m x 3.455m x 70kg/m2 = 1861.04kg
P. calaminn = 7.695m x 3.455m x 250kg/m2 = 6646.56 kg
total carga muerta = 22291.06
carga viva = 7.695m x 3.455m x 30kg/m2 = 797.59 kg
P.C (10-F) = CM + CV
P.C (10-F) = (1.5 x 22291.06 ) + (1.8 x 797.59)
P.C (10-F) = 34872.25kg.
COLUMNA 11-F:
1 piso:
COLUMNA 1-I:
VP = 0.0018m2 x 5.045m x 7.85 kg/m3 = 0.071 Kg
VS = 0.048m2 x 4.355m x 7.85 kg/m3 = 1.64 Kg
P. travesao metalico = 5.045m x 4.355m x 7.85kg/m2 = 172.47 kg
P. falso piso = 5.045m x 4.355m x 140kg/m2 = 3075.94 kg
P.losa = 5.045m x 4.355m x 210kg/m2 = 4613.90 Kg
P. tabiqueria = 5.045m x 4.355m x 150kg/m2 = 3295.65kg
P. acabado = 5.045m x 4.355m x 150kg/m2 = 3295.65kg
P. ladrillo = 5.045m x 4.355m x 70kg/m2 = 1537.97 kg
total carga muerta = 15993.291
carga viva = 5.045m x 4.355m x 400kg/m2 = 8788.39 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 15993.291) + (1.8 x 8788.39)
P.C = 39809.03 kg.
COLUMNA 2-I:
VP = 0.0018 m2 x 10.465m x 7.85 kg/m3 = 0.15 Kg
COLUMNA 3-I:
VP = 0.0018 m2 x 10.465m x 7.85 kg/m3 = 0.15 Kg
VS = 0.048 m2 x 4.355m x 7.85 kg/m3 = 1.64 Kg
P. travesao metalico = 10.465m x 4.355m x 7.85kg/m2 = 357.76 kg
P. falso piso = 10.465m x 4.355m x 140kg/m2 = 6380.51 kg
P.losa = 10.015m x 4.355m x 210kg/m2 = 9159.22 Kg
P. tabiqueria = 10.015m x 4.355m x 150kg/m2 = 6542.30kg
P. acabado = 10.015m x 4.355m x 150kg/m2 = 6542.30kg
P. ladrillo = 10.015m x 4.355m x 70kg/m2 = 3053.1kg
total carga muerta = 32036.47 kg
carga viva = 10.015m x 4.355m x 400kg/m2 = 17446.13 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 32036.47) + (1.8 x 17446.13)
P.C = 79457.739 kg.
COLUMNA 4-I:
VP = 0.0018 m2 x 9.505m x 7.85 kg/m3 = 0.13 Kg
VS = 0.048 m2 x 4.355m x 7.85 kg/m3 = 1.64 Kg
P. travesao metalico = 9.505m x 4.355m x 7.85kg/m2 = 324.94 kg
P. falso piso = 9.505m x 4.355m x 140kg/m2 = 5795.2 kg
COLUMNA 7-I:
VP = 0.0018m 2 x 10.695m x 7.85 kg/m3 = 0.15 Kg
VS = 0.0048m2 x 4.355m x 7.85 kg/m3 = 0.16 Kg
P. travesao metalico = 10.695m x 4.355m x 7.85kg/m2 = 365.63 kg
P. falso piso = 10.695m x 4.355m x 140kg/m2 = 6520.74 kg
P.losa = 10.695m x 4.355m x 210kg/m2 = 9781.11Kg
P. tabiqueria = 10.695m x 4.355m x 150kg/m2 = 6986.51kg
P. acabado = 10.695m x 4.355m x 150kg/m2 = 6986.51kg
P. ladrillo = 10.695m x 4.355m x 70kg/m2 = 3260.37 kg
total carga muerta = 33901.18
carga viva = 10.695m x 4.355m x 400kg/m2 = 18630.69 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 33901.18) + (1.8 x 18630.69)
P.C = 84387.01 kg.
COLUMNA 8-I:
VP = 0.0018m 2 x 9.505m x 7.85 kg/m3 = 0.13 Kg
VS = 0.0048m2 x 4.355m x 7.85 kg/m3 = 0.16 Kg
P. travesao metalico = 9.505m x 4.355m x 7.85kg/m2 = 324.95 kg
P. falso piso = 9.505m x 4.355m x 140kg/m2 = 5795.20 kg
P.losa = 9.505m x 4.355m x 210kg/m2 = 8692.80Kg
P. tabiqueria = 9.505m x 4.355m x 150kg/m2 = 6209.14kg
P. acabado = 9.505m x 4.355m x 150kg/m2 = 6209.14kg
P. ladrillo = 9.505m x 4.355m x 70kg/m2 = 2897.60 kg
total carga muerta = 30129.12
carga viva = 9.505m x 4.355m x 400kg/m2 = 16557.71 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 30129.12) + (1.8 x 16557.71)
P.C = 74997.558 kg.
COLUMNA 9-I:
VP = 0.0018m 2 x 10.015m x 7.85 kg/m3 = 0.14 Kg
VS = 0.0048m2 x 4.355m x 7.85 kg/m3 = 0.16 Kg
P. travesao metalico = 10.015m x 4.355m x 7.85kg/m2 = 342.38 kg
P. falso piso = 10.015m x 4.355m x 140kg/m2 = 6106.15 kg
P.losa = 10.015m x 4.355m x 210kg/m2 = 9159.22Kg
P. tabiqueria = 10.015m x 4.355m x 150kg/m2 = 6542.30kg
P. acabado = 10.015m x 4.355m x 150kg/m2 = 6542.30kg
P. ladrillo = 10.015m x 4.355m x 70kg/m2 = 3053.07 kg
total carga muerta = 31745.72
carga viva = 10.015m x 4.355m x 400kg/m2 = 17446.13 kg
P.C (9-I) = CM + CV
P.C (9-I) = (1.5 x 31745.72) + (1.8 x 17446.13)
P.C = 79021.614 kg.
COLUMNA 10-I:
VP = 0.0018m 2 x 10.06m x 7.85 kg/m3 = 0.14 Kg
VS = 0.0048m2 x 4.355m x 7.85 kg/m3 = 0.16 Kg
COLUMNA 11-I:
VP = 0.0018m2 x 5.045m x 7.85 kg/m3 = 0.071 Kg
VS = 0.0048m2 x 4.355m x 7.85 kg/m3 = 0.16 Kg
P. travesao metalico = 5.045m x 4.355m x 7.85kg/m2 = 172.47 kg
P. falso piso = 5.045m x 4.355m x 140kg/m2 = 3075.94 kg
P.losa = 5.045m x 4.355m x 210kg/m2 = 4613.90 Kg
P. tabiqueria = 5.045m x 4.355m x 150kg/m2 = 3295.65kg
P. acabado = 5.045m x 4.355m x 150kg/m2 = 3295.65kg
P. ladrillo = 5.045m x 4.355m x 70kg/m2 = 1537.97 kg
total carga muerta = 15991.81
carga viva = 5.045m x 4.355m x 400kg/m2 = 8788.39 kg
P.C (11-I) = CM + CV
P.C (11-I) = (1.5 x 15991.81) + (1.8 x 8788.39)
P.C = 39806.82 kg.
COLUMNA 1-H:
VP =(0.0048m2x 4.355m) + (0.0047m2x 8.16m) x 7.85 kg/m3 = 0.32 Kg
VS =0.0018m2 x 4.71m x 7.85 kg/m3 = 0.06 Kg
P. travesao metalico = 12.515m x 4.71m x 7.85kg/m2 = 463.02 kg
P. falso piso = 12.515m x 4.71m x 140kg/m2 = 8252.39 kg
P.losa = 12.515m x 4.71m x 210kg/m2 = 12378.59 Kg
P. tabiqueria = 12.515m x 4.71m x 150kg/m2 = 8841.85kg
P. acabado = 12.515m x 4.71m x 150kg/m2 = 8841.85kg
COLUMNA 2-H:
VP =(0.0048m2x 4.465m) + (0.0047m2x 8.09m) x 7.85 kg/m3 = 0.45 Kg
VS =0.0018m2 x 9.4m x 7.85 kg/m3 = 0.13 Kg
P. travesao metalico = 12.555m x 9.4m x 7.85kg/m2 = 926.43 kg
P. falso piso = 12.555m x 9.4m x 140kg/m2 = 16522.38 kg
P.losa = 12.555m x 9.4m x 210kg/m2 = 24783.57 Kg
P. tabiqueria = 12.515m x 9.4m x 150kg/m2 = 17702.55kg
P. acabado = 12.515m x 9.4m x 150kg/m2 = 17702.55 kg
P. ladrillo = 12.515m x 9.4m x 70kg/m2 = 8261.19 kg
total carga muerta = 85899.25 kg
carga viva = 12.515m x 9.4m x 400kg/m2 = 47056.4 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 85899.25) + (1.8 x47056.4)
P.C = 213550.40 kg.
COLUMNA 3-H:
VP =(0.0048m2x 4.46m) + (0.0047m2x 8.07m) x 7.85 kg/m3 = 0.32 Kg
VS =0.0018m2 x 9.36m x 7.85 kg/m3 = 0.13 Kg
P. travesao metalico = 12.53m x 9.36m x 7.85kg/m2 = 920.65 kg
P. falso piso = 12.53m x 9.36m x 140kg/m2 = 16419.31 kg
P.losa = 12.53m x 9.36m x 210kg/m2 = 24628.97 Kg
P. tabiqueria = 12.53m x 9.36m x 150kg/m2 = 17592.12kg
P. acabado = 12.53m x 9.36m x 150kg/m2 = 17592.12kg
P. ladrillo = 12.53m x 9.36m x 70kg/m2 = 8209.656kg
total carga muerta = 85363.28 kg
carga viva = 12.53m x 9.36m x 400kg/m2 = 46912.32kg
P.C (I-1) = CM + CV
COLUMNA 4-H:
VP = (0.0048m2 x 4.45) + (0.0047m2 x 8.085) x 7.85 kg/m3 = 0.32 Kg
VS = 0.0018m2 x 4.675m x 7.85 kg/m3 = 0.07 Kg
P. travesao metalico = 12.54m x 4.675m x 7.85kg/m2 = 460.20 kg
P. falso piso = 12.54m x 4.675m x 140kg/m2 = 8207.43 kg
P.losa = 12.54m x 4.675m x 210kg/m2 = 12311.15Kg
P. tabiqueria = 12.54m x 4.675m x 150kg/m2 = 8793.66kg
P. acabado = 12.54m x 4.675m x 150kg/m2 = 8793.66kg
P. ladrillo = 12.54m x 4.675m x 70kg/m2 = 4103.72 kg
total carga muerta = 42670.15
carga viva = 12.54m x 4.675m x 400kg/m2 = 23449.80 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 42670.15) + (1.8 x 23449.80)
P.C = 106216.37 kg.
COLUMNA 5-H:
VP = 0.0018m2 x 10.00 x 7.85 kg/m3 = 0.14 Kg
VS = 0.0048m2 x 4.45m x 7.85 kg/m3 = 0.17 Kg
P. travesao metalico = 10.00m x 4.45m x 7.85kg/m2 = 349.33 kg
P. falso piso = 10.00m x 4.45m x 140kg/m2 = 6230.00 kg
P.losa = 10.00m x 4.45m x 210kg/m2 = 9345.00Kg
P. tabiqueria = 10.00m x 4.45m x 150kg/m2 = 6675.00kg
P. acabado = 10.00m x 4.45m x 150kg/m2 = 6675.00kg
P. ladrillo = 10.00m x 4.45m x 70kg/m2 = 3115.00 kg
total carga muerta = 32389.64
carga viva = 10.00m x 4.45m x 400kg/m2 = 17800.00kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 32389.64) + (1.8 x 17800.00)
P.C = 80623.50kg.
COLUMNA 7-H:
VP = 0.0018m2 x 10.00 x 7.85 kg/m3 = 0.14 Kg
VS = 0.0048m2 x 4.495m x 7.85 kg/m3 = 0.17 Kg
P. travesao metalico = 10.00m x 4.495m x 7.85kg/m2 = 352.86 kg
P. falso piso = 10.00m x 4.495m x 140kg/m2 = 6293.00 kg
COLUMNA 9-H:
VP = (0.0048m2 x 4.47) + (0.0047m2 x 8.08) x 7.85 kg/m3 = 0.32 Kg
VS = 0.0018m2 x 9.365m x 7.85 kg/m3 = 0.13 Kg
P. travesao metalico = 12.55m x 9.365m x 7.85kg/m2 = 922.62 kg
P. falso piso = 12.55m x 9.365m x 140kg/m2 = 16454.31 kg
P.losa = 12.55m x 9.365m x 210kg/m2 = 24681.46Kg
P. tabiqueria = 12.55m x 9.365m x 150kg/m2 = 17629.61kg
P. acabado = 12.55m x 9.365m x 150kg/m2 = 17629.61kg
P. ladrillo = 12.55m x 9.365m x 70kg/m2 = 8227.15 kg
total carga muerta = 85545.21
carga viva = 12.55m x 9.365m x 400kg/m2 = 47012.30 kg
P.C (I-1) = CM + CV
COLUMNA 10-H:
VP = (0.0048m2 x 4.47) + (0.0047m2 x 8.085) x 7.85 kg/m3 = 0.47 Kg
VS = 0.0018m2 x 9.4m x 7.85 kg/m3 = 0.13 Kg
P. travesao metalico = 12.555m x 9.4m x 7.85kg/m2 = 926.43 kg
P. falso piso = 12.555m x 9.4m x 140kg/m2 = 16522.38 kg
P.losa = 12.555m x 9.4m x 210kg/m2 = 24783.57Kg
P. tabiqueria = 12.555m x 9.4m x 150kg/m2 = 17702.55kg
P. acabado = 12.555m x 9.4m x 150kg/m2 = 17702.55kg
P. ladrillo = 12.555m x 9.4m x 70kg/m2 = 8261.19 kg
total carga muerta = 85899.27
carga viva = 12.555m x 9.4m x 400kg/m2 = 47206.8 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 85899.27) + (1.8 x 47206.8)
P.C = 213821.15 kg.
COLUMNA 11-H:
VP = 0.0018m 2 x 4.71m x 7.85 kg/m3 = 0.067 Kg
VS = 0.0048m2 x 4.355m x 7.85 kg/m3 = 0.16 Kg
P. travesao metalico = 4.71m x 4.355m x 7.85kg/m2 = 161.02 kg
P. falso piso = 4.71m x 4.355m x 140kg/m2 = 2871.69 kg
P.losa = 4.71m x 4.355m x 210kg/m2 = 4307.53Kg
P. tabiqueria = 4.71m x 4.355m x 150kg/m2 = 3076.81kg
P. acabado = 4.71m x 4.355m x 150kg/m2 = 3076.81kg
P. ladrillo = 4.71m x 4.355m x 70kg/m2 = 1435.84 kg
total carga muerta = 14929.93
carga viva = 4.71m x 4.355m x 400kg/m2 = 8204.82 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 14929.93) + (1.8 x 8204.82)
P.C = 37163.57 kg.
NIVEL
P (Tn)
h (m)
2
1
suma
COLUMNA I-3:
VP = 0.0012m2 x4.46m x 7980 kg/m3 = 42.71 Kg
VS = 0.0009m2 x 10.015m x 7980 kg/m3 = 71.93 Kg
P.losa = 4.46m x 10.015m x 210kg/m2 = 9380.05 Kg
P. placa colaborante = 4.46m x 10.015m x 8.36kg/m2 = 373.42kg
P. tabiquera = 4.46m x 10.015m x 150kg/m2 = 6700.04kg
P. acabado = 4.46m x 10.015m x 150kg/m2 =6700.04kg
P. ladrillo = 4.46m x 10.015m x 70kg/m2 = 3126.68 kg
P. calaminn = 4.46m x 10.015m x 250kg/m2 = 11166.73 kg
total carga muerta = 37561.60
Carga viva = 4.46m x 10.015m x 30kg/m2 = 1340.007kg
P.C (7-I) = CM + CV
P.C (7-I) = (1.5 x37561.60) + (1.8 x 1340.007)
P.C (7-I) = 58754.413kg.
Pxh
COLUMNA 3-H:
VP = (0.0012m2 x 4.46) + (0.0018m2 x 8.07) x 7980 kg/m3 = 158.63 Kg
VS = 0.0009m2 x 9.37m x 7980 kg/m3 = 67.30 Kg
P.losa = 12.53m x 9.37m x 210kg/m2 = 24655.28 Kg
P. placa colaborante = 12.53m x 9.37m x 8.36kg/m2 = 981.51kg
P. tabiquera = 12.53m x 9.37m x 150kg/m2 = 17610.92kg
P. acabado = 12.53m x 9.37m x 150kg/m2 =17610.92kg
P. ladrillo = 12.53m x 9.37m x 70kg/m2 = 8218.43 kg
P. calaminn = 12.53m x 9.37m x 250kg/m2 = 29351.53 kg
total carga muerta = 98654.52
carga viva = 12.53m x 9.37m x 30kg/m2 = 3522.18 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 98654.52) + (1.8 x 3522.18)
P.C = 154321.704 kg.
COLUMNA 3-G:
VP = (0.0018m2 x 8.07) + (0.0012m2 x 3.465) x 7980 kg/m3 = 149.10 Kg
VS = 0.0009m2 x 8.19m x 7980 kg/m3 = 58.82 Kg
P.losa = 11.535m x 8.19m x 210kg/m2 = 19839.05 Kg
P. placa colaborante = 11.535m x 8.19m x 8.36kg/m2 = 789.78kg
P. tabiquera = 11.535m x 8.19m x 150kg/m2 = 14170.75kg
P. acabado = 11.535m x 8.19m x 150kg/m2 =14170.75kg
P. ladrillo = 11.535m x 8.19m x 70kg/m2 = 6613.02 kg
P. calaminn = 11.535m x 8.19m x 250kg/m2 = 23617.91 kg
total carga muerta = 79409.18
carga viva = 11.535m x 8.19m x 30kg/m2 = 2834.15 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 79409.18) + (1.8 x 2834.15)
P.C = 124215.24 kg.
COLUMNA 3-F:
VP = 0.0012m2 x 3.465m x 7980 kg/m3 = 33.18 Kg
VS = 0.0009m2 x 7.68m x 7980 kg/m3 = 55.16 Kg
P.losa = 3.465m x 7.68m x 210kg/m2 = 5588.35 Kg
P. placa colaborante = 3.465m x 7.68m x 8.36kg/m2 = 222.47kg
P. tabiquera = 3.465m x 7.68m x 150kg/m2 = 3991.68kg
P. acabado = 3.465m x 7.68m x 150kg/m2 =3991.68kg
P. ladrillo = 3.465m x 7.68m x 70kg/m2 = 1862.78 kg
P. calaminn = 3.465m x 7.68m x 250kg/m2 = 6652.80 kg
total carga muerta = 22398.10
carga viva = 3.465m x 7.68m x 30kg/m2 = 798.34 kg
P.C (I-1) = CM + CV
P.C (I-1) = (1.5 x 22398.10) + (1.8 x 798.34)
P.C = 35034.162 kg.