You are on page 1of 5

POWER SYSTEM OPERATION CORPORATION LIMITED.

SOUTHERN REGIONAL LOAD DESPATCH CENTRE

DAILY OPERATION REPORT


POWER SUPPLY POSITION IN SOUTHERN REGION FOR 06-SEP-2012

DATE OF REPORTING : 07-SEP-2012 AT 06:00HRS

1. REGIONAL AVAILABILITY
EVENING PEAK (19:00HRS)
AVAILABILITY
(MW)*

SHORTAGE
(MW)#

28843

5287

NIGHT OFF-PEAK (03:00HRS)*

DAY ENERGY (MU)

FREQUENCY (Hz)

AVAILABILITY
(MW)*

SHORTAGE
(MW)#

FREQUENCY (Hz)

MET

SHORTAGE #

49.60

24408

1775

50.17

632.16

110.28

* MW Availabilty indicated above includes SR ISTS Loss.


2 A. STATE DEMAND (ENERGY - MU)

#Shortage is calculated at 50 Hz which is the sum of Load Shedding and Frequency Correction at 50 Hz.

STATE

THERMAL

HYDRO

GAS/NAPTH
A/ DIESEL

WIND

OTHERS

NET SCH
(FROM GRID)

DRAWAL
(FROM GRID)

AVAILABILITY

DEMAND
MET

SHORTAGE #

AP

97.03

12.78

23.23

1.19

7.31

63.17

67.76

204.71

209.30

51.87

KAR

34.72

25.47

22.34

16.51

15.46

26.61

25.18

141.11

139.68

15.41

KERALA

0.00

18.81

1.87

0.36

0.10

30.80

32.48

51.94

53.62

1.26

TN

64.98

7.97

9.00

70.10

20.64

51.06

50.56

223.75

223.25

41.59

PONDY

0.00

0.00

0.00

0.00

0.00

6.50

6.31

6.50

6.31

0.15

TOTAL

196.73

65.03

56.44

88.16

43.51

178.14

182.29

628.01

632.16

110.28

# The accuracy of shortage computation depends on timely load shedding details furnished in the web directly by constitutents
2 B. STATE DEMAND (MW) & ENERGY FORECAST (MU)
19:00 HRS PEAK

03:00 HRS OFF-PEAK

DAY PEAK

DAY ENERGY (MU)


DEVIATION
FROM
FORECAST
(ACTUAL +
LS FORECAST)

STATE

DEMAND
MET

SHORTAGE #

DEMAND
MET

SHORTAGE #

DEMAND
MET

TIME

SHORTAGE#

FORECAST

AP

8314

2133

8093

900

9215

01:00

2118

245.03

13.89

KAR

6800

909

5027

300

7094

19:00

871

165.00

-11.32

KER

3048

199

1718

3043

19:30

174

53.52

0.83

TN

10050

2022

8990

575

10108

18:30

1918

246.46

16.33
-0.05

PONDY

281

24

230

301

18:53

23

6.46

SR ISTS LOSS

350

--

350

--

--

--

--

--

--

SR

28843

5287

24408

1775

29461

19:00

5287

716.47

19.68

3. GENERATION :
STATION

INSTALLED
CAPACITY(MW)

19:00HRS
PEAK MW

03:00HRS
OFF-PEAK MW

DAY PEAK
MW

HRS

DAY ENERGY
(MU)

AVG MW

ANDHRA PRADESH
Vijayawada TPS

1760

1448

1089

1519

19:45

30.18

1257

Kothagudam TPS

1720

990

985

990

19:00

24.56

1023

Rayalaseema TPS

1050

741

707

741

19:00

17.30

721

Simhadri (IPP)

1000

449

658

697

04:45

12.48

520

Kakatiya TPP

500

434

409

473

15:21

10.02

418

Other Thermal*

271

140

165

165

03:00

2.49

104

Total Thermal

6301

4202

4013

--

--

97.03

4043
--

N'Sagar

816

29

17

61

13:51

--

Srisailam LB (Gen)

900

--

--

132

18:19

0.03

Srisailam RB

770

200

--

460

00:05

2.74

114

Srisailam LB (Pump)

900

--

--

--

--

--

--

Lower Sileru

460

120

42

143

23:49

3.74

156

Upper Sileru

240

--

--

64

18:50

0.35

15

Other Hydro

749

306

339

--

--

5.92

247

Total Hydro

3935

655

398

--

--

12.78

533

Vijjeswaram Gas

272

132

131

147

05:41

3.07

128

Reliance Energy Ltd.

220

--

--

--

--

1.75

73

Jegrupadu

217

128

132

133

00:02

3.15

131

Spectrum

208

75

81

81

03:05

3.01

126

LANCO

351

--

--

--

--

3.57

149

Vemegiri (GMR)

370

--

--

--

--

--

--

Jegrupadu Ext.

220

155

154

161

10:11

3.67

153

Konaseema

445

171

171

171

19:00

4.21

175

Gauthami

464

--

--

--

--

--

--

GMR(BRG)

237

34

34

43

23:59

0.80

33

Other Gas/Naptha/Diesel

69

--

--

--

--

--

--

Total Gas/Naptha/Diesel

3073

695

703

--

--

23.23

968

Wind

216

92

87

92

19:00

1.19

50

Others

532

45

45

45

19:00

7.31

305

Total AP

14057

5689

5246

--

--

141.54

5899

* The genaration includes the injection of CPPs for which installed capacity not considerd due to variable nature.

Page 1 of 16

STATION

INSTALLED
CAPACITY(MW)

19:00HRS
PEAK MW

03:00HRS
OFF-PEAK MW

Raichur TPS

1720

721

Bellary TPS

1000

372

UPCL(IPP)

600

Total Thermal

DAY PEAK

DAY ENERGY
(MU)

AVG MW

14:30

15.74

656

00:08

7.81

326

657

19:00

11.17

465

1460

--

--

34.72

1447

378

107

752

07:13

6.74

281

280

--

282

19:01

0.84

35

460

345

57

432

07:21

5.29

220

Other Hydro

1768

1066

648

--

--

12.60

525

Total Hydro

4148

2069

812

--

--

25.47

1061

MW

HRS

590

744

300

421

657

570

3320

1750

Sharavathi

1035

Nagjher

885

Varahi

KARNATAKA

Yelehanka Diesel

128

15

15

15

10:18

0.38

16

Jindal

1390

972

841

1070

22:59

21.96

915

Other Gas/Naptha/Diesel

107

--

--

--

--

--

--

Total Gas/Naptha/Diesel

1625

987

856

--

--

22.34

931
688

Wind

1818

595

748

916

13:05

16.51

Others

692

295

257

295

19:00

15.46

644

Total KAR

11603

5696

4133

--

--

114.50

4771

141

KERALA
Iddukki

780

512

24

556

21:08

3.39

Sabarigiri

280

214

--

221

21:52

1.04

43

Lower Periyar

180

170

173

173

06:20

4.14

173

Other Hydro

749

513

245

--

--

10.24

427

Total Hydro

1989

1409

442

--

--

18.81

784

Kayamkulam

360

152

--

192

18:38

1.04

43

Reliance Energy Ltd

157

--

--

--

--

--

--

Brahmapuram DPP

107

17

--

20

15:35

0.09

Kozhikode DPP

128

42

--

43

11:33

0.74

31

Other Gas/Naptha/Diesel

22

--

--

--

--

--

--

Total Gas/Naptha/Diesel

774

211

--

--

--

1.87

78
15

Wind

35

--

--

--

--

0.36

Others

20

--

--

--

--

0.10

Total KER

2818

1620

442

--

--

21.14

881

TAMILNADU
Ennore TPS

450

101

101

114

10:13

2.89

120

North Chennai TPS

630

380

353

389

15:19

9.66

403

Tutucorin TPS

1050

756

744

771

20:15

18.71

780

Mettur TPS

840

754

760

779

07:03

19.52

813

Neyveli-I (IPP)

600

381

381

381

19:00

8.17

340

ST-CMS

250

224

223

228

13:06

6.03

251

Other Thermal

--

--

--

--

--

--

--

Total TN Thermal

3820

2596

2562

--

--

64.98

2707

Kadamparai (G)

400

--

196

199

00:06

1.76

73

Kadamparai (P)

400

--

--

--

--

1.25

52

Other Hydro

1824

346

364

--

--

6.21

259

Total TN Hydro

2224

346

560

--

--

7.97

332

Basin Bridge

120

--

--

--

--

--

--

Kovilkalappal

108

86

86

86

00:00

2.09

87

Kuttalam

101

--

--

--

--

--

--

Valattur(Stg 1&2)

187

--

--

--

--

1.48

62

Samalpatty

106

12

12

12

16:32

0.24

10

P P Nallur

331

--

--

--

--

--

--

Madurai Power CL

106

12

12

13

01:44

0.26

11

GMR Vasavi

196

46

48

49

15:07

1.15

48

Other Gas/Naptha/Diesel

1477

959

960

960

03:00

3.78

158

Total Gas/Naptha/Diesel

2732

1115

1118

--

--

9.00

376

Wind

7040

3676

2454

3988

17:17

70.10

2921

Others

806

74

74

74

19:00

20.64

860

Total TN

16622

7807

6768

--

--

172.69

7196

Page 2 of 16

STATION

INSTALLED
CAPACITY(MW)

19:00HRS
PEAK MW

03:00HRS
OFF-PEAK MW

Ramagundam,NTPC

2600

1895

Neyveli TPS II

1470

1017

Neyveli TPS I (EXP)

420

Madras APS

DAY PEAK

DAY ENERGY
(MU)

AVG MW

14:17

47.35

1973

11:57

25.24

1052

385

12:03

9.19

383

312

349

22:51

7.25

302

286

292

296

06:11

7.16

298

440

287

293

297

13:20

6.90

287

Neyveli TPS II (EXP)

--

--

--

--

--

--

--

Talcher II, NTPC

2000

894

928

996

05:34

22.85

952

MW

HRS

1954

2227

947

1089

381

381

440

310

Kaiga STGI

440

Kaiga Unit 3 & 4

CENTRAL SECTOR (ISGS)

Simhadri II, NTPC

500

478

353

493

23:04

10.06

419

Total ISGS

8310

5548

5460

--

--

136.00

5666

Vallur

500

--

--

168

13:18

3.16

132

Total JV

500

--

--

--

--

3.16

132

JOINT VENTURE

IPP UNDER OPEN ACCESS


LKPPL

366

--

--

37

00:00

--

--

SIMHAPURI

300

123

122

129

00:040

2.98

124

MEENAKSHI

--

--

--

--

--

2.20

92

Total IPP

666

123

122

--

--

5.18

216
8197

Total State Thermal

13441

8548

8035

--

--

196.73

Total ISGS Thermal

6990

4665

4563

--

--

114.69

4779

Total Thermal

20431

13213

12598

--

--

311.42

12976

Total Hydro

12296

4479

2212

--

--

65.03

2710

*Total Gas/Naptha/Diesel

8570

3008

2677

--

--

56.44

2353

Total Nuclear

1320

883

897

--

--

21.31

887

Total Wind

9109

4363

3289

--

--

88.16

3674
1813

Total Others

2050

414

376

--

--

43.51

Inter-regional (Except Talcher II)

--

1976

1951

--

--

46.39

1933

Grand Total

53776

28336

24000

--

--

632.16

26340

* Total Gas/ naptha/Diesel includes pondy Karaikal Power Plant of 32.5 MW

4 A. INTER-REGIONAL EXCHANGES & HVDC - PHYSICAL FLOWS [IMPORT(+)/EXPORT(-)]


MAX INTER-CHANGE (MW)

ELEMENT

19:00 HRS PEAK


MW

03:00 HRS OFFPEAK MW

IMPORT

TIME

EXPORT

TIME

Bhadrawati B2B

972

930

1000

0000

--

--

Gazuwaka B2B

298

298

300

0000

--

--

7.222

Talcher-Kolar

1601

1651

1700

0415

--

--

38.251

Talcher Stage II I/C

706

723

--

--

--

--

15.404

ENERGY (MU)
22.468

4 B. INTER-REGIONAL EXCHANGES - SCHEDULES, WHEELING, UI & TALCHER AC I/C


ISGS Schedule
Talcher
Stage II
to SR

Bilaterals of SR
constituents

Power Exchange

Wheeling through
SR

Through Through Through ER to SR


ER ISGS Through
ER
WR
ER
WR

20.120

2.978

16.283

-0.736

5.173

0.000

0.000

WR to
SR

Diversion of SR
power

IR Schedule

Through Through ER to SR
ER
WR

0.000

0.000

0.000

22.248

Net UI

Inter-Regional

WR to
SR

ER to SR

WR to
SR

Schedule
(Total)

Flow
(Total)

23.579

0.379

-1.111

45.826

45.094

5. FREQUENCY PROFILE
% OF TIME
RANGE

<48.5 Hz

<48.8 Hz

<49.0 Hz

<49.2 Hz

<49.5 Hz

<49.7 Hz

49.5 To 50.2 Hz

>50 Hz

>50.2 Hz

0.0

0.0

0.0

0.0

2.7

42.0

96.8

6.8

0.5

Instantenous Maximum

Instantenous Minimum

Block Maximum

Block Minimum

Day Avg

Hz

TIME

Hz

TIME

Hz

TIME

Hz

TIME

Hz

Frequency
Variation
Index

50.32

3:04

49.36

6:27

50.08

15:00

49.55

6:30

49.75

0.87

Std. Var.
0.15

Page 3 of 16

6. SHORT TERM OPEN ACCESS TRANSACTION


WHEELING
NAME OF THE TRANSACTION

BILATERAL
ER END

WR END

NAME OF THE TRANSACTION

MU

PEAK
(MW)

OFF-PEAK
(MW)

APTRANSCO TOTAL EXPORT

0.000

JINDALPOW-APCPDCL(JPL)(83.35MW)(ER-SR)

0.943

83.350

83.350

STERENERGY-APCPDCL(PTC)(38.18MW)(ER-SR)

0.406

38.180

38.180

GRIDCO-APPCC(NVVN)(150MW)(ER-SR)

3.600

150.000

150.000

JSWEL-APCPDCL(JSWPTC)(350MW)(SR-SR)

8.400

350.000

350.000

SIMHAPURI-APCPDCL(PTC)(170MW)(SR-SR)

4.080

170.000

170.000

SIL-APCPDCL(PTC)(30MW)(SR-SR)

0.720

30.000

30.000

SIMHAPURI-APCPDCL(PTC)(75MW)(SR-SR)

1.800

75.000

75.000

JSWEL-JSWCEMENT(JSWPTC)(25.5MW)(SR-SR)

0.564

25.500

25.500

APTRANSCO TOTAL IMPORT

20.513

JSWEL-APCPDCL(JSWPTC)(350MW)(SR-SR)

8.400

350.000

350.000

SIL-APCPDCL(PTC)(30MW)(SR-SR)

0.720

30.000

30.000

JSWEL-JSWSMETTUR(JSWPTC)(1.05MW)(SR-SR)

0.021

1.050

1.050

JSWEL-JSWCEMENT(JSWPTC)(25.5MW)(SR-SR)

0.564

25.500

25.500

KPTCL TOTAL EXPORT

9.705

KPTCL TOTAL IMPORT

0.000

KSEB TOTAL EXPORT

0.000

KARCHWANG-KSEB(NVVN)(28.1MW)(ER-SR)

0.318

28.100

28.100

STERENERGY-KSEB(NVVN)(41.33MW)(ER-SR)

0.439

41.330

41.330

CSPDCL-KSEB(NVVN)(14MW)(ER-SR)

0.159

14.000

14.000

ADHPL-KSEB(PTC)(27.78MW)(ER-SR)

0.314

27.780

27.780

JINDALPOW-KSEB(PTC)(27.78MW)(ER-SR)

0.314

27.780

27.780

STERENERGY-KSEB(NVVN)(83.78MW)(ER-SR)

0.911

83.780

83.780

KARCHWANG-KSEB(NVVN)(60.59MW)(ER-SR)

0.645

60.590

60.590

STERENERGY-KSEB(NVVN)(27.92MW)(ER-SR)

0.301

27.920

27.920

KARCHWANG-KSEB(IEX)(60.59MW)(ER-SR)

0.684

60.590

60.590

MPTRADECO-KSEB(IEX)(121.18MW)(ER-SR)

1.369

121.180

121.180

KSEB TOTAL IMPORT

5.454

TNEB TOTAL EXPORT

0.000

LANCOANPAR-TNEB(NETS)(26.31MW)(ER-SR)

0.298

26.310

26.310

SHRECEMTPS-TANGEDCO(SHREECEM)(55.56MW)(ER-SR)

0.629

55.560

55.560

STERENERGY-TANGEDCO(NVVN)(81.82MW)(ER-SR)

0.870

81.820

81.820

KARCHWANG-TANGEDCO(NVVN)(69.45MW)(ER-SR)

0.786

69.450

69.450

KARCHWANG-TANGEDCO(PTC)(83.35MW)(ER-SR)

0.943

83.350

83.350

SHRECEMTPS-TANGEDCO(SHREECEM)(65MW)(ER-SR)

0.739

65.000

65.000

KARCHWANG-TANGEDCO(NVVN)(151.47MW)(ER-SR)

1.613

151.470

151.470

JSWEL-JSWSMETTUR(JSWPTC)(1.05MW)(SR-SR)

0.021

1.050

1.050

TNEB TOTAL IMPORT

5.899

GOASR-GOAWR(GOASR)(91.97MW)(SR-WR)

0.736

91.970

91.970

GOA TOTAL EXPORT

0.736

GOA TOTAL IMPORT

0.000

LKPPL TOTAL EXPORT

0.000

Page 4 of 16

7. VOLTAGE LEVEL AT CRITICAL SUB STATION


% OF TIME
SUBSTATION

400 KV

<380 KV

<390 KV

>420 KV

>430 KV

HYDERABAD

0.00

0.00

61.25

GOOTY

0.00

0.00

VIJAYWADA

0.00

KOLAR

MAXIMUM

220 KV / 230 KV
MINIMUM

MAXIMUM

MINIMUM

KV

TIME

KV

TIME

KV

TIME

KV

TIME

0.14

428

0300

416

1900

233

0300

224

1900

47.85

0.56

430

0300

413

0900

242

0300

233

0900

0.00

100.00

30.49

435

0300

423

1900

235

0300

213

1900

0.00

0.00

0.07

0.00

419

0300

396

0800

221

0400

207

0800

BANGALORE

0.00

7.43

0.00

0.00

417

0300

387

1900

225

0100

201

0700

HIRIYUR

0.00

0.00

56.39

0.00

427

0300

413

0900

234

2300

222

0800

CHENNAI

0.00

2.71

0.00

0.00

414

0300

388

1200

230

0000

216

1600

TRICHY

8.61

34.31

0.00

0.00

405

0000

379

1500

230

0000

212

1600

TRIVENDRAM

6.46

23.96

0.14

0.00

417

0000

385

1500

225

0000

208

1500

8. MAJOR RESERVOIR PARTICULARS


DESIGNED

PRESENT

LAST YEAR

LAST DAY

MONTH

RESERVOIR

MDDL
(Mts)

FRL (Mts)

Energy
(MU)

Level (Mts)

Energy
(MU)

Level (Mts)

Energy
(MU)

Inflow
(Mus)

Usage
(Mus)

Prog. Inflow
(Mus)

Prog. Usage
(Mus)

JALAPUT

818.39

838.40

534

834.69

380

837.10

478

7.84

1.76

23.37

8.79

SRISAILAM

243.84

270.70

--

258.29

269.41

0.00

2.77

0.00

7.83

N.SAGAR

149.30

179.90

--

155.57

178.03

0.00

0.00

0.00

0.00

LINGANAMAKKI

522.73

554.50

4557

550.59

3387

553.36

4207

48.21

7.01

295.94

28.53

SUPA

495.00

564.00

3159

546.35

1736

556.95

2536

21.24

0.22

109.76

0.78

IDUKKI

694.94

732.43

2148

709.61

631

728.33

1852

17.40

3.60

90.41

13.83
7.24

KAKKI

908.30

981.45

916

959.96

355

977.16

757

10.61

1.29

55.46

NILAGIRIS

--

--

1504

0.00

683

0.00

1296

15.62

1.57

118.56

5.45

TOTAL

--

--

12818

--

7172

--

11126

120.92

18.22

693.50

72.45

Note: The Reservoirs data are of previous day and Cumulative figures for the month is upto previous day

9. DETAILS OF OVER DRAWAL WHEN EXCESS OF 3% OF SCHEDULE OVER A DAY WHEN FREQUENCY < 49.7 HZ
CONSTITUENTS

AP

KARNATAKA

KERALA

TAMILNADU

PONDY

AVERAGE MW ( F<49.7)

127.95

0.00

100.53

101.76

10.83

OD MU'S ( F<49.7)

1.06

0.00

0.96

0.76

0.04

OD NO OF BLOCK( F<49.7)

33

38

30

13

GENERATOR

NLCII

NLCEXPI

RSTP

SEPL

LANCO

AVERAGE MW ( F<49.7)

0.00

0.00

0.00

0.00

0.00

Under Injection MU'S ( F<49.7)

0.00

0.00

0.00

0.00

0.00

Under Injection NO OF BLOCK( F<49.7)

Note: Over drawal/Under Injection computed above for the day is the average MW value of all the time blocks during which the BENEFICIARY/BUYER was over drawing at freq. below 49.7Hz AND the total
over drawal/Under Injection of the day while freq.was below 49.7Hz was exceeding 3% of the respective schedule.

10. SIGNIFICANT EVENTS (IF ANY) :

11. SYSTEM CONSTRAINTS (IF ANY) :


12. WEATHER CONDITIONS:
MODERATE RAINS IN KARNATAKA & KERALA AND CLEAR WEATHER IN REST OF THE REGION

Page 5 of 16